HomeMy WebLinkAbout20031306 Ver 1_Year 6 Monitoring Report_2011090203 -(306 Shepherds Tree Stream and Wetland Restoration EEP Project No. 333 2010 Monitoring Report: Year 6 Construction Completed: 2004 Submission Date: February 2011 y,\ Jordan, Jones and Goulding 309 East Morehead Street, Suite 110 Charlotte, NC 28202 r4'N- l�j Ecgsystem �YA� NCDENR Prepared for: (� `' RECEIVED E® NCDENR -EEP S E P - 2 2011 1652 Mail Service Center Raleigh, NC 27699 NC ECOSYSTEM ENHANCEMENT PROGRAM Prepared by: Jordan, Jones and Goulding 309 East Morehead Street, Suite 110 Charlotte, NC 28202 r4'N- l�j Ecgsystem �YA� NCDENR Table of Contents SECTION I — EXECUTIVE SUMMARY 1 1 Goals and Objectives 1 -1 12 Vegetative Assessment 1 -2 13 Stream Assessment 1 -3 14 Wetland Assessment 1 -3 1 5 Annual Monitoring Summary 1 -4 SECTION 2 — METHODOLOGY 2 1 Methodology 2 -1 SECTION 3 — REFERENCES SECTION 4 — APPENDICES List of Appendices Appendix 1— General Figures and Plan Views 1 1 Project Vicinity Map 12 Current Condition Plan View Appendix 2 — General Project Tables 2 1 Project Mitigation Structure and Objectives 2 2 Project Activity and Reporting History 2 3 Project Contacts 2 4 Project Attribute Table Appendix 3 — Vegetation Assessment Data 3 1 Vegetation Plot Mitigation Success 3 2 Vegetation Monitoring Plot Photos 3 3 Vegetation Plot Summary Data Table 3 4 Vegetation Condition Assessment Shepherds Tree Monitoring Report February 2011 EEP Project No 333 Monitoring Year 6 Page u Table of Contents Appendix 4 — Stream Assessment Data 4 1 Stream Station Photos 4 2 Qualitative Visual Stability Assessment 4 3 Verification of Bankfull Events 4 4 Cross - Section Plots and Raw Data Tables Appendix 5 — Wetland Assessment Data 5 1 Precipitation — Water Level Plots for Gauges 5 2 Wetland Criteria Attainment Shepherds Tree Monitoring Report February 2011 EEP Project No 333 Monitoring Year 6 m-l" SECTION I EXECUTIVE SUMMARY SECTION 1 EXECUTIVE SUMMARY The Shepherds Tree Stream and Wetland Restoration Project (Site) was developed as a North Carolina Department of Transportation (NCDOT) project and is located in Iredell County, southeast of Statesville between Triplett Road (SR 2362) and Knox Farm Road (SR 2363) (Appendix 1 1) The Shepherds Tree main channel and its tributary are a first order stream of Third Creek, located within the Yadkin River watershed (HUC 03040102) The site drams approximately 106 square miles, occupying approximately 160 acres within the 2, 10, and 100 year floodplain of Third Creek The stream and wetland enhancement /restoration was designed by KCI Associates of North Carolina, PA Construction activities were completed in 2004 Monitoring has been conducted annually from 2005 to present Beaver have been plentiful and persistent in making use of the channel since construction As per correspondence with North Carolina Ecosystem Enhancement Program ( NCEEP), a wildlife control contractor was dispatched by NCEEP on 5 separate control efforts to remove the beaver and the associated dams so that the stream could be evaluated under a fluvial state as opposed to one of partial impoundment The intense drought that impacted the area from late 2006 to early 2009 also contributed to the basis for survey delays in that the areas not intermittently impounded by beaver exhibited little to no flow through much of this time period Due to some remnant dam material left by the contractor and the rapid recolonization by beaver after each control effort, impoundment and backwater conditions were observed to varying degrees between 2007 and 2010 The small channel size in combination with the extensive acreage of the Site and the apparent abundant beaver population make this a particularly challenging site to monitor As such, the Site has been under constant (monthly) monitoring by NCEEP's wildlife control contractor for the last year This report serves the sixth year of monitoring for the Site 1.1 Goals and Objectives Historically, the Site was utilized for agricultural activities and improvement projects through the Civilian Conservation Corps, resulting in the re- alignment, ditching and berming of Third Creek Adjacent floodplains and streams were also cleared, dramed, and ditched These activities are thought to have inhibited stream and wetland function within the Site, resulting in a degraded riparian community The main goal of the project was to re- establish an integrated wetland- stream complex that likely existed on the Site before its historic disturbance This wetland- stream complex was proposed to restore ecosystem processes, stricture, and composition to mitigate for wetland functions and values that have been lost as a result of human induced disturbances in the Yadkin River Basin The proposed mitigation plan included stream, wetland, and riparian restoration components Shepherds Tree Monitoring Report February 2011 EEP Project No 333 Monitoring Year 6 Page 1 -2 Executive Summary The project consisted of restoring approximately 10,704 linear feet of stream, 91 acres of forested wetland, and 5 acres of emergent wetland The stream restoration component consisted of restoring approximately 9,904 linear feet of perennial stream and 800 linear feet of intermittent stream A sinuous, stable pattern, with riffle -pool bed features was constructed In- stream structures were installed to provide bank stabilization, habitat, and maintain grade control Wetland restoration consisted of plugging and filling agricultural ditches and planting native vegetation Riparian areas were planted with native bare root seedlings and herbaceous cover to enhance the riparian areas, improve habitat, and stabilize streambanks Appendix 2 provides detailed project activity, history, contact information, and watershed/site background information for this project 1.2 Vegetative Assessment The 2010 (year 6) vegetative assessment and vegetative plot analysis was conducted in September 2010 Vegetation assessments were conducted following the NCEEP 2004 Stem Counting Protocol, which consists of counting woody stems within the established vegetation plots Approximately 91 acres were planted with various native hardwood tree and shrub species for the Site Previous monitoring reports indicated that ten 50 ft by 50 ft (0 057 acres) monitoring plots were established by NCDOT for this project During the 2006 monitoring year, fourteen vegetative plots were identified and monitored, which is different than the ten originally reported to have been established The following success goals for vegetation were established for the Site ■ 320 stems per acre years 1 through 3 ■ 290 stems per acre year 4 ■ 260 stems per acre year 5 The 2010 vegetation monitoring results indicated that the Site is meeting vegetative success criteria Although, not all the plots meet the success criteria individually (Plots 2, 5, and 10), the average site density is approximately 436 planted stems per acre, which exceeds the year 5 goal of 260 planted stems per acre There is an average of 42 live planted stems per plot A review of the natural recruits monitored indicated an increase in the average site density to approximately 1,321 stems per acre with an average of 99 recruitment stems per plot The total number of native woody species per plot ranged from 8 -15, indicating good diversity as well Plots 2, 5, and 10 also meet the success criteria with the addition of natural recruits, 289, 232, and 232 planted stems per acre, respectively Some loss of streambank vegetation was evident in previous monitoring years due to beaver activity, however, the overall growth of the streambank vegetation is good and appears to have improved over the past few years This is most likely due to the resprouting of suspected dead saplings and new volunteer species Throughout the Site and along the easement fencing, Kudzu (Pueraria lobata) encroachment has remained an issue Near and within vegetation Plot 8, Kudzu has dominated the vegetation along the stream channel and is strangling planted woody species During the 2010 monitoring year, NCEEP initiated active exotic invasive vegetation treatments to control the Kudzu An additional follow up treatment will be conducted in 2011 as well Please refer to Appendix 12 Shepherds Tree Monitoring Report February 2011 EEP Project No 333 Monitoring Year 6 Paae 1 -3 Executive Summary for specific information on the areas of concern The Site has met the vegetation success criteria requirements for monitoring year 6 (2010) Although a few of the plots did not meet the vegetation success threshold (Plots 2, 5, and 10), the inclusion of the natural woody recruits to the Plot's woody planted stem density resulted in the Plot being considered successful Please refer to Appendix 3 for detailed information on the 2010 vegetation data results 1.3 Stream Assessment Morphological measurements for the 2010 monitoring year consisted of a cross - section re- survey and a general stability assessment to comply with the scope of monitoring specified in the permit conditions The dimensional measurements were not evaluated in 2007 or 2008 as per consultation with NCEEP due to the aforementioned reasons of partial, periodic impoundment and low flow due to drought In lieu of a complete morphological survey, the main channel and its tributary were visually assessed from the upstream point of the project (approximately 285 if upstream of Triplett Road) to the confluence with Third Creek in 2007 and 2008 In 2009, the cross - sectional surveys were resumed Certain areas have been impacted by beaver activity, resulting in inundated, backwater conditions for extended periods in previous monitoring years This has most likely attributed to the areas of aggradation and in- stream vegetation that have developed within the Site Overall, the present stream dimensions along Shepherds Tree appear to be stable with some areas of minor aggradation The average bankfull width (11 56 ft) of the surveyed cross - sections is higher than the proposed 10 20 ft and the average surveyed mean bankfull depth is 141 ft compared to the proposed 1 85 ft The surveyed bankfull widths and depths lead to an average Width/Depth (W /D) ratio of 9 12, which has increased since the 2006 (6 37) and 2009 (8 85) monitoring years A few of the cross - sections (1, 2, and 7) have illustrated an increase in sediment deposition from the previous monitoring year Other cross - sections that were previously experiencing aggradation, have either scoured out (5 and 8) or have remained the same (6 and 11) Most of these changes can be attributed to the beaver activity and state wide drought conditions that have occurred over the past six monitoring years With control of beaver activity and time to allow for higher flow events, the system should continue to flush out finer, aggraded sediments Four surface gauges are located within the Shepherds Tree project site (three on the main channel and one on the tributary) More than one bankfull or greater event was recorded on the the main channel and its tributary during the 2010 monitoring year Due to an on -going malfunction with surface gauge 2 in 2010, visual assessments, such as wrack lines, were used in lieu of the surface gauge to verify that a bankfull or greater event occurred along the tributary Please refer to Appendix 4 for detailed stream data tables and plots and Appendix 12 for the location of the monitoring features and current conditions for the 2010 monitoring year 1.4 Wetland Assessment Seventeen automated groundwater monitoring gauges and four surface water gauges are located on Site The monitoring gauges are programmed to download water levels daily and were downloaded monthly in order to capture hydrologic data during the growing season The target Shepherds Tree Monitoring Report February 2011 EEP Project No 333 Monitoring Year 6 1 -4 Executive Summary wetland hydrology success criterion is saturation or inundation for at least 8 percent (15 days) of the growing season in the lower landscape (floodplam) locations To achieve the stated hydrologic success criterion, groundwater levels need to be within 12 -mches of the ground surface for 15 consecutive days of the April 14 to October 24 growing season Groundwater monitoring results from the 2010 monitoring year indicated that twelve of the seventeen groundwater gauges (l, 2, 4, 6, 8, 11, 12, 13, 14, 15, 16, and 17) achieved the wetland success criteria of saturation for 15 consecutive days (8 %) during the growing season Gauges 3, 5, 7, 10, and 18 did not meet the wetland success criteria Topographic constraints may be contributing to the lack of wetland hydrological success at these gauges Within the wetland zones, hydrophytic vegetation and hydrology indicators have developed Hydrophytic vegetation consists of a thick herbaceous layer of sedge species (Carex spp ), rush species (Juncus spp ), and bulrush species (Scirpus spp ) Please refer to Appendix 5 for wetland plots and a summary of wetland criteria attainment 1.5 Annual Monitoring Summary Overall, the Site is meeting mitigation goals in the majority of the proposed areas Some zones are exhibiting lower vegetation densities and some gauges are not meeting the hydrologic thresholds The Site will continue to be controlled for beaver activity on a monthly basis and will be monitored again in 2011 to further assess the Site's success and to allow the streams and wetlands to return to a more typical hydrologic flow regime The background information provided in this report is referenced from the NCDOT mitigation plan (prepared by KCI) and the previous monitoring report prepared by Soil and Environmental Consultants Summary mformation/data related to the occurrence of items such as beaver or encroachment and statistics related to performance of various project and monitoring elements can be found in the tables and figures in the report appendices Narrative background and supporting information formerly found in these reports can be found in the mitigation and restoration plan documents available on NCEEP's website All raw data supporting the tables and figures in the appendices is available from NCEEP upon request Shepherds Tree Monitoring Report February 2011 EEP Project No 333 Monitoring Year 6 JJG SECTION 2 METHODOLOGY SECTION 2 METHODOLOGY 2.1 Methodology Methods employed for the Site were a combination of those established by standard regulatory guidance and procedures documents (see below), the Shepherds Tree Mitigation Plan (state project no 6 769001t) submitted by the NCDOT (prepared by KCI) and the Soil and Environmental Consultants monitoring reports Vegetation assessments were conducted following the NCDOT protocol which consists of counting woody stems within the established vegetation plots JJG used the Flora of the Carolinas, Virginia, Georgia, and surrounding areas by Alan S Weakley as the taxonomic standard for vegetation nomenclature for this report Precipitation data for the hydrographs was obtained from an off -site resource in Statesville, NC weather station (the nearest station offering daily precipitation data) through Weather Underground URL (http //www wunderground com/history /auport/KSVH /2008 /1 /1 /Custom History html ?dayend =31 &monthend= l0 &yearend= 2008 &req cit3 = NA &req state= NA &req sta tename= NA &MR =1) Shepherds Tree Monitoring Report February 2011 EEP Project No 333 Monitoring Year 6 iiC� SECTION 3 REFERENCES SECTION 3 REFERENCES Martin, W and Nunnally, N 2001 Air and Water An Introduction to the Atmosphere and the Hydrosphere Kendall/Hunt Publishing Company, Dubuque, Iowa NCDOT 2001 Shepherds Tree Mitigation Plan (state project no 6 769001t) Raleigh, NC Rosgen, D L (1996) Applied River Morphology Wildland Hydrology Books, Pagosa Springs, CO Soil and Environmental Consultants, PA 2006 Shepherds Tree Stream and Wetland Restoration 2005 Annual Monitoring Report (Year 1) Raleigh, NC State Climate Office of North Carolina (SCONC) 2007 Data retrieval from Statesville for 1948 -01 -01 through 2007 -01 -01 NC CRONOS Database, Raleigh, North Carolina USACOE (2003) Stream Mitigation Guidelines USACOE, USEPA, NCWRC, NCDENR- DWQ USACOE (1987) Corps of Engineers Wetlands Delineation Manual Tech report Y -87 -1 AD /A 176 Weakley, A S 2008 Flora of the Carolinas, Virginia, Georgia, Northern Florida, and Surrounding Areas (Draft April 2008) University of North Carolina at Chapel Hill Chapel Hill, NC Shepherds Tree Monitoring Report February 2011 EEP Project No 333 Monitoring Year 6 Appendix 1 - General Figures and Plan Views Appendix 2 - General Project Tables Appendix 3 - Vegetation Assessment Data Appendix 4 - Stream Assessment Data Appendix 5 - Wetland Assessment Data Shepherds Tree Monitoring Report EEP Project No 333 SECTION 4 APPENDICES February 2011 Monitoring Year 6 IN APPENDIX 1 GENERAL FIGURES AND PLAN VIEWS 1.1 Project Vicinity Map 1.2 Current Condition Plan View Shepherds Tree Monitoring Report February 2011 EEP Project No 333 Monitoring Year 6 2360 A 2— BM 7_ k7 4 0 Legend Restoration 0 Conservation Easement Directions to the site: V From Charlotte, NC take 1-77 north to Statesville. Take exit 49A and go east on US 70. Follow US 70 approximately six miles to Triplett Rd., turn 2,000 1,000 11 2,000 Feet right. Travel for 1.5 miles, site is on the left. Appendix 1.1 Project Vicinity Map Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 ,:dj Iredell County, NC !PC Eomvsre—in 11 F.IfflilM011ellt Monitoring Year 6 Submittal Date: February 2010 CORN IN GAUGE 10 � 1 J Q z_ C.7 00 / z GAUGE 2 o J 8 +p0 Q z � 6 s W (Y- Xoo 3 00 ►�kcp Q 5 5 4 SR 2360) 1 CHANNEL CENTERLINE BANKFULL #Q PHOTO POINT CROSS VANE (CV) J —HOOK VANE (JV) STEP POOL (SSP) ROOT WAD RlVEGETATION PLOT 00 GROUNDWATER GAUGE SURFACE GAUGE F-I RAIN GAUGE RVAM9I610U1 11911 VEGETATION INVASIVE SPECIES —KUDZU VEGETATION PLOT — INVASIVE SPECIES 0 GROUNDWATER GAUGE — FAILED NCDOT— SHEP -2 N = 726,169.91 E = 1,472,847.50 ELEV. = 737.21 \ I_Q N x ci e °vN °PRA 10 +00 GAUGE 30 �S \R 2362 GRAPHIC 100 0 50 100 GAUGE 6 QQ o° ON AX k A�j � Cp fL ALE 200 400 ( I FEET ) 1 Y h = 100 ft. 'OSySteIll ; NOTES: 1. GENERAL SITE DATA PROVIDED BY NCEEP. 2. ALL LOCATIONS ARE APPROXIMATE. EEP PROJECT NO. 333 IREDELL COUNTY, NORTH CAROLINA MONITORING YEAR 6 NC ECOSYSTEM ENHANCEMENT PROGRAM SHEPHERDS TREE STREAM & WETLAND RESTORATION DATE DECEMBER 2010 SCALE 1" =100' JOB NO.: JJX31100 APPENDIX 1.2 CURRENT CONDITION PLAN VIEW FIGURE 1 OF 6 o N PSG \GPI 90 �s bl X OQ GAUGE 4 45) 100 Z Z Ln O J + J Z L/ 00,E 11 2 GRAPHIC SCALE 0 50 100 200 CHANNEL CENTERLINE BANKFULL ®GAUGE 5 Q# PHOTO POINT CROSS VANE (CV) J -HOOK VANE (JV) STEP POOL (SSP) ROOT WAD \Rl VEGETATION PLOT ( IN FEET ) 1 inch = 100 ft. 400 so GAACE VG oo 14 ` E 4 2 A o 0 GROUNDWATER GAUGE SURFACE GAUGE D RAIN GAUGE 2010 CURRENT CONDITION IN- STREAM VEGETATION kp0 A- fs s 0 N (0 Q O V) w Ld Z J U W Q W :2 V) INVASIVE SPECIES -KUDZU VEGETATION PLOT - INVASIVE SPECIES _ — © GROUNDWATER GAUGE - FAILED !' Ill IOSySte NOTES: 1. GENERAL SITE DATA PROVIDED BY NCEEP. 2. ALL LOCATIONS ARE APPROXIMATE. EEP PROJECT NO. 333 IREDELL COUNTY, NORTH CAROLINA MONITORING YEAR 6 NC ECOSYSTEM ENHANCEMENT PROGRAM SHEPHERDS TREE STREAM & WETLAND RESTORATION DATE DECEMBER 2010 SCALE 1" =100' JOB NO.: JJX31100 APPENDIX 1.2 i'I) 1 �In�;cl t CURRENT CONDITION PLAN VIEW FIGURE 2 OF 6 f� F CHANNEL CENTERLINE BANKFULL Q# PHOTO POINT CROSS VANE (CV) J -HOOK VANE (JV) STEP POOL (SSP) ROOT WAD 1_#1 VEGETATION PLOT OO GROUNDWATER GAUGE b SURFACE GAUGE F-1 RAIN GAUGE IN- STREAM VEGETATION INVASIVE SPECIES -KUDZU VEGETATION PLOT - INVASIVE SPECIES OO GROUNDWATER GAUGE - FAILED GAUGE 11 / GAUGE 12 to A- do O 14 �� z0 y 1 � � IL �y 0 �2 VO 32 +00 �4. 00 16. 0 7 18 o° 17 OGAUGE 7 J GRAPHIC SCALE 100 0 50 100 200 ( IN FEET ) 1 inch = 100 ft. 400 OSjy��StE'IIl I 1 1',Il tCk2ll ICI It NOTES: 1. GENERAL SITE DATA PROVIDED BY NCEEP. 2. ALL LOCATIONS ARE APPROXIMATE. EEP PROJECT NO. 333 NORTH COUNTY, NORTH CAROLINA MONITORING YEAR 6 09 NC ECOSYSTEM ENHANCEMENT PROGRAM SHEPHERDS TREE STREAM & WETLAND RESTORATION DATE DECEMBER 2010 SCALE 1" =100' JOB NO.: JJX31100 APPENDIX 1.2 1 CURRENT CONDITION PLAN VIEW FIGURE 3 OF 6 v A • a W 0 LL w w 0 Lo 0 �I w z J 2 U H Q CHANNEL CENTERLINE BANKFULL APHOTO POINT CROSS VANE (CV) J -HOOK VANE (JV) STEP POOL (SSP) ROOT WAD I t I VEGETATION PLOT 0 GROUNDWATER GAUGE SURFACE GAUGE RAIN GAUGE 2010 CURRENT CONDITION IN- STREAM VEGETATION INVASIVE SPECIES -KUDZU VEGETATION PLOT - INVASIVE SPECIES GROUNDWATER GAUGE - FAILED 0GAUGE 14 W OGAUGE 10 JVI \I P VL GAUGE 1 1� A 6pk� 2 8X 2-1. -0 9 v-o v oN v GRAPHIC SCALE 0 50 100 zoo 400 ( IN FEET ) 1 inch = 100 ft. O NOTES: 1. GENERAL SITE DATA PROVIDED BY NCEEP. 2. ALL LOCATIONS ARE APPROXIMATE. EEP PROJECT NO. 333 IREDELL COUNTY, NORTH CAROLINA MONITORING YEAR 6 Ln NC ECOSYSTEM ENHANCEMENT PROGRAM SHEPHERDS TREE STREAM & WETLAND RESTORATION DATE DECEMBER 2010 SCALE 1" =100' JOB NO.: JJX31100 APPENDIX 1.2 CURRENT CONDITION PLAN VIEW FIGURE 4 OF 6 N c0 (D LL_ O Q M Lli L d Z U GAUGE 13 ~ Q w 0 LLI :2 V) 1� A 6pk� 2 8X 2-1. -0 9 v-o v oN v GRAPHIC SCALE 0 50 100 zoo 400 ( IN FEET ) 1 inch = 100 ft. ,' �lll �)Ste NOTES: 1. GENERAL SITE DATA PROVIDED BY NCEEP. 2. ALL LOCATIONS ARE APPROXIMATE. EEP PROJECT NO. 333 IREDELL COUNTY, NORTH CAROLINA MONITORING YEAR 6 NC ECOSYSTEM ENHANCEMENT PROGRAM SHEPHERDS TREE STREAM & WETLAND RESTORATION DATE DECEMBER 2010 SCALE 1" =100' JOB NO.: JJX31100 APPENDIX 1.2 CURRENT CONDITION PLAN VIEW FIGURE 4 OF 6 LEGEND O GROUNDWATER GAUGE CHANNEL CENTERLINE SURFACE GAUGE ON BANKFULL ❑ RAIN GAUGE #Q PHOTO POINT CROSS VANE (CV) 2010 CURRENT CONDITION o `� �\ J -HOOK VANE (JV) IN- STREAM VEGETATION STEP POOL (SSP) INVASIVE SPECIES -KUDZU ROOT WAD VEGETATION PLOT- Q INVASIVE SPECIES VEGETATION PLOT GROUNDWATER GAUGE - FAILED \, k1101 XS 12 Q 82 +00 SURFACE ! I GAUGE 2 BEGIN x LONGITUDINAL i 3 PROFILE 2 \ O CO � li Q O V) W Ld Z � c� U W Q W :2 (/,) n„ 66j� 00 0 50 100 200 400 ( IN FEET ) 1 inch = 100 ft. GAUGE 15 xp o GAUGE 16 ."16X0 ks g Op °° 74 +00 30 11 ' J O Ln CV (0 00 LL_ Q O (n (C) W Ld Z J U L`' I­— W Q W :� 07 telIl I�•n 1tII tcCilient NOTES: 1. GENERAL SITE DATA PROVIDED BY NCEEP. 2. ALL LOCATIONS ARE APPROXIMATE. I EEP PROJECT NO. 333 NORTH COUNTY, N MONITORING YEAR 6 ORTH CAROLINA N pp) NC ECOSYSTEM ENHANCEMENT PROGRAM SHEPHERDS TREE STREAM & WETLAND RESTORATION DATE DECEMBER 2010 SCALE 1" =100' JOB NO.: JJX31100 APPENDIX 1.2 CURRENT CONDITION PLAN VIEW I FIGURE 5 OF 6 Q No a Q Q �0 �X ob (O co (p Ay J� x r CHANNEL CENTERLINE BANKFULL QPHOTO POINT CROSS VANE (CV) J -HOOK VANE (JV) STEP POOL (SSP) ROOT WAD ® VEGETATION PLOT SURFACE 10 GAUGE 3 p 36 I v O 0 4 +00 _ ®GAUGE 17 GRAPHIC SCALE 100 0 50 100 200 00 GROUNDWATER GAUGE b SURFACE GAUGE n RAIN GAUGE IN VEGETATION INVASIVE SPECIES -KUDZU VEGETATION PLOT - INVASIVE SPECIES G GROUNDWATER GAUGE - FAILED GAUGE 8 0 `�x g A8" k O � � RAF P NCDOT- SHEP -5 N = 725,309.72 E = 1,479,717.81 ELEV. = 731.86 ' 1 39 \ `Q O ( IN FEET ) 1 inch = 100 ft. �' �Stelll Iil ?�lI1tC'ill(lI NOTES: 1. GENERAL SITE DATA PROVIDED BY NCEEP. 2. ALL LOCATIONS ARE APPROXIMATE, EEP PROJECT NO. 333 IREDELL COUNTY, NORTH CAROLINA MONITORING YEAR 6 NC ECOSYSTEM ENHANCEMENT PROGRAM SHEPHERDS TREE STREAM & WETLAND RESTORATION DATE DECEMBER 2010 SCALE 1" =100' JOB NO.: JJX31100 APPENDIX 1.2 CURRENT CONDITION PLAN VIEW FIGURE 6 OF 6 ji-6 APPENDIX 2 GENERAL PROJECT TABLES 2.1 Project Mitigation Structure and Objectives 2.2 Project Activity and Reporting History 2.3 Project Contacts 2.4 Project Attribute Table Shepherds Tree Monitoring Report February 2011 EEP Project No 333 Monitoring Year 6 Appendix 2.1 Project Mitigation Structure and Objectives Shepherds Tree Stream and Wetland Restoratton/EEP Project #333 Monitoring Year 6 -Linear Mitigation Footage or Stationing a Segment/Reach, ° Type Approach °'_' Acre`s (ft) Comments,, _ _= Channel restoration, relocation with Perennial Mamstem Reach R P1 9,904 If 0 +00 -99 +04 use of grade control and bank protection structures Channel restoration, relocation with Intermittent Tributary R P 1 800 If 0 +00 -8 +00 use of grade control and bank protection structures Restoration/Enhancement of Piedmont/Mountam R - 48 56 acres bottomland hardwood communities Bottomland Hardwood Forest N/A by breaching channel berms, plugging drainage ditches and revegetation C - 37 71 acres Restoration /Enhancement of swamp Piedmont/Mountain Swamp hardwood communities by breaching Hardwood Forest R - 5 acres N/A channel berms, plugging drainage ditches and revegetation Preservation of an existing levee Low Elevation Seep P - 4 54 acres N/A forest Phase III R PI 284 If N/A Channel Relocation - Component Summations ° - Wetland (ac) Non - Restoration Level Stream (If) Riparian Riparian Upland (ac) Buffer (ac) BMP Restoration (R) 10,988 53 56 N/A N/A N/A N/A Enhancement (E) N/A N/A N/A N/A N/A N/A Enahncement I (E) N/A N/A N/A N/A N/A N/A Enhancement I1(E) N/A N/A N/A N/A N/A N/A Creation (C) N/A 3771 N/A N/A N/A N/A Preservation (P) N/A 454 N/A N/A N/A N/A HQ Preservation (P) N/A N/A N/A N/A N/A N/A Totals 10,988 95.61 N/A N/A N/A N/A Appendix 2.2 Project Activity and Reporting History Shepherds Tree Stream and Wetland Restoration /EEP Project #333 Monitoring Year 6 Elapsed Time Since Grading Complete: 6 Years Elapsed Time Since Planting Complete: Unknown Number of Reporting Years: 6 Activity or Report Data Collection Completed Actual Completion or Delivery Restoration Plan N/A Jun -01 Final Design -90% N/A N/A Construction N/A 2004 Temporary S &E mix applied to entire project area* Fall 2001 Fall 2001 Permanent seed mix applied to reach Spring 2002 Spring 2002 Mitigation Plan/ As -Built (Year 0 Monitoring) Jun - 01/2004 Jun - 01/2004 Year 1 Monitoring ** 2005 Feb -06 Year 2 Monitoring ** 2006 Jan -07 Year 3 Monitoring ** 2007 Nov -07 Year 4 Monitoring ** 2008 Dec -08 Year 5 Monitoring ** 2009 Jan -10 Year 6 Monitoring ** 2010 Dec -10 Year 7 Monitoring TBD TBD *Seed and mulch is added as each section of construction is completed * *Data is collected throughout the monitoring year Appendix 2.3 Project Contacts Table Shepherds Tree Stream and Wetland Restoration /EEP Project #333 Monitoring Year 6 Designer KCI Associates of North Carolina, PA Suite 200 Landmark Center I 4601 Six Forks Rd Raleigh, NC 27609 Contractor's Name Phase NCDOT Highway Maintenance Contractor's Name (Phase II Northstate Environmental Contractor's Name (Phase III) NCDOT Bridge and Highway Maintenance Planting Contractor Unknown Seeding Contractor Unknown Monitoring Performers Jordan, Jones and Goulding 309 E Morehead Street, Suite 110 Charlotte NC 28202 Stream Monitoring, POC Alison Nichols, 704 -527 -4106 ext 227 Vegetation Monitoring, POC Wetland Monitoring, POC Table 2.4 Project Attribute Table Shepherds Tree Stream and Wetland Restoration /EEP Protect #333 Monitoring Year 6 Project County Iredell North Carolina Ph sio ra hic Region Piedmont Ecore ton Outer Piedmont Project River Basin Yadkin USGS RUC for Project 14 dirt 03040102040030 NCDW Sub -basin for Project and Reference 03 -07 -06 Within extent of EEP Watershed Plan9 U WRC Class Warm Cool Cold U % of project easement fenced or demarcated?, 100% Beaver activity observed during design hase9 U Restoration Component Attribute Table Main Channel Tributary Drainage Area (sq mt 2 17 Stream Order 1 st Restored Length ft 9904 13 800 Perennial or Intermittent Perennial Perennial Watershed type Rural Urban Developing) Rural Watershed LULC Distribution Agriculture - Commercial - Public /Institutional - Residential Transportation - Watershed Impervious Cover % —10% NCDW AU /Index number - NCDWQ classification C 303d listed? No Upstream of a 303d listed sedment9 No Reasons for 303d listing or stressor N/A Total acreage of easement 164 9 acres Total vegetated acreage within the easement U Total planted acreage as part of the restoration U Ros en classification of the pre-existing U N/A Ros en classification of the As -Built E5 N/A Valley Type U Valley sloe U Valley side slope range U Valley toe slope range U Cowardin classification R2U3B4 Trout waters designation No Species of concern endangered, etc ? (Y/N ) N/A Dominant soil series and characteristics Chewacla, Conagree Series Chewacla Congaree Depth - - Clay % - - K - - T - - "N /A" items do not apply / " -" items are unavailable / "U" items are unknown JJS APPENDIX 3 VEGETATION ASSESSMENT DATA 3.1 Vegetation Plot Mitigation Success 3.2 Vegetation Monitoring Plot Photos 3.3 Vegetation Plot Summary Data Table 3.4 Vegetation Condition Assessment Shepherds Tree Monitormg Report February 2011 EEP Project No 333 Monitormg Year 6 Appendix 3.1 Vegetation Plot Mitigation Success Shepherds Tree Stream and Wetland Restoration /EEP Project #333 Monitoring Year 6 Vegetation Plot ID Vegetation Survival Threshold Met (Y /N) Plot 1 Y Plot 2 N Plot 3 Y Plot 4 Y Plot 5 N Plot 6 Y Plot 7 Y Plot 8 y Plot 9 y Plot 10 N Plot 11 Y Plot 12 Y Plot 13 y Plot 14 Y Vegetation Plot 1 (10/2010) Vegetation Plot 3 (10/2010) Vegetation Plot 2 (10/2010) Vegetation Plot 4 (10/2010) Prepared For: Appendix 3.2 Vegetation Monitoring Plot Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 r-�-f Monitoring Year 6 l c? iu nu i ?t r Submittal Date. February 2011 Prepared By: opt Vegetation Plot 5 (10/2010) Vegetation Plot 7 (10/2010) Vegetation Plot 6 (10/2010) Vegetation Plot 8 (10/2010) Prepared For: Appendix 3.2 Vegetation Monitoring Plot Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 r-'I , Monitoring Year 6 1,ti �:�tmenl Submittal Date: February 2011 Prepared By: Opt Vegetation Plot 9 (10/2010) Vegetation Plot 11 (10/2010) Vegetation Plot 10 (10/2010) Vegetation Plot 12 (10/2010) Prepared For: Appendix 3.2 Vegetation Monitoring Plot Photos .rte Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 J� Monitoring Year 6 1 ai Submittal Date: February 2011 Prepared By: ;R Vegetation Plot 13 (10/2010) Vegetation Plot 14 (10/2010) Prepared For: Appendix 3.2 Vegetation Monitoring Plot Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 r-�- Monitoring Year 6 III »1 , te1cht Submittal Date: February 2011 Prepared By: Ire de /EEP Project #333 Current Data i i 0 ©0 ©0 ©0 ©0 ©0 ©0 ©0 ©0 ©0 ©0 ©0 ©0 ©0 ©0 ©0 ammmmmmmm�ommmommmmmmmmmommm ©� ©� © ©o�oommm ©o� ©oo�mmmo ®mmmm�oo ©omo ©m ©m ©mmmmmmm ©mmmommmommmmm ©mm� ©� © m ©��oommmmmmmmmmmmmmmmmmmmmmoo ©i © m ©mmm ©mmmmmmmommmmmmmmmommmm ® ©�i © mm�mommmmm ©ma ®mmommoommm ® ®m ®omo� © mmmmmmmm�mmmmmmmmommmmmmmmm� ®o� .. ©mo ©m0000moo ©momma ©moo ©ao ®mm000a ©� © m® ��oo ©000mm ©eo ©oomom ©oommoo ©v ©� © Am ©ommmmmmomaommmm000 ©mm000000 ©� ©mmmmmmmm�mmmmomom ©mmmmmmm ©mom ©�! , , om ©oomoo ©oomomom ©m ©00000 ©mommm� mmo�mmmmmmmmm ® ®mmmo ®mm ®mmmmmmm© Appendix 3 4 Vegetation Condition Assessment Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Planted Acreage 91 Vegetation Category Definitions Mapping Threshold (acres) Number of Polygons Combined Acreage % of Planted Acreage Bare Areas Very limited cover of both woody and herbaceous material 0 1 0 0 0% Low Stem Density Areas Woody stem densities clearly below target levels based on MY3, 4, or 5 stem count criteria 0 1 0 0 0% Total .0 - 0 _ 0 %' =' Areas of Poor Growth Rates or Vigor Areas with woody stems of a size class that are obviously small given the monitoring year 025 0 0 10% Easement Acreage 1649 U Unknown Mapping % of Threshold Number of Combined Planted Vegetation Category Definitions (SF) Polygons Acreage Acreage Invasive Areas of Concern Areas of points (if too small to render as polygons at map scale) 1000 3 U U Various Easement Encroachment Areas Areas of points (if too small to render as polygons at map scale) none U U Locations U Unknown APPENDIX 4 STREAM ASSESSMENT DATA 4.1 Stream Station Photos 4.2 Qualitative Visual Stability Assessment 4.3 Verification of Bankfull Events 4.4 Cross - Section Plots and Raw Data Tables* *Raw data tables have been provided electronically Shepherds Tree Monitoring Report February 2011 EEP Project No 333 Monitoring Year 6 Photo Point 1- Vegetation Plot (10/2010) Photo Point 2 -View Upstream Photo Point 2 -View Downstream Main Channel (7/2010) Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Prepared By: Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 �7 Monitoring Year 6 1.11 _er�lca�t Submittal Date: February 2011 Photo Point 3 -View Upstream Main Channel (7/2010) Photo Point 3 -View Downstream Main Channel (7/2010) Photo Point 4 -View Upstream Photo Point 4 -View Downstream Main Channel (7/2010) Main Channel (7/2010) Prepared For: Prepared By: Appendix 4.1 Stream Station Photos �. Shepherds Tree Stream and Wetland Restoration /EEP Project No. 333 7 Monitoring Year 6 3 i z< z <<r�,�•r t Submittal Date: February 2011 Photo Point 5 -View Upstream Main Channel (7/2010) Photo Point 5 -View Downstream Main Channel (7/2010) Photo Point 6 -View Upstream Photo Point 6 -View Downstream Main Channel (7/2010) Main Channel (7/2010) Prepared For: Prepared By: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 �7 Monitoring Year 6 �{ raj r��ic�lt Submittal Date: February 2011 Photo Point 7 -View Upstream Main Channel (7/2010) Photo Point 8 -View Upstream Main Channel (7/2010) Photo Point 7 -View Downstream Main Channel (7/2010) Photo Point 8 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 1r7 Monitoring Year 6 T,' jai ei��crlt Submittal Date: February 2011 Prepared By: Photo Point 9 -View Upstream Main Channel (7/2010) Photo Point 9 -View Downstream Main Channel (7/2010) Photo Point 10 -View Upstream Photo Point 10 -View Downstream Main Channel (7/2010) Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Prepared By: Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 �� Monitoring Year 6 i 1 lI : — it Submittal Date: February 2011 ig Photo Point 11 -View Upstream Main Channel (7/2010) Photo Point 13 -View Upstream Main Channel (7/2010) Photo Point 11 -View Downstream Main Channel (7/2010) Photo Point 13 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 r � Monitoring Year 6 J i tl CImIit Submittal Date: February 2011 Prepared By: ire Photo Point 14 -View Upstream Main Channel (7/2010) Photo Point 15 -View Upstream Main Channel (7/2010) Photo Point 14 -View Downstream Main Channel (7/2010) Photo Point 15 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 �7 Monitoring Year 6 I ,►7 ��t mrr�t Submittal Date: February 2011 Prepared By: 01 Photo Point 16 -View Upstream Main Channel (7/2010) Photo Point 17 -View Upstream Main Channel (7/2010) Photo Point 16 -View Downstream Main Channel (7/2010) Photo Point 17 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 r_�s Monitoring Year 6 1,11 Submittal Date: February 2011 Prepared By: im Photo Point 18- Vegetation Plot (7/2010) Photo Point 19 -View Upstream Main Channel (7/2010) Photo Point 19 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 r'' Monitoring Year 6 I�,n ial Yment Submittal Date: February 2011 Prepared By: iffl Photo Point 20 -View Upstream Main Channel (7/2010) Photo Point 21 -View Upstream Main Channel (7/2010) Photo Point 20 -View Downstream Main Channel (7/2010) Photo Point 21 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos �.` Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 Monitoring Year 6 .� 111 'L111Cli� Submittal Date: February 2011 Prepared By: Photo Point 22 -View Upstream Main Channel (7/2010) Photo Point 23 -View Upstream Main Channel (7/2010) Photo Point 22 -View Downstream Main Channel (7/2010) Photo Point 23 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 �7 Monitoring Year 6 � �tcm I .r �,��,_;i;�,, Submittal Date: February 2011 Prepared By: IT Photo Point 24 -View Upstream Main Channel (7/2010) Photo Point 25 -View Upstream Main Channel (7/2010) Photo Point 24 -View Downstream Main Channel (7/2010) Photo Point 25 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 Monitoring Year 6 I i �aa cnitrt� Submittal Date: February 2011 Prepared By: ;R Photo Point 26 -View Upstream Main Channel (7/2010) Photo Point 27 -View Upstream Main Channel (7/2010) Photo Point 26 -View Downstream Main Channel (7/2010) Photo Point 27 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 Monitoring Year 6 �' 1 l,'ll "l'1i1C911 Submittal Date: February 2011 Prepared By: re Photo Point 28 -View Upstream Main Channel (7/2010) Photo Point 30 -View Upstream Main Channel (7/2010) Photo Point 28 -View Downstream Main Channel (7/2010) Photo Point 30 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 �7 Monitoring Year 6 V-11 I'l -1 I.Cht Submittal Date: February 2011 Prepared By: ;R Photo Point 31 -View Upstream Main Channel (7/2010) Photo Point 32 -View Upstream Main Channel (7/2010) Photo Point 31 -View Downstream Main Channel (7/2010) Photo Point 32 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration /EEP Project No. 333 Ecomfem Monitoring Year 6 ill Submittal Date: February 2011 Prepared By: 0 Photo Point 33 -View Upstream Main Channel (7/2010) Photo Point 34 -View Upstream Main Channel (7/2010) Photo Point 33 -View Downstream Main Channel (7/2010) Photo Point 34 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 4 Monitoring Year 6 l �i Submittal Date: February 2011 Prepared By: Photo Point 35 -View Upstream Main Channel (7/2010) Photo Point 36 -View Upstream Main Channel (7/2010) Photo Point 35 -View Downstream Main Channel (7/2010) Photo Point 36 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 Monitoring Year 6 i n tat TIN u�Ilt Submittal Date: February 2011 Prepared By: 0 Photo Point 37 -View Upstream Main Channel (7/2010) Photo Point 38 -View Upstream Main Channel (7/2010) Photo Point 37 -View Downstream Main Channel (7/2010) Photo Point 38 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 Monitoring Year 6 Eri iarn Submittal Date: February 2011 Prepared By: 0 Photo Point 39 -View Upstream Main Channel (7/2010) Photo Point 39 -View Downstream Main Channel (7/2010) Prepared For: Appendix 4.1 Stream Station Photos Shepherds Tree Stream and Wetland Restoration/EEP Project No. 333 Monitoring Year 6 E a�lc��t Submittal Date: February 2011 Prepared By: iffl Appendix 4 2 Qualitative Visual Stability Assessment Main Channel (9,904.13 If) Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 U Unknown *Several structures have been buried with sediment and therefore a majority of the structures could not be assessed Adjust % Number Number with Footage with for Major Stable, Total Number of Amount of % Stable, Stabilizing Stabilizing Stabilizing Channel Channel Performing Number in Unstable Unstable Performing Woody Woody Woody Category Sub-Category Metric as Intended As -Built Segments Footage as Intended Vegetation Vegetation Vegetation 1 Bed 1 Vertical Stability Aggradation 2 1600 84% Degradation 0 0 100% (Riffle and Run units) 2 Riffle Condition Texture /Substrate 0 U 0% 3 Meander Pool Depth Sufficient U 150 U Condition Length Appropriate U 150 U Thalweg centering at upstream of meander bend (Run) 150 150 100% 4 Thalweg Position Thalweg centering at downstream of meander bend (Glide) 150 150 100% 2 Bank 1 Scoured/Eroded Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 2 115 99% 2 115 100% Banks undercut/overhanging to the extent that mass wasting appears likely 2 Undercut Does NOT include undercuts that are modest, appear sustainable and are 0 0 100% 0 0 100% providing habitat 3 Mass Wasting Bank slumping, calving, or collapse 0 0 100% 0 0 100% Totals 2 115 97% 2 115 100% 3 Engineered Structures* I Overall Integrity Structures physically intact with no dislodged boulders or logs U 57 U 2 Grade Control Grade control structures exhibiting maintenance of grade across the sill U 57 U 2a Piping Structures lacking any substantial flow underneath sills or arms U 57 U 3 Bank Protection Bank erosion within the structures extent of influence does not exceed 15% 57 57 100% 4 Habitat Pool forming structures maintaining —Max Pool Depth Bankfull Depth > 1 6 Rootwads/loas providing some cover at baseflow U 57 U U Unknown *Several structures have been buried with sediment and therefore a majority of the structures could not be assessed Appendix 4.2 Qualitative Visual Stability Assessment Tributary (800 If) Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 U Unknown Adjust % Number Number with Footage with for Major Stable, Total Number of Amount of % Stable, Stabilizing Stabilizing Stabilizing Channel Channel Performing Number in Unstable Unstable Performing Woody Woody Woody Category Sub-Category Metric as Intended As -Built Segments Footage as Intended Vegetation Vegetation Vegetation 1 Bed I Vertical Stability Aggradation l 800 0% Degradation 0 0 100% (Riffle and Run units) 2 Riffle Condition Texture /Substrate 0 U 0% 3 Meander Pool Depth Sufficient U 7 U Length Appropriate U 7 U Condition Thalweg centering at upstream of meander bend (Run) 7 7 100% 4 Thalweg Position Thalweg centering at downstream of meander bend (Glide) 7 7 100% - 2 Bank 1 Scoured /Eroded Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100% 0 0 100% Banks undercut/overhanging to the extent that mass wasting appears likely 2 Undercut Does NOT include undercuts that are modest, appear sustainable and are 0 0 100% 0 0 100% providing habitat 3 Mass Wasting Bank slumping, calving, or collapse 0 0 100% 0 0 100% Totals 0 0 100% 0 0 100% 3 Engineered Structures 1 Overall Integrity Structures physically intact with no dislodged boulders or logs U 7 U 2 Grade Control Grade control structures exhibiting maintenance of grade across the sill U 7 U 2a Piping Structures lacking any substantial flow underneath sills or arms U 7 U 3 Bank Protection Bank erosion within the structures extent of influence does not exceed 15% 7 7 1000/ 4 Habitat Pool forming structures maintaining —Max Pool Depth Bankfull Depth > 16 Rootwads/logs providing some cover at baseflow U 7 U U Unknown Appendix 4.3 Verification of Bankfull Events Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Date of ,Collectibn' Date of Occurrence - y Method 5 Photo # (if a ,r available)' w N/A Jun -05 Visual Assessment N/A N/A Aug-05 Surface Gauge 1 and 3 -MC N/A N/A Oct -05 Surface Gauge 1 -MC N/A N/A Dec -05 Surface Gauge 1 -MC N/A N/A Nov -06 Surface Gauge 3 -MC N/A N/A Dec -06 Surface Gauge 3 -MC N/A N/A Jan -07 Surface Gauge 3 -MC N/A N/A Mar -07 Surface Gauge 3 -MC N/A N/A Aug-08 Surface Gauge 3 -MC N/A N/A Sep-08 Surface Gauge 3 -MC N/A N/A Apr-09 Surface Gauge 2 -Trib N/A N/A Mar -09 Surface Gauge 3 -MC N/A N/A Apr-09 Surface Gauge 3 -MC N/A N/A Jun -09 Surface Gauge 3 -MC N/A N/A Apr-09 Surface Gauge 2 -Trib N/A N/A Jun -09 Surface Gauge 2 -Trib N/A N/A Aug-09 Surface Gauge 2 -Trib N/A N/A Sep-09 Surface Gauge 2 -Trib N/A N/A Apr-10 Surface Gauge 3 -MC N/A N/A May-10 Surface Gau e 1, 3 and 4 -MC N/A N/A Jun -10 Surface Gauge 1, 3 and 4 -MC N/A N/A Jul -10 Surface Gauge 4 -MC N/A N/A Aug- 10 Surface Gauge 1, 3 and 4 -MC N/A N/A Sep-10 Surface Gauge 3 and 4 -MC N/A N/A Oct -10 Surface Gauge 1, 3 and 4 -MC N/A Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID YS -1, Riffle Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 99.29 Bankfull Cross - Sectional Area (ft 2) 10.63 Bankfull Width ft 6.90 Flood Prone Area Elevation ft 100.91 Flood Prone Width ft >100 Bankfull Mean Depth ft 1.22 Bankfull Max Depth ft 1.62 W/D Ratio 5.66 Entrenchment Ratio >2.2 Bank Height Ratio 1.00 Station Elevation Notes 0 99.21 xl 3 99.25 x1 6 99.1 x1 9 99.07 x1 12 99.17 xl 15 99.31 xl 18 99.52 xl 20 99.5 xl 21 99.35 x1 22 97.95 xl 23 97.89 xl 24 97.67 xl 25 97.67 x1 26 97.82 xl 27 98.24 xl 28 99.35 xl 30 99.44 X1 33 99.38 xl 36 99.32 xl 39 99.26 x1 42 99.45 x1 45 99.42 x1 48 99.48 xl XS -1: View Upstream XS -1: View Downstream Shepherds Tree (Main Channel) -MY6 Cross - Section 1- Riffle 100 99.5 -- - -- - - T99 - - - - - - -- - - - - - - - - s 98.5 - - - - - -- - 0 98 -- - - cc w 97.5 - 97 - -- - 96.5 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 Station (ft) MY1- 9/2006 MY5- 1/2010 -o- MY6- 11/2010 ....... Bankfull Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration /EEP Project #333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS -2, Pool Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 100.10 Bankfull Cross - Sectional Area (ft) 5.12 Bankfull Width ft 7.90 Flood Prone Area Elevation ft 101.41 Flood Prone Width ft N/A Bankfull Mean Depth ft 0.65 Bankfull Max Depth ft 1.31 W/D Ratio 12.15 Entrenchment Ratio N/A Bank Height Ratio 1.15 Station Elevation Notes 0 100.01 x2 0.1 100 x2 1 100.06 x2 3 100.07 x2 6 100.1 x2 9 100.2 x2 12 100.28 x2 15 100.24 x2 18 100.3 x2 21 100.34 x2 22 99.84 x2 23 99.3 x2 23 99.1 x2 23 99.15 x2 23.2 99.01 x2 24.2 98.79 x2 25.2 98.86 x2 26.2 99.31 x2 27.2 99.83 x2 31 100.3 x2 35 100.26 x2 38 100 x2 41 100.02 x2 44 100.07 x2 47 100.22 x2 51 100.19 x2 52 100.22 x2 52.1 100.44 x3 XS -2: View Upstream XS -2: View Downstream Shepherds Tree (Main Channel) -MY6 Cross - Section 2 -Pool 101 100.5 - - - - - T100 - ........... .................. ........... .0 99.5 - -- - c 99 - - - 0 M 98.5 97.5 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 Station (ft) MY1- 9/2006 MY5- 1/2010 MY6- 11/2010 • • ..... Bankfull Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS -3, Riffle Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 99.82 Bankfull Cross - Sectional Area (ft2) 7.37 Bankfull Width ft 10.31 Flood Prone Area Elevation ft 101.15 Flood Prone Width ft >100 Bankfull Mean Depth ft 0.71 Bankfull Max Depth ft 1.33 W/D Ratio 14.52 Entrenchment Ratio >2.2 Bank Height Ratio 1.00 Station Elevation Notes 4.1 99.75 x3 4.1 99.65 x3 5.1 99.65 x3 7.1 99.7 0 10.1 99.8 0 13.1 99.85 x3 16.1 99.86 x3 19.1 99.87 0 20.6 99.9 x3 23.1 99.95 x3 24.1 99.8 0 25.1 99.6 x3 26.1 98.71 0 27.1 98.49 0 28.9 98.65 0 29.9 98.88 0 34.7 99.91 0 35.7 99.96 0 38.7 100 0 41.7 99.9 0 44.7 99.94 0 47.7 99.89 x3 50.7 99.75 0 53.7 99.84 0 54.1 1 99.75 0 XS -3: View Upstream XS -3: View Downstream Shepherds Tree (Main Channel) - MY6 Cross - Section 3- Riffle 100.2 100 - __ - - - - -- - - - 99.8 ............................... l... .................. ........................... .. .... ............ ....... .............. .... T 99.6 CO 5 99.4 - -- - - - - - 99.2 - - - -- - - -- - - - 99 r w 98.8 - - - -- -- - -- - -- 98.6 - - - - -- -- - - -- - 98.4 98.2 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 Station (ft) MY 1-9/2006 MY5- 1/2010 t MY6 - 11/2010 ........ Bankfull Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration /EEP Project 4333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS -4, Riffle Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 94.10 Bankfull Cross - Sectional Area (ft) 17.63 Bankfull Width ft 9.64 Flood Prone Area Elevation ft 96.74 Flood Prone Width ft >100 Bankfull Mean Depth (ft) 1.83 Bankfull Max Depth ft 2.64 W/D Ratio 5.27 Entrenchment Ratio >2.2 Bank Height Ratio 1.00 Station Elevation Notes 2.9 93.95 x4 5.9 94.15 x4 8.9 94.43 x4 11.9 94.36 x4 15.1 94.24 x4 15.9 92.65 x4 16.9 92.46 x4 17.9 91.97 x4 18.9 91.6 x4 19.9 91.46 x4 21.9 92.01 x4 22.9 92.52 x4 23.9 92.54 x4 24.7 94.05 x4 25.4 94.37 x4 27.9 94.5 x4 30.9 94.45 x4 33.9 94.46 x4 36.9 94.4 x4 39.9 94.65 x4 42.9 94.54 x4 46.9 94.57 x4 XS -4: View Upstream XS -4: View Downstream Shepherds Tree (Main Channel) - MY6 Cross - Section 4- Riffle 95 94.5 - 93.5 - - 4 93 - - - - 0 92.5 , - - -- w 92 91.5 -- - -- - - 91 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 Station (ft) MY1- 9/2006 MY5- 1/2010 MY6- 11/2010 ....... Bankfull Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration /EEP Project #333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS -5, Pool Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 94.71 Bankfull Cross - Sectional Area (ft 2) 13.17 Bankfull Width ft 8.86 Flood Prone Area Elevation (ft) 96.99 Flood Prone Width ft N/A Bankfull Mean Depth (ft ) 1.49 Bankfull Max Depth ft 2.28 W/D Ratio 5.95 Entrenchment Ratio N/A Bank Height Ratio 1.00 Station Elevation Notes 3.4 94.55 x4 3.4 94.36 x4 4.4 94.55 x4 6.4 94.57 x4 9.4 94.76 A 12.4 94.71 x4 15.4 94.71 x4 18.4 94.82 x4 21 94.72 A 21.4 94.35 x4 23 93.41 x4 23.4 93.23 x4 24.4 92.76 A 25.4 92.56 x4 26.4 92.43 x4 27.4 92.57 x4 28.4 93.45 x4 29.4 93.76 A 30 94.97 x4 31.5 94.9 A 34.5 94.91 x4 37.5 94.94 x4 40.5 95.01 A 43.5 94.99 x4 46.5 94.86 A 47.5 95.06 x4 XS -5: View Upstream XS -5: View Downstream Shepherds Tree (Main Channel) - MY6 Cross - Section 5 -Pool 95.5 �-- 95 •��•� .......... ....................... ............... I ........... ................ 94.5 94 - -- - - - - 93.5 - - - - e 93 - - - - - - - -- w 92.5 92 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 Station (ft) MYI- 9/2006 MY5- 1/2010 --•-- MY6- 11/2010 ....... Bankfull Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration /EEP Project 4333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS -6, Riffle Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 94.37 Bankfull Cross - Sectional Area (ft) 2.75 Bankfull Width ft 5.78 Flood Prone Area Elevation ft 95.15 Flood Prone Width ft >100 Bankfull Mean Depth (ft) 0.48 Bankfull Max Depth ft 0.78 W/D Ratio 12.04 Entrenchment Ratio >2.2 Bank Height Ratio 4.41 Station Elevation Notes 0 94.7 x6 1 94.61 x6 2 94.41 x6 4 94.49 x6 7 94.52 x6 10 94.73 x6 13 94.54 x6 16 94.63 x6 18 94.64 x6 18.9 94.56 x6 20.6 94.69 x6 22 94.32 x6 23 93.83 x6 24 93.64 x6 25 93.59 x6 26 93.86 x6 27 94.17 x6 28 94.51 x6 28.8 94.77 x6 30 94.7 x6 31.2 94.78 x6 33 94.89 x6 36 94.53 x6 39 94.53 x6 42 94.57 x6 44.4 94.79 x6 XS -6: View Upstream XS -6: View Downstream Shepherds Tree (Main Channel) - MY6 Cross - Section 6 -Run 95 94.5 - - - -- -- T 94 L t 93.5 - - - - 0 .q 93 w 92.5 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 Station (ft) MY1- 9/2006 MY5- 1/2010 t 1`1Y6- 11/2010 • • • • • • • Bankfull Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration/EEP Project 4333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS -7, Pool Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 94.33 Bankfull Cross - Sectional Area (ft 2) 13.68 Bankfull Width ft 15.98 Flood Prone Area Elevation ft 96.42 Flood Prone Width ft N/A Bankfull Mean Depth ft 0.86 Bankfull Max Depth ft 2.09 W/D Ratio 18.58 Entrenchment Ratio N/A Bank Height Ratio 1.00 Station Elevation Notes 1 94.33 x7 4 94.3 x7 7 94.16 x7 10 94.25 x7 13 94.23 x7 16 94.39 x7 17.5 94.28 x7 19 93.32 x7 19.3 93.18 x7 20 92.89 x7 21 92.65 x7 22 92.24 x7 23 92.25 x7 24 92.64 x7 25 92.9 x7 26 93.2 x7 26.3 93.31 x7 26.9 93.84 x7 28 94.2 x7 31 94.3 x7 34 94.35 x7 37 94.39 x7 40 94.3 x7 43 94.27 x7 46 94.2 x7 49 94.17 x7 49.7 94.18 x7 XS -7: View Upstream XS -7: View Downstream Shepherds Tree (Main Channel) - MY6 Cross - Section 7 -Pool 95 94.5 -- - - •,.,� ............... \ .. ............................... .. . -�,,,� 94 �- - - - - 93.5 - - - - - T 2; w 92.5 - - - - - -- c w 91.5 - - 91 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 Station (ft) MYl- 9/2006 MY5- 1/2010 --*-- MY6- 11/2010 ....... Bankfull Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration /EEP Project 4333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS -8, Pool Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 94.72 Bankfull Cross - Sectional Area (ft2) 47.18 Bankfull Width ft 27.64 Flood Prone Area Elevation ft 98.34 Flood Prone Width (ft) N/A Bankfull Mean Depth ft 1.71 Bankfull Max Depth ft 3.62 W/D Ratio 16.16 Entrenchment Ratio N/A Bank Height Ratio 1.00 Station Elevation Notes 0.3 94.67 x8 0.3 94.58 x8 1.3 94.69 x8 3.3 94.69 x8 6.3 94.66 x8 9.3 94.67 x8 12.3 94.74 x8 15.3 94.61 x8 18.3 94.45 x8 20.2 94.06 x8 21.3 93.65 x8 23 92.99 x8 23.3 92.67 x8 24.3 92.19 x8 25.3 91.8 x8 26.3 91.64 x8 27.3 91.58 x8 28.3 91.11 x8 29.3 91.12 x8 30.3 91.1 x8 31.3 91.11 x8 32.3 91.58 x8 33.3 91.94 x8 34.3 92.36 x8 35.3 92.81 x8 36.3 93.28 x8 37.3 93.58 x8 38.3 93.77 x8 39.2 93.89 x8 40.3 94.64 x8 43.3 94.48 x8 46.3 94.59 x8 49.3 94.57 x8 52.3 94.69 x8 55.3 94.73 x8 56.9 94.75 x8 57.3 1 94.79 x8 XS-8: View Upstream XS -8: View Downstream Shepherds Tree (Main Channel) - MY 6 Cross - Section 8 -Pool 95.5 95 ............................................................... .. 94.5 94 - - -- - 93.5 - - a 93 - - w 92.5 - - -- 92 - - - 91.5 - - - w 91 - 90.5 0.00 10.00 20.00 30.00 40.00 50.00 60.00 Station (ft) MYl- 9/2006 MY5- 1/2010 MY6- 11/2010 ....... Bankfull Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS -9, Riffle Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 94.30 Bankfull Cross - Sectional Area (ft 2) 37.05 Bankfull Width ft 21.74 Flood Prone Area Elevation ft 97.82 Flood Prone Width (ft) >100 Bankfull Mean Depth ft 1.70 Bankfull Max Depth ft 3.52 W/D Ratio 12.79 Entrenchment Ratio >2.2 Bank Height Ratio 1.05 Station Elevation Notes 2.7 94.76 x9 5.7 94.81 x9 8.7 94.74 A 11.7 94.15 x9 12.2 94.03 x9 13.7 93.82 x9 14.7 93.64 A 15.7 93.41 x9 16.6 92.89 A 17.7 92.36 A 18.7 91.89 x9 19.7 91.49 A 20.7 91.29 x9 21.7 91.29 x9 22.7 91.04 A 23.7 90.78 A 24.7 90.78 x9 25.7 91.67 x9 26.7 91.96 x9 27.7 92.62 x9 28.7 92.96 x9 29.7 93.42 x9 30.7 93.77 A 31.6 94.08 A 33.7 94.51 x9 36.7 94.61 x9 39.7 94.61 A 42.7 94.6 A 45.7 94.63 x9 48.7 94.58 A 49.1 94.58 A 49.1 94.75 A XS -9: View Upstream XS -9: View Downstream Shepherds Tree (Main Channel) - MY 6 Cross - Section 9 - Riffle 95.5 95 -- 94.5 - - -- . ............................... ................. ...� .�..................... ............. ............................... 94 - 93.5 - - - - -- - -- - -- a 93 cc 92.5 92 - - - -- - - - - - w 91.5 - - - - 90.5 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 Station (ft) MYI- 9/2006 MY5- 1/2010 t MY6- 11/2010 ....... Bankfull Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS -10, Pool Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 95.16 Bankfull Cross - Sectional Area (ft 2 24.81 Bankfull Width ft 16.29 Flood Prone Area Elevation ft 98.26 Flood Prone Width ft N/A Bankfull Mean Depth ft 1.52 Bankfull Max Depth ft 3.10 W/D Ratio 10.72 Entrenchment Ratio N/A Bank Height Ratio 1.00 Station Elevation Notes 1.5 95.11 x10 1.5 94.95 x10 2.5 95.05 x10 4.5 95.27 x10 7.5 94.97 x10 10.5 95.21 x10 13.5 94.98 x10 16.5 94.78 x10 19.5 95.12 x10 22.5 95.05 x10 23.2 95.03 x10 24.5 94.15 x10 25.5 93.51 x10 26.5 93.39 x10 27.5 92.77 x10 28.5 92.66 x10 29.5 92.45 x10 30.5 92.09 x10 31.5 92.34 x10 32.5 92.06 x10 33.9 93.88 x10 35.5 94.68 x10 37.2 95.17 x10 38.5 95.16 x10 41.5 95.21 x10 44.5 95.17 x10 47.5 94.98 x10 50.5 95.04 x10 53.5 95.18 x10 56.5 95.06 x10 59.5 95.11 x10 60.5 95.26 x10 XS -10: View Upstream XS -10: View Downstream Shepherds Tree (Main Channel) -MY6 Cross - Section 10 - Pool 96 95.5 -- -- -- - - ........... ............................ .... .r"` 95 94.5 - - a 94 - - - -- w 0 93.5 - - 93 - - - - w 92.5 - - - 92 91.5 0.00 10.00 20.00 30.00 40.00 50.00 60.00 Station (ft) MY 1-9/2006 MY5- 1/2010 t MY10- 11/2010 ....... Bankfull Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration /EEP Project 4333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS -11, Pool Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 95.00 Bankfull Cross - Sectional Area (ft 2) 19.11 Bankfull Width (ft) 13.17 Flood Prone Area Elevation ft 97.79 Flood Prone Width 11 N/A Bankfull Mean Depth 11 1.45 Bankfull Max Depth ft 2.79 W/D Ratio 9.08 Entrenchment Ratio N/A Bank Height Ratio 1.00 Station Elevation Notes 0.5 95.03 x11 0.5 94.86 x11 1.5 94.9 x11 3.5 94.98 x11 5.8 94.98 x11 6.5 94.57 x11 7.5 93.95 x11 8 93.58 x11 8.5 93.36 x11 9.5 92.99 x11 10.5 92.74 x11 11.5 92.44 x11 12.5 92.21 x11 13.5 92.82 x11 14.5 93.06 x11 15.4 93.54 x11 16.5 94.41 x11 17.8 94.81 x11 18.5 94.98 x11 20.5 95.07 Al. 22.5 94.98 x11 23.7 94.95 x11 XS -11: View Upstream XS -11: View Downstream Main Channel Cross - Section 11 - Pool 95.5 95 94.5 94 - - - 93.5 C 0 > 92.5 - -- -- - - - - -- - - - - - - w - - - -- - - - 91.5 0.00 5.00 10.00 15.00 20.00 25.00 30.00 Station (ft) MY1- 9/2006 MY5- 1/2010 MY6- 11/2010 ....... Bankfull Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS -12 Riffle Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 99.66 Bankfull Cross - Sectional Area (ft 2) 26.07 Bankfull Width ft 13.00 Flood Prone Area Elevation ft 102.86 Flood Prone Width ft >100 Bankfull Mean Depth (ft) 2.01 Bankfull Max Depth ft 3.20 W/D Ratio 6.47 Entrenchment Ratio >2.2 Bank Height Ratio 1.00 Station Elevation Notes 0 99.92 x12 0 99.78 x12 1 99.83 x12 3 99.83 x12 6 99.82 x12 9 99.83 x12 12 99.75 x12 15 99.66 x12 18 99.6 x12 21 99.49 x12 24 99.52 x12 27 99.55 x12 27.4 99.52 x12 29.5 97.96 x12 30 97.41 x12 31 97.13 x12 32 96.81 x12 33 96.75 x12 34 96.6 x12 35 96.46 x12 36 96.69 x12 37 97.39 x12 38.1 97.98 x12 39 99.25 x12 40 99.66 x12 41 99.74 x12 41.8 99.8 x12 43 99.65 x12 46 99.91 x12 49 99.86 x12 52 99.95 x12 55 100.14 x12 56.1 100.14 x12 XS -12: View Upstream XS -12: View Downstream Shepherds Tree (Main Channel) - MY6 Cross - Section 12- Riffle 101 100.5 - - -- - - - - 100 - - -- - - - -- -- 99.5 .................... .......... ... ........................... .. ......................................... ............................... - - - 99 ... 98.5 - -- -- - - - ° 98 - -- 0 97.5 97 w I 96.5 - - - - 96 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 Station (ft) MYI- 9/2006 MY5- 1/2010 -♦-- MY6- 11/2010 Bankfull Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration/EEP Project 4333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS -13, Pool Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 98.53 Bankfull Cross - Sectional Area (ft2) 32.59 Bankfull Width ft 21.63 Flood Prone Area Elevation ft 101.92 Flood Prone Width 11 N/A Bankfull Mean Depth ft 1.51 Bankfull Max Depth ft 3.39 W/D Ratio 14.32 Entrenchment Ratio N/A Bank Height Ratio 1.00 Station Elevation Notes 0.6 99.89 x13 0.6 99.83 x13 1.6 99.76 x13 3.6 99.77 x13 6.6 99.47 x13 9.6 99.44 x13 12.6 99.1 x13 15.6 98.9 x13 18.6 98.77 x13 21.6 98.51 x13 22.6 98.08 x13 23.3 97.15 x13 23.6 96.47 x13 24.6 95.69 x13 25.6 95.31 x13 26.6 95.14 x13 27.6 95.37 x13 28.6 95.18 x13 29.6 95.17 x13 30.6 95.54 x13 31.6 96.03 x13 32.6 96.57 x13 33.6 96.86 x13 34 97.26 x13 34.6 97.57 x13 35.6 98.17 x13 36.6 98.36 x13 37.4 98.43 x13 40.6 98.49 x13 43.6 98.54 x13 46.6 98.59 x13 49.6 98.51 x13 51.9 98.55 x13 XS -13: View Upstream XS -13: View Downstream Shepherds Tree (Main Channel) - MY6 Cross - Section 13- Pool 101 100 - - - -- - - - 99 ........................... ............................... ..... ............................... 9$ - -- - - - - -- c 97 - - - - -- - - M 96 - - - 95 94 0 10 20 30 40 50 60 Station (ft) MYl- 9/2006 MY5- 1/2010 MY6- 11/2010 ....... Bankfull Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration/EEP Project 9333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS-14 Riffle Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 102.20 Bankfull Cross - Sectional Area (ftz) 26.10 Bankfull Width ft 13.58 Flood Prone Area Elevation (ft) 105.74 Flood Prone Width ft >100 Bankfull Mean Depth ft 1.92 Bankfull Max Depth (ft) 3.54 W/D Ratio 7.07 Entrenchment Ratio >2.2 Bank Height Ratio 1.00 Station Elevation Notes 22.1 103.08 x14 22.1 103.03 x14 23.1 103.04 x14 25.1 103.06 x14 28.1 102.61 x14 31.1 102.89 x14 34.1 102.8 x14 36.5 102.64 x14 37.1 102.05 x14 38.1 101.13 x14 39.1 100.46 x14 40.1 99.94 x14 41.1 98.96 x14 42.1 98.66 x14 43.1 98.7 x14 44.1 98.9 x14 45.1 99.23 x14 46 100 x14 47.1 100.77 x14 48.1 101.57 x14 49.1 102.03 x14 49.9 102.12 x14 52.1 102.4 x14 55.1 102.53 x14 58.1 102.59 x14 61.1 102.67 x14 64.1 102.9 x14 66.1 103.03 x14 XS -14: View Upstream YS -14: View Downstream Shepherds Tree (Main Channel) - MY6 Cross - Section 14 - Riffle 104 103 - - - - - - - -- ........................................ ............................... �.. ......................... ............................... 102 -- - - - - - - - -- - -- s Ip 2; w 101 - - -- - -- - - -- -- c 0 100 - - - w 99 - -- - - - 98 0 10 20 30 40 50 60 70 80 Station (ft) MY1- 9/2006 MY5- 1/2010 MY6 - 11/2010 ....... Bankfull , Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration /EEP Project 4333 Main Channel Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS -15, Pool Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 98.78 Bankfull Cross - Sectional Area (ft' -) 21.70 Bankfull Width 11 11.04 Flood Prone Area Elevation ft 102.01 Flood Prone Width ft N/A Bankfull Mean Depth ft 1.97 Bankfull Max Depth ft 3.23 W/D Ratio 5.60 Entrenchment Ratio N/A Bank Height Ratio 1.18 Station Elevation Notes 0.7 100 x15 0.7 100.05 x15 3.7 99.86 x15 6.7 99.77 x15 9.7 99.82 x15 12.7 99.86 x15 15.7 99.86 x15 18.7 99.45 x15 21.7 99.7 x15 24.7 99.64 x15 27.7 99.52 x15 30.7 99.36 x15 33.7 99.32 x15 36.7 99.14 x15 39.2 99.39 x15 39.7 99.08 x15 40.7 98.36 x15 41.7 97.8 x15 42.7 97.1 x15 43.7 96.24 x15 44.7 95.98 x15 45.7 95.69 x15 46.7 95.55 x15 47.7 95.78 x15 48.7 96.23 x15 49.4 97.05 x15 50.7 98.61 x15 51.7 98.98 x15 52.7 99.14 x15 55.7 99.52 x15 58.7 99.41 x15 61.7 99.16 x15 64.7 99.41 x15 67.5 99.59 x15 XS -15: View Upstream XS -15: View Downstream Shepherds Tree (Main Channel) - MY6 Cross - Section 15 - Pool 101 100 99 .. ...................... ............................... ......................... .............. - ........,..... ............................... 98 - w c 0 97 - - - - w 96 - - 95 0 10 20 30 40 50 60 70 80 Station (ft) MY1- 9/2006 MY5- 1/2010 t- MY6- 11/2010 ......• Bankfull Appendix 4.4 Cross - Section Plots and Raw Data Tables Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Tributary Monitoring Year 6 Project Name Shepherds Tree EEP Project Number 333 Cross - Section ID XS -16 Riffle Survey Date 11/2010 SUMMARY DATA Bankfull Elevation ft 93.48 Bankfull Cross - Sectional Area (ft) 5.19 Bankfull Width ft 8.35 Flood Prone Area Elevation ft 94.74 Flood Prone Width ft >100 Bankfull Mean Depth ft 0.62 Bankfull Max Depth ft 1.26 W/D Ratio 13.47 Entrenchment Ratio >2.2 Bank Height Ratio 1.25 Station Elevation Notes 1 95.34 x16 2 95.38 x16 4 95.43 x16 7 95.3 x16 10 94.75 x16 13 94.21 x16 16 93.67 x16 17.5 93.59 x16 19 93.44 x16 20.7 93.83 x. 16 21.5 93.57 x16 23.4 92.98 x16 24 92.36 x16 25 92.22 x16 26 92.27 x16 27 92.48 x16 27 92.82 x16 28 93.01 x16 28 93.23 x16 31.5 93.79 x16 33.8 93.86 x16 35.4 93.65 x16 37.7 94.41 x16 41 95.03 x16 44 95.17 x16 47 95.11 x16 50 95.22 x16 50.1 95.23 x16 XS -16: View Upstream XS -16: View Downstream Shepherds Tree (Tributary) - MY6 Cross - Section 16 - Riffle 96 95.5 -- - - -- - - _ 95 - - - 5 94.5 - - - 2? 0 93.5 -�� Cz w 93 - - - 92.5 - 92 0 5 10 15 20 25 30 35 40 45 50 Station (ft) MY 1-9/2006 MY5- 1/2010 t MY6- 11/2010 ....... Bankfull r-,l It APPENDIX 5 WETLAND DATA ASSESSMENT 5.1 Precipitation — Water Level Plots for Gauges* 5.2 Wetland Criteria Attainment *Raw data tables have been provided electronically Shepherds Tree Monitoring Report February 2011 EEP Project No 333 Monitoring Year 6 Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Growing Season: April 14- October 24 5 0 -5 S -10 S iu 3 -15 -o v -20 0 p -25 -30 -35 -40 Shepherds Tree Hydrology Monitoring -MY6 Groundwater Gauge 1 24 Consecutive Days M t d l i W 2 1.8 1.6 1.4 e 1.2 _ 0 1 0 U 0.6 a 0.4 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N ^ N N N N N N N N N 00 Date 1=111 Off -Site Rainfall Amount - Groundwater Gauge 1 - Required Depth Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project 4333 Monitoring Year 6 Growing Season: April 14- October 24 10 0 -5 9 -10 3 c -15 V -20 a Q -25 -30 9 -35 -40 36 Consecutive Days Shepherds Tree Hydrology Monitoring -W6 Groundwater Gauge 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C. 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N 00 � � � M \ � 7 00 •-•. .�-i Q\ M � O 7 V1 Vl �O lFz 00 O� O O •\+ Date Off -Site Rainfall Amount - Groundwater Gauge 2 Required Depth 2 1.8 1.6 1.4 S 1.2 c 7 O 1 0 0.8 ;a a`. 0.6 0.4 0.2 0 Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project 4333 Monitoring Year 6 Growing Season: April 14- October 24 Shepherds Tree Hydrology Monitoring -MY6 Groundwater Gauge 3 2 5 0 1.8 1.6 -5 1.4 -10 b id 1.2 3 -15 � � 1 0 V 0 o a -20 '« 0.8 .Q 9 Consecutive Days 0.6 � 0.4 _30 P, 0.2 -35 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N O N N N vl vii n 00 CN O O Date Off -Site Rainfall Amount — Groundwater Gauge 3 — Required Depth Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Growing Season: April 14- October 24 Shepherds Tree Hydrology Monitoring -W6 Groundwater Gauge 4 2 10 5 1.8 0 1.6 -5 1.4 .S b -10 1.2 o -15 1 � v o •R o s -20 37 Consecutive G Days -25 0.6 r a 0.4 -35 d t 02 ` p -40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N 0 0 0 0 N N N N 0 0 0 0 0 0 N N N N N N 0 0 N N 0 0 N N N M •-- N N \ 7 00 N 00 M n O Date Off -Site Rainfall Amount — Groundwater Gauge 4 — Required Depth Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Growing Season: April 14- October 24 0 -5 -10 .S -15 3 v o -20 V c -25 N Q -35 -40 Shepherds Tree Hydrology Monitoring -MY6 Groundwater Gauge 5 o O O o O o O o o O o O o 0 o O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N �. — Q � 00 N.i 01 M \ 7 00 z .�. T M r- O N N N N 00 N — N V'1 h r- 00 D\ a, O O Date Off -Site Rainfall Amount — Groundwater Gauge 5 — Required Depth 2 1.8 1.6 1.4 c 1.2 c 0 I G' 0.8 'a U 0.4 0.2 0 a I L iH I L__ —IOU I I -. _.- --1 -1 o O O o O o O o o O o O o 0 o O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N �. — Q � 00 N.i 01 M \ 7 00 z .�. T M r- O N N N N 00 N — N V'1 h r- 00 D\ a, O O Date Off -Site Rainfall Amount — Groundwater Gauge 5 — Required Depth 2 1.8 1.6 1.4 c 1.2 c 0 I G' 0.8 'a U 0.4 0.2 0 Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Crowing Season: April 14- October 24 Shepherds Tree Hydrology Monitoring -W6 Groundwater Gauge 6 10 5 0 -5 .5 -10 c c -15 C7 0 -S -20 D -25 -30 79 Consecutive Days a i A r E � E a ti 1 l i Iq -35 - 0 E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 M 22 S2 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N Date Off -Site Rainfall Amount — Groundwater Gauge 6 — Required Depth 2 1.8 1.6 1.4 1.2 .5 y I' c 0.8 0 'o. 0.6 4 0.4 0.2 0 6 Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Growing Season: April 14- October 24 (Gauge malfunctioned 9/2010) Shepherds Tree Hydrology Monitoring -MY6 Groundwater Gauge 7 0 2 1.8 -5 1.6 -10 1.4 -15 1.2 8 10 Consecutive b -20 Days a 1 0.8 o g -25 ;a a Q 0.6 a Q -30 j 0.4 -35 0.2 -40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N � \ N d' 7 v1 V1 �O n 00 O� Date — Off -Site Rainfall Amount — Groundwater Gauge 7 — Required Depth Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration /EEP Project #333 Monitoring Year 6 Growing Season: April 14- October 24 Shepherds Tree Hydrology Monitoring -MY6 Groundwater Gauge 8 2 10 5 1.8 0 N\N 1.6 1.4 -J 1.2 5 -10 3 R � c 1 U -15 74 Consecutive 0.8 °- o Days -20 ca 0.6 a -25 a 4 i 0.4 -30 I 0.2 0 -35 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N Q N N N N N 00 �O O� M \ 7 00 .�. CS Date =11111 Off -Site Rainfall Amount - Groundwater Gauge 8 - Required Depth Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Growing Season: April 14- October 24 (Gauge malfunctioned at the beginning of the growing season prior to starting the 2010 monitoring) 0 -5 "I 11 14 3 -20 2 C7 0 ry -25 N Q -30 -35 40 Shepherds Tree Hydrology Monitoring -MY6 Groundwater Gauge 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N l� 00 Date Off -Site Rainfall Amount - Groundwater Gauge 10 - Required Depth 2 1.8 1.6 1.=1 c 1.2 c 0 0 1 Q e 0 0.8 s U 0.6 a 0.4 0.2 0 Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Growing Season: April 14- October 24 i Shepherds Tree Hydrology Monitoring -W6 Groundwater Gauge 11 10 2 1.8 5 1.6 1.4 v 0 1.2 .5 iu 1 ..= 0 219 Consecutive = U -5 Days 0.8 0 G E 1 0.6 -10 4 I 5 -15 0 O O O O O O N N N N N N O O O O O O N N N N N N O O O O N N N N �V 7 h vl n 00 Date � Off -Site Rainfall Amount — Groundwater Gauge 11 — Required Depth i Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Growing Season: April 14- October 24 (Gauge malfunctioned 11/2010) Shepherds Tree Hydrology Monitoring -MY6 Groundwater Gauge 12 15 2 I.R 10 1.6 1.4 5 a 1.2 S L � 0 t�/ C 1 ,v3 a L 0 219 Consecutive a 0 0'8 .� L _� Days a Q 0.6 a 1 i 0.4 -10 0.2 -15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C. 0 0 0 N N N N N 0 0 0 0 0 0 N N N N N N 0 C, 0 0 N N N N It N ,N. N z Q Q �O N � N zt O20 Z Q n � oo 0% n N N Q "r 't kn t` oo 0% 0% O O Date Off -Site Rainfall Amount — Groundwater Gauge 12 — Required Depth Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Growing Season: April 14- October 24 (Gauge malfunctioned at the beginning of the growing season prior to starting the 2010 monitoring) s Shepherds Tree Hydrology Monitoring -W6 Groundwater Gauge 13 5 2 0 1.8 -5 1.6 1.4 -10 v 1.2 v. u -15 N 53 Consecutive 5 1 o -20 Days ¢ C7 0.8 .2 o � a -25 4 ;a q 0.6 e -30 a 0.4 -35 0.2 IIIJ -40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N 0 0 N N 0 N N IN ^ Date Off -Site Rainfall Amount — Groundwater Gauge 13 — Required Depth s Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Growing Season: April 14- October 24 (Gauge malfunctioned at the beginning of the growing season prior to starting the 2010 monitoring) 0 -5 -10 iv 3 c 0 0 -15 c A -20 -25 Shepherds Tree Hydrology Monitoring -MY6 Groundwater Gauge 14 53 Consecutive Da s 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N Date Off -Site Rainfall Amount — Groundwater Gauge 14 — Required Depth 2 1.8 1.6 1.4 1.2 c 1 0 C 0.8 .o 2 .Q 0.6 a 0.4 0.2 I 0 Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Growing Season: April 14- October 24 Shepherds Tree Hydrology Monitoring -MY6 Groundwater Gauge 15 2 5 11 Consecutive 0 Days 1.8 1.6 -5 1.4 -10 1.2 •°-� -15 Y e 2 -20 c c7 0.8 a -25 Q p 0.6 -30 9 0.4 -35 0.2 -40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O o N N N N N N C. 0 0 0 0 0 N N N N N N Q 00 0 0 0 N N N M 0 N •�. 00 N �O O� M \ N •-- N N \ 00 � r- N O� M [� N \ N O \ el• h Vl �D l� 00 Date Off -Site Rainfall Amount — Groundwater Gauge 15 — Required Depth Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Growing Season: April 14- October 24 Shepherds Tree Hydrology Monitoring -MY6 Groundwater Gauge 16 2 10 5 1.8 1.6 -5 1.4 -10 1.2 ^ a L -15 1 R -20 .. U I 71 Consecutive 0.8 -25 Days 15 a 0.6 n -30 a -35 0.4 -40 0.2 -45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N 00 � ON N \ N 7 �f' vl VI 00 Date � Off -Site Rainfall Amount - Groundwater Gauge 16 - Required Depth Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Growing Season: April 14- October 24 5 0 -5 -10 L c o -15 0 0 s Q -20 -25 -30 21 Consecutive Days Shepherds Tree Hydrology Monitoring -W6 Groundwater Gauge 17 Growing Season (April 14 - October 24) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N 0 0 0 0 0 \J N N N N 0 0 0 0 0 N N N N N 0 0 0 0 0 N N N N N r- O Date Off -Site Rainfall Amount Groundwater Gauge 17 - Required Depth 2 1.8 1.6 1.4 1.2 ,g 7-i I 0.8 0 0.6 a, 0.4 0.2 0 Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Growing Season: April 14- October 24 (Gauge malfunctioned at the beginning of the growing season prior to starting the 2010 monitoring; another malfunction or an incorrect calibration occurred in 7/2010 and 8/2010) Shepherds Tree Hydrology Monitoring -MY6 Groundwater Gauge 18 2 0 -5 1.8 -10 1.6 1.4 -15 c 1.2 -20 c 3 c I g -25 a c7 0.8 O :d -30 ° �" c 0.6 2 A a -35 0.4 -40 0.2 -45 0 0 0 0 0 0 0 0 0 N N N N O � Date Off -Site Rainfall Amount — Groundwater Gauge 18 — Required Depth Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration /EEP Project 4333 Monitoring Year 6 Shepherds Tree Hydrology Monitoring -MY6 Surfacewater Gauge 1 2 0 -i 1.8 -10 a i 1.6 1.4 1.2 .5 -20 p � a 1 0 0 [ -25 a 0.8 .o w -30 a 0.6 2 a. -35) 0.4 -40 0.2 -45 0 0 0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N 7 00 Date � Off -Site Rainfall Amount -Surfacewater Gauge 1 Bankfull Elevation Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration/EEP Project #333 Monitoring Year 6 Shepherds Tree Hydrology Monitoring -MY6 Surfacewater Gauge 3 0 2 1.8 -5 1.6 -10 1.4 -15 1.2 v y -20 ; 1 g � 0.8 ' -25 a w 0.6 -30 0.4 -35 0.2 -40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N 0 0 0 0 0 0 N N N N N N 0 0 0 N N N 0 N N N N N S2 l� N N O \ Date Off -Site Rainfall Amount -Surfacewater Gauge 3 Bankf ill Elevation Appendix 5.1 Precipitation - Water Level Plots for Gauges Shepherds Tree Stream and Wetland Restoration /EEP Project #333 Monitoring Year 6 Shepherds Tree Hydrology Monitoring -MY6 Surfacewater Gauge 4 2 0 1.8 -5 I 1.6 -l0 1.4 1.2 -15 1 S -20 c 0.8 .o w -25 0.6 a 0.4 -30 M 0.2 0 _ -35 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N 0 0 0 0 0 N N N N N 0 0 0 0 0 0 N N N N N N 0 0 0 0 N N N N :t 00 •-- O� M l� O � d• •S vl � � n 00 � � O O Date I Off -Site Rainfall Amotuit -Surfacewater Gauge 4 Bankfull Elevation Appendix 5.2 Wetland Criteria Attainment Shepherds Tree Stream and Wetland Restoration /EEP Project 4333 Monitoring Year 6 Summary of Groundwater Gauge Results for Years I through 7 Success Criteria Achieved /Max Consecutive Days During Growing Season (Percentage %) Gauge Year 1 (2005)* Year 2 (2006) Year 3 (2007) Year 4 (2008) Year 5 (2009) Year 6 (2010) Year 7 (2011) Yes /35 Days Yes /17 Days Yes/ 18 Days Yes /17 Days Yes /24 Days GW 1 Yes 44% 9% 25% 30% 38% No /1 Days No /0 Days Yes /194 Days Yes /29 Days Yes /36 Days GW2 No (I % ) (0% 100% (35 %) 52 %) No /8 Days Yes /20 Days Yes /16 Days No /9 Days GW3 No ** 4% 29% 24% 18% Yes /25 Days No /11 Days Yes /46 Days Yes /49 Days Yes /37 Days GW4 Yes 37% 6% (37% ) (51% (50 %) No /0 Days No /0 Days No /0 Days No /0 Days GW5 No No /0 Days (0 %) 0% 0% 0 %a 0% Yes /76 Days Yes /76 Days Yes /59 Days Yes/] `11 Days Yes /79 Days GW6 No 72% 74% 83% (94%T- (84% Yes /22 Days No /11 Days No /5 Days Yes /15 Days No /10 Days GW7 No 32% 6% 12% (21%)- - 23% Yes /54 Days Yes /33 Days Yes /46 Days Yes /81 Days. Yes /74 Days GW8 Yes 78% 30% 66% 70% 79% Yes/ 109 Days No /4 Days No /5 Days No /4 Days No /0 Days GW 10 Yes 86% 2% 8% 7% ) (0%)** Yes/ 194 Days Yes /150 Days Yes /194 Days Yes/194 Days Yes/219 Days GW I I Yes (100% ) (77% 100 %) 100 %) 100% Yes /94 Days Yes /61 Days Yes /61 Days Yes /87 Days Yes /200 Days G W 12 Yes 88% 49% (85%)- 86% 93% Yes /194 Days Yes /47 Days Yes /80 Days Yes /81 Days Yes /53 Days GW 13 No 100% 45% 90 %) 70% (76%)** Yes /194 Days Yes /46 Days Yes /67 Days Yes /80 Days Yes /53 Days GW 14 Yes 100% 44% 89% 60% (75%)** Yes/ 194 Days No /9 Days Yes /161 Days No /12 Days Yes /11 Days GW 15 No 100% 5% 87% 16% 16% Yes/194 Days No /3 Days Yes/160 Days Yes /21 Days Yes /71 Days GW 16 No 100% 3% 86% 42% 68% No /3 Days No /5 Days Yes /19 Days Yes /21 Days GW 17 N/A No /4 Days (8 %) 2% 8% 18% 16% No /11 Days No /8 Days No /13 Days No /9 Days No /5 Days GW18 N/A 18% (4 %) 16 %) 16 %) (1 %)^^ *Raw data was not provided, results from 2005 monitoring report. * *Gauge malfunctioned and was not replaced until after the growing season and beaver removal. ^Gauge mailfunctioned 10/7/2008, replaced 11/2008. * *Gauge mailfunctioned prior to monitoring beginning (date of failure unknown- unable to download gauge), replaced 6/2010. 'Gauge mailfunctioned prior to monitoring starting date; malfunction or incorrect calibration occurred after first visit (date of failure unknown - unable to download gauge), replaced 9/2010. K I X Go,)SIC earth feet 4000 km 1A Zvi 3 -� 6 6 -2> 3 r 35.72851, - 80.758938 - Google Maps Page 1 of 1 http: / /maps.google.coml maps ?f--q &source= s_q &hl= en &geocode = &q= 35.72851,+ -80.75 89... 5/5/2012 Address North Carolina Shepards Tree Mitigation Gao,g e 20031306 -2,3 &Iz - IS,2- t� �b S�cy Neetl�o e Rd ?t � me •�. p ry0 F IlmS6 X. Statesville j Coto" Clod � F s 3 0 70 Twin Oa k3 .� Golf Cotose 70 ® 70 Salisbury Htvy �rO C��F:;huC�� 70 70 S x ac a to Cleveland Q4 r -F * S��tesO &1yp 88t A7nR'1 "Ilk a 2 $�a hi 5 qA S, OstwaltAM� o p o- �an� 801 O 80t 0 Mt ulla $ 0 2t d ti`s t Mazeppa 0 (t �n s x S ®2012 Google - Map data 02012 Goo* http: / /maps.google.coml maps ?f--q &source= s_q &hl= en &geocode = &q= 35.72851,+ -80.75 89... 5/5/2012