Loading...
HomeMy WebLinkAboutNCC202266_NOT Closeout Documents_20211012Sedimentation/Construction Stormwat•Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Cabarrus Project: Hendrick Commercial Truck Center River basin: Yadkin-PeeDee Person financially responsible: HSREI, LLC -A. Scott Ennis, SVP, CFO Project #: CABAR-2020-072 Address: 6000 Monroe Road, 4400 Papa Joe Hendrick Boulevard, Charlotte, NC 28262 1. Project Location: Papa Joe Hendrick Boulevard, Concord Pictures: No 2. Weather and soil conditions: Sunny, Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one on site Title: Inspection report: Sent Report Date given/sent: September 03, 2021 9. Corrective action needed: 10. Comments: Site is active with construction of the building. This project overlaps CABAR-2021-053 and CABAR-2020-020. This permit is going to be closed out because permit CABAR-2021-053. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedocs.deq.ne.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kenny Llywelyn Others present: Date of inspection: September 02, 2021 Time arriving on site: 12:30 PM Time leaving site: 1:10 PM cc: