HomeMy WebLinkAbout20211364 Ver 1_Pre-Filing Meeting Information_20211014DWR Pre-Fil ing Meeting Req u est Form
Contact Name *
Contact Email Addre ss *
Proje ct Owne r *
Proje ct Name *
Proje ct County *
Owne r Addre ss:*
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low and include location information.*
Ple ase attach the docume ntation you would like to hav e the me e ting about.
James Mason
james.mason@threeoaksengineering.com
NCDOT Highway Division 2
17BP.2.R.90
Lenoir
City
Kinston
State / Province / Region
NC
Postal / Zip Code
28504
Country
USA
Street Address
2815 Rouse Road Extension
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
THIS PROJECT IS THE REPLACEMENT OF BRIDGE NO. 530068 ON
SR 1515 (ALDRIDGE STORE RD) OVER GROUNDNUT CREEK
NEAR LA GRANGE, LENIOR COUNTY, NC. THE BRIDGE WILL BE
REPLACED IN PLACE WITH MINIMAL STREAM, WETLAND, AND
BUFFER IMPACTS. THREE OAKS ENGINEERING IS ASSISTING
DIVISION 2 WITH AQCUIRING THE PERMITS FOR THIS PROJECT. IT
IS ASSUMED THAT THIS PROJECT WILL BE PERMITTED UNDER A
NWP 3. BASED ON THE IMPACTS, IT DOES NOT APPEAR THAT
WRITTEN AUTHORIZATION WILL BE REQUIRED FOR EITHER THE
SECTION 401 OR BUFFER IMPACTS. HOWEVER, WE WOULD LIKE
CONFIRMATION THAT THIS IS CORRECT.
Signature *
Submittal Date
17BP.2.R.90_Permit Drawings_20210609.pdf 1.79MB
17BP.2.R.90_Permit
Drawings_BUFFER_20210609.pdf
1.14MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
9/15/2021