HomeMy WebLinkAbout780108_Routine Inspection_20211012Facility Number
164
.e Division of Water Resources
0 Division of Soil and Water Conservation
0 Other Agency
Pyth /0fi)J2
Type of Visit: -a-Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: 212outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: J t/42, f :/
Farm Name:
Owner Name:
Arrival Time:
W`dotittn
(..
!DaA 4,1)9
Mailing Address:
Physical Address:
Departure Time:
ectifim
Owner Email:
Phone:
County:
11 Region: Fed)
Facility Contact:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Title:
Latitude:
Integrator:
Phone:
cp/ 6-69I
Certification Number:
Certification Number:
Longitude:
Design Current
Capacity Pop.
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other f -k ,,,e,
Wet Poultry:
Design Current
Capacity Pop,
Layer
Non -Layer
Cattle
Design Current
Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes ❑ No .,TNA ❑ NE
❑ Yes ❑ No ❑ NA 0 NE
b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ No f 'NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No 'NA ❑ NE
of the State other than from a discharge?
Page 1 of 3
2/4/2015 Continued
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ NoNA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No _❑-NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed? 0 Yes ❑ No] NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑ No ' NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ No 0 NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ No ❑DNA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No .0NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift
12. Crop Type(s):
13. Soil Type(s):
❑ Application Outside of Approved Area
14. Do the receiving crops differ from those designated in the CAWMP? 11] Yes ❑ No] NA 0 NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NoNA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ,❑`NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA ❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ,NA ❑ NE
the appropriate box.
❑ W UP ['Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No 17-NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No 0 NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No FINA ❑ NE
Page 2 of 3 2/4/2015 Continued
Facility Number: - / 0 4‘
Date of Inspection: /O i j2 / .
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes ❑ No ...„®'NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No .0,NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes -No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No .ErIA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ,0-No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes _.jallo ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No E`NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No J1A ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes . 'No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes , ®` No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes -No ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recammenda
Use drawings of facility to beer
explain situations (use additional pages as necessary),
Jut
J C-
A
4,e9 - r. dyz
Cese", Peesr(.1"-;1 a
10-74:V 7-0
d,AQrr j d A /0Cderi r, V
/26t4-1-1.(7-
ctC
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
r ropte n c5
Phone: g/d g35`5 g-
Date: /Oh,.,-2
2/4/2015