HomeMy WebLinkAbout20050785 Ver 16_Approval Letter_20100805 (2) t�CDEWR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakild,P, E. Dee Freeman
i
Governor Director Secretary
j October 31,2012
I
Mr.Jay Johnson
North Carolina Department of Transportation
P.O.Box 1587
Greenville,NC 27835
i
Subject: Modification to the 401 Water Quality Certification Pursuant to Section 46I of the Federal Clean Water Act and Tar-
Pamlico Buffer Authorization,with ADDITIONAL CONDITIONS for Proposed improvements to US 17(Washington By-
pass)from North of SR 1509(Springs Rd)to North of SR 1418(Roberson Rd)in Beaufort County,Federal Aid Project No.
MAF-75-3(26),TIP No.R-2510 C.
NCDWQ Project No.20050785 v. 16
Dear Mr.Johnson:
Attached hereto is a modification of Certification No.3527 issued to The North Carolina Department of Transportation(NCDOT)
dated September 6,2005. This modification is applicable only to the additional activities in R-2510 section C. All the authorized
activities and conditions associated with the original Water Quality Certification dated September 6,2005 and subsequent
modifications still apply except where superceded by this certification.
If we can be of further assistance,do not hesitate to contact us.
Sincerely,
Charles Wakild,P.E.
Director
Attachments
cc: Tom Steffens,US Army Corps of Engineers,Washington Field Office
Chris Rivenbark,NC DOT, 1548 Mail Service Center,Raleigh NC 27699-1549
Steve Sollod,Division of Coastal Management,Raleigh.
Stephen Lane,Division of Coastal Management,Morehead City
File Copy
North Carolina Division of Water Quality Internet One
943 Washington Square Mall Phone: 252-946-6481 No hCarolina
Washington,NC 27889 FAX 252-946-9215
An Equal OpporlunitylAfllmtative Action Employer—5D%RecycledllD%Post Consumer Paper aturaIr
Page 2 of 5
Modification to the 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act and Tar-Pamlico
Buffer Authorization with ADDITIONAL CONDITIONS
THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United
States and subject to the North Carolina Division of Water Quality(NCDWQ)Regulations in 15 NCAC 2H.0500 and 15A NCAC 2B
.0259. This certification authorizes the NCDOT to impact'1.92 acres of jurisdictional wetlands,0.47acres of surface waters,2,088
linear feet of jurisdictional streams and 156,855 square feet of protected riparian buffers in Beaufort County. The project shall be
constructed pursuant to the modification request dated received September 12,2012 and revised request dated received October 30,
2012. The authorized impacts are as described below:
I
Stream Imipactsin the Tar-Pamlico River Basin approved with the Au ust 5,2010 Modification
Permanent Fill Temporary Fill Permanent Temporary Total Stream Impacts
Perennial Perennial Surface Water Surface Water Stream Requiring
Section C,Site: Stream Stream Impacts Impacts Impact Mitigation
(linear ft linear ft ac ac (linear ft linear it
IA 34 262 <0.01 0.17 296 -
i
IC - - - -
2* n/a n/a n/a n/a
3 122 116 0.01 0.01 238 -
4A 779 27 0.07 0.01 806 779
4B 0 270 0 0.12 270 -
4C 0 116 0 <0.01 116 -
5A 120 20 0.01 0 140 -
5B 154 20 0.02 <0.01 174 154
5C 21 27 <0.01 <0.01 48 1 21
TOTAL: 1,230 858 0.13 0.34 1 2,088 954
Total Stream Impact for Project:2,088 linear feet
2* subsequent site visits by DWQ and Corps of Engineers personnel found no stream feature present
i
Stream impacts in the Tar-Pamlico River Basin approved with this Modification
Permanent FIR Temporary Fill Permanent Temporary Total Stream Impacts
Perennial Perennial Surface Water Surface Water Stream Requiring
Section C,Site: Stream Stream Impacts Impacts Impact Mitigation
inear ft (linear ft ac ac (linear it) (linear it)
IA 34 262 <0.01 0.17 296 -
113 - - - -
1C - - - -
2* n/a n/a n/a n/a
3 122 116 0.01 0.01 238 -
4A 779 27 0.07 0.01 806 779
4B 0 270 0 0.12 270 -
4C 0 116 0 <0.01 116 -
5A 135 20 0.01 0 155 -
5B 154 20 0.02 <0.01 174 154
5C 21 27 <0.01 <0.01 48 21
MODIFIED TOTAL: 1 45 858 0.13 0.34 2103 954
Difference +15 0 0 0 +15 0
Total Stream Impact for Project:2,103 linear feet
Page 3 of 5
Tar-Pamlico Ri arian Buffer Impacts A roved with the A ril 11 2012 Modification
Zone 1 minus =Zone 1 Zone 1 Buffer g" Zone 2 minus zone 2 Zone 2 Buffer
Section C Impact Wetlands Buffers Mitigation Impact Wetlands Buffers Mitigation
(sq ft) in Zone 1 (not wetlands) Required (sq ft) in Zone 2 (not wetlands) Required
Site: (sq ft) (sq ft) (using 3:1 ratio) (sq ft) (sq ft) (using 1,5:1
ratio
IA 3,913 20 3,893 11,679 '{',v 4,506 151 4,355 6,533
IA 13,197 3,018 10,179 **n/a -F-
3,905 799 3,106 **n/a
I Bride 9,575
;_.
3 13 360 469 12,891 38,673 8,411 2,028 6,383
4 40,228 60 40,168 120,504 23,055 510 22,545 33,818
4 Bride 12,312 2,280 10,032 **n/a N;F 2,298 493 1,805 **n/a
5A 7,518 0 7,518 *n/a ^;'i 4,528 0
4,528 *n/a
SB 9,730 1,118 8,612 25,836 6,095 1,214 4,881 7,322
SC 2,588 0 2,588 7,764 't ; 911 Q 911 1,367
102,846 6,965 95,881 204,456 53,709 5,195 48,514 58,615
Totals -�a
*n/a=Total for Site is less than 1/3 acre and 150 linear feet of impact,no mitigation required
**n/a=Impact due to bridge structure,no mitigation required
Total Buffer Impact for Project:156,555 square feet.
Tar-Pamlico Ri arian Buffer Im acts Approved
with this Modification
Zone 1 minus =Zone 1 Zone 1 Buffer < ' Zone 2 minus =Zone 2 Zone 2 Buffer
LSection Impact Wetlands Buffers Mitigation Impact Wetlands Buffers Mitigation
,(sq ft) in Zone 1 (not wetlands) Required (sq ft) inZone 2 (not wetlands) Requ re
s ft s it usin 1.5:1
(sq ft) (sq ft) (using 3:1 ratio) ( 9 ) ( q } ( ratio
I' lA 3,913 20 3,893 11,679 4,506 151 4,355 6,533
10,179 **n/a 3,905 799 3,106 **n/a
IA Bridge. 13,197 3,018
3 13,360 469 12,891 38,673 ;: 8,411 2,028 6,383 9,575
4 40,228 60 40,168 120,504 ;''; 23,055 510 22,545 33,818
4 Bride 12,312 2,280 10,Q32 **n/a 1:;-` 2.298 493 1,805 **n/a
5A 7,818 0 7,818 *n/a 4,528 0 4,528 *n/a
SB 9,730 1,118 8,612 25,836 6,095 1,214 4,881 7,322
5C 2,588 0 2,588 7,764 911 0 911 1,367
103,146 6,965 96,181 204,456 53,709 5,195 48,514 58,615
Totals
Difference
+300 0 +300 0 0 0 0 0
*n/a=Total for Site is less than 1/3 acre and 150 linear feet of impact,no mitigation required
**n/a=Impact due to bridge structure,no mitigation required
Total Buffer Impact for Project:156,855 square feet.
The application provides adequate assurance that the discharge of fill material into the waters of the Tar-Pamlico River Basin in
conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge
guidelines. Therefore,the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301,
302,303,306,307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth.
This approval is only valid for the purpose and design that you submitted in your modification request dated received September 12,
2012 and additional information dated received October 30,2012. All the authorized'activities and conditions associated with the
original Water Quality Certification dated September 6,2005 and all subsequent modifications still apply except where superseded by
Page 4 of 5
this certification. Should your project change,you are required to notify NCDWQ and submit a now application. If the property is
sold,the new owner must be given a copy of this Certification and approval letter,and is thereby responsible for complying with all
the conditions. If any additional wetland impacts,or stream impacts,for this project(now or in the future)exceed one acre or 150
linear feet,respectively,additional compensatory mitigation may be required as described in 15A NCAC 211.0506(h)(6)and(7).
i Additional buffer impacts may require compensatory mitigation as described in 15A NCAC 2B.0260. For this approval to remain
valid,you are required to comply with all the conditions listed below. In addition,you should obtain all other federal,state or local
permits before proceeding with your project including(but not limited to)Sediment and Erosion control,Coastal Stormwater,Non-
discharge and Water Supply watershed regulations. This Certification shall expire on the same day as the expiration date of the
corresponding Corps of Engineers Permit.
Condition(s)of Certification:
1. This modification is applicable only to the additional proposed activities in R-2510 Section C. All of the authorized
activities and conditions associated with the original Water Quality Certification dated September 5,2005 and subsequent
modifications still apply except where superseded by this certification.
2. The issuance of this certification does not exempt the Permittee from complying with any and all statutes,rules,regulations,or
ordinances that may be imposed by other government agencies(i.e.local,state,and federal)having jurisdiction,including but
not limited to applicable buffer rules,stormwater management rules,soil erosion and sedimentation control requirements,etc.
3. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for
approval.
i
4. Upon completion of the project(including any impacts at associated borrow or waste sites),the NCDOT Division Engineer
shall complete and return the enclosed"Certification of Completion Form"to notify NCDWQ when all work included in the
401 Certification has been completed.
5. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition,the Water
Quality Certification and all subsequent modifications,if any,shall be maintained with the Division Engineer and the on-site
project manager.
Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil
penalties. This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and/or
Coastal Area Management Act Permit. This Certification shall expire upon the expiration of the 404 or CAMA permit.'
If this Certification is unacceptable to you have the right to an adjudicatory hearing upon written request within sixty(60)days
following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North
Carolina General Statutes and filed with the Office of Administrative Hearings,6714 Mail Service Center,Raleigh,N.C. 27699-6714.
If modifications are made to an original Certification,you have the right to an adjudicatory hearing on the modifications upon written
request within sixty(60)days following receipt of the Certification. Unless such demands are made,this Certification shall be final
and binding.
This the 30th day of Ocotber,2012
DIVISI F WATER QUALITY
6Z&,Ir�
- Charles Wakild,P.E.
Director
WQC No.3527
Page 5 of 5
NCDWQ Project No.: County:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,and any subsequent
modifications,the applicant is required to return this certificate to the 401 Transportation Permitting Unit,North Carolina Division of
Water Quality,1650 Mail Service Center,Raleigh,NC,27699-1650. This form may be returned to NCDWQ by the applicant,the
applicant's authorized agent,or the project engineer. It is not necessary to send certificates from all of these.
i
I
Applicant's Certification
! I, ,hereby state that,to the best of my abilities,due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules,the approved plans and specifications,and other supporting materials.
Signature: Date:
Agent's Certification
I, ,hereby state that,to the best of my abilities,due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules,the approved plans and specifications,and other supporting materials.
Signature: Date:
Engineer's Certification
Partial Final
I, ,as a duly registered Professional Engineer in the State of North Carolina,having
been authorized to observe(periodically,weekly,full time)the construction of the project,for the Permittee hereby state that,to the
best of my abilities,due care and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and
specifications,and other supporting materials.
Signature Registration No.
Date