Loading...
HomeMy WebLinkAbout20210451_2019-01251 NWP 3 Tearsheet_20210617 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-01251 County: Caswell U.S.G.S.Quad:NC-Greensboro GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: NCDOT Division 7 Attn:Wright Archer III,PE Address: PO Box 14996 Greensboro,NC 27415 Size(acres) -4 Nearest Town Yanceyville Nearest Waterway Country Line Creek River Basin Roanoke USGS HUC 03010104 Coordinates 36.403330,-79.299200 Location description: The site is located along SR 1780(South Gatewood Road)over Country Line Creek at NCDOT Bridge 117 in Caswell County,North Carolina. Description of projects area and activity: This verification authorizes the discharge of clean fill material associated with removal of an existing bridge(Bridge 117 on SR 1780).The project includes permanent impacts to<0.01 acre(10 linear feet)of stream channel(bank stabilization)and 0.049 acre of riparian non-riverine wetlands(excavation),and temporary impacts to 0.03 acre (33 linear feet)of stream channel and 0.01 acre of riparian non-riverine wetlands(construction access and bridge bent removal).The project would also require hand clearing in an additional 0.02 acre of riparian non-riverine wetlands. Applicable Law(s): N Section 404(Clean Water Act,33 USC 1344) ❑Section 10(Rivers and Harbors Act,33 USC 403) Authorization: Regional General Permit Number and/or Nationwide Permit Number:NWP 3 Maintenance SEE ATTACHED RGP or NWP GENERAL,REGIONAL AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions,your application signed and dated 3/26/2021 and additional information submitted 6/7/2021,and the enclosed plans "Wetland and Surface Water Impacts Permit",Permit Drawing Sheets 1 through 7.Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order,a restoration order,a Class I administrative penalty,and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified,suspended or revoked. If,prior to the expiration date identified below,the nationwide and/or regional general permit authorization is reissued and/or modified,this verification will remain valid until the expiration date identified below,provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit,activities which have commenced(i.e.,are under construction)or are under contract to commence in reliance upon the nationwide and/or regional general permit,will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration,modification or revocation,unless discretionary authority has been exercised on a case-by-case basis to modify,suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources(telephone 919-807-6300)to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act(CAMA),prior to beginning work you must contact the N.C.Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal,State or local approvals/permits. If there are any questions regarding this verification,any of the conditions of the Permit,or the Corps of Engineers regulatory program, please contact David E.Bailey at(919)554-4884 X 30 or David.E.Bailev2(&,,usace.armv.mil. Date:2021.06.17 09:08:26 Corps Regulatory Official: 04'00' Date: 6/17/2021 Expiration Date of Verification: 03/18/2022 SAW-2019-01251 SPECIAL CONDITIONS 1. The U.S. Fish and Wildlife Service's (USFWS's) Programmatic Biological Opinion (PBO) titled, "NCDOT Program Effects on the Northern Long-eared Bat in Divisions 1-8", dated November 6, 2020, contains agreed upon conservation measures for the NLEB. As noted in the PBO, applicability of these conservation measures varies depending on the location of the project. Your authorization under this Department of the Army permit is conditional upon your compliance with all applicable agreed upon conservation measures in the PBO,which are incorporated by reference in this permit. Failure to comply with the applicable these conservation measures would constitute non-compliance with your Department of the Army permit. The USFWS is the appropriate authority to determine compliance with the terms and conditions of its PBO, and with the ESA. 2. The USFWS's Programmatic Biological/Conference Opinion (PBO/PCO) titled "Bridge and Culvert Replacements/Repairs/Rehabilitations in Eastern North Carolina,NCDOT Divisions 1- 8)," dated September 11, 2019, contains mandatory terms and conditions to implement the reasonable and prudent measures that are associated with "incidental take" that are specified in the PBO/PCO. Your authorization under this Corps permit is conditional upon your compliance with all the mandatory terms and conditions associated with incidental take of the PBO/PCO, which terms and conditions are incorporated by reference in this permit. Failure to comply with the terms and conditions associated with incidental take of the PBO/PCO,where a take of the listed species occurs,would constitute an unauthorized take, and it would also constitute non- compliance with your Corps permit. The USFWS is the appropriate authority to determine compliance with the terms and conditions of its PBO/PCO, and with the ESA. 3. For areas authorized for temporary fill in wetlands, temporary fill material must be completely removed and restored to pre-project conditions upon completion of the construction activity. For areas authorized for excavation in wetlands associated with bridge demolition, the affected areas must be restored such that they match the immediately adjacent natural wetland grades upon completion of the construction activity.Within 30 days of the above the above,these wetland areas must be planted with regionally appropriate plant species. Date: 2021 .06.17 09:08:08 -04'00' Corps Regulatory Official: _ Date: 6/17/2021 Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public.To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Copy furnished: Jerry Parker,NCDOT,P.O.Box 14996,Greensboro,NC.27415-4996 Ryan Conchilla,NCDEQ-DWR, 1617 Mail Service Center,Raleigh,NC 27699-1617 i lr is, • O e7reimm ¶argera vxTw�aGmga�eAaNt¶�w NO. .¶ .T M 1616 `,1577 / ,I STATE OF NORTH `�i��®�-/� � �V n�in ALA�JC"n®n�JL `\J JL 1594 RrArs PRO B r NC, RA.PROarm Pedal /11/111 1615 1589• �eme�ia:r .0. DIVISION OF HIGHWAYS 1:4 •1582 Yanceyville 1163 pop.2,213 1592 1522 6 iilleallill • Vann 4 16Z8 CAS WELL COUNTY e 4={ 1780 1610 PERMIT DRAWING 1'613 > Pleasant SHEET 1 OF 7 GLI 1156 17 B P.7.R.130 Grove liftimi LIMITS PROJECT s LOCATION: BRIDGE NO.117 OVER COUNTRY LINE CREEK ON SR 1780 (GATEWOOD ROAD) s 1746 TYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURE REMOVAL Ellillill � • 4 1734 62 1776 V WETLAND AND SURFACE WATER IMPACTS PERMIT L44VICINITY MAP (NOT TO SCALE) O Z ..it:�+ 4 Q. ..._______ V.„., BEG/ PROJECT /7BP7RJ30 QW �� -L- POC Stu.l3+OOA0 , \ END PROJECT /7BP7RJ30 2+25.00 i(/ --______ To -Y- POT Sta�N 165A0 C c.c os /5_ 44/ <E 4S9 a /�/5 �� IX K.p} '\om','', �o (JS Nc 6 &6 '�; GAT "CI-OD 0 NO OUT 5 9 NU 8 �� s6�G i G47- ROp�0 REMOVE BEG/N CONSTRUCT/0 Rao EXISTING E D CO STRUCT/0 -Ll- PC Sta.10+00.00 �--_,_ END OF 7.; BRIDGE —L— POT Sta.20+00.00 '—�\ —� EXISTING ATIN Y o 72 C c 2 5 Lui F K • elmill DOCUMENT NOT CONSIDERED FINAL '� UNLESS ALL SIGNATURES COMPLETED r 1 I Prepared In the Office of Mott MacDonald for 1 ROADWAY DESIGN ENGINEER PLANS PREPARED BY: 0 9 DESIGN DATA PROJECT LENGTH DIVISION 7 �w 7621 Purfoy Road,Suite 115 NORTH CAROL/NA DEPARTMENT OF TRANSPORTATION 'Y' Fuquay-Varina,NC 27526 m vO RTIi (1.. QI ADT 1981 = 100 2018 STANDARD SPECIFICATIONS (919)552-2253 Q ^ qO, = c.MOTT (919)552-2254 (Fax) LENGTH ROADWAY TIP PROJECT 0.175 MILES MACDONALD www.malinaca Amer a iT :y TIM JORDAN, PE N " {7" 9 ADT 2025 = 200 LETTING DATE: PROJECT ENGINEER SIGNATURE LICENSE NO.F-0669 o' �/ zt LENGTH STRUCTURE TIP PROJECT = 0.000 MILES HYDRAULICS ENGINEER 9°, '!�i C o �� �2 V = 35 MPH ELENHI M cRIGGS, PE S ENGINEER o;_ ar�� Qo4 TOTAL LENGTH TIP PROJECT = 0.175 MILES V�i P OF TtiN' SUB REGIONAL TIER o C , NCDOT CONTACT: TIM POWERS, PE O v LOCALDIVISION BRIDGE ) ) l PROGRAM MANAGER / P.E SIGNATURE �•- PROJECT REFERENCE SHEET NO. DETAIL A RIP RAP AT EMBANKMENT Q \-'S\ 17BP.7.R.130-CASWELL 117 4 ININto Scale) ROADWAY DESIGN HYDRAULICS gp• ENGINEER ENGINEER CD Dean I pim, s 0' Z coN�Cam\ oNc MDT. Grade T BASE OF TIME GEOTEXTILE �� /Type of Liner- CL I Rip-Rap \„ \ S\ -L-STA.13+68 TO 14+51 LT / S. MOTT MACDONALD 18 E,LLC MOTs MACDONALD 18 E,LLC LICENSE NO.F0aa9 LICENSE NO.F0aa9 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M MARIA M.PASCHAL a RaAoy rt Sane ns END CONSTRUCTION Moor M Faqua Varino,NC]T56 TOL RIP RAP @ EMBANKMENT -L- POT Sta.20+00.00 AmONAIa w..w.n,enn,ar.<ea✓Terl[a5 SEE DETAIL A KEyIN F.�yAEGERLE S'hyj. EST.45 TONS RIP RAP DAWN C.{�AEGERLE VERTICALT SCALE p HORIZONTALQ SCALE( �I�II�II 2�1+11�1� rya \ EST.85 SY GEOTEXTILE • Q$ PERMIT DRAWING hyy. WOODS -L- PCC Sta.13t/8.99 L� ' -L- PT Sta. I r rClA55 B RIP RAP SHEET 2 OF 7 GLI -L- POT Ski.1Ot0000 BEGIN PROJECT l7BP.7J3J30 I UP To ELEv.4za.T fro.) -L- PC Sto.18+9090 ,,, �\ TEMPORARY CAUSEWAY (STRUCTURE PAY ITEM) -L- POC Sta.13+00.00 SEE DETAIL FOR SECTIONS II li REMOVE , 1 oNc\ 'qi `I I EXISTING 'fie •'\ * *di *i •\\* * * lc/ *GODS "� / Via'/ /'' : BRIDGE 7* \) WOODS �e */ . IILee\ *�0 -L- PC Sta.10+6433 ..•* . '- II.. E� RETAIN'•1,. '� �� ♦��/• �4Y- A UELLiw H 6' 1: i - • . ,si .,ate'A. -AL I,f, E�Epengior. "c0N'Hi �e.-: Ai1 iS���'!ri I i41' •► E n. r• I I $ OUTLET .- r 1 �C� ���� I SR nea SAT RD — — bi:,s,, +1% '.�}►��4• .r .--- a , --r:-7.T7 ii ,EOIROIM:1 TES ,pmalinftrAm11121C1111g 18'BST I ,r'7•- -. ,, ;';` '; �d nnnM .!tic: .. .. .. .. .. .. .. .. \\ 1�1 TES ES 1 {'. L*1`- *LB * *r NLe \ sl.Tl D -L- PCC Sta.12t783/ �\ EXCAVATION — 1 * * * * ---Wts— TES . . TES 1 G,d ��, l \1 e, EXCAVATION r 1 V / � \ 7A ' F LIMITS q * i * * / ' WOODS \ . VIDA J.WILKES E ` 0 /* !', Q WOODS L J , -. \ E.JOHNSTON � % ` A 1 WOODS j \_ i 2 LEGEND SEE ENLARGED AREA NORTH CAROLINA WILDLIFE ////A DENOTES TEMPORARY -L- PT Sta.13+88.801 �\ ON SHEET 4A i FILL IN WETLAND Y/✓//// DENOTE WEXLAVATION 100 0 PLAN VIEW I[[y�t/T1y/ Y�//� IMPACTS O IN E SL RFACE WATER SITEDENOTES (/jam////j M ACCTS INPERMANENT 5 RFACE WATER 50 100 SCALE: 1 100' HORIZ. 4 DE HANDNOTES CLEARING 11 -L- (III 460 "" 460 —V7ST BRIDGE¢hTA.F5+1d 7-L (III 1 yclglfOKz`6n Pd JBTE OF''x GIRDERS • S - % iS_ -eI r".- 1111 1 3 1 1 s 440 BRIDGE HYDRAULIC DATA i Vim= 440 EXISTING DESIGN DISCHARGE = 8700 CFS J BItIUUE (III 6 — DESIGN FREQUENCY = 25 _ YRS 430 DESIGN HW ELEVATION = 4253 FT ...t•'• ' 1 r w:.il. "" 430 E BASE DISCHARGE = 12000 CFS Z "" BASE FREQUENCY = 100 _ YRS ���' �;+2:: 1111 .5 BASE NW ELEVATION = 427.4 FT excP.oATION `47q �:::I•:.; _ __ 1111 " OVERTOPPING DISCHARGE= 6/00 CFS 111111111111111111111111111 "''I"'!!hill 11111 111111111 - - T ` —g 420 I OVERTOPPING FREQUENCY= 500+ _'RS TI.t i • •-? ����� iiii 420 OVERTOPPING ELEVATION = 423.0 FT 'bt1. BXCAVAT• (III LIW" M1S ��� S•PE d:l 410 I DATE OF SURVEY = 4-4-19 1 V 410 ft g IWS.ELEVATION 4/2.8 FT IEL `,✓ " reMPSRAR) ralstwao// 1111 AT DATE OF SURVEY = • mi ' 1 CLASS B RIP RAY 1111 ' I I P-0 EXCAVATED 4223.8' di ""' o� a fRU TURE PAY ITEry1J u uN ;.-.�--. EXCAVATION - TEA1 CY I 11111 r1 390 (STRUCTURE MY ITEMJ� 390 sF:; 11 12 13 14 15 16 17 18 19 20 21 -� . - 2 '' 11 \ \l V'1 \\ / _\\—\ -�i./, - \ \ /�-� `� ��\\. 2 I PROJECT REFERENCE SHEET NO. _ �‘—.._--,=_---____—___._ 11 \\�\\� lip t—��� ti /I > \� S \�� \\\�� - \• \ -� —/� / J I 1 1 1 \\ \\ \ RIP RAP AT EMBANKMENT ` 7 f ` ^. _-�j� I r \ 1 \\ -�\\\ ` 17BP.7.R.130-CASWELL 117 _\ - 9/ I I \ \ \ - �\=r / ----/ \ \\\-� ROADWAY DESIGN HYDRAULICS _ " • \ \\\\`_ ENGINEER ENGINEER \\ ae� — I\\\/, \ oir<n in:CL 2.0' \\\\ I�` r �za_s/\ \ I / ^ n \ � � ti -= —�,�/ I I \ \\ Grade \\----,. r /- \ C� l \ -/r -- �� \ ��-� ) 1 _.*\._ \ \ \ GEOTEXTILE �`- \�1��\\\\` I \ �1 ^ / \/ /�fy \ \ C�L��M—��r� =J \\ \� r,-------\. ---,..--,-N k \\y \(Il \j \\ �/y / \ 7— `�Y l _ ....-_,-N i ��1 \\\ __ 1 1/ 1\\• _ Type of Liner- CL I Rip-Rap -- \\� \ /_ I \\ \ / /// �y�\ - \ \ �-��� — \ \ _L-STA.13+68 TO 14+51 LT �\\\ �\ \ \\ / — ) / ( . �. �\/ J I \ 1 \ 1 \\ ��\\\\\ \\ \ \ \ .� -/ MOTT MAC nt°I8 E,LLC MOTE M Z'sn LO 18 E'LLC } 1� -`\\�_t\_ \��.�\�.-�I I / \ \\\\\ \\ \���\ \\�\ 1 I1\ \\�1\\�� _ �L /� / /V 1 Q /�� I / / CENSE NO.F0669 CENSE NO.F0669 7- _ ✓- -' \ \\ )� \ \ \1 �� I 11 __ _V _.� ( \( ( �� I / - \ DOCUMENT NOT CONSIDERED FINAL ���/ / \\ I \\'\��\�� \V\/ ,l r\ \\ \ \ \l \ \\ \\\\ III` \ \ ` � // > /' J 1 UNLESS ALL SIGNATURES COMPLETED ' , \t��-- \ \\I I \\\ 11 \\ \ \ / I 1 \lll4 ��— ) �� \ — r > \ \\ \\\ \\\ I Il 1111 �Il\I\\\11\\ I i ( \ I J Prepared m the \\s�((/\_ ,1 • 1L_ _�\\— ,,,� il,\ P 1 \\\\ 141/4-111,11„)))\,11\1,,Y11,6irr /1/- I1 11 _ ; M7a„ReyR d.Selre„5��\V \ MA A 1" /Jirr �� \ " < �� r / I , 7=in'=5'6MOTT 4�.y-yerin\��� 1111 / ���`=\ �p<<�\ ��\��'=_%-=i-I—�f'jj�/yJ I I P ,'f�� /�� � �> � E_Nr� srRucrioN\\\ / �,\l�> �= _ -� —__ _ j ,� / I � / l ) I E � / lO•20�Q�� VERTICAL SCALE HORIZON\�\\\\\ \\\\� ��\ l`l�.' ` ' �+c�.i— ---�J/�/////l/1 I� � r ✓ J KAC. AEGER�E C� 1 1 " 2 2 5 l�1\\\\\\\\ �r — D,—==__=85.r�--> / �� l /„(1 Il(ir,7%l \- \ 1 r ( ER ���� \\\\\ , /1�\\\ SAS l-=' '?�--- — '� ri�.0 J.�l ' _ �l I / / rl�l1 ''i', \ i—vJ -L 0.19 /6.9�� � \_ PERMIT DRAWING I` \ \\\x \�t. 1r••.,,..:.:.0;:—' \\�� / �`— ,, ;,- r / ,// 11 (TO I( ()j 1 - ' l TTCTELIPPAY3ITEMII1 r') - k 1L, : ,i 7,8 ? SHEET 3 OF 7 C7LI A\\\\\\ _. ,A , - fir i / iii 1 ) I I `� \ 1 0)jJ1(11`\\\����\`k\\j,(`I�����_ :. . N4Z. •: ,�_ � !/ jl////4/ ��1 `\1 \-1 ,1 EX r �\ \ 1 � 1 �s \\\I\\ \\\\\ \\III / � y �// \\ \\ \ \\ 1/��—�•-•.,.\ �� °�_ / / / ,. ,BR� P j J,'00D.1 i i�� 4 r WOODS '-\1- `.. `1, \' I lull\ \\III\\\\\\\\\I / ( _ , \ = _ . .//l///l/1/ 11 I(.: )11 I\ 1 '' J/� .\_,,,..,..; —/ — \* _ I __ ) �\ __ \ \\� )\ 11 l )iii 11 1.. 1). 1 IIf . f �� - /,� /��'�, 7::.,,Lr / ( 'y\' S �; , n,,_ �' y c ./-- \ =—\'/= _= I. .E ,. ._ � ,. - ��, �' 'am. �` '' - 11111l111111(/�////(Illll III I�l�— \�\S\ / / �'� ., _ ;mji IlII 11111II\tll—_-\\\\\ ,, _ :,5, _.., �. ,�,.., -. _ --T-- t 1 I II I I 1111\\\���� \ \\\\ - _. _ — _ - 1p�.�-. ,.' ww _. _ , �-a_ - , / _ -—_— r�) ( .II 1 \ \\\\\ /_o� \�, i' .- :�' .,A( `\?1. \' 'Ix' �_ I'io a--' -- —, .. i,.. \ s1i�'T /_ —- —�_ I 1,1//� I) 1111 \\`\�\\\\�`�\\ \\\\\\\\ \^—�� 1/���� \\\� � ..' ///P�� \� 'y,,,,,,. I \�f " i- > L __='. /�-ALB '-.�bs _� �\ \ TEN— �. \�\\ -f �� ��/-\-% (I lI l ( \ \\\ \ \ \ \� .. _ lLTT� \ \ �1,. q IMl SA ON /\ , Le / -IB TES i i-—/' \ 1\ �)1\\\ \\\\ \\ \ \.� , /1 co ; 1 f , ) �c 25,E , -. ,11!�Ds'\- /,-•"- // /' \\\, tl�L�\\\��\ \\\\\\�q, �\�\ \\�� Lv'\�✓ � — c �c//// ,� � 1 J , � �, TIo (7 r i � ` ± �, 2 � •. � \ . - / l> \\\\\ \ \ �\ �\\\�\\\\\ ,\� \\���\\� �\\> /��� . E; � �/� � /\ ;; J j, A ,r V� -��ll �� f (- /i /�;_�,�> l \ \ \ \\ \\\"'\\� \\\\\ \\��\\ rr _ /j [ ! OOD f J ( �\ \ \ A \ /1 ////�-/// /// /?\/�/> 1 \ *\\ \\\\\ \\\�\�\ � \\ \ \\ < ' _\ < \�_ \1' / ._� -3 < \ 1 I 1 \1(i J ( \ '/ ,i/ // / I \\� \\\\ \ Ifs \ �� ` 1 / / I I \\ \\-N\\\�)1 2\\\�0 ����\ ��` t 1 "'OBS f ) ` •.t 1� . ) \ \ l I /( L< 1J �}� / \ LEGEND // i/1 I \ \\\\ \\ �� `\�\\\\\\\\\ ��1� 11$ ' EE EI�1LA GED`AR «" `/ % / 7 ) y < /j/ / \ \\\\\\\\�\\\\� \�\\�\\\\\\\1 I 1 J�c �, I \\I�1 �\ NOR"Fi C,,ROLINA uILDLIFE / \ ` / /2/ (/ \ ///�A DENOTES TEMPORARY /// \ N.\ \\\\\ \ \ \\\ 9ta�3+8 BQ� 1Q\\ \ �\\ ON $ EET �\ / / \ l FILL IN WETLAND l\ I i/ \\ �� \\\\ \�\\\\\\\�\\\\ �))1�t\\��\\\\\\\� �\ �) / • \\J r 1=L�sf. j \> \ 3 ./ .-1 1\. 1 J ( / / j/ ( \ // _�.4 ) / r,7 DENOTES EXCAVATION 10 0 0 \ \\\\\\\\\\\\ \\\11\�\\\ ,\\\\\\\ \\\' I / l/ /I�-- \ \ ✓��/,` / f PLAN VIEW 1 / /\/j`/ ( /j v , / // IN WETLAND \ \\ \\\\\\\\\\\\\\\\\\\\\\\\\ ` 1 ` • \ . ..\ •`\• - < ' PL �d, C 1 1\ / /^----J A M c)c%INE$UORIME WATER 1 cc''\\\ )1\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\1 ) / ;_X� ��> '\ \ y SITE ///ll /ram/ — �1 I I \\ \\ \ ) `- L SIT 8�_ 1 / j' { �/�� DENOTES PERMANENT \ L?' JU 7 / V.//r j IMPACTS IN SURFACE WATER C �1�111111111�1\\\111\ \\\ \\\\\\\\1 \\I lk��\\�Sl � / "'� `�i/\> ) > rJ� 1 -� / ' � � / i/// // -�— �(� 5 0 0 0 I 1 I \ \ / / D ,r` ` 1_' L %, l---r J� \7 ) y/,- / 1 / /r/ —�_�K %�,�% DE COLTES HAND SCALE: I"= 100' HORIZ. j /Illllll(l l(I\l\\�\�, \\\�\\\\\\\\\�\\' 111\I\ll ( ( // %`r / Cl ) �/�t c-' I / /Jrm r 1 / /� l l J7//!fll J I -L- =II I III IlUl —JBST BRI®GE¢hTA.F5+T6 7-L 17111.11 \ 1 7AIr3` 2t xBTE;5,4c GIRn■ A,g e�YitiaEC 'ei El{Fr�.rdl or■■■■i I ' is,- ■ { • - I■I 11111111 440 BRIDGE HYDRAULIC DATA — I.Pedfl,= 440 .'2 CBSTING DESIGN DISCHARGE 8700 CFS II '�`DESIGN FREQUENCY 25 _ YRS 1 1■���...., i 430 DESIGN HW ELEVATION = 425.3 FT ����. a �_ ■�■frw:�il.� ����■� ■�■ 430 I BASE DISCHARGE = 12000 CFS ■— M�Z*R— I_I _ _i I '_' T 1 BASE FREQUENCY = 100 _ YRS ������• BASE HW ELEVATION = 427.4 FT ExcPo,, ,. `�':, �:�oZ! I��11�■1=1 11,•11. �. — p'i. ■ a . ■■■ ■■■■ ■■■■■ ■■■ noun■ ■■■L 420 OVERTOPPING DISCHARGE= 6/00 CFS 11111111 11 11111 4L t. 1111 11111 111111111 -a,. -c�� , , , . 420 ...OVERTOPPING FREQUENCY= 500+ YRS l� 1,:i.• �s.OVERTOPPING ELEVATION = 423.0 FT a 410 DATE OF SURVEY = 4-4-19 AT DATE OF SURVEY = 4/2.8 FT 111111 ■� t`� V r. . MI 410 ■oomm im 1 1 ■�111�� CLASS B RIP RAP 1__I M �_•_I�■_I■=I_IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ' 1 1 V 1.111 N EXCAVATED )3i III ■ I ■i I ii•i 11111111111111111111111111111111111 o EN P-O ELEV.423.8' �� fRJCTURE PAY ITE J Z ■ I ■I I II■I■IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII O V m. ... MI III ,P---A EXCAVATION - 1080 CY r�- 390 (STRUCTURE PlfY ITEMJ� ME= M 390 sFi; 11 12 13 14 15 16 17 18 19 20 21 PROJECT REFERENCE SHEET NO. 17BP.7.R.130-CASWELL 117 4A ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER Z �OMM �J" ZMOTf MACDO N E ALD I E.E,LLC r LICENSE O. 066, DOCUMENT NOT CONSIDERED FINAL O UNLESS ALL SIGNATURES COMPLETED Prepared in the J Office or: M 7631 Pyu-t Ro7,Vu;115 MOTT M F 9cnSrteccnn, 275]6 mACoorvA{D www.mottmaccom MIT G /, I RIP RAP @ EMBANKMENT Ps ETD OFI7 TEMPORARY CAUSEWAYGLI EST. 45 TONS RIP RAP m SEE DETAIL FOR SECTIONS EST. 85 SY GEOTEXTILE�oi i /10 ...... .46, WOODS i (f e°, � REMOVE �' I tco EXISTING / ) WOOD`. m� 1 BRIDGE / / —I— 4. , , jI - / �� . di ci N., , /sr . _ ,.... _ x A.- ..,_ _ _ , ....... i 477 ve., rreo,.....- vir • prAro- _ _ _ .. _1 tm,rroE,IA id( L. 41 .,,/,, dr. A 1 7. 4 1 Nr W.% c''' ____,:_.„7_7_,n_ __ pi . , _c __ , c,_. , -)--) ,,n, T .- _ if _ - _ _ .W7S' y -c �,N' TES/ '� - _ -`I*— WLB— — - EXCAVATION , �,, - -LIMITS ` WLB— — E / 1 ! 4 EXCAVATION1 1 0 r---.., , 02_, 1 F II% LIMITS L I I WOODS a v T I LEGEND p:c. o ENLARGED / � DENOTES FILLL IN W WETLAND / / IMPACTS IN DENOTES PERMANENT WATER v PLAN VIEW //�/ DENOTESIN WETLAND TION Af/Ay NCET ARINGND o j 0 3- 0 ��� fI/c//ix DENOTES TEMPORARY 0 a � IMPACTS IN SURFACE WATER ov 15 30 N 1 sic SCALE: III= 30' HORIZ. PROJECT REFERENCE SHEET NO. 17BP.7.R.130—CASWELL 117 4A ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER V\j7 'V Z MOOT MACDONALD 18 E,LLC MENUNO.F-0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared m the or<e eJ: M )621 y"-ti Raj Suile 116 Mari M Fu .monmac.co C ]526 MACoarvalD wawi.monmac.com 1 1 I I l I r J I �� � PERMIT DRAWING / 0/ / . �( � ( / 1 I 1/2)))1/1 \l i 11� �a�1 T 6RARY CAUYSEW,AY _JI SHEET 5 OF 7 GLI/ �P/ � / EI�NQ I lif, I I T 1 \ \ l ll III - I 1- / / I�,-r1 I l / /� l I ' \ \ lr SEE' DETAIL FO /�ECTIONS- s-rz / ,tis� x/1 P I � // ,. I l I / 1\ 1 ,V Ill/ IIII I \ �� \�\ l 8/ / G Y/T/ / ,G /// / ) 1 i� / ///ll 1 \ \ �/ / / /�j / / /m / / / // /// / //P / I I ) I ! II I I IIII N / r i / /W� D'S/ /� / l // lll; ,� Ill / // ,, 11 � I W \� I �11111 —� N \ \ \����� / /�j ft� / / ll l / / /I � I11 III / y \ \ I I /1i \ ���/ / / / l/ 1/ / I/ 0/l l / / / i �,\ I \ i \ / WOOD/ / / / / l / // 11 Hof ll/// �I /l1 I I I i/// ��\1� I I \ I . EXISTING / \ \ . I� // �`, 7 / / / �/ / / ll mll/(// II II , I I 1I \ \\ f BRI ��/ / // // / l // l' llllI I / I� 're ll) / 1 I 2 II8,i s 1 � \ S//�: ,,,, i � // /// / // ll////jjl/l/ / 1//l/ I 111 //// =/ 1 11II "I� \1 / \ /� ` /� ��`� / / / / /f ;,�1� I11 / /t/ iji T; /1 1 1/ --N _ - -- / - �wui:ri�ainwiiir/S W7U,,. i//� / 1 �, I /1" ., �I I►/ii_i —� ——— ' / �I1�f/td'�'ili_::WAIL: iie l 7~/����L;�11,,~Lh�, l / I I / \\ r 77 '� v — ,434-is, •- ,� v� , ►,�i//// j / / .,� I l /r _ / �`�— r A 10 --_. - - ►v!�ili�i► Div / 4 /*'', 4----__ 1 r . gI �- ►a!1►��r►1►�1I I l ,1� I r Vi I / //.' .�h°° — \ _— \ ;000 ' I.`,I / 41 ii7 • --` \\1111 I * ' ' ----- - \I 460.71 ,, Ai:,\—__.________.„- —_-::: _ __ E —7-- ,, 7- /-4'n..-- --___-- -- ___ --4--,&,,e_i_m- P'44 'el,1, /-)- / - - -\.:;\it,\‘,0\.\\\,s\ \\\ \\\\\A\____________.- \\iilill\\3\, —N\ LL�S1�i j/ i i�� �/I I / �/� I p i I A\ ,`,'t v� I� �l r �— A ��,-' '1�1LB— �V— / / / / i / J I MMIT 1 . I t` \ / _ � � / l / / l /� 5 tk, l / / 111\l o / \ G� / / / �� v 1� N v 1 r l _ / / / / // j -m „ \ , I\/ / I\II\Ij I' / i 1 / EXC AT-I C�N\ \ / m m WI _// / / / / // 7 / CO �, \ / 1 Illlj\I / I I LIMITS- J/ / /�\ ��� A- �, / �v��2I///2l l� lhk \ \ k I� I \I1�j'�+,�, \ �/ \���-- WOODS�J L I --tT -o T O LEGEND o ENLARGED Y ,�/// D Ea?! NO INS TWETLAANDRY / // / M AOCTSS INERSURFACE WATER uNE'l PLAN VIEW //T DEN INE WET ANDTION ���� DENOTES ARINGND 0f 30 0 SITE ]� o I/7/T/ DENOTES TEMPORARY 0 ` ' IMPACTS IN SURFACE WATER U I 15 30 N1g s4� SCALE: III= 30' HORIZ. WETLAND AND SURFACE WATER IMPACTS PERMIT DETAIL OF CAUSEWAY -L- STA. 114+78 TO STA. 15+11 15' -4 r- CLASS I RIP RAP OHW ELEV. TOP ELEV. = 414.0 = 412.0' CLASS II RIP RAP CHANNEL BED SECTION A-A Inc BENT NO. 2 NATURAL GROUND TOB ±7.5' 1. CLASS I RIP RAP --- -- OHW ELEV. 1.0' =412.0' tttttItt!' i___ wt.. h amiLikiLatalir CHANNEL BOTTOM APPROX. ELEV. = 408.0' CLASS II RIP RAP SECTION B-B NCDOT DIVISION OF HIGHWAYS OASWELL COUNTY V FROJEOT:17B1?I,R.13Q 40Vrad I ER BRIDOE NO.117 OVER (`OUNTRY LINE ( REEK ON $R 170 OATEWOOD RED) PERMIT DRAWING NOT TO $tALE SHEET 6 OF 7 0/14%$ 1 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 14+39 TO 16+35 BRIDGE REMOVAL 0.01 0.049 0.02 < 0.01 0.03 10 33 TOTALS*: 0.01 0.049 0.02 < 0.01 0.03 10 33 0 *Rounded totals are sum of actual impacts NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS JANUARY 14, 2021 CASWELL COUNTY 17BP.7.R.130 Revised 2018 Feb SHEET 7 OF 7 Action ID Number: SAW-2019-01251 County: Caswell Permittee: NCDOT Division 7 (Attn: Wright Archer III, PE) Project Name: NCDOT/U5841 /West Friendly Avenue widening and improvements /Greensboro/ Guilford County/transportation Date Verification Issued: 6/17/2021 Project Manager: David E. Bailey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest,North Carolina 27587 or David.E.Bailey2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S.Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date A.Determination of Jurisdiction: 1. ® There are waters,including wetlands,on the above described project area, that may be subject to Section 404 of the Clean Water Act(CWA)(33 USC§ 1344)and/or Section 10 of the Rivers and Harbors Act(RHA)(33 USC§403). The waters,including wetlands,have been delineated,and the delineation has been verified by the Corps to be sufficiently accurate and reliable. Therefore,this preliminary jurisdiction determination may be used in the permit evaluation process,including determining compensatory mitigation. For purposes of computation of impacts,compensatory mitigation requirements,and other resource protection measures,a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process(Reference 33 CFR Part 331). However,you may request an approved JD, which is an appealable action,by contacting the Corps district for further instruction. 2. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403)and Section 404 of the Clean Water Act(CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. 3. ❑ There are waters within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. 4. ❑ A jurisdiction determination was not completed with this request. Therefore,this is not an appealable action. However,you may request an approved JD,which is an appealable action,by contacting the Corps for further instruction. 5. ❑ The aquatic resources within the above described project area have been identified under a previous action. Please reference the approved jurisdictional determination issued . Action ID: SAW- B.Basis For Jurisdictional Determination: See attached Preliminary Jurisdictional Determination Form C.Remarks: D. Attention USDA Program Participants The delineation included herein has been conducted to identify the location and extent of the aquatic resource boundaries and/or the jurisdictional status of aquatic resources for purposes of the Clean Water Act for the particular site identified in this request.This delineation and/or jurisdictional determination may not be valid for the Wetland Conservation Provisions of the Food Security Act of 1985,as amended.If you or your tenant are USDA program participants,or anticipate participation in USDA programs,you should discuss the applicability of a certified wetland determination with the local USDA service center,prior to starting work. E. Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above). If you object to this determination,you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process(NAP)fact sheet and Request for Appeal(RFA)form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Mr.Philip A. Shannin Administrative Appeal Review Officer 60 Forsyth Street SW,Floor M9 Atlanta,Georgia 30303-8803 AND PHILIP.A.SHANNIN@USACE.ARMY.MIL In order for an RFA to be accepted by the Corps,the Corps must determine that it is complete,that it meets the criteria for appeal under 33 CFR part 331.5,and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form,it must be received at the above address by iv/A. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. i! 0. Date:2021.06.17 09:07:12 Corps Regulatory Official: 04'00' David Bailey Date of JD: 6/17/2021 Expiration Date of JD: N/A NOTIFICATION OF ADMINISTRATIVE QUESTFOR APPEALAPPEAL OPTIONS AND PROCESS AND RE Applicant: NCDOT Division 7 File Number: SAW-2019-01251 Date: 6/17/2021 Attached is: See Section below E INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B [ PERMIT DENIAL C L APPROVED JURISDICTIONAL DETERMINATION D II PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit(Standard or LOP)because of certain terms and conditions therein,you may request that the permit be modified accordingly.You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice,or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter,the district engineer will evaluate your objections and may: (a)modify the permit to address all of your concerns,(b)modify the permit to address some of your objections,or(c)not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections,the district engineer will send you a proffered permit for your reconsideration,as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit(Standard or LOP)because of certain terms and conditions therein,you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety,and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD,you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed),by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: ii s 1 If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may I appeal process you may contact: also contact: District Engineer,Wilmington Regulatory Division, MR.PHILIP A. SHANNIN Attn: David E.Bailey ADMINISTRATIVE APPEAL REVIEW OFFICER 69 Darlington Avenue CESAD-PDS-O Wilmington,North Carolina 28403 60 FORSYTH STREET SOUTHWEST,FLOOR M9 ATLANTA,GEORGIA 30303-8803 PHONE: (404)562-5136;FAX(404)562-5138 EMAIL:PHILIP.A.SHANNIN@USACE.ARMY.MIL RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel,and any government I consultants,to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation,and will have the opportunity to participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer,Wilmington Regulatory Division,Attn: David E.Bailey,69 Darlington Avenue,Wilmington,North Carolina 28403 For Permit denials,Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer,Commander,U.S.Army Engineer Division,South Atlantic,Attn: Mr.Phillip Shannin, Administrative Appeal Officer,CESAD-PDO,60 Forsyth Street,Room 10M15,Atlanta,Georgia 30303-8801 Phone: (404)562-5137