Loading...
HomeMy WebLinkAbout20210553 Ver 1_U-5896 Final Permit Drawings_20211011(Version 2.08; Released April 2018)44674.1.2TIP No.:U-5896County(ies):Guilford Page 1 of 2TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesDesign/Future:Year:2040Existing:Year:Aquatic T&E Species?NoComments:NoN/AN/AWetlands within Project Limits?Critical Supply Watershed Supplemental Classification: Forest, grassy median, residentialRichland Creek17-7-(0.5)11.50.72Project DescriptionProposed ProjectCape FearRiver Basin(s): City/Town:13.6Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)Nobckey@ncdot.govAddress:12/11/2019GuilfordHigh PointBryan KeyRaleigh, NC 27610WBS Element:Bridge ReplacementWBS Element:VHB/ Reid Robol, PENCDOT Contact:(919) 707-6263Suite 500Raleigh, NC 27606Contractor / Designer:(919) 829-0328940 Main Campus DrNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:1000 Birch Ridge DrAddress:General Project InformationU-589644674.1.2Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)Project U-5896 involves the reconstruction of an interchange at I-85BUS/US 29/US 70 and S Main Street/BUS 311 near High Point. This project is located in the Randleman Lake watershed and is buffered according to the rules of that watershed. A retaining wall has been used to limit erosion and disturbance to Richland Creek. Existing erosion was noted and rock plating was used to minimize further erosion of the stream banks and to aid in the stability of the proposed retaining wall in areas from 10+50 to 14+00 -L- LT. Typical sections at the start of the -Y- line were adjusted to minimize impacts to Richland Creek. 2:1 side slopes were used where possible to limit permanent fill impacts to jurisdictional features. Erosion Control devices such as preformed scour holes, stilling basins, special stilling basins, silt fence, special sediment control fence, rock inlet sediment traps, pipe inlet sediment traps, and slope drains will be utilized to contain and minimize sedimentation. Additional avoidance and minimization efforts are attached.Randleman LakeBuffer Rules in Effect:38070-L- line: 4x12' lanes, 10' paved median w/ 2' barrier, 18' paved shoulders-Y- line: 4x12' lanes, 10' paved median w/ 2' barrier, 12' paved shouldersWaterbody Information2020NCDWR Stream Index No.:NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Water Supply IV (WS-IV)NCDWR Surface Water Classification for Water Bodyac.-L- line: 4x11-12' lanes w/ grassy median-Y- line: 4x11-12' lanes w/ grassy median42700rrobol@vhb.comProject Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer?N/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative) (Version 2.08; Released April 2018)44674.1.2TIP No.:U-5896County(ies):Guilford Page 2 of 2Sheet No.Station & Coordinates (Road and Non Road Projects)Surface Water Body Riprap TypeDrainage Area(ac)Conveyance Structure-L- 9+25 Rt.-L- 21+00 Rt.Preformed Scour Holes and Energy DissipatorsYes1.8Pipe 157.310.5WBS Element:Class 'B'5(1)Richland Creek(1)Richland Creek4Highway Stormwater ProgramAdditional CommentsNorth Carolina Department of TransportationPSH 0.4V10(fps)Energy Dissipator TypePSHSTORMWATER MANAGEMENT PLANFOR NCDOT PROJECTSBMP Associated w/ Buffer Rules?Pipe0.7Class 'B'Q10(cfs)Pipe/Structure Dimensions(in)3.4 Yes15* Refer to the NCDOT Best Management Practices Toolbox (2014), NCDOT Standards, the Federal Highway Administration (FHWA) Hydraulic Engineering Circular No. 14 (HEC-14), Third Edition, Hydraulic Design of Energy Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria. U‐5896 Avoidance and Minimization Effort Description  SMP General Narrative Attachment  10/28/2020  Due to the proximity of Richland Creek to the existing US-29-70/I-85 BUS, the originally proposed typical for the interchange improvements pushed slope stake lines into Richland Creek and would have created significant relocation and impact to Richland Creek. A retaining wall from -L- STA. 10+00 to STA. 15+50 was designed in order to minimize impacts and prevent relocation of Richland Creek. The location of the proposed retaining wall and the existing conditions of Richland Creek’s bank in this location raised erosion and stability concerns if left as bare soil. It was determined through coordination with multiple disciplines that rock plating should be utilized to stabilize the bank of Richland Creek and to protect the stream bank, retaining wall, and roadway. Stabilizing the existing bank with rock plating should reduce existing bank erosion and sedimentation downstream. The existing 5’x6’ RCBC crossing has a scour hole at the outfall in Richland Creek likely due to the existing crossing being undersized. A supplemental 48” Welded Steel pipe has been proposed to reduce crossing outlet velocities which will help reduce scour of Richland Creek. Class II Rip Rap is proposed in our current design in order to bring the current scour hole up to the natural Richland Creek bed elevation and protect Richland Creek from further scouring. The existing 5’x6’ RCBC is also being retained in order to minimize impacts to the UT to Richland Creek and Richland Creek itself. o It was considered to replace the existing 5’x6’ with an upsized crossing, however due to the existing site conditions and necessary crossing relocation for constructability, it was likely to create additional impacts to JS features and deemed not appropriate. o It was considered to not add the 48” supplemental pipe and maintain the existing RCBC. However, due to anticipated future buildout of the upstream drainage area, the undersized crossing, along with the current and future scour potential downstream, it was determined a supplemental pipe would be beneficial. C: (Jl u .c U) I +­OJ 3 I E L Q_ I u >-, .c I <.O 0 . 8 E Green Dr 1468 1278 6 .1 8 "' VICINITY MAP See Steet IA For Index of Steets, See Steet 1 B For Conventional Symbols ◄TO THOMASVILLE -� BEGIN TIP PROJECT U-5896 -L-POT Sta. 6 + 40.00 ft'A.TB IT.Aft noncr U1EUNCE NO. STATE OF DIVISION NOR TH CAROLIN A OF HIGHWAY§ PERMIT DRAWING SHEET 1 OF 11 .c. U-5896 4 GUILFORD COUNTY LOCATION: INTERCHANGE AT US 29, US 70 AND S MAIN STREET (SR 1009 & US 311 BUSINESS), NEAR HIGH POINT TYPE OF WORK: GRADING, PAVING, DRAINAGE, STRUCTURE, SIGNALS SITE SITE 3 BEGIN CONSTRUCTION -Y-POC Sta. 10+50.00 N JECT B-535324+ 78+/- '-'?,04, 5 BEGIN TIP PROJECT B--5353-L-POC Sta. 22 +47 +I- END CONSTRUCTION -Y-POC Sta. 25 + 80.00 STATS PllOJ,NO. P.A.PllOJ,NO. 44674.1.2 NHP-0029 068 ��6___, EENSBORO► END TIP PROJECT U-5896 -L-POC Sta. 44 + 25.00 WETLAND AND SURFACE WATER IMPACTS PERMIT SIIEBT TOTAL NO. SHUTS 1 PE U-5896 CJ) co Ln I ::, / U) (Jl C: 3 *PROPOSED SIGNAL THIS PROJECT IS WITHIN HIGH POINT MUNICIPAL BOUNDARIES. 0 L D ��!\i.J CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD THIS IS A CONTROLLED-ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. GRAPHIC SCALES � W I � C""'III O 100 � � 11111 1 ::;,��PROFILE (HORIZONTAL) DESIGN DATA ADT 2020 = 38,070 ADT 2040 = 42,700 K 10 % D 60 % T 9 % * V 60 MPH *TTST =4% DUAL =5% FUNC CLASS = PROJECT LENGTH LENGTH OF ROADWAY TIP PROJECT U-5896 LENGTH OF STRUCTURE TIP PROJECT B-5353 TOTAL LENGTH TIP PROJECTS U-5896 & B-5353 0.683 0.034 0.717 Ml Ml Ml PLANS PREP/.RED FOR THE NCDOT BY: 2018 STANDARD SPECIFICATIONS TIM JORDAN. PE PROJECT ENGINEER RIGHT OF WAY DATE: MAY 31. 2019 JORDAN WOODARD, PE PROJECT DESIGN ENGINEER LETTING DATE: FREEWAY AUGUST 18, 2020o...�U) '-,,J O 10 20 ��§ \..J 11111 BRYAN C. KEY, PE HYDRAUUCS ENGINEER SIGNATURE: ROADWAY DESIGN ENGINEER P.E. P.E. I DOCUMENT NOT CONSIDERED FINAL IUNLESS ALL SIGNATURES COMPLETED 9.,::·0 PROFILE ERTIc L STATEWIDE TIER NCDOT coNr11cT vms10N 1 SIGNATURE, n�(JJI..:::=:::::....:::=========:::::.,:::=========�=======================�=================::::::::::::::::::::::::::::::::========::::'.�=========� PERMIT DRAWING SHEET 2 OF 11 DENOTES TE������ WATERIMPACTS IN WOODS r,.1ERLAY & WIDENING LTBEGIN vv 0 -L -Sta. 7 +70.0 -ffi-------� �-,_, BEGIN TIP U-5896 -L-Sta. 6+40.00 ------:i-�==-�- - .--JS ·--� 1s r---OVERLAY & WIDENING RTBEGIN 0 /-L -Sta. 6+40.0 I I I I \ -E SHEET NO . PROJECT REFE�RE�NC�E�N�O'.:._. -+----= ----:: 41= ---u,-,-:-5B96 RW SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGI NEER . NC PC. (C-3705) 6.t.t: ■ VHB Engineerings Drive; Suite 500 �b 940 Ma1�aT:i�rNc 27606 FOR -L-PROFILE SEE SHEET 8 EMPIRE BUILDING, LLC SITE (BA K STABILIZATI JOO'TAPER /C___ --�EXISTING R/W ss-� -----t::e;;--- _ _J!___ - /44.23' FULJ. E -� I 0 0 LO + LO 0 .- 0 �z V, 1- 1 w ...I w I J: V) w z� :J V, J: PERMIT DRAWING SHEET 3 OF 11 DENOTES TEMPORARY IMPACTS IN SURFACE WATER BEGIN Oi/ERLAY & WIDENING LT -L -Sta. 7 +70.00 WINDSOR INVESTMENTS OF NORTH CAROLINA, LLC PROJECT REFERENCE NO. U-5896 RW SHEET NO. ROADWAY DESIGN ENGINEER M SHEET NO. 4 HYDRAULICS ENGINEER MOTT M �u:v:�i�a, NC 27526 MACDONALD www.mottmac.combm11ricas �b VHB Engi�eering NC'. P.C. (C-3705) 940M.a1n(ampusDrive,SuiteSOO Raleigh, NC27606 FOR -L-PROFILE SEE SHEET 8 EMPIRE BUILDING, LLC SITE 1 STABILIZATION) I � + "0 :: cj �z V, t:;_!,w 1I V, w ��� V, I SITE 6 SITE 2 SITE 5 MECH. CLEARING FILL IN WETLAND PERM. SW IMPACTS ----s;i DIJ;f.EIEllfitft/'11 � ����--+BEGIN GR/!DE U-5896 -L -Sta. 10+751JO ® Cl.ASS II RIP RAP tlli \�o �NEL EST. 205 SY GEOID:IILE � SEE ounET DETAIL (BANK WC< -L-STA 50 LT F I E 1 a.ASS 8 RIP RAP ST. 2 TONS EST. 7 SY GEOTEXTILE BEGIN SBG +70 RT CLASS B RIP RAP ESJ: ?o rg.N�OTEXTILE CUL1 CUL2 CE1 HW1 cuu CUL4 CE2 HW2 • RJP RAP BANK �b't�ill.0rEWE 0 SITE 2 PILING NIITR \. SITE 4 ,ef STREAM SA � _/ cu,�JP'ONE BARREL NORTH 796064.20 796067 .19 796065.90 796065.56 796160.19 796163.16 796161.70 796161. 79 EAST SEE 1705604, 1705608, 1705606, 42 1705606.50 1705533,29 1705537.37 1705535,45 1705535. 31 SALVATION ARMY 798.19 804.22 805.78 PERM.SW IMPACTS SITE 3 ( FILL IN WETLAND MECH. CLEARING GEOTEXTILE CY DOE . v::,' ' • . ' - ESl:25 SY © � /"' GI * � 'I- SITE 4 TEMP.SW IMPACTS ' 5TANWtllD BASE DITCH �f. �Wi'Ml RIP RAP EST. 195 SY GEOTEmLE EST. 1160 CY DDE " ,. -'�:+�"""'�"" O'REILLY AUTCNOTIVE. II«:. 6ST Fl§JIF BCI ----- ISBLKBUS O..EIIENTS F AIIL Y CLOVERLEAF, LLC aTY OF IIGII POtn' BLAIR PARK GOLF CO�SE f.:EfMaET1.PifH / ;o.JL 13 I:()�: no 1WM'iT�LE // EST. lS0 CY OOE / �\�FE �l!H / / SEE DETAIL 14 _,, ,,,-p(Jf Sfa.23-f62BT ,..,,. PT ,' / l r«>RTH CAROLIU. DEPARTMENT OF TRANSPORTATION - ---,,,.�-_J;_ C / ----------------------------// -ENCs�----..!----, ·� US 2!1-70/HlS BIJS -4J5'BST ---------- -------=- ,,/ C -----------f': LATERAL BASE DITCH EE DETAIL 4 \ �TE�A'IMt DITCH T. 90 TONS RIP RAI' EST. itlll SY GEOTElmLE EST. 210 CY DDE 2fH(J() ST. 70 TONS RJP RAP EST. 185 SY GEOlEXTlLE INCOMPLE E PLANS 00 NOT tl:!lll POil FYI ACOUltlTION DOCUMl!NT NOT CONSIDl!Rl!D FINAL UNLESS All SIGNATURES COMPLETED �hb VHB E�ileeing NC. P.C. (C-3705) 940 t.1,1, C.mp.o, 0...,., Su.,. SOO Rele�fi.NC27t-06 ATHENS INVEST�TS BBtM 'V' DITCH S E DETAIL 7 EST. 35 TONS RIP W EST. lOS SY GEOTEXTILE EST. 90 CY OOE BERM BASE DITCH SEE DETAIL 2 EST. 30 TONS RIP W EST. 70 SY GEOTEXTILE EST. 40 CY ODE + LATERAL 'V' Dl'fOl .<----------ETAIL 1 _. _. GR Pl!OTECTION FOR -;_ --OVERHE,i,,D SIGN 'C' SEE SHEET SIGN-2B ----====-- US l!!!rr0/1-«J BUS JUJ' BSr + /JS 29-70/HJ5 9./S :JS.SI BS1 STANDARD BASE DITCH SEE DETAIL 19 S pg a,• 56.Y E ND CONsrRJJcr/ON �J:nW�Mf� -DR!-PCfr sta. 14+25/XJEST. 10 CY ODE MODEL FARM PROPERTES,, LLC �-----------! LOCATION: NTERCHANGE AT 1-B5 BUSINESS, US 29, US 70 ANO S MAIN SlREET ISR 1009) TIP NO.:U-S896 COUNlY: GUILFORD REVISIONS SITE 6 CUL1 CUL2 CE1 HW1 cuu CUL4 CE2 HW2 NORTH 796064.20 796067 -19 796065.90 796065.56 PERMIT DRAWING SHEET 5 OF 11 SITE 2 MECH. CLEARING 1705608, 1705606, 42 1705606.50 796160.19 1705533,29 796163.16 1705537.37 796161-70 1705535,45 796161. 79 1705535.31 SALVATION ARMY PERM. SW IMPACTS PERM. SW IMPACTS FILL IN WETLAND SITE 3 MECH. CLEARING 806--- TEMP.SW IMPACTS TEMP.SW IMPACTS r---.....-..-I FfflT PENTECOST AL H0LtESS CI-UDI OF' IIGH POflT NC \ BEGIN CONSTRUCTION-Y-Sta. !0+55.00 \ / � TERAI. IIASE DIT SEE DETAIL 10 EST. 165 TON5 RIP PERM. SW m: 11t � 1l'DE IMPACTS ,..,,r ______ .,,, ------ ) aTY OF IIGII POtn' BLAIR PARK GOLF C0�SE 9, TO S RIP. 290 SY GEOT lSO DDE ; ; V l • ,/' ' -- ', � -- �----- �----- ff�¥:� j;c�LE\Bf� �:A.��B}�-� -�"Q �-, &irrosrt.R 1 · DE ADEPA T � ORTA.TIO -_.-SPECIAL CUT DITC $EE DETAIL 1 I -----------� N0DEL FARM PROPERTES,, LLC PROJECT REFERENCE NO. SHEET NO. U-5896 5 JJW SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLE E PLANS DO NOT tl:!lll POil FYI ACOUltlTION DOCUMl!NT NOT CONSIDl!Rl!D FINAL UNLESS All SIGNATURES COMPLETED ATHENS INVEST�TS GR Pl!OlECTION FOiJ'-.,,-'--� � iiE�?D S�G�2t -� -""-------= �---- \.._ US 2!H'Qfl-«, BUS :mt'BSr I \ \ � -......__ � -�- � -� -\. \ I I I / / S pg a,• 56.Y E ND CONsrRJ.Jcr/ON -DR!-PCfr sta. 14+25/XJ �hb VHB E�ileeing NC. P.C. (C-3705) 940 t.1,1, C.mp.o, o....,._ Su.,. SOO Rele�fi.NC27t-06 C 01 -0 _c .9-s u � 9--g, -'i <.!) CJ' co 'f' / .rn C ;�D/ 0 +' C ID E C � C � CJ) f-- ,;' a: w0.. / .� 5:] 9.-g, "1I 0/ PERMIT DRAWING SHEET 6 OF 11 200/ /50/ /00/ 820 APPROXIMATE LOCATION-----fG F-�E �A.-1 N-� If-< -1\1 H f '-� '--Ill RI A/ =-'\I 118/0 � ->-f-- 800 lh K H 1-.i. Kl-=� --1 C 6 I') r-, IA / .,.... :-r'\ �-� 790 . r IA /I '--,- r I J ri ( � � � �� I\ ,- ) -- K f--T-./ �-' K l t-=�E- '='= " " i' I I /J Ill llf ,-� � \ \ ' ' �-..... ...... r-.. -i----� I I ' ., /.,,,. f-, /1 LJ,_ _,, :--- / / / A \I-) ,_ � I�� 50/ 0 . ,.' " j",. ........ --I"-. ----- "-" ... -� \ ""'Ill._ I \ V \ \. I \ \ A \ � ----·--II.I ·----·-- ----·-- r r r J '\'-.r r \ .J I\ I \1 . V --n, 'v -( j S,1/ - I ' UIJ 50/ /00/ /50/ CL STA 13+15,41 -L -RETAIN & EXTEND EXISTING 1©5'x6' RCBC INLET ONLY GP -815, 98' - SKEW -85, 7 °- � ·--.....�,.___ I', ;--.. r ,_ f--X .., \/ r: r1rI\ / F x� I\ ....... � L / I •' j ,_ _ _( \R I \ � -_ .. J.. ., I \ -' ,,, I I I I i • I - :....: ------- ,_ '-7 " l "' !'II I 'I' I \ \ I/ J -11, ) _ __, I \ I \ \ -I� J __,I J, /,,->--1 \ [C, '-- ' · +.., 11< I I h l r-'\W_ J-+ I-Cl-�5-8 :5-h---83-9� I -- \ \ -1 -· :..._i v._ _, -- � Cl Cl I&:'.' -,-- -__ ,------,_ 1_,_ -1---I ...,. � / v I'-... 1......-- / i----- �- "-- 200/ µ l:i U __J [y l::s� 'Ii I"--.,_ -• ' ) __J h l ') J 'h-1 I lh -< I IH I 11/1 <....,-' 1L C •h n A ,-,!--, ,-C I r, I r ,. w " 1� 'fJ L I IL I II ,f'( IH - X <.... I Ir ( f-f-1 \ L� _,-< J _,Jr-, I)t I- I L_ A [') ') I-< t-r JJ I-' \A / r- :::-"IT =-fl� =-'-'-'-' --- -'- PROJECT REFERENCE NO. SHEET NO. U-5896 RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER M MOTT M �u:v:�i�a, NC 27526 MACDONALD www.mottmac.combm11ricas ... th'.' b VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 Raleigh, NC 27606 r08,5' H J7,8' ��--------------------------------------------------------------------------------------------' R: \H ydr au l \PERMITS _E ronm ental \ Draw1 ngs \ U-58 96_ Hy d _ pLL .d gn 6/23/16 3:05:36 PM R: \H ydr au l 1cs \PERMITS _E nv1 ronm ental \ Draw1 ngs \ U-58 96_ Hy d _ x pLRPB. dgn sc,Jones 1-1 I �� re I I"!' 6/23/16 IE? I$ � -E0 I$ c ,., ',et-tit!, ;ll . "' CD m I.OZ 01(;1 9 xi� lc.>t+IJ.. ffi-tsz 9 7 + I.O �-0<z t; tu lw ...J :r: I v, WW Zw:::::i V) :r: RAWING P���T� OF 11 � ��� ��o ... �.�� CITY OF HIGH POINT ���.c;�tq, � ... ,.,,,.,.,; ���,� � �\, POC sta. ITT ZT.39 OFFSET GATE CITY HOLDINGS WW FENCE ��DSTA. 41+25 GRADE U-5896 Sta. 39+50.00 0 END -L- RM PROPERTIES, LLC MODEL FA MPORARY R DENOTE S TE SURFAC E WATE IMPACTS IN MPACTS IN DENOATCE ES �ATER SURF Y & WIDENING 0VERLA Sta. 4!+25.00 TIP U-5896 �t9 Sta. 44+25 LT �� 'f ��"�-���-EIP �' 8� I � STAN L 12 RD BASE 8� < ��f. � iAIT��Esr�rE m�5�Y DDE END -L- TO GREEN RETAIN SYSTEM LAY & WIDENING OIER Sta. 44+25.00 � RT SITE 7 N 6f 06' 26.5' £ -- BROKERS INC, PROJECT REFERENCE NO. ROADWAY DESIGN ENGINEER M M ;;',,!°;,?,��,, ",,;,,�;;;;, ��ONALD www.mottmac.co �• ■ VHB Engi_neering NDrive; Suite 500 C PC. .(C-3705) �vhb 940 Ma1RaT:;�c 27606 PERMIT DRAWING SHEET 10 OF 11 GATE CITY HOLDINGS END OVERLAY & WIDENING LT -L -Sta.4!+25.00 END WW FENCE -L-STA. 41 +25 END GRADE U-5896 -L -Sta. 39+50.00 -RPO-ST sta. IO+ooJJO-L -POC sta. 39+43.43Z1 .39 OFFSET ITT 0 MODEL FARM PROPERTIES, LLC DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES IMPACTS IN SURFACE WATER END TIP U-5896 -L -Sta. 44+25 CITY OF HIGH POINT SITE 7 CLASS B RIP RAP ST. 5 TONS EST. 14 SY GEOTEXTILE END OIERLAY & WIDENING RT -L -Sta. 44+25.00 {BANK STABILIZATION) RIP RAP AT EMBANKMENT EE DETAIL 18 EST. 5 TONS RIP RAP EST. 7 SY GEOTEXTILE N 6f 06' 26.5' £ PROJECT REFERENCE NO. U-5896 RW SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. 6 HYDRAULICS ENGINEER P,IOTT M �qu!;v���a, NC 27526 MACDONALD www.mottmac.co111'1lmerica, �b VHB Engi�eer_ing NC, P.C (C-3705) 940 Main Campus Drive, Suite 500 Rale1gh,NC27505 FOR -L-PROFILE SEE SHEET 8 & 9 HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural SiteStationStructureFill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To)Size / TypeWetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 10+45 to 11+50 -L- LT Bank Stabilization0.01 0.01 101 1112 12+60 to 14+05 -L- LT Bank Stabilization0.03 0.01 103 732 12+60 to 14+05 -L- LT Scour Hole Stabilization0.02 < 0.01 40 233 10+91 to 11+44 -L- RTToe Protection< 0.01< 0.014 12+73 to 13+18 -L- RT Bank Stabilization< 0.01 < 0.01 40 164 13+13 to 13+23 -L- RTCulvert< 0.01215 13+19 to 14+47 -L- RTRip-rap Ditch0.021496 15+41 to 16+58 -RPB- LT 18" RCP, Roadway Fill 0.030.017 47+23 to 47+40 -L- LT Bank Stabilization< 0.01 < 0.01 4 15TOTALS*:0.030.020.09 0.04 458 238 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET 11OF 11Site 1 and Site 2 impacts are to Richland CreekSite 4 impacts are to feature SASite 5 impacts are to feature SWSite 6 - Total take of wetlandWETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSGUILFORDU-589644674.1.2NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS8/20/2021