Loading...
HomeMy WebLinkAboutSW6211001_Design Calculations (Culvert, Pipe 3)_20211014Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, Jul 22 2021 Pipe 3 Invert Elev Dn (ft) = 246.10 Calculations Pipe Length (ft) = 42.30 Qmin (cfs) = 39.20 Slope (%) = 3.45 Qmax (cfs) = 39.20 Invert Elev Up (ft) = 247.56 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 39.20 No. Barrels = 1 Qpipe (cfs) = 18.33 n-Value = 0.012 Qovertop (cfs) = 20.87 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 10.41 Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) = 10.47 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) = 247.58 HGL Up (ft) = 249.01 Embankment Hw Elev (ft) = 251.98 Top Elevation (ft) = 251.20 Hw/D (ft) = 2.95 Top Width (ft) = 25.00 Flow Regime = Inlet Control Crest Width (ft) = 10.00 ear (t) 252A0 251.00 260A0 249.00 248.00 247.00 246.00 245.00 0 Pipe 3 Hw Depth (t) 4.44 3.44 2.44 1.44 0.44 -0.56 AM -2.56 5 10 15 20 25 30 35 40 45 50 55 60 65 cirWffcWvert HGL Embank Reach (tt)