HomeMy WebLinkAboutNCC204554_NOT Closeout Documents_20211013North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Lenoir Project: NFRC East Facility River basin: Neuse
Person financially responsible: NC Global Transpark - Richard Barkes, Director Project #: LENOI-2021-010
Address: 2780 Jetport Rd, Kinston, NC 28504
1. Project Location: John Mewborne Rd, Kinston
Pictures: No
2. Weather and soil conditions: Cloudy, warm, wet Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one on site Title:
Inspection report: Sent Report Date given/sent: October 14, 2021
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -
inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under
10. Comments:the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee
via a Notice of Termination (NOT). The NOT is available at: https://edocs.deci.nc.goy/Forms/NCGO1-Termination.
Please note that this correspondence must be uploaded as part of completing the NOT process
Reported by: Bradley West Others present:
Date of inspection: October 12, 2021 Time arriving on site: 10:20 AM Time leaving site: 10:40 AM
cc: