HomeMy WebLinkAboutNC0027103_Facility Update_20090325Town of Pembroke WWTP
Subject: Town of Pembroke WWTP
From: Paul Rawls <Paul.Rawls@ncmail.net>
Date: Wed,.25 Mar 2009 16:43:08 -0400
To: Belinda Henson <Belinda.Henson@ncmail.net>, Chad Turlington <Chad.Turlington@ncmail.net>,
Dale Lopez <Dale.Lopez@ncmail.net>, Danny Strickland <Danny.Strickland@ncmail.net>, Hughie
White <Hughie.White@ncmail.net>, Mike Lawyer <Mike.Lawyer@ncmail.net>, Trent Allen
<Trent.Allen@ncmail.net>, Mark Brantley <Mark.Brantley@ncmail.net>, Ken Averitte
<Ken.Averitte@ncmail.net>
All
Rhonda Locklear with the Town of Pembroke called this morning to report that they
are changing out the control gates for the chlorine contact. The work should only
take a day.'
They are utilizing a pump around system and will let us know if there are problems
or if the project will take longer than anticipated.
COPY TO INSPECTION FILE, Pembroke WWTP.
Paul Rawls
3/25/2009
1 of 1 3/25/2009 4:43 PM