HomeMy WebLinkAboutSW6210908_O&M Agreement/Plan_20211012Operation & Maintenance Agreement
Project Name: I Bay Tree Solar, LLC
Project Location: 11700 George Long Road, Harrells, NC 28444
Cover Page
Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location.
Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can
affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s).
The SCM(s) on this project include (check all that apply & co
Infiltration Basin
Quantity:
Infiltration Trench
Quantity:
Bioretention Cell
Quantity:
Wet Pond
Quantity:
Stormwater Wetland
Quantity:
Permeable Pavement
Quantity:
Sand Filter
Quantity:
Rainwater Harvesting
Quantity:
Green Roof
Quantity:
Level Spreader - Filter Strip
Quantity:
Proprietary System
Quantity:
Treatment Swale
Quantity:
DryPond
Quantity:
Disconnected Impervious Surface
Present:
User Defined SCM
Present:
Low Density
Present:
ing O&M sheets
Location
Location
Location
Location
Location
Location
Location
Location
Location
Location
Location
Location
Location
Location
Location
Ty
will be added automatically):
(s):
(s):
(s):
(s):
(s):
(s):
(s):
(s):
(s):
(s):
(s):
(s):
(s):
(s):
(s):
pi : Dis ersed flow onl
1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for
each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to
the system or responsible party.
Responsible Party:
Title & Organization:
Street address:
City, state, zip:
Phone number(s):
Email:
i
/� -
Signature:�2A Date: 9/ q 07
I, iSU+, a Notary Public for the State of pa(� 6W ^0
County of U64 do hereby certify that ,le% �nq(r,W
personally appeared before me this day of Denke ml—( 9 -)'L\ and
acknowledge the due execution of the Oper ions and Maintenance Agr ement .
Witness my hand and official seal,
T
iosolv
�.. G �mfsaioq• 0��.,
�•�� NoTgA? I _
;tn 'OUSLIC
F'•••••••••••' My commission expires �b7h,
Cous
STORM-EZ
Version 1.5 08M Agreement 9/212021
Page 1 of 1
Low Density Maintenance Requirements
Important maintenance procedures:
The drainage area to the vegetated conveyance or vegetated receiving area will be carefully managed to reduce the
sediment load to the vegetated conveyance or vegetated receiving area.
After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated receiving area, fertilizer
will not be applied to the vegetated receiving areas.
The vegetated conveyance or vegetated receiving area will be inspaphautterly Records of operation and maintenance will be kept in a
known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
SCM element:
Potential problem:
How to remediate the problem:
Vegetation
Vegetation is too short or too
Maintain grassed vegetation such that the swale or vegetated area does
long.
erode during the peak flow from the 10-year storm
Trash/debris is present.
Remove the trash/debris.
Areas of bare soil and/or erosiN
Regrade the soil if necessary to remove the gully, and then re -sod (or pl
Vegetated receiving areas
with other appropriate species) and water until established. Provide lime
gullies have formed.
a one-time fertilizer application.
Clogging has occurred.
Clean out the outlet device. Dispose of the sediment off -site.
The outlet device (if
applicable)
The outlet device is damaged
Repair or replace the outlet device.
Erosion or other signs of
damage have occurred at the
Repair the damage and improve the flow dissipation structure.
outlet.
The receiving water
Discharges from the site are
causing erosion or
Contact the local NCDEO Regional Office.
sedimentation in the receiving
water.
not
nt
and