Loading...
HomeMy WebLinkAbout20211364 Ver 1_Pre-Filing Meeting Information_20211014DWR Pre-Fil ing Meeting Req u est Form Contact Name * Contact Email Addre ss * Proje ct Owne r * Proje ct Name * Proje ct County * Owne r Addre ss:* Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low and include location information.* Ple ase attach the docume ntation you would like to hav e the me e ting about. James Mason james.mason@threeoaksengineering.com NCDOT Highway Division 2 17BP.2.R.90 Lenoir City Kinston State / Province / Region NC Postal / Zip Code 28504 Country USA Street Address 2815 Rouse Road Extension Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No THIS PROJECT IS THE REPLACEMENT OF BRIDGE NO. 530068 ON SR 1515 (ALDRIDGE STORE RD) OVER GROUNDNUT CREEK NEAR LA GRANGE, LENIOR COUNTY, NC. THE BRIDGE WILL BE REPLACED IN PLACE WITH MINIMAL STREAM, WETLAND, AND BUFFER IMPACTS. THREE OAKS ENGINEERING IS ASSISTING DIVISION 2 WITH AQCUIRING THE PERMITS FOR THIS PROJECT. IT IS ASSUMED THAT THIS PROJECT WILL BE PERMITTED UNDER A NWP 3. BASED ON THE IMPACTS, IT DOES NOT APPEAR THAT WRITTEN AUTHORIZATION WILL BE REQUIRED FOR EITHER THE SECTION 401 OR BUFFER IMPACTS. HOWEVER, WE WOULD LIKE CONFIRMATION THAT THIS IS CORRECT. Signature * Submittal Date 17BP.2.R.90_Permit Drawings_20210609.pdf 1.79MB 17BP.2.R.90_Permit Drawings_BUFFER_20210609.pdf 1.14MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 9/15/2021