HomeMy WebLinkAbout20211364 Ver 1_17BP.2.R.90_Permit Drawings_20210922_20211014(Version 2.08; Released April 2018)17BP.2.R.90TIP No.:B-4569County(ies):Lenoir Page 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesDesign/Future:Year:2040Existing:Year:Aquatic T&E Species?NoComments:YesNoNoWetlands within Project Limits?Swamp Waters (Sw) NoneSupplemental Classification: (NSW)Rural Area with Agricultural or Residential Land UsesGroundnut Creek27-77-2-20.20.099 MilesProject DescriptionProposed ProjectNeuseRiver Basin(s): City/Town:0.3Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)Nomcaman@ncdot.govGreenville, NC 27835Address:9/22/2021LenoirLa Grange Michael Aman1037 W.H. Smith Blvd.WBS Element:Bridge ReplacementWBS Element:Jason Patskoski, P.E., PhDNCDOT Contact:(252) 439-2812100 East Six Forks Road, Suite 300Raleigh, NC 27609Contractor / Designer:(919) 322-0115Summit Design and Engineering ServicesNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:Project Development UnitAddress:General Project InformationB-456917BP.2.R.90Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)State Project involves the replacement of NCDOT Brdige 530068 over Groundnut Creek on SR 1515 in Lenoir County. The existing structure is a 60 feet long, 2 span (2@30') prestressed concrete channel bridge with a sufficient rating of 29.3. The proposed structure will be a single span (1@70') 24 inch girder bridge with an out to out deck width of 30 feet.The existing bridge has deck drains. The proposed bridge collects bridge runoff with four TB 2GIs without deck drains and outlets the runoff outside BZ-2. Rip-rap pads will be utilized at each outlet to dissapate flow and minimize erosion. The proposed bridge maintains the existing level of service with a single span bridge, so no bents will be placed in the water. The bridge utilizes 4.0' caps, so the rip-rap key in ties in outside the existing top of bank under the bridge. Grassy 3:1 fill slopes are utilized with a low roadway profile to minimize impacts to the wetland areas.NeuseBuffer Rules in Effect:Groundnut CreekNone6602 lane road with 10' travel lanes and 4' unpaved graded shoulders. The total bridge length is 70' with an out to out width of 30'.Waterbody Information2015NCDWR Stream Index No.:NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (2): Class CNCDWR Surface Water Classification for Water Bodyac.2 lane road with 10' travel lane and 1' paved shoulders. The total bridge length is 60' and width is 25'-10". 1600jason.patskoski@summitde.netProject Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer?NoDeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)
SITE 2
SITE 1
1
15" RCP-III
15" RCP-III 15"15"BRIDGE #68
ALDRIDGE STORE RD SR 1515
V
=
=
=MPH
ADT
ADT
FUNC CLASS =
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA
SIGNATURE:
SIGNATURE:
P.E.
P.E.
2018 STANDARD SPECIFICATIONS
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
GRAPHIC SCALES PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
22-SEP-2021 15:34B-4569_prm_SW 1 tsh.dgnhe.yangCONTRACT:ARTMEN
N ASO
H
DEPT
O
F TRA SPORTTIONTATEOFNRTCAR
O
LI
NALENOIR COUNTY
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES
VICINITY MAP
See Sheet 1C-1 For Survey Control Sheet
See Sheet 1B For Conventional Symbols
See Sheet 1A For Index of Sheets
BRIDGE NO. 530068 ON SR 1515 (ALDRIDGE STORE RD)
OVER GROUNDNUT CREEK
GRADING, DRAINAGE, PAVING, AND STRUCTURE
903
903
903
70
Middle
Sch.
E.B.Frink
Sch.
Elem.
LaGrange
LOCAL
2020 1000
PROJECT LENGTHPROJECT LENGTH
NCDOT CONTACT:
LENGTH STRUCTURES PROJECT = 0.013 MILES
LENGTH ROADWAY PROJECT = 0.086 MILES
TOTAL LENGTH PROJECT = 0.099 MILES
4TIP PROJECT:17BP.2.R.902040 1600
-L- STA. 14+75.00
BEGIN BRIDGE END BRIDGE
-L- STA. 19+50.00
-L-
17BP.2.PE.90 PE
(SR 1001)
TO PAULS PATH RD
JEFFREY P. MUHLBAUER, PE
FAITH E. JAHNKE, PE
MICHAEL AMAN, PE
PROJECT ENGINEER- DIVISION 2
SUB REGIONAL TIER
60
50 10025
50 1002550
50
10 5 10 20
BEGIN TIP PROJECT B-4569
END TIP PROJECT B-4569
Prepared in the Office of:
FIRM NO. P-0339
TO LA GRANGE
SITE
PROJECT
DETOUR ROUTE
END APPROACH SLAB
BEGIN APPROACH SLAB
Crossroads
Hardison
La Grange
Pop. 2,783Pop. 2,783
CAROLI
NARAI
LROAD17BP.2.R.90
17BP.2.R.90
CLEARING ON THIS PROJECT SHALL BE PREFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
OCTOBER 9, 2019
MARCH 25, 2020
(ALDRIDGE STORE RD.)SR 1515
BRIDGE #68
-L- STA. 16+41.00
-L- STA. 16+51.88 -L- STA. 17+24.13
-L- STA. 17+35.00
17BP.2.R.90 CONST
ROW & UTL
ROW PLANS
www.summitde.net
Fax: (919) 732-6776
Voice: (919) 732-3883
Hillsborough, NC 27278-8551
320 Executive Ct.
903
903
903
903 70
Pop. 2,783
La Grange
Simroe
Church
Rouse
Chapel
Taylors
ChapelMosley
CreekGr
o
u
n
dnut
Cr
e
e
k Falli
ngJumpingRunBranchBuckBranchLake
Pine
SHEET 1 OF 7
PERMIT DRAWING
NAD 83/ 2011Was
hi
ngt
onSt.E.Fi
el
ds
St
ati
onRd.Ho
d
gesFar
mRd.L.D.Ha
r
d
y
Rd.Mos e l e yC reekR d.
Eason
Rd.Mos el eyCr eekRd.EasonRd.WatersMillRd.E.
WahingtonSt.Railr
oa
dSt.AlridgeStoreRd.Fire
Tower Rd.
RouseLoopPa
u
l
s
Pat
h
Rd.
Aldridge
Store
Rd.Bo
n
nie
Walters
Rd.
AlphonsoWaltersRd.
Rd.
Five
P
oints
Rd.BrothersRd.N.CharlesSt.
Rouse
Chape
lRd.Wal
t
er
sSt
.
FieldsStation
Rd.HarveyFieldsRd.W.P.HardyRd.Brothers
Coli
eRd.E.Nort
hMoseleyCre ekRd.
Brothers
Rd.
Loop
Fields
1001
1513
1512
1509
1510
1514
1507
1515
1515
1516
1502
1514
1515
1503
1518
1517
1519
1519
1001
1524
2005
1523
1527
15231603
1325
1378
1690
1503
1690
1514
1531
1519
1515
1511
Pauls Path Rd
EXCAVATE TO 73.5 EST 51 CY
CL II RIP-RAP KEYED IN 3.5' (TYP)
WSEL AT DATE OF SURVEY (4/30/19) = 68.8 FT
EXCAVATE TO 73.5 EST 93 CY
NWSEL = 69.8 FT
CL II RIP-RAP KEYED IN 3.5' (TYP)
RIP RAP BELOW EXCAVATION KEYED IN 1.5'RIP RAP BELOW EXCAVATION KEYED IN 1.5'
EXCAVATE TO 73.5 EST 93 CY
NWSEL = 69.8 FT
CL II RIP-RAP KEYED IN 3.5' (TYP)
RIP RAP BELOW EXCAVATION KEYED IN 1.5'
EXCAVATE TO 73.5 EST 51 CY
CL II RIP-RAP KEYED IN 3.5' (TYP)
WSEL AT DATE OF SURVEY (4/30/19) = 68.8 FT
RIP RAP BELOW EXCAVATION KEYED IN 1.5'
EXISTING BRIDGE TO BE REMOVED
EXISTING BRIDGE TO BE REMOVED
FILL IN WETLAND
MECHANIZED CLEARING
PERMANENT STREAM IMPACTS
REVISIONS DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.8/17/9922-SEP-2021 15:34B-4569_prm_SW 2.dgnhe.yang50
60
70
80
90
100
50
60
70
80
90
100
110
120120
110
10 11 12 13 14 15 16 17 18 19 20 21 22
-L- SR 1515 (ALDRIDGE STORE RD.)
40 40
EL = 71.44'
-BL- STA 17+33.00, 126.00' RT
-L- STA 18+18.39, 115.69' RT
BM #1: R/R SPIKE IN 18" HARDWOOD
(919) 732-6676 (FAX)
(919) 732-3883
Hillsborough, NC 27278
320 Executive Ct.
NC FIRM LICENSE No: P-0339
Office of:
Prepared in the
TYPE-III
TYPE-III
TYPE-III
TYPE-III
1
22vvvvSR 1515 (ALDRIDGE STORE RD.) 20' BST SR 1515 (ALDRIDGE STORE RD.) 20' BST
CHARLES E. ROUSE
ALBRET L. ROUSE,et ux
GARY A. CROUSE
GARY A. CROUSE
GARY A. CROUSE
GARY L. TAYLOR,et ux
JESSE R. HARRISON, et ux
JESSE R. HARRISON, et ux
KENNETH G. HARRISON70.00'EXISTING R/W
EXISTING R/W 70.00'EXISTING R/W
EXISTING R/W
AMY L. ALDRIDGE
AMY L. BROWN,et al
CHARLES E. ROUSE
ANNE D. ROUSE
CORY L. BRACY, et ux
CHARLES E. ROUSE
15" RCP-III
15" RCP-III 15"15"15" RCP-III
15" RCP-III 15"15"1.5:11.5:1EL = 79.27'
16+10.83
SAG
ELEV = 80.45'
-L- STA 14+75.00
BEGIN GRADE
(-)1.5363%
EXIST GRADE
(+)1.5684%
EXIST GRADE
ELEV = 80.65
-L- STA 19+50.00
END GRADE
PI = 19+05.00
EL = 80.16'
PI = 15+65.00
EL = 79.08'
(-)1.5222%(+)0.3176%(+)0.3176%(+)1.0889%1.5:11.5:1-L- STA 16+51.88
BEGIN BRIDGE
-L- STA 17+24.13
END BRIDGE
-L- STA 16+41.00
BEGIN APPROACH SLAB
-L- STA 17+35.00
END APPROACH SLAB
GRAPHIC SCALE
0'100'100'
SITE 1
2
SHEET 2 OF 7
PERMIT DRAWING
BRIDGE 68
ENLARGEMENT OF
SEE SHEET 4 FOR
WETLAND
DENOTES FILL INFF
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
17BP.2.R.90
EXCAVATE TO 73.5 EST 51 CY
CL II RIP-RAP KEYED IN 3.5' (TYP)
WSEL AT DATE OF SURVEY (4/30/19) = 68.8 FT
EXCAVATE TO 73.5 EST 93 CY
NWSEL = 69.8 FT
CL II RIP-RAP KEYED IN 3.5' (TYP)
RIP RAP BELOW EXCAVATION KEYED IN 1.5'RIP RAP BELOW EXCAVATION KEYED IN 1.5'
EXCAVATE TO 73.5 EST 93 CY
NWSEL = 69.8 FT
CL II RIP-RAP KEYED IN 3.5' (TYP)
RIP RAP BELOW EXCAVATION KEYED IN 1.5'
EXCAVATE TO 73.5 EST 51 CY
CL II RIP-RAP KEYED IN 3.5' (TYP)
WSEL AT DATE OF SURVEY (4/30/19) = 68.8 FT
RIP RAP BELOW EXCAVATION KEYED IN 1.5'
EXISTING BRIDGE TO BE REMOVED
EXISTING BRIDGE TO BE REMOVED
FILL IN WETLAND
MECHANIZED CLEARING
PERMANENT STREAM IMPACTS
676868 68686969697
0
707
0 71717171717171717
27272727272727272727272727272727272727272727272727272 7272
7272727272 727272
72 7272727272
727
27
2
727272727272727272727272727272727272727272737373737373
73
73
737373737373
737373737373
73 7373747474
747
4
74
74
7474
7
5 7575757575757576 76767676
76
76
7676
767777777777777777777777
787878787878
7878
7979 797979 798080808080
8080
818181
818182828
2
82 8283838383838384
848
4
848484858585 858585858586868
6 86868686
8686
8686
868686
8687
87878787878787888888 8888888888898989898989
89
899090
90909090
90
90919191 919191
91919191
9
19191919292
92929292
92929293
939393939394949494 9595
969
7
98REVISIONS DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.8/17/9922-SEP-2021 15:34B-4569_prm_SW 3.dgnhe.yang50
60
70
80
90
100
50
60
70
80
90
100
110
120120
110
10 11 12 13 14 15 16 17 18 19 20 21 22
-L- SR 1515 (ALDRIDGE STORE RD.)
40 40
EL = 71.44'
-BL- STA 17+33.00, 126.00' RT
-L- STA 18+18.39, 115.69' RT
BM #1: R/R SPIKE IN 18" HARDWOOD
(919) 732-6676 (FAX)
(919) 732-3883
Hillsborough, NC 27278
320 Executive Ct.
NC FIRM LICENSE No: P-0339
Office of:
Prepared in the
TYPE-III
TYPE-III
TYPE-III
TYPE-III
1
22vvvvSR 1515 (ALDRIDGE STORE RD.) 20' BST SR 1515 (ALDRIDGE STORE RD.) 20' BST
CHARLES E. ROUSE
ALBRET L. ROUSE,et ux
GARY A. CROUSE
GARY A. CROUSE
GARY A. CROUSE
GARY L. TAYLOR,et ux
JESSE R. HARRISON, et ux
JESSE R. HARRISON, et ux
KENNETH G. HARRISON70.00'EXISTING R/W
EXISTING R/W 70.00'EXISTING R/W
EXISTING R/W
AMY L. ALDRIDGE
AMY L. BROWN,et al
CHARLES E. ROUSE
ANNE D. ROUSE
CORY L. BRACY, et ux
CHARLES E. ROUSE
15" RCP-III
15" RCP-III 15"15"15" RCP-III
15" RCP-III 15"15"1.5:11.5:1EL = 79.27'
16+10.83
SAG
ELEV = 80.45'
-L- STA 14+75.00
BEGIN GRADE
(-)1.5363%
EXIST GRADE
(+)1.5684%
EXIST GRADE
ELEV = 80.65
-L- STA 19+50.00
END GRADE
PI = 19+05.00
EL = 80.16'
PI = 15+65.00
EL = 79.08'
(-)1.5222%(+)0.3176%(+)0.3176%(+)1.0889%1.5:11.5:1-L- STA 16+51.88
BEGIN BRIDGE
-L- STA 17+24.13
END BRIDGE
-L- STA 16+41.00
BEGIN APPROACH SLAB
-L- STA 17+35.00
END APPROACH SLAB
GRAPHIC SCALE
0'100'100'
SITE 1
3
SHEET 3 OF 7
PERMIT DRAWING
BRIDGE 68
ENLARGEMENT OF
SEE SHEET 5 FOR
WETLAND
DENOTES FILL INFF
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
17BP.2.R.90
FILL IN WETLAND
MECHANIZED CLEARING
PERMANENT STREAM IMPACTS
TYPE-III
TYPE-III
TYPE-III
TYPE-III
1
70.00'**********************************
R/R SPIKE SET IN 18" HARDWOOD
BL STATION 17+33.00 126 RIGHT
N 575711 E 2374011
BM1 ELEVATION = 71.44
**********************************
15" RCP-III
15" RCP-III 15"15"O
O 15"15"O
O
SITE 1
SCALE: 1"= 100'
0'25'25'
SHEET 4 OF 7
PERMIT DRAWING
WETLAND
DENOTES FILL INFF
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
(919) 732-6676 (FAX)
(919) 732-3883
Hillsborough, NC 27278
504 Meadowlands Drive
NC FIRM LICENSE No: P-0339
Office of:
Prepared in the
17BP.2.R.90 4
FILL IN WETLAND
MECHANIZED CLEARING
PERMANENT STREAM IMPACTS
676868 686869697
0 717171727272
7272727272727272
727
2 72727272
7272
7272727373
73
7373 73
73737373
73
7374
7474
7474
75757576767777777
77777
787878TYPE-III
TYPE-III
TYPE-III
TYPE-III
1
70.00'15" RCP-III
15" RCP-III 15"15"O
O
15" RCP-III
15" RCP-III 15"15"O
O
SITE 1
BRIDGE 68
ENLARGEMENT OF
SEE SHEET 5 FOR
SCALE: 1"= 100'
0'25'25'
SHEET 5 OF 7
PERMIT DRAWING
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
S S SURFACE WATER
DENOTES IMPACTS IN
WETLAND
DENOTES FILL INFF
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
(919) 732-6676 (FAX)
(919) 732-3883
Hillsborough, NC 27278
504 Meadowlands Drive
NC FIRM LICENSE No: P-0339
Office of:
Prepared in the
17BP.2.R.90 5
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
Office of:
Prepared in the NC FIRM LICENSE No: P-0339
(919) 732-6676 (FAX)
(919) 732-3883
Hillsborough, NC 27278
504 Meadowlands Drive
22-SEP-2021 15:35B-4569_HYD_xpl.dgnhe.yangPROJ. REFERENCE NO.SHEET NO.0
75 75
80 80
85 85
70 7016+50.00
65 65
70 70
75 75
80 80
60 60
16+75.00
70 70
75 75
80 80
85 85
65 65
17+00.00
75 75
80 80
70 70
17+25.00
X-3
-L-
2.5 5
SHEET 6 OF 7
PERMIT DRAWING
17BP.2.R.90
WETLANDS
WETLANDS78.59
BEGIN BRIDGE -L- STA. 16+51±2:12:1 0.0200.020
68.12
0.0200.020
70.29
END BRIDGE -L- STA. 17+24±
0.0200.020
WETLANDS78.66 2:12:1 0.0200.020
HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural SiteStationStructureFill In Fill In in Clearing in SW SW Impacts Impacts StreamNo.(From/To)Size / TypeWetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 16+41 to 17+35 -L- Bridge 68 and Fill Slope<0.01**<0.01**1 16+69 to 17+01 -L- Temporary Turbidity Cutrain0.024711 17+21 to 17+47 -L- Bridge 68 and Fill Slope<0.01** <0.01*** 16 21TOTALS*:<0.01***<0.01***<0.01*** 0.02 16.00 92Revised 2018 Feb SHEET 7OF717BP.2.R.909/22/2021LENOIR COUNTYNC DEPARTMENT OF TRANSPORTATIONB-4569*Rounded totals are sum of actual impactsNOTES: ** mechanized clearing in wetlands = 8.8 sfWETLAND AND SURACE WATER IMPACTS SUMMARYSURFACE WATER IMPACTSWETLAND IMPACTSDIVISION OF HIGHWAYS** permanent fill in wetland = 50.0 sf *** Permanent SW impacts = 15 sf (Note, this is a roadside ditch; however, since a PJD is being pursued, this impact was left in as a precaution since it was not definitively known whether it would be claimed or not) **Tributary Bridge and Fill Slope Temporary SW impacts = 117 sfPlease note the 21 LF of temporary surface water impacts includes the16 LF of permanent surface water impacts