Loading...
HomeMy WebLinkAboutNC0027103_Facility Update_20090325Town of Pembroke WWTP Subject: Town of Pembroke WWTP From: Paul Rawls <Paul.Rawls@ncmail.net> Date: Wed,.25 Mar 2009 16:43:08 -0400 To: Belinda Henson <Belinda.Henson@ncmail.net>, Chad Turlington <Chad.Turlington@ncmail.net>, Dale Lopez <Dale.Lopez@ncmail.net>, Danny Strickland <Danny.Strickland@ncmail.net>, Hughie White <Hughie.White@ncmail.net>, Mike Lawyer <Mike.Lawyer@ncmail.net>, Trent Allen <Trent.Allen@ncmail.net>, Mark Brantley <Mark.Brantley@ncmail.net>, Ken Averitte <Ken.Averitte@ncmail.net> All Rhonda Locklear with the Town of Pembroke called this morning to report that they are changing out the control gates for the chlorine contact. The work should only take a day.' They are utilizing a pump around system and will let us know if there are problems or if the project will take longer than anticipated. COPY TO INSPECTION FILE, Pembroke WWTP. Paul Rawls 3/25/2009 1 of 1 3/25/2009 4:43 PM