Loading...
HomeMy WebLinkAboutNC0024244_SOC Qtrly Report_20211014Strickland, Bev From: Rob McIntyre <rob@lkcengineering.com> Sent: Thursday, October 14, 2021 2:59 PM To: Basinger, Corey; Scheller, Roberto Cc: Redwine, Judy; dworl@albemarlenc.gov; Whitley, Derek S; Plyler, Brandon W; 'blhinson@ci.albemarle.nc.us'; Adam Kiker Subject: [External] 2021 - Q4 Quarterly Report for Albemarle SOC WQ S19-007 Attachments: 2021 - Q4 Report - SOC WQ S19-007.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon Corey and Roberto — Please see attached 2021— Q4 Quarterly Report for the City of Albemarle's current SOC WQ S19-007. Please let us know if you have any questions or comments. Thank you, Rob ROB MCINTYRE, P.E. LKC Engineering, PLLC 140 Aqua Shed Court Aberdeen, NC 28315 Ph: (910) 420-1437 Fax: (910) 637-0096 Cell: (980) 622-0376 Follow us on Instagram! @Ikc_engineering 1 ___________ LKC Engineering, PLLC, 140 Aqua Shed Court, Aberdeen, North Carolina 28315 PH: 910/420-1437 * FAX: 910/637-0096 * License No. P-1095  October14,2021  Mr.W.CoreyBasinger RegionalSupervisor,Mooresville NCDEQ–DivisionofWaterResources 610ECenterAvenue,Suite301 Mooresville,NC281115  Re:QuarterlyReport–FourthQuarter2021 SOCWQS19Ͳ007  DearMr.Basinger:  OnbehalfofAlbemarle,pleaseacceptthisasaQuarterlyReportforthesubjectSpecialOrderbyConsent. BelowisabriefupdateontheSOCandassociatedprojects:  1. AlbemarlereceivedfundingthroughtheDivisionofWaterInfrastructurefor$16,453,000in fundingforamajorrenovationtotheLongCreekWastewaterTreatmentPlant.Theprimary objectiveoftheprojectistotransitiontheaerationprocessfromthefloatingaeratorsoverto diffusedaeration.Theprojectwouldalsoprovidefor8,000,000gallonsofflowequalization volumetomanagepeakflowevents. 2. TheEngineeringReportwassubmittedtotheNCDEQWastewaterProjectsUnitonAugust25, 2021.OurteamexpectstoreceivecommentsfromNCDEQbytheendofOctober.Following receiptofcomments,ourteamwillmakerevisionsasnecessarytotheEngineeringReportand resubmittoNCDEQforapproval.WeexpecttoreceiveapprovaltoproceedtotheDesignPhase byJanuaryof2022. 3. Albemarle’sCouncilvotedtoutilizeallfundsobligatedunderCS370522Ͳ07ongravitysewer rehabilitation.ThePhase3projectwillincludesaninvestmentof$6,156,000ontherehabilitation of24”,18”,12”,and8”gravityseweralongtwomajoroutfallsthatareknownsourcesofinflow andinfiltration. 4. TheDivisionofWaterInfrastructure(DWI)approvedtheEngineeringReportandissueda CategorialExclusionforthePhase3projectonApril22nd.Theprojectiscurrentlyinthedesign phaseandwillbesubmittedtoDWIforreviewinthecomingweeks.Theprojectisexpectedto beginconstructionintheSpringof2022andtakeapproximatelyninemonthstocomplete.  Ifyouhaveanyquestions,orifwemaybeofassistance,pleasedonothesitatetocontactmebyphone at(910)420Ͳ1437orbyemailatrob@LKCengineering.com.  VeryBest,   JohnR.McIntyre,P.E. !"#$%&’()*