Loading...
HomeMy WebLinkAbout780108_Routine Inspection_20211012Facility Number 164 .e Division of Water Resources 0 Division of Soil and Water Conservation 0 Other Agency Pyth /0fi)J2 Type of Visit: -a-Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 212outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: J t/42, f :/ Farm Name: Owner Name: Arrival Time: W`dotittn (.. !DaA 4,1)9 Mailing Address: Physical Address: Departure Time: ectifim Owner Email: Phone: County: 11 Region: Fed) Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Integrator: Phone: cp/ 6-69I Certification Number: Certification Number: Longitude: Design Current Capacity Pop. Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other f -k ,,,e, Wet Poultry: Design Current Capacity Pop, Layer Non -Layer Cattle Design Current Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No .,TNA ❑ NE ❑ Yes ❑ No ❑ NA 0 NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ No f 'NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No 'NA ❑ NE of the State other than from a discharge? Page 1 of 3 2/4/2015 Continued Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ NoNA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No _❑-NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? 0 Yes ❑ No] NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑ No ' NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ No 0 NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑DNA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No .0NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift 12. Crop Type(s): 13. Soil Type(s): ❑ Application Outside of Approved Area 14. Do the receiving crops differ from those designated in the CAWMP? 11] Yes ❑ No] NA 0 NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NoNA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ,❑`NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ,NA ❑ NE the appropriate box. ❑ W UP ['Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No 17-NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No 0 NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No FINA ❑ NE Page 2 of 3 2/4/2015 Continued Facility Number: - / 0 4‘ Date of Inspection: /O i j2 / . 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ...„®'NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No .0,NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes -No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No .ErIA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ,0-No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes _.jallo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No E`NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No J1A ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes . 'No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes , ®` No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes -No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recammenda Use drawings of facility to beer explain situations (use additional pages as necessary), Jut J C- A 4,e9 - r. dyz Cese", Peesr(.1"-;1 a 10-74:V 7-0 d,AQrr j d A /0Cderi r, V /26t4-1-1.(7- ctC Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 r ropte n c5 Phone: g/d g35`5 g- Date: /Oh,.,-2 2/4/2015