Loading...
HomeMy WebLinkAboutSWA000115_Email_20211012 Farkas, Jim J From:Farkas, Jim J Sent:Tuesday, October 12, 2021 11:58 AM To:'stewartpe@aol.com' Cc:'jp@johnsonproperties.com'; 'ewilliamsonpe@gmail.com'; Lawyer, Mike Subject:RE: SWA000115; Tanglewood Good Morning, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete, Stormwater Management Authorization To construct (ATC) Permit Application for the subject project on October 7, 2021. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 - 1062 rules. We are forwarding Authorization To Construct (ATC) Permit No. SWA000115, dated October 12, 2021, for the construction, operation and maintenance of the subject project and the stormwater system. This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee, James W. Johnson III, at the following address (NOTE: An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): James W. Johnson III PO BOX 310 Angier, NC 27501 I will hold onto the hard copy of this project for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made) after which point, it will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact me at jim.farkas@ncdenr.gov. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov 1 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Farkas, Jim J Sent: Thursday, September 16, 2021 3:15 PM To: stewartpe@aol.com Cc: jp@johnsonproperties.com; ewilliamsonpe@gmail.com; Lawyer, Mike <mike.lawyer@ncdenr.gov> Subject: SWA000115; Tanglewood Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Authorization to st Construct (ATC) Permit Application for the subject project on September 1, 2021. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 2 Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. 3