Loading...
HomeMy WebLinkAboutNCC192282_NOT Closeout Documents_20211015e SedilllelltLIti011/COIISti-LICt']OlI StornmaterInspection North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 County: Onsiow Project: Piney Green Road Gas Line River basin: White Oak Person financially responsible: Piedmont Natural Gas - Joseph B Keily Project M: ONSLO-2020-015 Address: 401 Executive Parkway, New Bern, NC 28562 1. Project Location: Piney Green Road, Jacksonville Pictures: Na 2. Weather and soil conditions: Sunny and workable 3. Is site currently under notice or violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): None Title: Inspection report; Sent Report Date given/sent: July 16, 2021 9. Corrective action needed: 10. Comments: Project appears complete and stabilized. File will be closed. Any further/future development will require a new permit application to be submitted. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at; https:?'edocs.deq.nc.goviForms/NCG01-Termination. Please note that this correspondence must be uploaded as pa f completing the NOT process. Reported by: Connor Musia] Others present: Date of inspection: July 09, 2021 Time arriving on site: 1:00 PM Time leaving site: 1:15 PM cc; Yes