Loading...
HomeMy WebLinkAbout20190529 Ver 2_Compliance Evaluation Inspection_20211012Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20190529 NCDOT - East Vineyard Road Improvement Clay NCDOT - East Vineyard Road Improvement NC DOT Division 14 - Sylva 10/11/2021 Routine Site Inspection (DOT) Version: 2 Status:Issued Project Type:Road maintenance/repair/improveme ntsRegion:Asheville Longitude:-83° 39' 28''+35° 12' 22'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on October 11, 2021. Jamie Mintz was present during the inspection. The following are items that need attention: - ~ Station L 43+00 LT - Stabilize exposed soils between JS and silt fence. - ~ Station L 32+00 LT - Remove soil above JS. Site is compliant with the 401 Water Quality Certification. NPDES records were up to date. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190529 10/11/2021 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2