Loading...
HomeMy WebLinkAbout20211497 Ver 1_ePCN Application_20211014DW R mrlsloa of ware. Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1, 2021 Ver 4.1 Initial Review Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. BIMS # Assigned* Version#* 20211497 1 Is a payment required for this project? No payment required What amout is owed?* Fee received $240.00 Fee needed - send electronic notification $570.00 Reviewing Office* Select Project Reviewer* Asheville Regional Office - (828) 296-4500 Mitchell Anderson:eads\mlanderson Information for Initial Review 1a. Name of project: Huffman la. Who is the Primary Contact?* Marathon Builders 1 b. Primary Contact Email: * 1c. Primary Contact Phone:* info@maratahonbuildersnc.com (828)289-6702 Date Submitted 10/14/2021 Nearest Body of Water Lake Lure Basin French Broad Water Classification French Broad River Site Coordinates Latitude: Longitude: 35.425354 -82.192065 A. Processing Information u County (or Counties) where the project is located: Rutherford Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No Pre -Filing Meeting Information Is this a courtesy copy notification?* Yes No ID# Version Pre -fling Meeting or Request Date 9/13/2021 Attach documentation of Pre -Filing Meeting Request here: Click the upload button or drag and drop files here to attach document DWR Pre -Filing Meeting Request Form.pdf File type must be PDF 1a. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted? Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (N W P) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Regional General Permit (RGP) Number: RGP Numbers (for multiple RGPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 197800056 - Piers, Docks, Boathouses le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?" Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 If. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project?" Yes No 2. Owner Information 2a. Name(s) on recorded deed: Lisa Huffman 2b. Deed book and page no.: 2028 3223 2c. Contact Person: Marathon Builders 50.63KB 401 Water Quality Certification - Express Riparian Buffer Authorization Yes No Yes No 2d.Address Street Address 4616 Palo Verde Or Address Line 2 City Boyton Beach Postal / Zip Code 33436 2e. Telephone Number: (561)436-8062 2g. Email Address:* bsbhuffman@gmail.com 3. Applicant Information (if different from owner) 3a. Name: Marathon Builders 3b. Business Name: Marathon Builders 3c.Address Street Address PO BOX 33 Address Line 2 City Lake Lure Postal / Zip Code 28746 3d. Telephone Number: (828)289-6702 3f. Email Address:* info@marathonbuildersnc.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) N/A 1c. Nearest municipality / town: Town of Lake Lure 2. Project Identification State / Province / Region Florida Country USA 2f. Fax Number: State / Province / Region NC Country USA 3e. Fax Number 2a. Property Identification Number: 2b. Property size: 225831 0.07 2c. Project Address Street Address 386 Charlotte Dr Address Line 2 City State / Province / Region Lake Lure NC Postal / Zip Code Country 28746 USA 3. Surface Waters 3a. Name of the nearest body of water to proposed project: Lake Lure 3b. Water Resources Classification of nearest receiving water:* French Broad River 3c. What river basin(s) is your project located in?* French Broad 3d. Please provide the 12-digit HUC in which the project is located. 030501050303 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The piles under the boat house are failing. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: N/A 4g. List the total estimated linear feet of all existing streams on the property: N/A 4h. Explain the purpose of the proposed project:" We would like to repair reinforce and replace all of the piles and girders on the boat house. We have an engineered inspection and repair form Kim Warner P.E. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * We will be installing temporary bracing under the dock, removing the existing piles digging and pouring footings by hand and then installing new piles and girders. All of the work is hand work and will be very little impact to the lake. We will be perfuming the work the 2nd week in October after the lake has been drawn down. We will complete the project at least 1 month prior the the lake coming back to full pond. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: No wetlands or streams 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? Permitting from the town of Lake Lure D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 4. Open Water Impacts 4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type :114e. Waterbody type 4f. Impact area Lake Lure pile repair P Lake Lure Dock & Pier Lake 0.01 4g. Total temporary open water Impacts: 4g. Total permanent open water impacts: 0.00 0.01 4g. Total open water impacts: 0.01 4h. Comments: Pouring footing for boat house pile repairs E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: repair made during lake draw down 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Hand digging and pouring footings 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: We are just repairing piles on a boathouse on a private lake F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: we are not working in the riparian buffer 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. Once we have made the repair no further action will be needed 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5d. Is another Federal agency involved?* Yes No 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The lake is drawn down during the repairs. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? The lake is drawn down during the repairs. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* private lake bed in which boat houses are allowed 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b. If yes, explain how project meets FEMA requirements: The lake is drawn down during repair 8c. What source(s) did you use to make the floodplain determination?* FEMA Maps Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Gino-HuffmanBH Piers LREV ALL.pdf 22.11KB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Jonathan Hinkle Signature Date 10/14/2021