Loading...
HomeMy WebLinkAbout20210553 Ver 1_U-5896_hyd_prm_buf_20210826_20211011; ; ; ; ;;; ; ; ; ;;; ; ; ;;;;; ;;; ;; ;; ; ; ; ; ;;;; ;; ; ; -L- STA. 6+40 BEGIN WW FENCE -L- STA. 7+70BEGIN WW FENCE -Y- STA. 23+45 END WW FENCE -Y- STA. 11+37BEGIN WW FENCE -Y- STA. 11+37 END WW FENCE 18+00 -RPD-GUTTER END EXP.-Y- STA. 24+16.85BEGIN WW FENCE-L- STA. 44+25 END WW FENCE -L- STA. 41+25END WW FENCE 12+00 -RPD- GUTTERBEGIN EXP. Uwharrie Rd Weaver Ave W Fairfield Rd Baker RdW English Rd E Green Dr E Green Dr E Green Dr W Green Dr E Russell Ave W Kivett Dr W Russell Ave S College DrW Green DrBaker RdW Green DrW Market Center Dr W Green DrS College DrW Market Center Dr 1961 1300 1300 1300 1231 1232 1193 1193 1311 1468 1970 3668 1961 1962 1278 1300 1176 1193 4053 1300 1300 610 311 311 BUS 311 BUS 311 BUS 70 29 BUS 85 Ave Finch S College DrSouthernNorfolkW Fairfield Rd E. Fairfield Rd. VICINITY MAP D T V = = = = = = % % MPH ADT ADT % * FUNC CLASS = DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED K 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. 2018 STANDARD SPECIFICATIONS GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 4:44:38 PMR:\Hydraulics\PERMITS_Environmental\Drawings\U-5896_hyd_buf_tsh.dgnscjonesCONTRACT:TIP PROJECT:ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NAPROJECT BEGIN PROJECT -L- MI MI MI PLANS PREPARED FOR THE NCDOT BY: PO Box 700 Fuquay-Varina, NC 27526 (919) 552-2253 (919) 552-2254 (Fax) www.mottmac.com/americas LICENSE NO. F-0669 GUILFORD COUNTY 60 2040 SIGNALS TYPE OF WORK: GRADING, PAVING, DRAINAGE, STRUCTURE, U-5896 U-5896END TO THOMASVILLE TO GREENSBOROTO HIGH POINTI-85 BUSINESS, US 29, US 70 -Y--RPA--RPB- -RPC- -RPD- RICHLAND CREEK 4 TO ARCHDALE5 6 7-Y- POC Sta. 25+80.00 END CONSTRUCTION -L- POC Sta. 44+25.00 END TIP PROJECT U-5896-L- POT Sta. 6+40.00 BEGIN TIP PROJECT U-5896 -Y- POC Sta. 10+50.00 BEGIN CONSTRUCTION TOTAL LENGTH TIP PROJECTS U-5896 & B-5353 LENGTH OF STRUCTURE TIP PROJECT B-5353 LENGTH OF ROADWAY TIP PROJECT U-5896 = 0.034 = 0.717 = 0.683 MAY 31, 2019 NAD 83/2011PROPOSED SIGNAL 50 100 10050 10 20 2020 38,070 42,700 10 9 60 * TTST =4%DUAL =5% FREEWAY STATEWIDE TIER PROJECT ENGINEER PROJECT DESIGN ENGINEER NCDOT CONTACT DIVISION 1 JORDAN WOODARD, PE TIM JORDAN, PE BRYAN C. KEY, PE 44674.1.2 NHP-0029(068)PE(U-5896) CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD _. THIS IS A CONTROLLED-ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES.25% PLANSSee Sheet 1B For Conventional Symbols See Sheet 1A For Index of Sheets, TERRACEGREENVIEW BUS. 311S MAIN ST/THIS PROJECT IS WITHIN HIGH POINT MUNICIPAL BOUNDARIES. -Y1- AUGUST 18, 2020 -L- POC Sta. 22+47+/- BEGIN TIP PROJECT B-5353 -L- POT Sta. 24+78+/- END TIP PROJECT B-5353 (SR 1009 & US 311 BUSINESS), NEAR HIGH POINT LOCATION: INTERCHANGE AT US 29, US 70 AND S MAIN STREET BUFFER IMPACTS PERMIT SHEET 1 OF 5 BUFFER DRAWING SITE 1A SITE 1B SITE 1C SITE 1D SITE 2 SITE 3 SITE 4 Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 20.00'REF. PB 34 PG 16 20' UTILITIES EASEMENT EXISTING R/W EXISTING R/W TO THOMASVILLE 24" RCP 18" RCPL SHAPED HW US 29S-70W/I-85S BUS 34' BST US 29N-70E/I-85N BUS 33' BST260.00'EXISTING R/W EXISTING R/W NORTH CAROLINA, LLC WINDSOR INVESTMENTS OF DI OF HIGH POINT, INC SOUTHWEST RENEWAL FOUNDATION EMPIRE BUILDING, LLC ;; ; ; ;;; 3 1 2 RETAIN RETAIN 2GI 2GI15" RCP-IV SEE DETAIL 20 PSH 15"15" RCP-IV SEE DETAIL 1 LATERAL 'V' DITCHEST. 410 CY DDE EST. 275 SY GEOTEXTILE EST. 105 TONS RIP RAP SEE DETAIL 2 BERM BASE DITCH 2GI JB w/MH PO Box 700 Fuquay-Varina, NC 27526 www.mottmac.com/americas SEE SHEET NO. 5MATCHLINE -L- STA 10+50.00HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 4 U-5896 1:46:52 PMR:\Hydraulics\PERMITS_Environmental\Drawings\U-5896_hyd_prm_buf_psh04.dgneberger8/17/99FOR -L- PROFILE SEE SHEET 8 MITIGABLE IMPACTS ZONE 1 MITIGABLE IMPACTS ZONE 2 SITE 1A SHEET 2 OF 5 BUFFER DRAWING Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 -L- POT Sta. 1+74.81 5+00-L- Sta. 6+40.00 BEGIN OVERLAY & WIDENING RT 10+00-L- 8:1 -L- Sta. 6+40.00 BEGIN TIP U-5896 -L- Sta. 7+70.00 BEGIN OVERLAY & WIDENING LT 8:1 -L- Sta. 10+00.00 BEG. RET. WALL 1 10' PSEXISTEXISTF F F C C F FNAD 83 / NA 2011 SS18" R C P36" RCP3 6 " RCP18" RCP 15" RCPS T 3-15" RCP T 30" RCP S 15" RCP36" RCP24" RCP 24" RCP 18" RCP S12" RCP 12" R C P 15 " RCP15" RCP 15" RCP 24" RCP24" RCP30" RCP30" RCP18" RCP15" RCP30" RCP18" RCP 4.5' CONC HW 18" DI 8" V C 8" DI 8" V C 18" DI16" DI18" DI8" DI30" RCP 30" RCP 8" VC 8" V C 30" RCP24" RCP8" CIS CB S18" RCP8" VC 8" VC BRIDGE #147 SEAT=834.82' SEAT=834.81'15" RCP18" RCP18" RCP S S S S S 18" RCP 30" RCP8" PVC8" VCS 15" RCP CB S 15" RCP15" RCPS S8" DI8" DI 8" VC8" PVC 8" VC8" DI8" DI 6" VC 8" VC 18" RCPEIP EIP EIP EIP S12" RCPDI S 15.00' RICHLAND CREEK RICHLAND CREEK RICHLAND CREEK EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/WREF. PB 49 PG 42 BY NC DEPT. OF TRANSPORTATION RAMP ACCESS CLOSED 7 0. 0 0' EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXIS TI NG R/WEXI STI NG R/W"ARDALE DRIVE" EXISTING R/W EIP EIP EIP 30 .00'REF. PB 146 PG 5630' ACCESS EASEMENTEXISTING R/WEXISTING R/W EXIS TI NG R/W15 .0 0'REF. PB 146 PG 5615' UTILITY EASEMENT15.00'25.00'2 5. 0 0'25.00' 25.00' EIP EIP EIP EIP EIP EIPEXISTING R/W EXI STI NG R/ W EXISTING R/WEXISTING R/WEXISTING R/WEX IST ING R /W 10 " HD PE 12" RCP 15" R C P GROUND PIPE EXPOSED ABOVE CE2 CUL4HW2CUL3CUL1HW1CUL2CE1 CULVERT #1 ONE BARREL NORTH EAST ELEV. CUL1 796064.20 1705604.44 799.21 CUL2 796067.19 1705608.47 799.24 CE1 796065.90 1705606.42 805.25 HW1 796065.56 1705606.50 806.85 CUL3 796160.19 1705533.29 798.21 CUL4 796163.16 1705537.37 798.19 CE2 796161.70 1705535.45 804.22 HW2 796161.79 1705535.31 805.781-5x6 BARREL2SFBUS 8" CONC CURB 8" CONC CURB8" CONC CURB8 " CONCCURB VAR. HT BLK WALL BST LT LT 24" C&G 24" C&G VAR. HT CONC WALL24" C&G24" C&G 1SBLKBUSG 24" RCP16' GR 15" RCP BST & CABLEMTL POST8"VC8" VC8" VCUNKNOWN END 8" VC8" VC 8" VC8" VC8" VC8" VC8" VC8" VC24" VCP30" C&G CONC60" CONC30" C&G6" CURB CONC6" CURB6" C U R B 60"CONCCONC60"CONCBSTCONC20" CONC WALL 1SBLKBUSCONCLTCONC 30" C&G30" C&G30" C&G30" C&G6" CURB6" CURB48"CONCCONCBS T BST60" CHL W/3SBW60" CHL W/3SBW 72" C H L W /3SBW72" CHL W/3SBW72" CHL72" CHL72" CONC72" CONC 72" ALUMINUM 72" ALUMINUM 8" CURB8" CURB8" CURB 8" CURB 72" CHL72" CHLGATEGATE96" CHL60" CHL W/3SBW60" CHL W/3SBW 60" CONC 30" C&G30" C&G30" C&G 30" C&G30" C&G30" C&G 30" C&G CONC 72" VINYL LT LT LT 60" CONC 30" C&G 30" C&G 3 0 " C&G3 0 " C&G24" C&G BSTBST BST BST LT SIGN 8" CURB8" C URB 12" R CP 96" WD 96" WD96" WD 30" C&G 24" C&G24"C &G 24" C&G 24" C&G 60" CONC 96" CONC 1SBKBUS76" CONCCANOPYCOVERED24" C & G24" C & G24" C&G24" C&GBS T CONC CONC24"C&G 24"C&G 6 0" C O N C SI GN24"C&G C ONC CONC CONCW/ L T CONC66" WD24" C&G 30" C &G60" C ONC 66" WD 1S F B K B U S 6 0 " CONC60" CONC SIGN 30" C&G 15" RCP 30" C&GLT CONCLT LT UNIT AIR/VAC CAP VENT W/3SBW72" CHL24" C&G72" CHLLT72" CHL7 2 " CHL6" CURB6" CURBCONC6" CURB8" CURB8" CURB CONCGR 5S E L E C 5S ELEC 5S ELEC 5S ELEC 5S ELEC 72" CHL W/3SBW LT60" CONC60" CONCCONC 60" CONC60" CONC60" CONC60" CONC60" CONC128.00'128.00' 12 8.0 0' 12 8.0 0' 5S ELEC 5S ELECW/3SBW72" CHL CONCW/36" MTL FENCE 48" CONC WALL 72" CHL72" CHL W/3SBW72" CHL 72" CHL UNKNOWN END REF. PB 40 PG 85DUKE ENERGY R/W REF. PB 40 PG 85 DUKE ENERGY R/W REF. PB 40 PG 85 DUKE ENERGY R/W REF. PB 40 PG 85 DUKE ENERGY R/W REF. PB 40 PG 85 DUKE ENERGY R/W EXI STI NG R/WEXISTING R/W 40.00'88.00'EXI STI NG R/WEXISTING R/WEXISTING R/W EXISTING R/W UNKNOWN END EXISTING R/W 15.00'REF. PB 40 PG 8515' SEWER EASEMENT150.00'EXISTING R/W EXISTING R/W EXISTING R/W 147.00'EXISTING R/W 10 0. 0 0' EXISTING R/W EXISTING R/W 44.00'EXISTI NG R/WEXISTING R/WEXISTING R/W60.00' 60.00' EXISTING R/W EXISTING R/W 88.00'EXISTING R/WEXISTING R/W88.00'EXISTING R/WEXISTING R/W EXISTING R/W 260.00'EXISTING R/W EXISTING R/W WW CONC W/LT W/LT W/LT W/LT W/LT W/LT3098.00'EXI STI NG R/WEXI STI NG R/WE XISTIN G R/W20.00'60.00'3 0.0 0 'EX ISTING R /W50.00' EXISTING R/W 15 " RC P T T HH TSWWWEOIEOIEOI EOIEOISE XISTI NG R/WEXISTING R/W 30" C&GRAMP D S W CLOVERLEAF PLACE / RAMP CRAMP A RAMP A RAMP DR AMP B RAMP B GREENVIEW TERRACE 30" C&G30" C&G30" C&G30" C&G30" C&G30" C&G30" C&G 30" C&G22' BST22.5' BST 23' BST 2 0' BST17' BST20. 7' BST21' BST16' BS T 21.5' BST17' BST 21.5' BSTUS 311 (S. MAIN ST) 53' BSTUS 311 (S. MAIN ST) 59.5' BSTUS 311 (S. MAIN ST) 55.8' BSTUS 29-70/I-85 BUS 32' BST US 29-70/I-85 BUS 33' BST US 29-70/I-85 BUS 35' BST US 29-70/I-85 BUS 33.5' BST US 29-70/I-85 BUS 33.5' BST US 29-70/I-85 BUS 36.5' BST MODEL FARM RD BST VAR IES CONC CONC 30" C&G6" CURB6" CURB6" CURB6" CURB6" CURB6" CURB6" CURB6" CURB6" C U R B 6" CURB6" CURB6" CURB6" CURB30" C&G6" CURBC O N C OWNERSHIP UNKNOWN 12" RCP18" RCP S S T 18" RCP18" RCP12"VCP21"VCP30"RCP8" DI30" RCP30"C&GBOLSKENDALL AVE 25' BST TO KENILLWORTH DR TO COLLEGE DRUS 311 (S. MAI N ST) 64' BST7.5'CONC8'CONCCUL12CUL11CUL10HW2CE2CUL9CUL8CUL7CUL1CUL2CUL3HW1CE1CUL4CUL5CUL6EXISTING R/W52.00' EXISTING R/W HHTO DEAD END TS12" CI6" CI6" CI6" CI 6" CI 6" CI 12" CI8" CI 8" CI 8" CI 6" CI 6" CI 2" CI6" CI6" C I12" CI12" CI10" CI 10" CI 10" CI 10" CI10" CI10" CI 10" CI 10" CI 6" CI 6" C I 6" C I 6" CI6" CISIZE UNKNOWN6" CI12" CI12" CI 8" CI12" CI 6" CI 6" CI 8" CI 8 " CI 8" CI 6" STL2" STL 1" STL6" STL6" PL6" PL1" PL 1" PL 6" PL6" PL4" PL 6" PL2" P L 2" PLBM 2 BM 3 OWNERSHIP UNKNOWN 15" RCP 12" RC P48" CHLCONCEXISTING R/W EMPIRE BUILDING, LLC W/FES W/FES EIP MODEL FARM PROPERTIES, LLC ATHENS INVESTMENTS KRISHNA OF HIGH POINT, INC. SCOTTISH BLUE, LLC EIP EIP EIP EIP EIP EIP EIP EIP EIP EIP LT W/LT LT CB MARY K. CLARK B. JOHNSON CHARLES EIP EIP EIP ACOUISITION LLC EPP RW CB CB CB CB SALVATION ARMY260.00'UNKNOWN END SIGN DI SIGN BK SIGN BK EIP LT LT POOL EIP BST LT W/LT BST BST 1SBLKBUS 1SBLKBUS W/LT BST BST BST 2SFBUS BREEZEWAY PIPE GROUND ABOVE EXPOSED REF. PB 146 PG 5620' SEWER EASEMENTLT OTCB DI CB LT JAY MELADI KRUPA INC. LT BST BST BST EIP LT W/LT W/MIRROR MTL POLE SIGN BST BST CLOVERLEAF, LLC CLEMENTS FAMILY BST GR GR GR 20.5' BS TMODE L F AR M R DW/LT MARKER HISTORICAL 12" TC QAMAR ZAMAN HW CONC L LT W/LT EIP CB JB BST UNKNOWN END 30" RCPMANHOLES TRAP GREASE BST 1SFBUSCONC UNKNOWN END JB BROKEN-UP BST LT BST LT LT SIGN POLE FLAG SIGN LT LT LT POLE SERVICE BST BST BST BST BST CONC 72" 6-BOLLARDS BLK WALL VAR. HT WELL MON. EIP LT BST WALL BLK 100" CONC SIGN SHED POOL STUCCO DI LT EIP HIGH POINT LLC MAHADEV OF BST BST BHATTI ANJAM NAHID LT WELL MON. W/LTCONC CANOPY MTL 1SBKBUS BST BST CONC LT W/LT GRAVEL SOIL & CONC SIGN EIP W/LT LT LT SIGN BLK OF TRANSPORTATION NORTH CAROLINA DEPARTMENT LT W/LT CONC CANOPY MTL 1SFBUS CANOPY MTL S POLE SERVICE (PER PLANS)18" RCP JB PLANS PER BST 30' CONC BST CONC LT MARGARET J. HERKE JOHN A. HERKE MARGARET J. HERKE JOHN A. HERKE EIP BST CULVERT 3'x3' BST EIPEIP POLE CAMERA TRAFFIC UNKNOWN END SIGN CONC DI WW CONC TANK HOLDING POSSIBLE OTCB DI OTCB CB SIGN NCDOT O'REILLY AUTOMOTIVE, INC. 1SBKBUS BST BST GR BST BST WELL MON. EIPW/LT 2SBKBUS GATE WELL MON. SAFE TRACK, INC. BK WALL VAR. HT LT PUMP DIESEL FUEL CONC CONC LT CAPS VENT LT CAPS TANK CONC BOLLARDS 1SBKBUS PUMP KEROSENE SIGNGR BST EIP WELL MON. OF HIGH POINT, INC. HOLINESS CHURCH FIRST PENTECOSTAL 24" CMP OUTCROPPING ROCK W/FES POSS. SERVICE END UNKNOWN CONC BST WELL MON. EIP LT VALVES CONC EIP 3-BOLLARDS CAPS VENT ALARM OVERFLOW CAPS TANK CAPS TANK CONC CONC HW CONC L- TANK KEROSENE A/G LT BST BST BST SIGN W/FES GATE BST BST PLACE CLOVERLEAF NW EIP CAPS TANK GROUND PIPE EXPOSED ABOVE REF. PB 40 PG 85 15' SEW ER EA SEM EN T CONC ABAND 1SBKBUS BST 2SFBUS R E F. P B 18 4 P G 9 U TILIT Y E AS E ME N T 2 5' AC C E S S &LT BST UNKNOWN END LT 72" VINYL LT BST BST BST MONUMENT CONCRETE W/FES W/FES CB BST BST BST REF. PB 184 PG 9& UTILITY EASEMENT25' ACCESS CB BST CB DI R C P15"EIP EIP 2-BOLLARDS WW CONC WW CONC OF TRANSPORTATION NORTH CAROLINA DEPARTMENT LT CONC CONC MONUMENT CONCRETE EIP LT BST SIGN DI JB EXPOSED EIP EIP HW CONC 8' BST BST BST LT DI LT LT OF HIGH POINT INC HOLINESS CHURCH FIRST PENTECOSTAL EIP EIP 15" RCP CB CB W/LT BST S BLK WALL VAR. HT BST EIP BRYNDA H. BULLARD MALCOLM F. BULLARD W/LT 1SBKBUS RCP 18" W/LT BLAIR PARK GOLF COURSE CITY OF HIGH POINT CBKENILWORTH DR28' BSTHW U-CONC ABANDONED LT BST CONC MTL RAIL W/ 34" BK WALL VAR HT CB CB RCP18" HW CONC BARRELS3-9x8UNIT AIR/VAC SIGN EIP LT DI RCP18" CB SIGN LT LT WALL IN NAIL W/LT UNKNOWNSIZEU/MTL CANOPY 8 GAS PUMPS 4-ISL'S SIGN BST W/LT CB EIP CONC JB CBRCP 30"RCP30"W/LT RCP 15"US 311 (S. MAIN ST) 61' BSTCB GR SIGN CONC BST CB W/LT BST CANOPYU/MTLPUMPS16 GAS8 - I SL'SRCP 15" BST GR HW CONC 6'W/3SBW72" CHLCONC30"GR GR 1SBLKBUS RCP18" CONC LT DI CB RCP12"C&G30"; ; ; ; ;;; ; ; ; ; ;; ;;; ;; ; ; ; ; ;; EIP US 29-70/I-85 BUS 43.5' BST US 29-70/I-85 BUS 42' BST -L- STA. 10+75 DOUBLE FACE GR TIE TO EXISTING 20+0020+00C B 8:1 8:1 15+0015+00A 25+0020+00D 2 0 + 0 0 15+0015+0018+00 -RPD- GUTTER END EXP. -DR1- PT Sta. 14+16.08 -DR1- PC Sta. 13+12.09 -DR1- PT Sta. 11+22.74 -DR1- PC Sta. 10+85.60 -DR1- 12+00 -RPD- GUTTER BEGIN EXP. 8:1 8:1 -L- STA. 18+75.00 END DOUBLE FACE GR -L- STA. 28+60.00 BEGIN DOUBLE FACE GR 8:1 8:1 SEE SHEET SIGN-2B OVERHEAD SIGN 'C' GR PROTECTION FOR -DR1- POT Sta. 10+80.00 -DR1- POT Sta. 14+25.00 2 22 23 21 4 3 608 609 24 11 607 605 605 604 603 602 601 606 5 5 14 15 13 604 PO Box 700 Fuquay-Varina, NC 27526 www.mottmac.com/americas 8:20:29 AMR:\Hydraulics\PERMITS_Environmental\Drawings\U-5896_hyd_prm_buf_psh05.dgnebergerLOCATION: DESIGNED BY: CHECKED BY: COUNTY:TIP NO.: DATE: PLANS 0 50 50 100 GRAPHIC SCALE REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 5 6/2/99TO PLOT 34"(HALF SIZE)TO PLOT FULL SIZE 62"X34"TO PLOT FULL SIZE 62"X34"TO PLOT 34"(HALF SIZE) GUILFORD SEE SHEET NO. 6MATCHLINE -L- STA 39+00.00SEE SHEET NO. 4MATCHLINE -L- STA 10+50.00SEE SHEET NO. 7MATCHLINE -Y- STA 23+50.00 U-5896 U-5896 S MAIN STREET (SR 1009) INTERCHANGE AT I-85 BUSINESS, US 29, US 70 AND MITIGABLE IMPACTS ZONE 1 MITIGABLE IMPACTS ZONE 2 SITE 1B SITE 1C SITE 1D SITE 2 SITE 3 SHEET 3 OF 5 BUFFER DRAWING Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SITE 1E PILING FOR AERIAL SEWER STABILIZATION RIP RAP BANK CB CB CB FS FS FLOWABLE FILL FILL WITH FS FS SBG +71 BEGIN REMOVE18"24" 2GI 2GI 2GI SYSTEM REMOVE RETAIN 2GI OTCB 2GI 2GI 15" RCP-IV 2GI 2GI 15" RCP-IV 2GI2GI 15" RCP-IV 24"CB 2GI CB 2GI CB 2GI CB CB 18" 2GI 2GI18" RCP- I I I FS 30" CB CB CB BDO 15"CB CB15" RCP-IV CB 15"CB CB CB 2GI 2GI CB SYSTEM REMOVE SYSTEM REMOVE 2GI 2GI 2GI1 5" RCP-III 2GI 15"2GI 2GI-A CB CB DI SPECIAL RETAI NRETAIN RETAINSEE DETAIL 16 SPECIAL CUT DITCH SEE DETAIL 16 SPECIAL CUT DITCH RETAINRETAIN RETAIN RETAINSEE DETAIL 16 SPECIAL CUT DITCH SEE DETAIL 16 SPECIAL CUT DITCH RETAIN2GI 2GI 2GI 2GI 15" 15" RCP-IV 24" RCP-IV 24"15"15"2GI 2GI 2GI 2GIELBOWS 15" W/ BDO 15" R CP-III 2GI 15" W/ELBOWS BDO SYSTEM REMOVE 24" SYSTEM REMOVE SYSTEM REMOVE BDO SYSTEM REMOVE SYSTEM REMOVE BDO 2GI 2GI SYSTEM REMOVE 2GI 2GI-A 2GI-A 2 4" RCP- I VSYSTEM REMOVE REMOVE REMOVE REMOVE 2GI SEE DETAIL 20 PSH 2GI 18" RCP-III 54" RCP-III CB FLOWABLE FILL FILL WITH FS RCP-III18"REMOVE FS48" RCP-IV48" RCP-IV42" RCP-IVRETAIN REMOVE2GI 2GI 15" RCP-IV 2GI-A 15" RCP-IV 15" RCP-IV 15" RCP-I V SYSTEM REMOVE REMOVE DI 15" RCP-IV TRENCHLESS INSTALLATION 48" WELDED STEEL SEE DETAIL 1 LATERAL 'V' DITCH SEE OUTLET DETAIL EST. 205 SY GEOTEXTILE EST. 180 TONS FILL IN CHANNEL CLASS II RIP RAP 36" RCP OF EXIST. REMOVE +/-10' EST. 475 CY DDE EST. 345 SY GEOTEXTILE EST. 195 TONS RIP RAP SEE DETAIL 12 STANDARD BASE DITCH EST. 3260 CY DDE EST. 295 SY GEOTEXTILE EST. 165 TONS RIP RAP SEE DETAIL 12 STANDARD BASE DITCH EST. 7 SY GEOTEXTILE EST. 2 TONS CLASS B RIP RAP EST. 10 SY GEOTEXTILE EST. 3 TONS CLASS B RIP RAP SEE DETAIL 1 LATERAL 'V' DITCH TRENCHLESS INSTALLATION 30" WELDED STEEL EST. 15 CY DDE SEE DETAIL 9 STANDARD 'V' DITCH EST. 10 CY DDE EST. 75 SY GEOTEXTILE EST. 45 TONS RIP RAP SEE DETAIL 19 STANDARD BASE DITCH SEE DETAIL 13 CUT DITCH BACK OF CURB SEE DETAIL 14 CUT BASE DITCH BACK OF CURB EST. 7 SY GEOTEXTILE EST. 2 TONS CLASS B RIP RAP SEE DETAIL 13 CUT DITCH BACK OF CURB INSTALLATION TRENCHLESS STEEL 48" WELDED SEE DETAIL 13 CUT DITCH BACK OF CURB SEE DETAIL 13 CUT DITCH BACK OF CURB INSTALLATION TRENCHLESS 24" WELDED STEEL INSTALLATION TRENCHLESS 24" WELDED STEEL EST. 7 SY GEOTEXTILE EST. 2 TONS CLASS B RIP RAP EST. 720 CY DDE SEE DETAIL 9 STANDARD 'V' DITCH EST. 1160 CY DDE EST. 195 SY GEOTEXTILE EST. 110 TONS RIP RAP SEE DETAIL 12 STANDARD BASE DITCH EST. 7 SY GEOTEXTILE EST. 2 TONS CLASS B RIP RAP TRENCHLESS INSTALLATION 18" WELDED STEEL SEE DETAIL 1 LATERAL 'V' DITCH SEE DETAIL 13 CUT DITCH BACK OF CURB 15"W/ELBOWS18"GTDGTD GTD GTD GTD GTD RETA IN W/ELBOWS 24" 15" RCP-III SYSTEM REMOVE GTD GTD GTD GTD GTD GTD GTD GTD GTD GTD GTD GTD GTD GTD GTD 30" RCP-IV30" RCP-IV42" RCP-IV42" RCP-IV30" RCP-IVW/ELBOWS15"SYSTEM REMOVE SEE DETAIL 13 CUT DITCH BACK OF CURB GTD W/ELBOWS15" FILL FLOWABLE FILL WITH W/ELBOWS 15" W/ELBOWS15"RCP-III 1 8 "W/ELBOWS15" W/ELBOWS 15" +13 END SBG +54 END SBG W/ELBOWS 15" 24" RCP-IV RCP-III 15"W/ELBOWS30" SEE DETAIL 16 SPECIAL CUT DITCH SYSTEM RETAIN SYSTEM RETAIN SYSTEM RETAIN SYSTEM REMOVE SYSTEM REMOVE 2GI 15" RCP-IV HW -L- STA. 10+50 TO 11+50 LT ROCK PLATING -L- STA. 12+60 TO 14+00 LT ROCK PLATING W/ELBOWS 18" W/ELBOWS 15" JB w/MH EST. 30 SY GEOTEXTILE EST. 10 TONS RIP RAP SEE DETAIL 3 TOE PROTECTION EST. 60 CY DDE EST. 140 SY GEOTEXTILE EST. 55 TONS RIP RAP SEE DETAIL 2 BERM BASE DITCH ELBOWS 18" W/ DI DI RCP-IV 24" EST. 10 SY GEOTEXTILE EST. 3 TONS CLASS B RIP RAP EST. 7 SY GEOTEXTILE EST. 2 TONS CLASS B RIP RAP EST. 65 GEOTEXTILE EST. 25 TONS RIP RAP SEE DETAIL 3 TOE PROTECTION 2GI ELBOWS 15" W/ +50 -L- RT END SBG SEE INLET DETAIL EST. 160 SY GEOTEXTILE EST. 100 TONS CLASS I RIP RAP EXISTING 5'x6' RCBC RETAIN & EXTEND SEE DETAIL 1 LATERAL 'V' DITCH EST. 7 SY GEOTEXTILE EST. 2 TONS CLASS B RIP RAP 48" RCP-IVDI 15" 2 4 " DI DI 36" RCP-IV36" RCP-IVRCP-IV 18" 2GI 24" 2GI 2GI 15" RCP-IV 2GI RCP-IV 15"RCP-IV 15"EST. 90 CY DDE EST. 105 SY GEOTEXTILE EST. 35 TONS RIP RAP SEE DETAIL 7 BERM 'V' DITCH EST. 40 CY DDE EST. 70 SY GEOTEXTILE EST. 30 TONS RIP RAP SEE DETAIL 2 BERM BASE DITCH EST. 40 CY DDE SEE DETAIL 8 BERM 'V' DITCH 24" RCP-IVEST. 40 CY DDE SEE DETAIL 8 BERM 'V' DITCH EST. 150 CY DDE EST. 290 SY GEOTEXTILE EST. 95 TONS RIP RAP SEE DETAIL 7 BERM 'V' DITCH EST. 60 CY DDE SEE DETAIL 11 LATERAL 'V' DITCH EST. 20 CY DDE SEE DETAIL 9 STANDARD 'V' DITCH HW SBG +96.5 BEGIN +70 RT BEGIN SBG 15" RCP-IV JBw/MH EST. 25 SY GEOTEXTILE EST. 10 TONS RIP RAP SEE DETAIL 3 TOE PROTECTION EST. 760 CY DDE EST. 120 SY GEOTEXTILE EST. 45 TONS RIP RAP SEE DETAIL 5 STANDARD BASE DITCH EST. 280 CY DDE EST. 135 SY GEOTEXTILE EST. 60 TONS SEE DETAIL 6 STANDARD BASE DITCH EST. 790 CY DDE EST. 160 SY GEOTEXTILE EST. 70 TONS RIP RAP SEE DETAIL 6 STANDARD BASE DITCH EST. 390 CY DDE EST. 145 SY GEOTEXTILE EST. 165 TONS RIP RAP SEE DETAIL 10 LATERAL BASE DITCH EST. 210 CY DDE EST. 120 SY GEOTEXTILE EST. 60 TONS RIP RAP SEE DETAIL 15 LATERAL BASE DITCH EST. 210 CY DDE EST. 205 SY GEOTEXTILE EST. 90 TONS RIP RAP SEE DETAIL 15 LATERAL BASE DITCH EST. 185 SY GEOTEXTILE EST. 70 TONS RIP RAP SEE DETAIL 4 LATERAL BASE DITCH EST. 90 CY DDE SEE DETAIL 9 STANDARD 'V' DITCH EST. 90 CY DDE EST. 250 SY GEOTEXTILE EST. 85 TONS RIP RAP SEE DETAIL 7 BERM 'V' DITCH EST. 90 CY DDE EST. 240 SY GEOTEXTILE EST. 95 TONS RIP RAP SEE DETAIL 2 BERM BASE DITCHSPSPWCWE-RPC- SC Sta. 12+24.00 26.57 OFFSET RT -L- POT Sta. 10+84.23 -RPC- ST Sta. 10+00.00 -L- Sta. 10+75.00 BEGIN GRADE U-5896 -Y- PC Sta. 10+00.00 -RPC- PC Sta. 21+54.12 -RPB- PT Sta. 20+06.74 -RPA- PT Sta. 22+18.75 -Y- Sta. 10+55.00 BEGIN CONSTRUCTION -Y- POC Sta. 13+53.84 -RPB- POT Sta. 21+37.77 -RPB- SC Sta. 12+24.00 15+00-Y- PT Sta. 17+91.23 -RPC- ST Sta. 18+37.10 -RPB- CS Sta. 15+89.72 -RPB- ST Sta. 18+13.72 -RPB- PC Sta. 19+04.78 -RPB- -RPC- -Y1- POT Sta. 10+00.00 -Y1- -L-20+008:1 -L- Sta. 15+50.00 END RET. WALL 1 8:1 -RPC- CS Sta. 16+13.10 -Y- PT Sta. 14+04.65 -RPA- PC Sta. 20+29.79 -RPA- ST Sta. 17+34.69 -RPD- PC Sta. 23+06.69 -Y- PC Sta. 23+21.69 -RPD- PT Sta. 24+95.64 -RPC- PT Sta. 23+80.96 -RPA-25+0030+0035+00-Y- POC Sta. 13+47.74 -RPA- POT Sta. 24+05.40 -Y- POT Sta. 21+39.99 -RPD- POT Sta. 26+15.27 -Y- PC Sta. 16+70.74 -Y- POT Sta. 21+39.99 -RPC- POT Sta. 24+12.66 -Y--Y--RPD- CS Sta. 15+33.76 -RPD- ST Sta. 17+57.76 -RPD- 8:1 -RPA- SC Sta. 12+24.00 -L- PC Sta. 37+51.17 -RPD- SC Sta. 12+24.00 27.38 OFFSET LT -L- POT Sta. 36+81.31 -RPA- ST Sta. 10+00.00 15+00 20+00 -RPA- CS Sta. 15+10.69 26.82 OFFSET LT -L- POT Sta. 12+53.87 -RPB- ST Sta. 10+00.00 BEGIN CONSTRUCTION END CONSTRUCTION SKEW 95.09° -Y- PT Sta. 16+91.33 -L- POT Sta. 23+62.87 C F F C F FF C F C F C C F C F C C CC FF C F C F C C F C C F FC C F F C F C C F C F F C C C F C C F C C C F F F C F F C C C C C C C C C C C C C F F C C C C C F F F C F F F F F F F C C C C C F F C CFF F F C F F F F C FNAD 83 / NA 2011 TO GREENSBORO 24" RCP24" RCPINV=815.93' US 29N-70E/I-85N BUS 34' BST US 29S-70W/I-85S BUS 34' BST US 29N-70E/I-85N BUS 32' BST US 29S-70W/I-85S BUS 33' BST TOP=812.65'260.00'EXISTING R/W EXISTING R/W 10' GR BST 10" CI 10" CI W/FES W/FES DI CONC EIP EIP GATE CITY HOLDINGS ;; ;; ; ; RICHLAND CREEKRICHLAND CRE E KOP EN SP ACE P ER PB 12 1 P G 14 2THE P UBLI C F OR DRAI NAGEWAY ANDAREA DEDI CATED TO THE CI TY OF HI GH POI NT ANDEIP EIP CITY OF HIGH POINTBROKERS I NC. EIP BROKERS INC. GATE CITY HOLDINGS MODEL FARM PROPERTIES, LLC OPEN SPACE PER PB 121 PG 142 THE PUBLIC FOR DRAINAGEWAY AND AREA DEDICATED TO THE CITY OF HIGH POINT AND EIP -L- STA. 44+25 END WW FENCE -DR1- POT Sta. 10+00.00 -L- STA. 41+25 END WW FENCE 23 24 24 SYSTEM RETAIN 2GI-A 2GI-A 30" 30" 30" 0603 06020601 EST. 400 CY DDE EST. 575 SY GEOTEXTILE EST. 320 TONS RIP RAP SEE DETAIL 12 STANDARD BASE DITCH EST. 7 SY GEOTEXTILE EST. 5 TONS RIP RAP SEE DETAIL 18 RIP RAP AT EMBANKMENT EST. 14 SY GEOTEXTILE EST. 5 TONS CLASS B RIP RAP AND INSTALL REMOVE SEPERATED FES EST. 14 SY GEOTEXTILE EST. 5 TONS CLASS B RIP RAP SEE DETAIL 1 LATERAL 'V' DITCH DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PO Box 700 Fuquay-Varina, NC 27526 www.mottmac.com/americas SEE SHEET NO. 5MATCHLINE -L- STA 39+00.00HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 6U-5896 4:45:17 PMR:\Hydraulics\PERMITS_Environmental\Drawings\U-5896_hyd_prm_buf_psh06.dgnscjones8/17/99INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED FOR -L- PROFILE SEE SHEET 8 & 9 MITIGABLE IMPACTS ZONE 1 MITIGABLE IMPACTS ZONE 2 SITE 3 SITE 4 SHEET 4 OF 5 BUFFER DRAWING Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 -L- PT Sta. 47+78.1245+00-L- PC Sta. 42+27.35 -L- Sta. 41+25.00 END OVERLAY & WIDENING LT -L- Sta. 44+25.00 END OVERLAY & WIDENING RT -L- Sta. 44+25 END TIP U-589640+00-L- Sta. 39+50.00 END GRADE U-5896 -L- -L- PT Sta. 39+74.71 27.39 OFFSET RT -L- POC Sta. 39+43.43 -RPD- ST Sta. 10+00.00 CC C C F FF NAD 83 / NA 2011 Site Station StructureNo. (From/To) Size / Type1A 9+02 to 10+78 -L- LT RoadwayX 3445 2166 56111B 11+45 to 12+76 -L- LT RoadwayX 3445 329 37741C 11+32 to 13+47 -RPB- LT RoadwayX 3883 2025 590815+85 to 20+53 -RPB- LT RoadwayX 6439 1574 801310+75 to 11+77 -Y- RT RoadwayX 2488 24881E 12+63 to 14+23 -L- LT Aerial SewerX 3246 621 38672 11+60 to 13+88 -L- RT 48" Welded Steel PipeX 7941 4596 125373 38+20 to 39+63 -L- LT RoadwayX 1437 2875 43124 46+62 to 47+40 -L- LT Standard Base DitchX 1292 901 219310429 4596 15025 23187 10491 33678 0 0NOTES:Revised 2018 Feb SHEET 5 OF 5RIPARIAN BUFFER IMPACTS SUMMARYNC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYSTOTALS*:ROAD CROSSINGBRIDGEPARALLEL IMPACTZONE 1(ft2)ZONE 2(ft2)TYPEGUILFORDU-5896ALLOWABLE MITIGABLE1DBUFFER REPLACEMENTIMPACTS44674.1.28/20/2021ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2)ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2)