Loading...
HomeMy WebLinkAbout20211490 Ver 1_Meeting Request Review_20211004 tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20211490 Version* 1 Regional Office* Winston-Salem Regional Office-(336)776-9800 Reviewer List* Dave Wanucha Pre-Filing Meeting Request submitted 10/4/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Amy Euliss Contact Email Address* aeuliss@ncdot.gov Project Name* Replacement of Bridge no. 155 on SR 2136 Project Owner* NCDOT Division 9 Project County* Rowan Owner Address: Street Address 375 Silas Creek Parkway Address Line 2 City State/Rovince/Region Winston Salem NC Fbstal/Zip Code Country 27127 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express • Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Dave Wanucha Please give a brief project description below and include location information.* We do not believe we need to have a meeting at this time.The project is currently scheduled for Let in October of 2022. If needed, a permit application will be submitted once it is complete. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 10/4/2021 Reviewer Meeting Request Decision ........................................................................................................................................................................................................................................................................................................................................................................................................................................................ Is a meeting required or is there more info needed?* r Yes r No If rmre inforrration is needed,please add comrents for the errail notification below.