Loading...
HomeMy WebLinkAbout20131024 Ver 1_CAMA Permit Application_20130923Q���� 20 13 102 4 _ NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C. Davis John E. Skvarla, III Governor Director Secretary September 20, 2013 MEMORANDUM TO: Karen Higgins, Compliance and Permitting Unit Supervisor Wetlands, Buffers, Stormwater — DWQ/Division of Water Resources FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA Permit Application Review Applicant: Tugboat Properties, LLC Project Location: Town of Hertford on S. Church St., Perquimans County Proposed Project: Marina, Condominiums & Townhouses with associated structures Please indicate below your agency's position or viewpoint on the proposed project and return this form by 10/11/13 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252- 247 - 3330). If you have any questions regarding the proposed project, please contact Lynn Mathis at (252) 264 -3901. When appropriate, in -depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 0 !SEP 1367 US 17 South, Elizabeth City, NC 27909 Phone: 252 -264 -39011 FAX: 252 -264 -3723 ; Internet: www.nocoastalmanagement.net 2 3 2013 An Equal Opportunity 1 Affirmative Action Employer � - �� DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Tugboat Properties, LLC - C/o Bill Bowen 2. LOCATION OF PROJECT SITE: Site is located in Perquimans County within the Hertford Town limits on South Church Street at the mouth of Raccoon Creek and on the Perquimans River. Photo Index: 2006:236-6800 015 -18, P15 -16, N14 -16, M16 -17, L16-17 2000: 236 -1783 J8 -10, K7 -10, 1-7 -9, W -8, N7- 81995:158 -1630 P21, Q19 -21, R19 -21, S19 -21, T19 -21 1989: Not Available 1986: Not Available 1979:127 -1587 06 -8, P6 -8, Q6 -8, R6 -7, S6 & 7 State Plane Coordinates: X: 2748579 Y: 895334 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit: 08/06/2013 and 08/21/2013 Was Applicant Present: No 5. PROCESSING PROCEDURE: Application Received Complete: Accepted on August 28, 2013 (Pending USACE Wetland confirmation) Office: Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan: Town of Hertford LUP Land Classification: Conservation and Limited Transition (B) AEC(s) Involved: PTA and PTW (C) Water Dependent: Yes (With CAMA Areas of Environmental Concern) (D) Intended Use: Residential Units with a Private 100 Slip Marina (E) Wastewater Treatment: Existing: None Planned: Town Wastewater System (F) Type of Structures: Existing: None Planned: Townhomes & Condominiums with associated infrastructure, boardwalk along the water, 2 access walkways, 2 piers with 24 finger piers and 100 slips, and a boat ramp (G) Estimated Annual Rate of Erosion: N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED SHADFD (A) Vegetated Wetlands: Walkways and (Non - coastal) Boardwalk:11,700sf (B)Non- Vegetated Wetlands: Piers/ Finger Piers (Open water) > Platforms/Boat Ramp Dodos: (Shallow Bottom) > Boat Ramp:1,300sf —> Boat Ramp: 700sf 10,131sf (overlaps dredge impacts) (C)Other. (High Ground) Boat Ramp Excavation: 600sf Walkway and Boardwalk:1,7009 (D) Total Area Disturbed: Within an AEC = 25.404sf (.58 acres) Total Prriiprt = lnar (E) Primary Nursery Area: No (F) Water Classification: SC Open: No Field Investigation Report Page 2 8. PROJECT SUMMARY: The project includes 10 residential condominium and townhome buildings with associated parking and a 100' slip marina. Associated structures and amenities include a fuel dock, pump -out facility, shoreline boardwalk, access walkways over 404 wetlands, a dock masters office, boat ramp, pool, clubhouse, and a tennis court. Proiect Setting The property in question is located in the Town of Hertford on South Church Street in Perquimans County, North Carolina. The project site abuts South Church Street to the east for a distance of 1,085'. Situated in the north east comer is a water transfer station operated by the Town of Hertford. Located on the north side of the property is Raccoon Creek, a bridge crossing Raccoon Creek, and the Perquimans River that follows around the north side of the property to a non - coastal wetland at Tom Water's Creek. Residential properties are adjacent to the property along the southern property line. Located across South Church Street is a mix of commercial, medical and governmental building uses. The current zoning designation of the property by the Town of Hertford is T -R which is a high density residential/commercial designation. The property is approximately 17 acres, of which 11.6 acres are high ground and 5.4 acres are delineated non - coastal wetlands confirmed by Tracy Wheeler with the US Army Corp of Engineers on April 27, 2007, reconfirmation of the wetland line is pending. The land is currently vacant with the exception of the Town of Hertford's Wastewater Transfer Station. Prior to being purchased a large dilapidated residential structure was situated on the property that was removed by the current owner. While there are no identified archeological sites there remains a reasonable possibility for a site to be on or near the property in question. Vegetation on the property includes, but is not limited to the following: bald cypress (Taxodium distichum), black gum (Nyssa sylvatica), groundsel tree (Bacchads halimifolia), loblolly pine (pinus taeda), pignut hickory (Carys glabra), red maple (Ater rubrum), sycamore (Plantanus occidentials), sweet gum (Liquidambar styracitlua), tulip poplar (Lidodendron tulipifera), arrow arum (Peltandra virginica), carolina jasmine (Gelsemium sempervirens), bee balm (Monarda didyma), cat brier (Smilax rotundifolia), broadleaf cattail (typha latifolia), day flower (Commelina erecta), marsh elder (Iva frutescens), common reed (Phragmites australis), switch cane (Arundinada tecta), poison ivy (Toxicodendron radicans), giant ironweed (Vemonia gigantean), and water iris (Iris pseudoacorous). Average elevations of the property are approximately 5' above normal water level along the high ground portion of the property and 2' above sea level within the wetland area. The flood designation for the property within the wetland area is AE, and the high ground portion of the tract is outside of a designated flood zone. The entire tract is located within the 100 year floodplain. Soils are a moderate to well draining Altavista loamy fine sand along the high ground and poor draining, frequently flooding, Dorovan muck within the wetlands. The shoreline gently slopes to the water along the wetlands, with a vertical escarpment 2' to 5' in height along the high ground. Water depths on the Perquimans River side of the property extend from 0 to a depth of 6' an average distance of 260' water wand of NWL. A dense population of southern niad (Najas guadalupenisi) was found in the waters adjacent to the property within the Perquimans River in a survey conducted in August 6, 2007; however, a recent survey conducted by the applicant's consultant found no evidence of submerged aquatic vegetation adjacent to the applicant's property. A small area of water lily (Nymphaea odorata) is located along Raccoon Creek near the bridge. Field Investigation Report Page 3 The property is located in the public trust shoreline Area of Environmental Concern (AEC) and the waters immediately adjacent to the property are within public trust waters. The dividing line between public trust waters and estuarine waters is approximately 200' to 400' water wand of NWL along the north side of the property in the Perquimans River. Currently there is only one marina operating in Perquimans County, located at Albemarle Plantation. Albemarle Plantation has a 158 slip marina exclusively for the residents of the Plantation. Fuel and pump -out facilities are available to the public for a fee. Development Proposal The applicant, Tugboat Properties, LLC is requesting a CAMA Major Permit to construct a residential condominium/townhome development marina. The proposed development will include the following activities and structures: High Ground Development Landward of the 30' Buffer': (8) condominium buildings with 12 residential units per building = 96 residential units (2) townhome buildings with 10 residential units per building = 20 residential units 116 residential units Residential unit parking for 127 vehicles (3) storm water retention ponds with a total surface area of 21,824 square feet (so Outflow structures in each pond piped to adjacent 404 wetlands A swimming pool Pool equipment building Clubhouse Tennis Court Shower and bathrooms (for the pool and marina) Dockmaster's office and access walkway Parking lot for 11 vehicles with boat trailers using the onsite boat ramp Fuel tanks Associated infrastructure H%gh Ground Development within the 30' Buffer: Boardwalk (elevated walkway) 150'x 10'= 1,500sf Walkway to the Dockmaster's Office- 20'x 10'= 200sf Boat ramp - excavate and concrete 20' x 30' _ High ground excavation within the 30' buffer for the boat ramp = Shallow Bottom: Boat ramp (Concrete) 35' below NI Excavation below NWL 65'x 20'= 600sf 2,300sf, 55 cubic yards (cy) NL x 20' = 700sf (Overlapping impact not added to total) 1.300sf Total 2' Ave. depth (65'x 20') = 27 = 96cy Field Investigation Report Page 4 Wetland Development': Open Water (2) walkways over wetland: 2(10' x 20 ") = 400sf Boardwalk 1,130'x 10'= 11.300sf h 1.700sf Total, Pier "A" 462'x 8'= 3,696sf Pier "B" 442' x 8'= 3,563sf Finger Piers 48 x 24sf = 1,152sf (2) T- Head platforms 2(56' x 10') =2 x 560sf = 1,120sf (2)Boat ramp docks 2(50'x6') = 600sf 10,104sf Tgtall There will be 100 free standing tie piles in association with the proposed 100 boat slips. A "No Wake" buoy is also being proposed approximately 180' north of the proposed pier alignment. The fuel dispenser will be located at Pier "A"s T- Head along with the Pump -out facility. Effluent from the pump -out facility will be piped to the Town's sewer system In 2007, an Environmental Assessment was submitted to the NC Division of Coastal Management for a residential development with a 100 slip marina on the property in question. In March of 2008, a Finding of No Significant Impact was issued to Hertford Bay Development, LL. Changes to the overall project, include a reduction in the total land area that also contained a remote parking lot for boat trailers. Environmental Assessments are no longer a required precursor to the CAMA process. As proposed, all slips within the marina will be exclusively for inhabitants of Hertford Bay Marina's residential community. A fuel dock and pump -out facility will be available to nonresident boaters and will be located at the end of Pier W. Fuel storage tanks will be located on high ground 40' from NWL, southeast of Pier "A ". Waste from the pump -out facility will be direct piped to the Town's sewer system. All of the 100 slips will be 25' in length. Slip widths will be as follows: (12) at 19', (76) at 15' and (12) at 12'. According to the narrative it is anticipated that the marina will accommodate vessels up to 50' in length. Water depths at the end of the pier are approximately -62. In August of this year a survey conducted by the applicant's consultant Atlantic Environmental Consultants, LLC found no submerged aquatic vegetation within or adjacent to the project area. Both pier platforms (including fuel and pump -out facilities) and 21 of the 100 slips will be constructed within the Estuarine Water AEC; the remaining slips along with the proposed boat ramp will be located within the Public Trust Water AEC. The proposed boat ramp will be located within Public Trust Waters. Anticipated Impacts 1) While vegetation was not found within the project area in August of 2013, submerged aquatic vegetation was documented within the project area on August 7, 2007. While not currently present southern niad (Naias guadalupenisi) has been documented within the project area. The proposed marina will adversely impact the future growth of SAVs in the area. 2) Shading of 10,131sf of water bottom from piers and platforms. 3) Shading of 16,050sf 404 wetlands from boardwalks and walkways. 4) Short term construction impacts will result in the temporary loss of wetland vegetation adjacent to elevated structures. Field Investigation Report Page 5 5) Construction impacts will result in reduction in vegetation density and diversity under the proposed walkways and board walk. 6) Short term construction impacts will include the lowering of the wetland substrate under and adjacent to the walkways and boardwalk. 7) Increased boating traffic involving up to 100 vessels immediately outside of the proposed no wake zone will result in increased wave action along adjacent shorelines, causing a greater risk for shoreline erosion. 8) Jetting pilings for the marina will result in temporally suspending sediments in the water that can disrupt aquatic vegetation outside of the project area. 9) Along the shallow waters of the proposed marina prop wash may cause resuspension of sediments within the water column. 10) The proposed development will permanently disrupt animal populations within the project area. 11) Vessels fueling at the marina run a risk of discharging fuel into the surrounding water body. 12) Displacement of 1,300sf of water bottom from excavation associated with the construction of the boat ramp. Submitted by: Lynn W. Mathis Date: September 18, 2013 MAJOR PERMIT FEE MATRIX Applicant: TUGBOAT PROPERTIES, LLC Selection Development Type Fee DCM % DWQ % (14300 16014351000931625 6253) (24300 1602 435100095 2341) I. Private, non - commercial development that does not $250 100%($250) 0%($0) involve the filling or excavation of any wetlands or open water areas: I1. Public or commercial ® development that does not $400 100%($400) 0%($0) involve the filling or excavation of any wetlands or open water areas: III. For development that involves the filling and /or excavation of up to 1 acre of wetlands and /or open water areas, determine if A, B, C, or D below applies: III(A). Private, non- El commercial development, if $250 100%($250) 0%($0) General Water Quality Certification No. 3490 (See attached ) can be applied: III(B). Public or commercial development, if General $400 100%($400) 0%($0) Water Quality Certification No. 3490 (See attached) can be applied: III(C). If General Water Quality Certification No. $400 60%($240) 40%($160) 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water Ej Quality Certification No. $400 60%($240) 40%($160) 3490 (see attached) cannot be applied: IV. For development that involves the filling and /or $475 60%($285) 40%($190) excavation of more than one acre of wetlands and /or open water areas: PROJECT NARRATIVE CAMA MAJOR PERMIT — Tugboat Properties, LLC Hertford, Perquimans County June 27, 2013 Revised August 8, 2013 AUG 2 8 2013 C0ASTAL. n "; n;pr,F!VENT EU 'F ",!' I Y LOCATION OF PROJECT: The proposed project is located within a mixture of undeveloped and residentially developed properties. The subject property is located adjacent to downtown Hertford on Church Street (SR 1336) off Highway 17, located at approximate latitude 36 010'55 °N and longitude 76027'44"W, adjacent to the Perquimans River, in Perquimans County, North Carolina. PROJECT DESCRIPTION: The 17 acre subject site is zoned TR by the town of Hertford and allows for higher density residential dwellings and some light commercial development. The subject property is comprised of 11.6 acres of uplands and 5.4 acres of U.S. Army Corp of Engineers ( USACE) jurisdictional Section 404 wetlands. The wetlands on the property were delineated by Atlantic Environmental Consultants, LLC (AEC) on January 25, 2006 and confirmed by the USACE on April 27, 2006. The upland portion of the property will be developed with 96 condominiums and 20 townhouses to include 10 acres of upland disturbance for construction. Upland development also includes a dock master station, a clubhouse, two tennis courts, one diesel and one gasoline storage tanks, boat ramp with parking and restrooms. No development is proposed within the 5.4 acres of wetlands, excluding temporary impacts to construct elevated walkways to access the proposed marina within the Perquimans River. Mature bald cypress are scattered along the shoreline and open water, out to a maximum distance of 180 feet. Proposed development does not include impacts to the existing bald cypress, excluding construction of walkway and dock, which will be constructed to avoid bald cypress as much as possible. This CAMA major application is being prepared for marina development with 100 boat slips, which will allow deep water access for recreational purposes and dockage within the Hertford Bay Condominium and Townhouse Complex on the Perquimans River. The Perquimans River comprises of Public Trust Waters and Estuarine Waters and is directly connected the Albemarle Sound. According to the Wildlife Resource Commission and Marine Fisheries Commission, the Albemarle Sound is classified as Coastal fishing waters, and the Perquimans River is classified as Inland and Joint waters. A portion of the proposed project lies within Joint waters boundary and majority of the project lies within Inland waters. The proposed boat ramp is adjacent to Inland waters and the proposed 100 boat slips are located within both Joint and Inland waters. JProject narrative Tugboat Properties, LLC pg. 2) i AUG 2 8 2013 TAl nl= =!'�%T The jurisdictional boundary between these two classifications are accurately depicted on the attached plat according to NCDMF Fisheries Rules 2007, Title 15A NCDENR, Chapter 3, Subchapter 3.0202, Descriptive Boundaries for Coastal- Joint - Inland Waters. The Perquimans River is within the Pasquotank River Basin; the stream classification for the Perquimans River is SC. Water depths were taken and the presence of Submerged Aquatic Vegetation (SAV) was evaluated by AEC staff on August 7, 2013. There is a small area (300 sf) of Water Lilies (Nymphaea sp.) located to the north of the proposed piers but the remaining area in and around the project area showed no signs of SAV's. Existing water depths range from four to six feet within the proposed 100 boat slips and a maximum water depth of -6.2 feet at the end of the proposed boat docking facility, where 28' to 50' length boats are proposed to be docked. Water depths at the center of the Perquimans River vary in depth from —5.6 feet to -12.4 feet. Current water depths were taken on August 7, 2013; which confirmed depths within the area of proposed boat slips are suitable for the size boats (18' to 50') in length) accommodated for this project. The proposed marina includes dockside power, potable water, lighting, restrooms located on uplands, a boat ramp with parking, a pump out facility and a fueling facility located landward of the 30' buffer on uplands. The closest pump out and fueling facility is located approximately 22 nautical miles downstream within the Albemarle Plantation Marina. The Albemarle Plantation Marina is a 216 boat slip facility for property owners within Albemarle Plantation. Pasquotank River Yacht Club is located within the Pasquotank River approximately 42 miles from the subject site and is a 32 boat slip facility with a pump out facility, and no fueling facility. There are no impervious surfaces proposed for the marina development. Impervious surfaces proposed for upland development for property include: driveway, parking, boat ramp, restrooms, dock master station, townhouse and condominium units totaling 218,181 square feet of impervious surfaces. The following permits were obtained for the property: A Clear and Grade Permit issued to Tugboat Properties, LLC on August 13, 2003 to clear and grade 6.0 acres of uplands (Permit No. SWGO3OOOO). A Sedimentation and Erosion Control Plan approved to disturb 6.0 acres (Erosion and Sediment Control Project No.: Perqu- 2007 -006 issued 12/22/06), a Stormwater General Permit approved to disturb six of the 17 acres of uplands (SW7O21213 issued 4/03/07). Revisions to the Sedimentation and Erosion Control Plan and Stormwater Permit will be submitted with the proposed additional disturbance on uplands; however, they are not submitted at this time. (Project narrative Tugboat Properties, LLC pg. 3) JProject narrative Tugboat Properties, LLC pg. 3) AUG 2 8 2013 I- ST''I ' •'R lr= �tf ='tr ..J PURPOSE OF THE PROJECT: The purpose for the proposed activity is to allow the future tenants of the Hertford Bay Townhouse and Condominium Complex opportunity to dock recreational boats within the Perquimans River and recreational boating access to the Perquimans River and Albemarle Sound. There is limited housing within this area and limited public access and dockage within the Perquimans River. According to Perquimans County tax records the vicinity of the proposed project comprises mostly of commercial businesses. The closest boat ramp is located downtown Hertford 0.6 miles northwest of subject site and Perquimans County boat ramp located nine miles southeast from the subject tract down the Perquimans River. The closest marina is the Albemarle Plantation Marina located approximately 22 miles downstream from the subject site with 216 boat slips, pump out and fueling facilities. The attached letter dated September 27, 2007 from the Town of Hertford states the proposed development would be a great asset to the gateway area and the Town. The attached letter from the Town also states the Hertford Town Council feels this development plan is consistent with their land use plan and plans for future development in the Town. FIELD MEASURMENTS: Water depths were taken and Submerged Aquatic Vegetation (SAV) growth was evaluated by AEC staff on August 7, 2013. DETAILS FOR OPEN WATER DISTURBANCE AND IMPACTS: Proposed structures within Public Trust Waters: Pier A (8'x 462') ............................... ............................... 3,696 s.f. PierB (8'x 452') ...... ............................... ..........................3,616 s.f. Platform A (10' x 56') ............................ ............................... 560 s.f. Platform B (10' x 56') . ............................... ............................560 s.f. Finger Piers (48 @ 24 s.f. each) ......... ................................ 1,152 s.f. Boat ramp below NWL (35'x20') ......... ....... ............................700 s.f. Boat ramp docks (2) (6'x 50') ... ............................... 600 s.f. Total s.f. of structures proposed within Public Trust Waters.... 10.884 s.f. (Project narrative Tugboat Properties, LLC pg. 4) r-- AUG 2 8 2013 'f1Q�ri + ,r:r,rgT Total fill within Public Trust Waters: Boat ramp (concrete) (20'x 35' within open water) ............(13 cu.yds.) Proposed construction /disturbance within the 30' Buffer: Elevated walkways . ............................... .........................14,070 s.f. Boat Rama (30'x 20') ............................. ............................600 s.f. Total proposed construction /disturbance within the 30' Buffer ...14,470s_f. WETLAND IMPACTS: • No proposed fill in Section 404 Wetlands. ol • Elevated walkways over Wetlands = 12,620 s.f. — 16, S� jv �C 5J-1179r IM NP-I APPLICATIONI'lor Maier Development Permit lwt revised 1=71") 7D AUG 2 8 2013 lllJ North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant Landowner Information Business Name Tugboat Properties, Llc Project Name (if applicable) Hertford Bay Marina Applicant 1: First Name Tugboat Properties. LLC MI Last Name Applicant 2: First Name MI Last Name If additional applicants, please attach an additional pages) with names listed. Mailing Address 1990 Smythewick Drive PO Box City Greenville State NC ZIP 27858 Country USA Phone No. 252 - 717 — 2912 ext. FAX No. - - Street Address (if different from above) City State ZIP Email N/A 2. AgentContractor Information Business Name Atlantic Environmental Consultants, Llc Agent! Contractor 1: First Name MI Last Name Doug A Dorman Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State P.O. Box 3266 Kitty Hawk NC ZIP Phone No.1 Phone No. 2 27949 252 -261 - 7707 ext 252-599-2603 ext FAX No. Contractor # 252 261 2965 Street Address (rf dfferent from above) City State ZIP Email dougdorman @myembargmail.com <Fonn continues on back> Form DCM MP -1 (Page 2 of 4) AUG 2 8 2013 APPLICATION for Major Development Permit 3. Project Location a. Total length of shoreline on the tract (ft) b. Sae of entire tract (sq.ft.) 1,600 linear feet 740,520 - J County (can be multiple) Street Address ._ _ _- _ ___ _. _ __ _ _ . _ .__ _ _. __ _ .i State Rd. # Perquimansl South Church Street 1336 Subdivision Name City State Zip None Hertford NC 44 279 - Phone No Lot No. (s) (d many, attach additional page with list) 252 -717 - 2912 ext. N /A, , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project If yes, by whom? Perquimans River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Perquimans River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed Was ❑No work falls within. Town of Hertford 4. Site Description a. Total length of shoreline on the tract (ft) b. Sae of entire tract (sq.ft.) 1,600 linear feet 740,520 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or N/A, I I NWL (normal water leveq (If many lot sizes, please attach additional page with a list) 5' ❑NHW or ®NWL e. Vegetation on tract Loblolly Pine, Tulip Poplar, Red Maple, Bald Cypress, Sweet Gum, Red Bay, Wax Myrtle, Giant Cane, Black Needle Rush, Sede, Rattan Vine, Greenbriar, Poison ivy, Grape Vine. f. Man -made features and uses now on tract None g. Identify and describe the existing land uses adjacent to the proposed project site. Single family residential, and Commercial h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? TR -h i ghdensity residential, light commercial (Attach zoning compliance certificate, if applicable) ®Yes []No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> 252 - 808 -2808 .. 1- 888- 4iRCOAST .. wwey.nceoastalmenagement -net Form DCM MP -1 (Page 3 of 4) AUG 2 8 2013 APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? i � ( ®Yes ❑No (ii) Are there coastal wetlands on the site? _ ®Yes []No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ❑No (Attach documentation, ifavailable) n. Describe existing wastewater treatment facilities. Wastewater treatment available from the Town of Hertford. o. Describe existing drinking water supply source. Public water supply p. Describe existing storm water management or treatment systems. None 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ®Commercial ❑Public/Govemment ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The propsosed marina will be used by the residents and guests of the proposed development. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Walkway and boat slips will be constructed using a barge and hydraulic pump to jet pillings and hand tools wil be used to construct walkways. The equipment will be stored onsite during construction. Buildings to be constructed with conventional framing practices. d List all development activities you propose. Construction of a boat ramp, walkways, piers, condominiums, townhomes, and 100 boat slips on the Perquimans River. e. Are the proposed activities maintenance of an existing project, new work, or loth? New f. What is the approximate total disturbed land area resulting from the proposed project? 10 ❑Sq.Ft or ®Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. None existing or proposed. i. Will wastewater or stormwater be discharged into a wetland? ®Yes ❑No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ®Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 252 - 808 -2808 .. 1- 888- 4RCQAST a: wwv- nccoastalmanagement.net Form DCM MP -1 (Page 4 of 4) i AUG 2 8 2013 APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name NCDOT do Gretchen Byrum Phone No. Address 1929 North Road Street, Elizabeth City, NC 27909 Name State Employees Credit Union Phone No. Address PO Box 27665, Raliegh, NC 27611 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pennittee, and issuing dates. FONSi, State Application Number 08-E- 4300-0279 Permit No. SWG030000, 8113/03, Tugboat Properties S &E Project No. Perqu- 2007 -006,12/22106, Tugboat Properties Stormwater Permit No. SW7021213, 4/3107, Tugboat Properties h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1 -10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Cer0cadon and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 8/21/13 Print Name _Doug Dorman, Consultant Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ®DCM MP -3 Upland Development ®DCM MP-4 Structures Information 252 - 808 -2808 :- �tww.n��oasta!rnareagsm+an #.na4 Form DCM MP -2 EXCAVATION and FILL (Except for bridges and culverts) AUG 2 8 2013 Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet 1, EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. Sand and sin 50 cubic yards c. (i) Does the area to be excavated include coastal wetiandstmarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SS OWL ®None (ii) Describe the purpose of the excavation in these areas: d. High -ground excavation in cubic yards. 55 cubic yards Z DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of deposal area. b. Dimensions of disposal area. Dredged material will be used as part of the road bed in the Approximately 119 x 29 parking area.. c. (i) Do you claim title to disposal area? ®Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlandstmarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of disposal in these areas: d. () Will a disposal area be available for future maintenance? ❑Yes ®No ❑NA (ill If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes ®No ❑NA (i) If yes, how much water area is affected? 252- 808 -2808 :: 1- 888- 4RCOAST :: wvwv.nccoastaimianaggment,net revised: 12/26/06 Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL ) stabilization Length 65' Width 29 Avg. Existing Depth 2' NA NA Final Project Depth 4' NA NA 1, EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. Sand and sin 50 cubic yards c. (i) Does the area to be excavated include coastal wetiandstmarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SS OWL ®None (ii) Describe the purpose of the excavation in these areas: d. High -ground excavation in cubic yards. 55 cubic yards Z DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of deposal area. b. Dimensions of disposal area. Dredged material will be used as part of the road bed in the Approximately 119 x 29 parking area.. c. (i) Do you claim title to disposal area? ®Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlandstmarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of disposal in these areas: d. () Will a disposal area be available for future maintenance? ❑Yes ®No ❑NA (ill If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes ®No ❑NA (i) If yes, how much water area is affected? 252- 808 -2808 :: 1- 888- 4RCOAST :: wvwv.nccoastaimianaggment,net revised: 12/26/06 Form DCM MP -2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ®This section not applicable (if development is a wood grain, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: []Bulkhead ❑Riprap ❑Breakwater /Sill ❑Other. Width: c Average distance waterward of NHW or NWL d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: f. (i) Has there been shoreline erosion during preceding 12 months? []Yes []No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. h. Type of fill material. ---------- ----"' Bulkhead backfill Riprap Breakwater /Sill Other i. Source of fill material. I - - -- "(7, i 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the (ii) Amount of material to be placed in the water number of square feet affected. (iii) Dimensions of fill area ❑CW ❑SAV ❑SB (iv) Purpose of fill ❑W- []None (ii) Describe the purpose of the fill in these areas: 15. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? The entire work area will be surrounded by silt fence to prevent Back hoe and excavator runoff. c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project ❑Yes ®No ❑NA site? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. 8/21/13 Authorized agent - Doug Dorman Applicant Name Date Hertford Bay Marina ` App nt Signature Project Name 252 - 808 -2808 :: 1- 8884RCOAST :: wwvv.nccoas1atrreana9erq rnta et revised: 12126/06 Form DCM MP -3 UPLAND DEVELOPMENT AUG ` $ 203 (construction and/or land disturbing activities) r' ^ ' ", • ' E w- Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures proposed. 14 total. 8 condominiums, 2 townhomes,1 cubouse, 1 utility building, 1 bathroom/shower facity, 1 dock master office. c. Density (give the number of residential units and the units per acre). 98 condominium units, 20 townhomes, 6.9 units per acre. `TL`Al[P I-�li e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land- disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ❑Yes ®No ❑NA (ii) If yes, list the date submitted: g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built-upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 0% 1. Give the percentage of the entire tract to be covered by impervious and/or built-upon surfoos, such as pavement, building, rooftops, or to be used for vehicular driveways or parking 43% j. Describe proposed method of sewage disposal. Central wastewater from the Town of Hertford. I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrialf commercial effluent, 'wwh down" and residential discharges). Surface runoff b. Number of lots or parcels. d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 10 acres f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. Concrete, asphalt, paver stones, and gravel. h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? []Yes ®No ❑NA (ii) If yes, list the date submitted: k. Have the facilities described in Item (i) received state or local approval? ❑Yes ®No ❑NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stonmwater design? ❑Yes ®No ❑NA If yes, attach appropriate documentation. 252 - 808 -28082 :: 1- 888- 4RCOAST :: www.nccoastaimanaaement.net revised: 12/26/06 Form DCM MP -3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Public System o. When was the lot(s) platted and recorded? Not available 8/21/13 Date Hertford Bay Marina Project Name Tugboat Properties, LLC Applicant Name Agent - Doug Dorman OC Applicant Signature n. (0 Will water be impounded? []Yes ®No ❑NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ®Yes []No ❑NA 1 j y hUG, 9- 8 2013 252- 808 -2808 1- 88"RCOAST :: vwvw.nccoastaimanagement.net revised: 12/26/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) t UG 2 8 2013 .n�c�tj Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. &-su p e all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY /MARINA CHARACTERISTICS a. (i) Is the docking facilky/madna: ❑Commercial ❑Public(Govemment OPrivate/Community ❑This section not applicable b. (i) Will the facility be open to the general public? ®Yes []No c. (1) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ®Yes ❑No (i) Number 2 If yes. (iii) Length Pier A - 462'. Pier B - 452' (ii) Number 48 (iv) Width $ (iii) Length 12' (v) Floating []Yes ®No (iv) Width 3' max to 1' min. (v) Floating ❑Yes ®No e. (i) Are Platforms included? ®Yes []No f. (i) Are Boatiifts included? []Yes ®No If yes: if yes: (i) Number 2 (ii) Number (iii) Length 56' (iii) Length (iv) Width 10' (iv) Width (v) Floating ❑Yes ®No Note: Roofed areas are calculated from dnpline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 100 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service 0 ® Dockage, fuel, and marine supplies ® Dockage ( wet slips' only, number of slips: 100 ❑ Dry storage; number of boats: ® Boat ramp(s), number of boat ramps: 1 ❑ Other, Please describe: i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water, dredging for basin and /or channel ®Open water, no dredging required ❑Other, please describe: k. Typical boat length: 18'-50' m. (i) Will the facility have tie pilings? ®Yes ❑No (ii) If yes number of tie pilings? j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mired types). Mixed type I. (i) Will the facility be open to the general public? ®Yes So 252 - 808 -2808 :: 1- 88&4RCOAST :: w.Pccaas+talrn:jns ! eMigtgt.r:Qt T @NJS+°LIa 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY /MARINA OPERATIONS ❑This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ® Office Toilets ® Toilets for patrons; Number: 1, Location: Pool bathroom facilities ® Showers ® Boatholding tank pumpout; Give type and location- Connected to central wastewater system. Pump out located at the end of proposed dock. b. Describe treatment type and disposal location for all sanitary wastewater. P i All sanitary wastewater will be treated at the town of Hertfords sewer plant. c Describe the disposal of solid waste, fish offal and trash. All waste will be disposed of in dumpster located on site. d. How will overboard discharge of sewage from boats be controlled? No overboard discharge of sewage allowed. A "No Sewage Discharge" sign will be posted on the piers. Boats will be directed to use off site pumpout facilities to control sewage discharge. e (i) Give the location and number of "No Sewage Discharge" signs proposed A sign will be posted on the entrance to the piers. (ii) Give the location and number of " Pumpout Available' signs proposed. Located at several locations on piers. See attached drawing for location. f Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products N/A g. Where will residue from vessel maintenance be disposed of? N/A h. Give the number of channel markers and "No Wake" signs proposed. One no wake sign proposed. 1. Give the location of fuel- handling facilities, and describe the safety measures planned to protect area water quality. Pumps located at the end of north pier. Tanks located on uplands in a contaiment area. j. What will be the marina policy on overnight and live - aboard dockage? No live- aboard dockage allowed. k. Describe design measures that promote boat basin flushing? Slips located in open water. The predominate northeast and southwest winds will provide adequate flushing of waters around boat slips. I. If this project is an expansion of an existing marina, what types of services are currently provided? N/A 252 - 808 -2808 :: 1- 888- 4RCOAST :: www_nccoastaimanagement.net revised: 12/27/06 +Form DCM MP -4 (Structures, Page 3 of 4) m. Is the madna/docking facility proposed within a primary or secondary nursery area? [iYes ®No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ®No r Auk 2 s 2013 t o. Is the madna/docking facility proposed within or adjacent to coastal wedands/marsh (CW), submerged "aquatic veegetation (SAV), shell bottom (SB), or other wetlands (WL)1 If any boxes are checked, provide the number of square feet affected. OCW ❑SAV OSB OWL ®None p. Is the proposed madna/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a (i) Is the boathouse structure(s): ❑Commercial OPubiictGovemment ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable a (i) Number (ii) Length (iii) Width & BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length c. Maximum distance beyond NHW, NWL or wetlands b. Average distance from NHW, NWL, or wetlands 6. MOORING PILINGS and BUOYS ❑This section not applicable a. Is the structure(s): ❑Commercial ❑PubliciGovemment ®Private /Community C. Distance to be placed beyond shoreline 650' Note: This should be measured from marsh edge, if present. e. Arc of the swing None 7. GENERAL b• Number 1 d. Description of buoy (color, inscription, size, anchor, eta) Single piling with no wake sign. 252 -808 -2808 :: 1- 888- 4RCOASY -- wwrw.nccoastalmananement.net revised: 12/27106 Form DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities.' 525' to the east, boat ramp pier 55' to existing NCDOT RNV. 445' Note: For buoy or mooring piling, use arc of swing including length of vessel. a Width of water body 1.240' at the end Ofpronosed piers. e. (i) Will navigational aids be required as a result of the project? j]Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWL 6_2 8. OTHER ❑This section not applicable a. Give complete description: 8/21/13 Date Hertford Bay Marina Project Name Tugboat Properties, LLC App1- Name Apple Signatun; AUG 2 8 2013 nn_'' 252- 808 -2808 :: 1- 888- 4RCOAST :: wavw.nccoastaiman ?o- q rinent.nf t revised: 12127106 11 -0� Plat Cab: 2 Plat Map: 6 Plat Slide: 148 Record Date: 20060506 Per quimans County, NC PIN Number: 7849-84-6938 Tax Value: 1140500 Parcel Number: 2-0050-0029 Township: BETHEL Owner Name: TUGBOAT PROPERTIES LLC PROPERTY MAP Owner Address: Owner Address 2: 1990 SMYTHEWICK DRIVE GREENVILLE, NC 27858 Owner Address 3: Disclaimer The data provided on this map are prepared for the inventory of real I property found within Owner Account: 259557 Perquimans County, NC and am compiled from recorded plats, deeds, and other public records Description: TR#1,WM BOWEN/CHURCH and date. This data is for informational purposes only and should not be substituted Deed Book: 129 for a true title search, property appraisal, survey, or for zoning verification, ---1 — Plat Cab: 2 Plat Map: 6 Plat Slide: 148 Record Date: 20060506 Sold Date: Deed Acres: 17.00 Tax Value: 1140500 Use Value: Township: BETHEL -7 -4 One Inch = 200 Feet _/.3 x -6.4' x -3.4l x -6-5` x -6,5' x 8' x NO WAKE BUOY -5.7' x -6.4' x 1.8' x AWL �dL Ci dL ILI SICVI% IL IL "VI AIL CYPRESS TREES -4,6, Y, AIL -5.2, x it AL N.T.S. PROPOSED RETAINING WALL IL yls M14 2 -3-27 -4.0' 'ZI _5,4! WETLANDS Z em _59' x XkL Amu j�CYPRESS TREES SrTE DATA 3/, -65 Y, -6. Ulf 1011 OWNER. TUGBOAT PROPERTIES, LLC 01- BILL BOWEN NO WAKE BUOY BOB0 S BY TYRIP H 199MT -6,4! x -2. GREENVILE, EWYCK NC 27858 DRIVE PLATFORM B 2, 9 TOTAL DRAINAGE AREA: fl `40 PROPOSED BUILDING 85,639 SF 177. PLATFORM A - -------- 'Lit, PROPOSED PARKING 121,306 SF 247. PROPOSED POOL/TENNIS 11,236 SF 2.2% TOM WATERS CREEK 76 5&87. 5 alL OPEN SPACE 286,935 9,F 7, + Z CYPRESS TREE,'�;; TOTAL AREA 505,116 SF 100% PROPOSED FUEL PUMPS AND PUMP OUT FACILITY 26 'A PIER 8 -VIN 'k-'25 (6) 19- WIDE SUPS POND CALCULATIONS: t J4 fil I" v (36) 15' WIDE SUPS (8) 19' WIDE SUPS I POND A: V.- 40% IMPERVIOUS CYPRESS TREES DRAINAGE AREA 1.5 AC DEPTH) SA DA FACTOR = 3.5v. (TAKEN FROM 90 7. TSS CHART, 4' POND REQUIRED SURFACE AREA 1,5 AC*43,560 SF*3.5/100 24287 SF . ...... Lim ,ERQUIMANS RIVER V10- + WETLANDS BASED ON A 3:1 LENGTH TO WIDTH RATIO: WIDTH = 28 FT e6.2 x LENGTH 83 FT _A ...... 7-H POND B: ALL PROPOSED PIERS 8' WIDE 2. 30' BUFFER LINE IMPERVIOUS AL Y, WALKWAY -6 DRAINAGE AREA 4.75 AC SA/DA FACTOR = 4.3% (TAKEN FROM 90 7. TSS CHART, 4' POND DEPTH) 1 , REQUIRED SURFACE AREA = 4.75 AC*43,560 Si -*4.3/100 = 8,897 SF -71 CYPRESS A _b �D BASED ON A 3:1 LENGTH TO WIDTH RATIO: WIDTH 55 FT ` 1A vu� lu TRACT 1 LENGTH 164 FT All, PIER A 7 ACRES NIF POND C: 1 (6) 19- WIDE SLIPS", AL -ALL IMPERVIOUS (36) 15' WIDE SLIPS" STATE EMPLOYEES CREDIT UNION + WIDE SLIPS I D , "k Mk 4ALKWAY DRAINAGE AREA 5.35 AC _W11 WETLANDS a b, SA/DA FACTOR 3.97. (TAKEN FROM 90% TSS CHART, 4' POND DEPTH) + 404 + + qg q" REQUIRED SURFACE AREA 5.35 AC*43,560 SF*3.9/100 9.089 SF , + -4,", all L N AD IL POOL EQUIPMENT Qr �h BUILDING + + + + BASED ON A 3:1 LENGTH TO WIDTH RATIO: WIDTH 56 FT --.--APPROXIMATE LOCATION OF LENGTH 166 FT I ADJACENT COn +MUNITY PIER 404 WETLANDS UNE POOL -- - - - - - - - - - Xqp%y_ RCA�ION, OF Y,,p aea sp.) -DOCKMASTER OFFICE g TOTAL LAND DISTURBANCE AREA! 10 ACRES (20' x 20') SHOWERS ANDzn BATHROOMS ENTIRE WORK AREA TO BE SURROUNDED BY SILT FENCE FUEL STORAGE 415' TANKS HERTFORD HEIGHTS PROPOSED t. 60'x100' HOUSING vk UNIT (TYP.) 0� X.)IL r '0 \61 HIGH STREET N + + S_ 10. 41, W111T. IS CYPRESS W- TREES. Iti POND B X11 cr" ....... 404 WETLAND LINE -,PP SURFACE ARE Fj!I11 OUTLOW 0, -------- 30' DCM BUFFER LINE 41 + 4, Al s 41 4. NORMAL WATER LINE (NWL) WETLANDS .... .. . ... .. 0.24 ACRE BOAT RAMP EXCAVATION PROPOSED TOUNITS WNHOMES fu -` = END OF OAT ti or 10 RAMP CONCRETE 17.472 SF 70 .9, oo, L 4, BOAT RAMP CONCRETE 3 PRQPOS D HIGHCROUND ❑ -nON (55 CY) PROPOSED EXCAVATION- EXCAVA TO - -4.0' (50 Cu. YDS.) BOAT RAIP SPOIL CONTAINMENT AREA POND C SURFACE AREA 10019 SF Lu a- PROPOSED TOWNHOMES 10 UNITS 17,472 SF L 13 0- cl. DR�DGIE SPOIL LOCATION NOTE: x �50 AREA WITH SILT FENCE • 80 TOTAL LAND DISTURBANCE AREA: 10 ACRES CHURCH STREET 1- IMP 1, SURROUNDED BY SILT FENCE m WORK AREA TO BE ENTIRE 51 DOWNTOWN HERTFORD GRAPHIC SCALE 100 0 50 100 200 fun== RACOON CREEK NQ, IN FEET 1 inch = 100 ft. 06-008A BY OTHERS DATT� 1 - 1 DRAWING FIL HERTFORD SAY 1! 1� 7 /06 PLO• SCAL'E',: 100' N0. ["AT"' I REVIS��ONS,' 11- L 10/5/07 'REVISED AS PER DCM COMMENTS DATED 9/24/07 1-I ------- _1_1 I ............ I 2 1 1/18/08 1 REVISED AS PER DCM COMMENTS DATED 11/19/07 3 i 6/27/13 i REVISED FOR CAMA MAJOR APPLICATION 4 8/6/13 REVISED AS PER DCM COMMENTS DATED 7/2/13 5 8/21/13 IREVISED AS PER DCM COMMENTS DATED 8/16/13 N.T.S. /A y/ xwl 71 A /v -7 / / L" Z. IL z L_e -i / I Z, PO Bf"IX 3266 K IT _FY HAWK I�IDRIP CAF,'D_L11W',l 55E)' E`61­2965 Phone E­Mo.,R