Loading...
HomeMy WebLinkAboutHISTORICAL BEFORE 2000DIVISION OF WATER QUALITY FAYETTEVILLE REGIONAL OFFICE SURVEY OF NPDES PERMITTED FACILITIES PLEASE RETURN ON OR BEFORE OCTOBER 15,1999 Pe vnIo K e, (Orr FACILITY ADDRESS: PO 6(4a/co Saari Rya/net) 0, 1^Q1 p�,Y'(', a31 PHONE NUMBER: 910 5kt a.c1$91 FAX: °'IDS 13+5 t999 What method of composite sampling !s your facility currently utilizing? E.VILLE REG. OFFICE a. Cnntiniioius b. Constant time / variable volume c. Variable time / constant volume d. Constant time / constant volume Please be aware that constant time / constant volume composting must meet the criteria outlined in the code. In addition to the above requested information, please describe your quality control / quality assurance techniques that are utilized in sampling. Please include the following: 2. What type of sample container is used: plastic, glass or metal for composite sampling? tha, 3. What procedures are used to clean the composite sample container? RAA,o-) N T f* tea- ruz.e_didt. LatQ a0-0) 4. What cleaning agents are used in the cleaning of the composite sample container? , - (cIoi'oc 6.tutic ) 5. How often is the composite sampler tubing cleaned and / or replaced? SRATc lAa.go o>avvvo eAffe, lobvIk e&eh yarn i� "takltt, d WAAA y airinfulAgm Alpicce.d 1\ trited1 6. What type of sampling device is used for grab sampling? U c ` o I e witk taccof (Auto Tcl . - tb . k (-Q. s 7. Is the grab sampling device kept outside? 8. How is the grab sampling device cleaned? ruc j Lo - ca u) )--k-kk:032A 991 LL ftsed-ek,10,6 bdigis, 9. What cleaning agents are used in the cleaning of the grab sampling device? 10. Please describe the effluent sampling point. b"' ' "�l a,-/-o (ca. cd-411 xAkcft 9)4-4_ 10,1- G(40 • --WAK cce + 10\(-PcQ IO+ %wU . O:c A few other questions related to what type of process control analyses are performed at your facility are also included in this survey: 11. Does your facility analyze the following parameters? Parameters Analyzed How Often Mixed Liquor Suspended Solids 3 (wK_. Food / Mass Ratio t h(1,(j Sludge Age 1 rn D Settleable Solids 11- j aL 12. Does your facility have Inflow (Infiltral (I/1) problems within the sewer system which flows to the wastewater treatment facility? [ 1.]' Yes [ ] No If you answer YES to the above question, would you consider it to be : [ Minor oderate Severe If the I / I problems are moderate or severe, what are the plans or what is being implemented to eliminate this from your system? W A, ' trove, �A & . 0 0 IlQf11.Ad ` o CD rYD1 4(40 `I-ka -�- �1 ..CC (Utp,0- 2 rt0- at A0 'kQ Caw s i cL C�n) &L W,�J2 . 1 _1i.A o toisz rrvCO�UJia) f cu lw.u.} um> ULQ., AFL( 4 Q, Jt a Q 0, - 13. Do you have access to the INTERNET at your facility and if so, what is your facility's INTERNET address? Survey Completed By: �- Dila Date: • MILTON R. HUNT MAYOR McDUFFIE CUMMINGS MANAGER JoANN NEVILLE CLERK April 19, 1999 NCDENR Belinda S. Henson 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Ms. Belinda: Town of Pembroke POST OFFICE BOX 866 PEMBROKE, NORTH CAROLINA 28372 ECEWED APR 2 1999 FAYETTEVILLE REG. OFFICE COUNCILMEN: LARRY BROOKS LARRY McNEILL GREGORY CUMMINGS ALLEN G. DIAL This letter is to follow up our conversation on April 16, 1999 concerning Clarifier 41, at the WWTP. The clarifier was taken out of service due to leak which was discovered. It was leaking directly into the sump pit . The clarifier had to be drained to get to the area. When it was drained, we discovered that part of the interior of the tank needed to be sandblasted and repainted. There was some rust of bolts and plates were missing off the weir. The caulking around the weir notches also needed to be replaced with a more substantial type of material other than bath tub grade. I called a professional paint company to come and give estimates and we also gave them the job to be done. The tank was cleaned last week and today the sandblasting and painting will begin. According to the painters the paint will need to set 6 to 8 days at at temperature of 72 degrees F., or more to be properly set for the type of climate it will be exposed to. If all goes well, the tank should be returned to service the week of the 26th of April, 1999. I will keep you informed of our situation concerning this tank. Sincerely, (a0 Karen T. Dial, WWTP Mgr. MILTON R. HUNT MAYOR McDUFFIE CUMMINGS MANAGER JoANN NEVILLE CLERK May 1, 1999 NCDENR Belinda Henson 225 Green Street Suite 714 Fayetteville, NC 28301-5043 Ms. Henson, e0 C2GIW/2i geridoeic& POST OFFICE BOX 866 PEMBROKE, NORTH CAROLINA 28372 0 3' 1999 B . L:.V? FAYE L E AEG. OFFICE COUNCILMEN: LARRY BROOKS LARRY McNEILL GREGORY CUMMINGS ALLEN DIAL As requested, this letter is to inform you that we have returned clarifier #1, back to service as of 4-30-99. Clarifier was cleaned, sandblasted ,caulked, and repainted. Paint was allowed to dry for seven days as required per specifications. With the exception of VFD drive #3, which also went out this month, we are operating smoothly. The drive is from Square D. and is being handled through CITI, a representative of Charlotte, NC. We will keep you informed of this situation. Sincerely, Karen T. Dial, WWTP, Mgr. PHONE (91 0) 521-9758 • FAX (91 0) 521-0472 • • • • • • • • • November 6, 1998 Harvi. C. Cooper Dear Harvi: Town of Pembroke WWTP P.O. Box 866 Pembroke, NC 28372 Telephone: (910) 521-2989 Fax: (910) 521-2343 NOV 0 9 1998 FAY` d TEVa REG. OFACE: This letter is a written response to the violations cited in the inspection performed June 11, 1998. During the telephone conversation held on November 6, 1998, between Rhonda Hagan Locklear and Harvi C. Cooper it was determined that the BOD calculation on 4/15/98 was correct. The seed correction calculation was determined as an average of 0.8, however the seed was doubled in the effluent dilutions samples, resulting in a seed correction of 1.6. The lab is currently documenting on the bench sheet that the sterile rinse water blanks analyzed at the beginning and the end of the series of Fecal Coliform MF samples is indeed 100m1s. The laboratory has currently launched a project to create a detailed SOP/Quality assurance manual that will include procedures from the 18 Edition of Standard Methods, the EHNR/DEM laboratory certification checklist, and any news letters that address currents changes or additions recommended by EHNR/DEM. incerely, Rhonda Hagan Locklear Laboratory Supervisor I • _ - • )34. \-'• • 1*.