Loading...
HomeMy WebLinkAboutNCC215593_Site Plan or Location Map_20211014Site Development Plan • Q • 0� ' E �� UQ N a: J R SITE INFORMATION E • Address - 235 Raleigh Road, Henderson, NC } • OG • Site Area-601,128 sf => 13.80 acres o 2O MR WILLIAMS, INCAF • Parcel Numbers - 0059 02001 and 0062 01013 • Existing Use - Warehouse/Distribution Center • Disturbed Area - 0.97 acres •� O v �>' z • Impervious area calculations V� (D •• Predevelopment Impervious - 480,505.1 sf=11.03 acres => 79.93% N � '7 •• Postdevelopment Impervious - 494,358.1 sf=11.34 acres => 82.17% Q >' � • Parking V) � N U X •• 38 parking spaces will be removed in demolition s •• 40 parking spaces will be added GNP�P SITE ••• This project will provide a net increase of 2 parking spaces FREE ER EXPANSION cc �� U a) 6 C'� Site o0 E� N o m w c co U d c 235 Raleigh RoadCity Henderson co E Vance County, North Carolina Vicinity Map - Not to Scale co 0 C O O s2 Legend: Govern i n A enc Approvals Existing Temporary Diversion Ditch Proposed TDD Sheet Index O 4-- O Propane LP * * Planning Approval: Date: Q- — CON — — —SF — — E- — — Roof Drain Conduit Silt Fence - Guy Wire RD °°N SF N/A * N.C.D.O.T. Driveway Permit No: Date: U � p U a� � � Sheet No. Revision No. Revision Date Sheet Title — X — — Fence x x * * —FM — — - - - - - - - - - - - - - Force Main - - Edge of Pavement FM N.C. D.O.T. Encroachment Permit No: Date: N o _ _ _ _ _ _ _ = Storm Drain Pipe C- 1 Cover Sheet * * N ______________= --------------- Curb and Gutter Property Line Surveyed Soils Evaluation Completed: Date: 4? M N eNot Line Surveyed Property Tree Woods/ Tree Line � � C-2 Existing Conditions and Demolition Plan Erosion Control L7 N — - - — CTV — — - - Right of Way Cable Centerline _ _ CTv - C-3 Site and Utility Plan * NCDEQ Permit No: N/A Date: E z - OHU — — Overhead Utility(s)(Generic) Underdrain OHU LID 1 Sewer Collection System: * N/A — — OHE — — —UGE — — Electric(Overhead)OHE Electric (Underground) UGE C-4 9-23-2021 Grading and Storm Drainage Plan NCDEQ Permit No: Date: — — OHT — — — — UGT — — Limits of Disturbance Telephone (Overhead) Telephone (Underground) OHT UGT C-5 Sedimentation and Erosion Control Plan Water Distribution System: N/A O —---— -- —-- — Ditch NCDEQ Permit No: Date: — FO — — —GAS — — - — — — — — Fiber Optic Gas - Gravel FO GAS FM C-6 Landscaping Plan (n --- =S = _ --- Sanitary Sewer Striping (Parking Lots) Striping / Road Markings S 7 Details Q Tree Protection Fence TPF — W — — Conc. C.P.P. Water Concrete Corrugated Plastic Pipe W C_g 1 9-23-2021 Underground Detention DI Drop Inlet 3 Ex. Ex. Disturbed Existing Q 9-23-2021 C-9 1 Underground Detention Details X EIP FES Existing Iron Pipe Flared End Section LU JB JB Iron Pipe Set Junction Box C-10 Impervious Area and Nutrient Sheet o = LF Linear Feet L MH PP RCP Manhole Power Pole Reinforced Concrete Pipe LU Q! C L SF SSMH Square Feet Sanitary Manhole r U STMH TSB TP Storm Manhole Traffic Signal Box Telephone Pedestal OWNER/DEVELOPER W = .� INV Invert SpotElevation- TopofCurb Spot Elevation Top Walk TC TW MR WILLIAMS, INC W O Z - of Spot Elevation - Flow Line Spot Elevation - Top of Asphalt FL TA 235 RAL E I G H ROAD, L - — — -99- — — Spot Elevation - Top of Wall - Contours WALL goo HENDERSON, NC ALA+ W L Demo/To be Removed ��������������������� This set containing plan sheets with the dates listed above are authorized for construction on O v = a C Railroad Tracks V p ° L— —v�-a Concrete J o ° ° this the day of , 20 . Cl) J �J Riprap O • Bollard WM0 Wv Water Meter 1 by (Engineer) Q wv Water Valve Fire Hydrant „ J Utility Pole �) OS Sanitary Manhole • SAP Storm Manhole • Telephone Manhole Temporary Benchmark . These plans are for bidding purposes only and are not to be used as L0 ai CAI 0 Area Light(s) Construction drawings unless initialed and dated as approved for Construction below by the Engineer. TSPO Traffic Signal Pole ■ —� Sign -r General Notes Approved for Construction: ® CTv' Catch Basin Cable TV Pedestal General Grading Notes: Date: ■ CTv Cable TV Box 1. Contact N.C. ONE -CALL (811) to have all underground utilities located at least 48 hours prior to excavating or trenching. 1. The contractor shall grade the site with positive drainage away TPo 2. Parking lot shall be striped in accordance with plan. from the building. no area shall be graded that would direct 3. Contractor field location depth be discrepancies Telephone Pedestal shall verify size, material, and of all utilities. engineer shall notified of any prior to construction. water to the foundation and at no point shall water be allowed to CONSTRUCTION SAFETY: FO o Fiber Optic Marker 4. This project disturbs LESS than 1 acre and does NOT require an approved sedimentation and and erosion control plan from the city of henderson. pond against the foundation wall. These drawings do not contain the requirements for job safety. All provisions for safety shall WVM 0 Water valve Marker 5. This project requires an approved encroachment agreement from the North Carolina department of transportation. 2. Remove topsoil before placing any fill, cabc or gravel. be the sole responsibility of the contractor. 6. All dimensions are to face or curb unless otherwise noted. �w Monitoring Well 7. Site shall meet all N.C. Accessibility Code requirements. TSB 0 Traffic Signal Box 8. Construction plan approval shall be obtained prior to construction of any street, water, and/or sanitary sewer and storm drainage systems. EXISTING CONDITIONS: MB O Mailbox O 9. Soil erosion and sedimentation control plan approval by the NCDEQ required prior to initiation of any land disturbing activities. The contractor shall be responsible for reviewing all existing job conditions. Any Not to Scale 10. Refer to architectural plans for building dimensions. 11. Property is subject to encumbrances found upon a normal title search. SaWCut Note: p Y 1 p adverse existing conditions affecting work shown on these drawings shall be brought to the attention of the engineer for possible clarification and ;\ y� Handicap 12. All distances shown are horizontal round distances unless otherwise noted. Where proposed utilities are routed under existing paved areas all existing pavement shall be 9 follows: reconciliation. ~CB 13. The contractor shall be responsible for verifying the minimum building setbacks prior to construction. removed as O co Catch Basin Clean -out • 14. The surveyor did not visibly see any cemeteries or marked graves in open areas on the site unless otherwise noted. 1. Sawcut paving and concrete curb and gutter 2. Removed of paving and concrete curb and utter, trench and install proposed utilities 15. The contractor shall be responsible for all work traffic control in or adjacent to NCDOT or City Right -of -Ways. All methods shall conform with the manual on uniform p g g p p ADA AND LEGAL DISCLAIMER: This document is not represented to comply with all requirements contained in the ADA or © Gas p� Spill Curb and Gutter Spill � traffic control devices (MUTCD) and NCDOT standards. 3. Backfill and compact 16. Any relocation of existing utilities will be at the cost of the developer/owner. The Town/City will not accept responsibility for damages to curb and gutter or street 4. Install new paving and concrete curb and gutter to match the abutting materials and elevations. other laws. Engineers are not licensed to interpret laws or give advise concerning laws. The owner should have this document reviewed by his attorney to determine legal I improvements if installed prior to underground services, nor will the Town absorb the cost for borings to install underground services, pavement patching, or damages compliance. Proposed Spot Elevation 000.00 to landscaping. These will be the responsibility of the developer/owner. 17. Existing underground utilities shown on this plan are approximate and were provided by others. All contractors are responsible for verifying the location of all Contractor shall coordinate, obtain and pay for all required permits and licenses to perform the Horz. Scale: n/a underground utilities prior to commencing work. work and shall be responsible for traffic control while performed said work. Vertical Scale: n/a 18. Approval of any signage is not implied by this review. Please obtain a sign permit from the Department of Planning and Development for approval of any freestanding, building mounted, or monument signs. Date: July 20, 2021 19. A geotechnical analysis has not been performed. all paving recommendations are typical and should be verified by geotechnical analysis and geotechnical recommendations should be followed. Project No.: P210163 Drawn by: PRJ Checked by: SM B Sheet: C-1 oo 0 N M N N 0 N E ME