Loading...
HomeMy WebLinkAboutNCC201165_NOT Closeout Documents_20211012ROY COOPERDA �AT�a Governor ELIZABETH S. BISER Secretary �M rsY BRIAN WRENN Director NORTH CAROLINA Environmental Quality Dear Sir or Madam: Attached is a copy of the inspection report which was prepared following an on -site inspection of the subject site. This report is intended to provide you with information concerning the status of the site as it relates to compliance with the North Carolina Sedimentation Pollution Control Act of 1973, Please review this report carefully as it may contain corrective actions needed or comments which will assist you in meeting the required performance standards of the Act. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact the named inspector at the address shown on the inspection report if you have any questions. Sincerely, Land Quality Section Mooresville Regional Office North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office] 610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704-663-1699 North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Mecklenburg Project: West Mecklenburg High School Gym Addition River basin: Catawba Person financially responsible: Charlotte Mecklenburg Board of Education -Gary project #: MECKL-2020-043 S Adams, Director of Architecture Address: 3301 Stafford Drive, PO Box 30035, Charlotte, NC 28208 1. Project Location: Tuckaseegee road, Charlotte Pictures: No 2. Weather and soil conditions: Sunny, Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No One Onsite Title: Inspection report: Sent Report Date given/sent: August 31, 7-021 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT) unless permit approval date was prior to April 1st 2019. The NOT is available at: https:Hedocs.deq.ne.gov/Forms/NCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Jeffrey Chandler Others present: Date of inspection: August 24, 2021 Time arriving on site: 4:30 PM Time leaving site: 4:40 PM cc: Yes