Loading...
HomeMy WebLinkAbout20050450 Ver 1_Year 4 Monitoring Report_201001150 -Aq Haw Branch Mitigation Project Onslow County, North Carolina DENR -EEP Contract No. D04015 - FINAL- Prepared for Environmental Banc and Exchange, LLC 909 Capability Drive, Suite 3100 Raleigh, NC 27606 Prepared by WK Dickson and Co., Inc. // \ 720 Corporate Center Drive Raleigh, NC 27607 (919) 782 -0495 And Ecosystem & Land Trust Monitoring PO Box 1492 3674 Pine Swamp Road Sparta, NC 2867 RECEIVED November 2009 DEC 0 R 2009 NC ECOSYSTEM ENHANCEMENT PRWRA&q Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Table of Contents 10 SUMMARY 20 INTRODUCTION 2 2 1 Project Description 2 22 Project Purpose 2 23 Project History & Schedule 2 30 HYDROLOGY 6 31 Hydrologic Success Criteria 6 32 Description of Hydrology Monitoring Efforts 6 3 3 Results of Hydrology Monitoring 9 3 3 1 Site Data 9 3 3 2 Reference Data 11 3 3 3 Climate Data 11 34 Hydrologic Conclusions 13 40 VEGETATION 13 41 Vegetation Success Criteria 13 42 Description of Species and Vegetation Monitoring 13 43 Results of Vegetation Monitoring 14 44 Vegetation Observations & Conclusions 15 50 STREAM MONITORING 15 5 1 Stream Success Criteria 15 52 Stream Morphology Monitoring Plan 16 5 2 1 Cross Sections 16 5 2 2 Longitudinal Profile 16 5 2 3 Hydrology 16 5 2 4 Photo Reference Stations 16 5 3 Stream Morphology Monitoring Results 16 5 3 1 Cross Sections 16 5 3 2 Longitudinal Profile 17 54 Stream Conclusions 21 6 0 CONCLUSIONS AND RECOMMENDATIONS 21 i November 2009 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) List of Figures Figure 1 Vicinity Map 4 Figure 2 USGS Map 5 Figure 3 Monitoring Summary Map 7 Figure 4 Groundwater Hydrographs 9 Figure 5 2009 Rainfall 12 Figure 6 Stream Problem Areas 19 List of Tables Table l Project Mitigation Structure and Objectives 2 Table 2 Project Activity and Reporting History 2 Table 3 Project Contacts 3 Table 4 Hydrologic Monitoring Results 1 1 Table 5 Comparison of Normal Rainfall to Onslow County 2009 Observed Rainfall 12 Table 6 Planted Tree Species 13 Table 7 Results of Vegetation Monitoring 14 Table 8 Volunteer Tree Species within the Wetland Restoration Area 15 Table 9 Stream Areas Requiring Observation 17 Table 10 Crest Gauge Data 17 Table I 1 Summary of Morphologic Monitoring Parameters 18 APPENDICES Appendix A As -Built Survey Appendix B 2009 Profile and Cross Section Data Appendix C 2009Gauge Data Appendix D 2009 Site Photos u November 2009 0 a Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) 1.0 SUMMARY This Annual Report details the monitoring activities during the 2009 growing season on the Haw Branch Mitigation Site Construction of the site was completed in December 2005 The 2009 data represents results from the fourth year of hydrologic, vegetation, and stability monitoring for both wetlands and streams Restoration of the Haw Branch site involves stream restoration, and riverme wetland restoration Restoration of the site included the construction of a stable meandering channel across hydric agricultural fields The channel was designed and constructed using natural channel design techniques Restoration also involved raising the local water table by filling drainage ditches on- site and creation of microtopography across the site After construction, it was determined that there is 10,005 linear feet of stream restoration and 25 8 acres of riverme wetland restoration This Annual Report presents the data from seven hydrologic monitoring stations, twenty vegetation monitoring plots, two crest gauges, a rain gauge, and twenty-one cross sections, as required by the approved Restoration Plan for the site All seven of the hydrologic stations are equipped with HOBO automated data loggers In 2009, six of seven hydrology monitoring gauges at the site recorded wetland hydroperiods of at least 17 percent of the growing season The remaining gauge exhibited a wetland hydroperiod of two percent of the growing season These results are similar to previous year's results which documented monitoring gauge hydroperiods significantly higher than the specified success criteria Weather station data from the Hoffmann Forest Weather Station were used in conjunction with a manual rain gauge located on the site to document local precipitation amounts The manual gauge is used to validate observations made at the automated weather station The manual gauge was damaged in the early part of the growing season and was not replaced until June, therefore on -site data is not available from January through June The rainfall total from the Hoffmann gauge was slightly below normal limits in January and February Rainfall was within normal limits for March, April, June, July, August, and September, and above normal limits for May Based on data collected from the Hoffman Forest Weather Station, 2009 had normal rainfall This Annual Report documents vegetation survival based on twenty vegetation - monitoring plots, as specified in the approved mitigation plan for this site The vegetation monitoring indicated a range of 160 stems per acre to 720 stems per acre with an average of 576 stems per acre Overall, the site has met the initial vegetation survival criteria of 320 stems per acre after the third growing season and is on track to meet the final vegetation success criteria of 260 surviving stems per acre after the fifth growing season The restored stream channel has remained stable and is providing the intended habitat and hydrologic functions Eight bankfull events were recorded during the year All monitored cross sections show very little adjustment in stream dimension, and it was concluded that the site remains on track to achieve the stream success criteria specified in the Restoration Plan for the site November 2009 t Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) 2.0 INTRODUCTION 2.1 PROJECT DESCRIPTION The Haw Branch wetland and stream restoration site is located near the community of Richlands in Onslow County, North Carolina (Figure 1 and Figure 2) The site has a past history of agricultural use consisting primarily of row crop agriculture Ditches on the site were used to increase subsurface drainage when the land was under agricultural production Construction of the site, including planting of trees, was completed in December 2005 Groundwater, surface water, and rain gauges were functional beginning January 2006 The 2009 monitoring season represents the fourth year of monitoring for the site As -built sheets for the Haw Branch Mitigation site are shown in Appendix A 2.2 PROJECT PURPOSE Monitoring of the Haw Branch Site is required to demonstrate successful restoration based on the criteria found in the Restoration Plan and through a comparison to reference site conditions Hydrologic, vegetation, and stream monitoring are conducted on an annual basis Success criteria must be met for five consecutive years Table 2 details the project history and schedule Table 1. Project Mitigation Structure and Objectives Reach Name As -Built Length ft Mitigation Units Restoration Approach Stream January 2006 Post - restoration Monitoring Begins November 2006 UT 1 A 3,148 3,148 Restoration UT 1 B 2,975 2,975 Restoration UT2 2,967 2,967 Restoration UT3 915 915 Restoration Total 10,005 10,005 Wetland 25.8 acres 25.8 Restoration 2.3 PROJECT HISTORY & SCHEDULE Table 2. Project Activity and Reporting History Month Activity January 2005 Construction Completed January 2006 Post - restoration Monitoring Begins November 2006 1 st Annual Monitoring Report November 2007 2nd Annual Monitoring Report November 2008 3rd Annual Monitoring Report November 2009 4th Annual Monitoring Report November 2010 scheduled 5th Annual Monitoring Report November 2009 •I [1 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Table 3. Project Contacts Contact Firm Information Project Manager EBX -Neuse 1, LLC Norton Webster 919 608 -9688 Designer Buck Engineering PC Kevin Tweedy, PE 919 463 -5488 Monitoring Contractor WK Dickson and Co, Inc Daniel Ingram 919 782 -0495 3 November 2009 0 0 State a d R .. -00 Highw I i:. � � Haw Branch Project Site _ - >4 a 181 °' - sI a - �, ' spa p ..� a d 121 R - - - Q� "state ; d y` N G p ..i . N m a JVC d 4) 1221 o 'm ILOO Sta m State Road Figure 2. Haw Branch Stream Mitigation Site USGS Topographic Map Onslow County, NC 1 inch equals 1 miles 0 0 c J ,r tdf° o �Od d 7� � soy a J 0 N ' O u Qo 1%AQ RON C5 'nr � GN N State a 8d �^ a 0 m H19 a Y 24 Sheri N Srat, R Haw Branch Project Site � = I 0 .dfP �o �O N 'P N d � fA � 0 , G �O Q' NC Hi da d d 9hway r�1 's ;, N 00 f�\ �/ \ CO state Road �2 .m V EBX Figure Project Location Map Onslow County, equals 1 inch Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) 3.0 HYDROLOGY 3.1 HYDROLOGIC SUCCESS CRITERIA As stated in the approved Restoration Plan, to meet the hydrologic success criteria, the monitoring data must show that for each normal year of rainfall within the monitoring period, the site has been inundated or saturated within 12 inches of the soil surface for a minimum of 7 percent of the growing season (17 days) The day count is based on the growing season for Onslow County, which is 239 days long (18 March through I 1 November) As specified in the approved Restoration Plan, data are collected from seven HOBO automated groundwater gauges The Restoration Plan further specified that in order for the hydrologic data to be considered successful it must be demonstrated that precipitation is either within or below normal limits Two additional HOBO automated groundwater reference gauges were installed along Haw Branch downstream of the restoration area 3.2 DESCRIPTION OF HYDROLOGY MONITORING EFFORTS Seven automated HOBO groundwater gauges were installed in February of 2008 to replace and supplement the existing 3 automated Infinities gauges and the 3 manual groundwater gauges that were installed before the beginning of the 2006 growing season In addition, two manual stream crest gauges were installed in 2006 on reaches UT1B and UT3 (Figure 3) An additional Infinities groundwater gauge was installed at the site for the 2007 growing season, but was subsequently replaced with a HOBO gauge in early 2008 The monitoring protocol for the site specifies that automated monitoring stations will be downloaded and checked for malfunctions on a monthly basis During monthly site visits the crest gauges are read and rainfall totals are collected from the on -site rain gauge The hydrologic monitoring data are presented in Appendix C Automated Gauges Automatic groundwater gauges record water table elevations four times a day at 06 00, 12 00, 18 00 and 24 00 (every six hours) HOBO gauges employ pressure sensors that record water depth above the bottom of the sensor (with a separate above ground ambient gauge located somewhere on site for comparison purposes) Each HOBO gauge is housed inside of a 2" diameter PVC casing which extends a minimum of 36" below the soil surface This well also acts as a manual calibration gauge The calibration water table depth is recorded at monthly downloads To determine wetland hydropenods the automatically recorded data are compared to the calibration data to determine a standard correction factor between the calibration gauge and the automatic gauge for each location The standard correction factor is applied to correct daily readings The corrected daily readings are then used to determine wetland hydroperiods Data Interpretation Wetland hydroperiods are calculated from water table depth recordings that are taken four times a day A wetland hydroperiod is defined as when the water table is equal to or less than 12 inches below ground surface for at least 24 hours If a water table falls below 12 inches for three consecutive readings (12 hours) then the wetland hydroperiod ends at the last reading within 12 inches If a water table falls below -12 inches for only one of the readings then maintains a reading above -12 inches for a minimum of 24 hours then the wetland hydroperiod is calculated continuously This methodology accounts for minor technical malfunctions occasionally experienced by the automatic gauges 6 November 2009 0 40 �l! XSEC6 \ \ WETLAND HYDROPERIOD O >7X Q 5-7 X • <5X \J _ 1\_( \ 1 I CGJ A Haw Branch Monitoring Summary �f 1 C � ! C� C; XSECS UT1b WETLAND HYDROPERIOD 11 r- 1 I tit e ` i 1 l -- S I l O >7X ON T I I 9 L f�/ �z1 ,L 'S 1�� I. ��' - , ,~ J, , 4 ` 5-7 X < 5 X ti�V1 f � I� � � `� �� � % I 1 � ? i � ti� Y \ `'3*� 4 , 1 ~I 1����fi,; Y, ` " tiS t � � �^ '_ __' � �• VEGETATION PLOT • `.� �j'- �/ �� r ) \ I �, Y t` .✓/"� �y Y jr \k �,,� �vf 'xseclo if C W \ >Nf AETATI O PLOT CRE6T'OAINiE VEgETATION PLOT 1 XSECII VEOETATIOti ORE6T GhJGE • XSEC13 J I I V tTAmN PLOT \ ` 1 XSEC12,\ AUTOMATIC 1 WELL #6 / _ ErnnoN war _ \ : =- %.li'Ir. +lam NNI it\ ! C 43 Haw Branch Monitoring Summary f Figure 3b 100 50 0 100 200 ju SCALE (FT) Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) 3.3 RESULTS OF HYDROLOGY MONITORING 3.3.1 Site Data The following hydroperiod statistics were calculated for each monitoring station during the growing season: 1) most consecutive days that the water table was within twelve inches of the soil surface; 2) cumulative number of days that the water table was within twelve inches of the soil surface; and 3) number of times that the water table rose to within twelve inches of the soil surface. The results of these calculations are presented in Table 4. Figure 4 provides charts of the water depth for each of the monitoring gauges on the site. Raw hydrograph data collected from the monitoring gauges are provided in Appendix C. Figure 4. Groundwater Hydrographs Figure 4a. 2009 Haw Branch Groundwater Gauges 0 r V -10 C O a � -2n d 3 7 O �I1 -50+.. .�. �. .a. .a r..� . • • ...�. �� .. .tea as ��� 1 F \I M ! 1 S O N D Months M Hoflrtrerm (NHOF) Daily Rainfall AW 1 AW2 AW3 10 9 y L 6 C C 5 4 •C L d 0 9 November 2009 10 0 .e u -10 C 7 d � -20 V m 0 e -30 O V 40 Haw Branch Mitigation Site Annual Monitoring Report, for 2009 (Year 4) Figure 4b. 2009 Haw Branch Groundwater Gauges 10 9 8 7 h d t 6 C C S O a :a a a 3 2 1 -50 +u. 0 Months MHodrorn(NHOF)Da4RamfaU \ \\a AW5 AW6 Figure 4c. 2009 Haw Branch Groundwater Gauges 10 10.0 Growing Season 9.0 0 8.0 t it J TO v--- - - - - -- -- - - - - - - -- - - -- `- - - ----- -------- a c r0. 6.0 O W � � d .0 W -20 ` 5.0 .LO, 3 'u 7 V C -30 p, 3.0 I 2.0 -a0 A .� l.l. �. ��i��I, �� .0 -,o ]L � � � +� ,1� L� L 0.0 J F M A M J i A S O N D Months MHofhrenn(NHOF)DailyRamfiU AW7 — REF -BP REF -WO 10 November 2009 0 0 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Table 4. Hydrologic Monitoring Results 2009 Max H dro 'eriod Growin ,Season 20 -Mar through 15 -Nov, 241 days) Gauge Consecutive Cumulative Occurrences Days Percent of growing Season, Days Percent of growing Season AW 1 47 20 144 60 9 AW2 96 40 197 82 6 AW3 97 40 206 86 7 AW4 117 49 211 88 4 AW5 5 2 27 11 12 AW6 42 17 153 64 11 AW7 45 19 119 50 12 Reference Gauges - RAW 1 46 19 140 58 13 RAW2 1 1 3 1 3 The 2009 monitoring data demonstrate that most of the site is functioning as designed Six gauges, AW 1, AW2, AW3, AW4 AW6 and AW7, have exceeded the seven percent hydrologic success criteria for the growing season Six of seven gauges have recorded hydroperiods far greater than the specified success criteria, with hydroperiods ranging from 17 to 49 percent of the growing season The exception was AW5, which recorded a shorter period than desired during all four years 3.3.2 Reference Data The approved Restoration Plan provides that if the rainfall data for any given year during the monitoring period is not normal, the reference wetland data can be used to determine if there is a positive correlation between the performance of the restoration site and the natural hydrology of the reference site The Haw Branch reference wells are located just a few miles south of the restoration site on Dell Brock Rd The reference data indicate that the restoration area exceeded reference hydrology 3.3.3 Climate Data Comparisons of the 2009 monthly rainfall totals to historical precipitation for Onslow County are shown in Table 5 and Figure 6 Monthly rainfall recordings are on -site and the daily rainfall readings are from a Hoffmann Forest weather station in Onslow County No on -site rain gauge data was collected for the months of January through April The rainfall total from the Hoffmann gauge was slightly below normal limits in January and February Rainfall was within normal limits for March, April, June, July, August, and September, and above normal limits for May Based on data collected from the Hoffman Forest Weather Station, 2009 had normal rainfall Rainfall data collected from the on -site visit in November is a cumulative amount from October and November 11 November 2009 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Table 5. Comparison of Normal Rainfall to Onslow County 2009 Observed Rainfall Month Average Normal Limits Hoffmann Monthly Precipitation On-Site to Precipitation 30 Percent 70 Percent January 5.17 4.00 6.13 2.23 - -- February 4.16 2.43 4.59 1.80 - -- March 4.64 3.37 5.14 3.85 - -- April 3.15 1.79 4.12 2.56 - -- May 3.67 2.58 4.27 4.93 - -- June 4.95 2.98 5.86 4.06 2.82 July 7.22 5.06 8.60 5.76 5.21 August 7.55 4.97 8.77 7.81 8.34 September 6.77 3.40 8.74 5.58 2.47 October 3.70 1.88 4.90 1.64 - -- November 3.67 2.61 4.47 9.80 9.42 December 3.32 2.13 4.26 - -- - -- Annual - -- 1 53.06 61.67 - -- - -- Total 57.97 1 - -- - -- 50.02 28.26 *On -site rain gauge was damaged and therefore no rain data is available prior to June Figure 5. 2009 Rainfall 2009 Precipitation for Haw Branch Site io.at II Crowing Season 9.00 8.00 7.00 6.00 C C 5.00. ...... 4.00 L 3.00 '00 �t� ,1�>, _IA 11 11111 _ ...1.� �. << . ki Ill LL 11 r nt ni s v Months HofHrenn (NHOF) Daly Rainfall On -site Ramgauge 30th/70th Percentile - Hoffmann Monthly Rainfall 12 November 2009 0 a Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) 3.4 HYDROLOGIC CONCLUSIONS A portion of the southeastern corner of the Haw Branch mitigation site is not performing as well as expected AW5 has consistently recorded hydroperiods that fall short of the seven percent target, but the hydroperiods recorded by AW5 have matched with the hydroperiods recorded by reference gauge RW 1 At the beginning of 2007, a shorter well (18 inches deep) was installed at AW5 to determine if a deep sand lens was draining water from the well Based on further evaluation, it is likely that due to the close proximity of a deep drainage ditch to the east of the well and outside of the easement area, the water table is lower than anticipated in this portion of the mitigation site AW5 experienced a seven percent hydroperiod at a depth of 20 inches 4.0 VEGETATION 4.1 VEGETATION SUCCESS CRITERIA The interim measure of vegetative success for the Haw Branch Mitigation Plan is the survival of at least 320 3 -year old planted trees per acre at the end of Year 3 of the monitoring period The final vegetative success criterion is the survival of 260 5 -year old planted trees per acre at the end of Year 5 of the monitoring period Up to 20 percent of the site species composition may be comprised of invaders Remedial action may be required should these (i e loblolly pine (Pinus taeda), red maple (Acer rubrum), sweet gum (Liquidambar styraciflua), etc ) present a problem and exceed 20 percent composition Nine tree species were planted in the Wetland Restoration Area (Table 6) Table 6. Planted Tree Species ID Common Name Scientific Name FAC Status 1 Swamp Chestnut Oak Quercus michauxii FACW- 2 Coastal Willow Oak Quercus phellos FACW- 3 River Birch Betula nigra FACW 4 Green Ash Fraxinus pennsylvanica FACW 5 Overcup Oak Quercus lyrata OBL 6 Sugar Berry Celtis laevigata FACW 7 Swamp Tupelo Nyssa Mora OBL 8 Bald Cypress Taxodium distichum OBL 9 Sycamore Platanus occidentalis FACW- 4.2 DESCRIPTION OF SPECIES AND VEGETATION MONITORING The following monitoring protocol was designed to predict vegetative survival Twenty plots were established on the Haw Branch Site, to monitor approximately two percent of the site Sixteen plots are located adjacent to newly constructed streambeds to monitor the vegetation in the stream restoration buffer The other four plots are randomly located to represent the range of conditions that exist on the site The plots were randomly located within each zone and randomly oriented within the wetland restoration area Plot construction consists of metal fence posts at each of the four corners to clearly and permanently establish the area to be sampled Ropes were hung connecting all four corners to help in determining if trees close to the plot boundary were inside or outside of the plot Trees on and dust outside of the boundary that appear to have greater than 50 percent of their canopy inside the boundary were counted inside the plot A piece of white PVC pipe ten feet tall was placed over the metal post on one corner to facilitate visual location of plots throughout the five -year monitoring period All of the planted stems inside the plot were flagged and marked with a 3 foot 13 November 2009 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) tall piece of half inch PVC to mark them as the planted stems (vs colonizers) and to help locate them in the future Each stem is tagged with a permanent numbered aluminum tag 4.3 RESULTS OF VEGETATION MONITORING The following tables present stem counts for each monitoring plot Each planted tree species is identified across the top row, and each plot is identified down the left column The numbers on the top row correlate to the ID column of the previous table Trees are flagged in the field on an as need basis before the flags degrade Flags are utilized, because they will not interfere with the growth of the tree Volunteers are also flagged during this process Annual variation in stem count data can be attributed to mortality and regeneration from root stock of stems previously assessed to be dead Table 7. Results of Vegetation Monitoring Average Stems per Acre 576 Range of Stems per Acre 160 -720 Volunteer species will also be monitored throughout the five -year monitoring period (Table 8) Volunteer woody species were observed in most all of the vegetation plots especially in and around Plot 4, but were deemed too small to tally If these trees persist into the next growing season, they will be flagged and added to the overall stems per acre assessment of the site Sweetgum (Liquidambar styraciva) is the most common volunteer, though red maple (Acer rubrum) and river birch (Betula nigra) were also observed 14 November 2009 0 a ' Stem I , 0 ©000 ©0000® ' :1 © ©OOQOOOOOm ' 11 © © ©00© ©000 • :1 0 ©© ©0000 ©0� • 1 ©0000 ©0000' •' 1 000 © © ©0 ©00� • 1 ,00000 ©0000 •1 00000 ©0 ©00® ' : 1 m0000 ©00 ©0� • 1 ®00 ©000 © © ©� •' 1 ®000000000® .11 0000 ©00000 •1 ®0000 ®0000 ®� ©© ©000 ©0 ©m • : 1 ©00000 ©QO® • 11 © ©00 ©0000® • 11 ©0000000 ©� • :1 �OQOOm0000� • :1 Average Stems per Acre 576 Range of Stems per Acre 160 -720 Volunteer species will also be monitored throughout the five -year monitoring period (Table 8) Volunteer woody species were observed in most all of the vegetation plots especially in and around Plot 4, but were deemed too small to tally If these trees persist into the next growing season, they will be flagged and added to the overall stems per acre assessment of the site Sweetgum (Liquidambar styraciva) is the most common volunteer, though red maple (Acer rubrum) and river birch (Betula nigra) were also observed 14 November 2009 0 a Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Table 8. Volunteer Tree Species within the Wetland Restoration Area ID , Scientific Name Common Name FAC Status A Liquidambar styraciflua Sweetgum FAC+ B Acer rubrum Red Maple FAC C Betula nigra River Birch FACW 4.4 VEGETATION OBSERVATIONS & CONCLUSIONS The site was planted in coastal plain small stream swamp species in December 2005 There were twenty vegetation - monitoring plots established throughout the planting areas The data for 2009 documents that the site has achieved the initial success criteria of 320 trees per acre by the end of year three and is on track to meet the final success criteria of 260 trees per acre by the end of year five Vegetation monitoring efforts have calculated the average number of stems per acre on site to be 576, which is a survival rate of greater than 82% based on the initial planting count of 688 stems per acre With the exception of plot 14, the vegetation survivability should remain excellent on site and vegetative success criteria should be met Both green ash (Fraxinus) and hackberry (Celtis) readily regenerate from rootstock and, as both species were planted in plot 14, it is possible that regeneration will occur in 2010 After construction of the mitigation site, a permanent ground cover seed mixture of Virginia wild rye (Elymus virginicus), switch grass (Panicum virgatum), and fox sedge (Carex vulpinoidea) was broadcast on the site at a rate of 10 pounds per acre These species are present on the site An application of Oust, a pre- emergent herbicide, was applied to give the planted stems strong growth potential at the start of the growing season This practice seemed to have been successful as there is ample ground cover across the site and the trees seem to be growing very well Hydrophytic herbaceous vegetation, including rush (Juncus effusus), spike -rush (Eleocharts obtusa), climbing hempweed (Mtkania scandens) and sedge (Carex spp ), were observed across the site, particularly in areas of periodic inundation The presence of these herbaceous wetland plants helps to confirm the presence of wetland hydrology on the site There are quite a few weedy species occurring on the site, though none seem to be posing any problems for the woody or herbaceous hydrophytic vegetation Broomsedge (Andropogon spp ), dogfennel (Eupatorium capillifolium), wild dill (Foeniculum vulgare), and goldenrod (Solidago spp ) were observed on site The weedy species seem to pose very little threat to survivability on site 5.0 STREAM MONITORING 5.1 STREAM SUCCESS CRITERIA As stated in the approved Mitigation Plan, the stream restoration success criteria for the site includes the following Bankfull Events Two bankfull flow events must be documented within the five -year monitoring period Cross- sections There should be little change in as -built cross - sections Cross - sections shall be classified using the Rosgen stream classification method and all monitored cross - sections should fall within the quantitative parameters defined for "E" or "C" type channels 15 November 2009 Haw Branch Mitigation Site Annual Monitoring Report,or 2009 (Year 4) • Longitudinal Profiles The longitudinal profiles should show that the bedform features are remaining stable, e g they are not aggrading or degrading Bedforms observed should be consistent with those observed in "E" and "C" type channels • Photo Reference Stations Photographs will be used to subjectively evaluate channel aggradation or degradation, bank erosion, success of riparian vegetation and effectiveness of erosion control measures 5.2 STREAM MORPHOLOGY MONITORING PLAN To document the stated success criteria, the following monitoring program was instituted following construction completion on the Haw Branch Site 5.2.1 Cross Sections Two permanent cross sections were installed per 1,000 linear feet of stream restoration work, with one of the locations being a riffle cross section and one location being a pool cross section A total of 21 permanent cross sections were established across the mitigation site Each cross section was marked on both banks with permanent pins to establish the exact transect used Permanent cross - section pins were surveyed and located relative to a common benchmark to facilitate easy comparison of year -to -year data The annual cross - section surveys include points measured at all breaks in slope, including top of bank, bankfull, inner berm, edge of water, and thalweg Riffle cross sections are classified using the Rosgen stream classification system Permanent cross sections for 2009 (Year 4) were surveyed in August 2009 5.2.2 Longitudinal Profile A longitudinal profile of approximately 3,000 feet was surveyed in 2009 along the restoration reach Measurements include thalweg, water surface, bankfull, and top of low bank Each of these measurements is taken at the head of each feature, e g riffle, run, pool, and glide, and the max pool depth A common benchmark is used each year to facilitate comparison of year -to -year data The longitudinal survey for 2009 (Year 4) was conducted in August 2009 5.2.3 Hydrology Two crest gauges were installed on the site to document bankfull events (Figure 3) The gauges are checked monthly and the highest out -of -bank flow event that occurred during the past month is recorded 5.2.4 Photo Reference Stations Photographs are used to visually document restoration success Reference stations are marked with wooden stakes and Global Positioning Satellite (GPS) coordinates have been determined for each location Reference photos are taken at each permanent cross - section from both stream banks The survey tape is centered in the photographs of the bank, and the water line is located in the lower edge of the frame with as much of the bank as possible included in each photo In- stream structures (e g , rock vanes, cross vanes, and constructed riffles) that can be located are also photographed Photo reference stations will be photographed at least once per year for at least 5 years following construction 5.3 STREAM MORPHOLOGY MONITORING RESULTS 5.3.1 Cross Sections Year 4 cross - section monitoring data for stream stability were collected during August 2009 and were compared to baseline data collected in early 2006 as well as data collected during the three previous monitoring seasons The Year 4 cross - section survey shows that there has been very little adjustment to stream profile or dimension since construction All monitored cross - sections 16 November 2009 n n Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) fell within the quantitative parameters defined for "E" or "C" type channels Cross sections with photographs can be viewed in Appendix B 5.3.2 Longitudinal Profile In- stream structures installed within the restored stream include log vanes, log weirs, and root wads Visual observations of structures throughout the past growing season have indicated that nearly all structures are functioning as designed Log weirs placed in riffle areas have maintained riffle elevations and provided a downstream scour hole that provides habitat Some minor areas of localized erosion have been observed and will be monitored over the coming years to determine whether maintenance action is needed A number of beaver dams have been built across the channel The beavers have been trapped and removed from the site All structural problem areas are minor and localized, and no corrective actions are recommended at this time Table 9 provides a summary of areas requiring continued observation, and their locations are shown on Figures 6a and 6b Table 9. Stream Areas Requiring Observation ID Station Feature Problem 1 UT IA 10 +50 Beaver dam, beavers have been removed 2 UT IA 12 +20 Beaver dam, beavers have been removed 3 UT IA 14 +50 Mowed path across channel, no action is required 4 UT IA 30 +30 Root wad deteriorated, no action is required 5 UT 1B 42 +50 Root wad deteriorated, no action is required 6 UT 3 12 +00 Settled ditch plug, will continue to monitor 7 UT 3 14 +40 Beaver dam, beavers have been removed 8 UT 3 14 +50 Bank erosion at ATV crossing, no action is required During the 2009 monitoring year, eight bankfull events were documented during site visits (Table 10) In August, two events for Crest Gauge 2 were recorded The largest stream flow recorded was on Crest -Gauge 2 at 1 4 feet above bankfull elevation in November 2009 The profile survey indicated little change to channel dimensions (Table 11; Appendix B) Table 10. Crest Gauge Data Month Recorded _ „ Crest Gauge 1 (ft) Crest Gauge 2 (ft) January - -- - -- February - -- 040 March 030 060 Apnl 055 - -- May 030 080 June - -- 035 July - -- 040 August 055 1 30 September 000 000 October ___ ___ November 1 00 140 December ___ ___ 17 November 2009 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Table 11. Summary of Morphologic Monitoring Parameters Parameter Year 4 Reach IA Year 4 Reach 1B Year 4 Reach 2 Year 4 Reach 3 Bankfull Cross - sectional Area, Abkf (sq ft) 95 11 9 79 82 Avg Bankfull Width, Wbkf (ft) 152 160 164 134 Bankfull W/D 274 21 7 346 232 Bankfull Mean Depth, Dbkf (ft) 06 08 05 07 Bankfull Max Depth, Dmax (ft) 1 3 1 5 1 0 1 6 18 November 2009 0 40 `y O V 'o T2�- _'�,�� J� I i Haw Branch ` Stream Problem Areas UT1b Tj t; 1 �. A OT iI ' r4 \ 41 1 5 VEGETATION PLAT O d J �✓ j / / z SPA6 UT3 — pp VEOETAT ON PLOT �; �".•`.. SPAT �.. _. . CAM GAUGE VWrTMpN PLOT \ IN, VEGETATION P4t •...'` GREFT QAVGE .6 02 SPAS. AUTOMATIC WELL - \ VELETATION PLOT ++ \ IQ VEGETATION 04 ' f AUTOMATIC l/ Dy WELL r ^ \ VEGETAPON PLOT Haw Branch i \� Stream Problem Areas Figure 6b loo so o ,qo 20D 1 I � SCALE (FT) Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) 5.4 STREAM CONCLUSIONS Overall, the Haw Branch stream is performing as designed Cross section data indicates that little change has occurred since the stream was built Eight bankfull events occurred at the site in 2009 The stream is stable and problem areas are minimal and localized No corrective actions are recommended at this time It was concluded that the site is on track to achieve the success criteria specified in the Restoration Plan for the site 6.0 CONCLUSIONS AND RECOMMENDATIONS During 2009, multiple bankfull events on the site were documented during site visits The largest stream flow documented by CG2 crest gauge was a flow that occurred during November and was approximately 14 feet above the bankfull stage at the crest gauge The first four years of monitoring documents that the majority of the site is on track to achieve criteria specified in the Restoration Plan for the site In 2009, six of the seven gauges recorded hydroperiods far greater than the specified success criteria The remaining gauge exhibited a hydroperiod for a portion of the growing season • The restored stream channel has remained stable and is providing the intended habitat and hydrologic functions Multiple bankfull events were again recorded at the site in 2009 All monitoring cross sections showed very little adjustment in stream dimension and the site is on track to achieve the stream success criteria specified in the Restoration Plan for the site • Vegetation monitoring efforts have calculated the average number of stems per acre on site to be 576 The initial vegetation success criteria have been met and the site is on track to meet the final vegetation success criteria • Vegetation Plot 14 had low survivability in 2009, but resprouting from rootstock of green ash and hackberry are possible in 2010 • Monitoring gauge AW5 is not performing as well as expected Based on further evaluation, it is likely that, due to the close proximity of a deep drainage ditch to the east of the well and outside of the easement area, the water table is lower than anticipated in this portion of the mitigation site This gauge recorded a seven percent hydroperiod at a depth of 20 inches, and documented a hydroperiod that matched that recorded by a reference gauge 21 November 2009 I. ' 'l wil WO: a IOy:1 As -Built Survey Cpl t� Q �, A/ m � C o s� tl U i U U O � H a oy x �o ® o o N � J m p c�ZZQ N � pZ o Q p m o N y Owzv� 5 an Z�aJfApWa4' zC6, w 7d"owRN >I-�tnlm li. WLM9O00�oy0 =UJO.PF- �pp w�wc~i5?z -jOf ZwCD a�� LL O In o OF m �N IT U O a 0 Mill o 11 i d Y Y �Y a W� ~U O� y g J v t_p � = yay y_ . 16 �< W CL. p W Z I4 O O N E 0 v O p 0 N z x� Z x 0 CN _ QNQ QU �� 00, V y 00E w ~ 2� 0 o R i HONVY9 At VH &Tr[ZO 913910xar � � p U. U. C � N N O II � o Q0 02 O h U U� p tiOZ x < W W h o h a d o o o L LL N h h � LL O O O HONVY9 At VH &Tr[ZO 913910xar 11R_EBX_AB_PSH_3 dg. fD co J W 01 A W N� f0 O r O U A W N� O m -0 -w to rs--Im OX * :E0 vam mO� g o a 5 O s ° 3 m � m�o 3 m il ^ m � � m m - m m mw 3, m m m '�o° m am m m 3 _ 0 =cn — m m m 3 = m w m 7 m f m m> m 0- X X f 'o �m nm m 5 m< m m> 0 m m o x w c a a m O m m< 03 m m O m n o m o_ �° S co 3 ,. o m Q O y m gm0 to CL X <°O �°DmQ. va c ° w 3 m? w a= c �°' n m v= °D °' w 0 3roX0 fg mm °m �xmm =c m g 50 me ° m 0 =� � m 5 � Sir 3 mmo0. 0 :30eL CLmm- "cmicmi� w 0 g � mM= - mm<o• c0cs5- n =o 3�,0�0 m- m° 2Qm m m 3 -1 c QC = 0< m M= � d m m 0 m m m N W m m °°m0� m0wo 3W �3w =301 �' m0 °?nw°c =3 ?°' < °m0 m �n 9'm_ m n Cr ° m m 2 m m m n 3 m 8 mmm ox = n '�otrcn �VmmmrtnM 0 C) nm0m�°�ma3(A�<3vm�o�3 -2t, »° mm m Qm C o m am g rr 0 7 m 0 0 d m n n m m mm m m aw ?' m3 m m -�3 a nm � w _ nmv �m -v =S 0 5m n vao n m r m n' m CO m m m< 0 -0 2 w 0 0 o Q m m m S m o 3 0 m= m 9 m St CL m m o m gm nE m g n m w7 m 3 51 0= 2 m 0- n ° a 2 ' m m 0< n w m 0 00° ao _ � m a ; m c m m '' m i 0 o w m n c m o a m m a 0 f m Q m o m£ m o m ^m ' wm3m = > s m 3mm oc m m - w CL CL m w �< n CL m° m O m m W m '° 0 R ?c w 3 -am m a m y m m m ro 0= 13 0-00 1< 3 o w m m 3 >> 2 o o m W w : o <o wQ�mm=m0 -mxm nm m _ m0:3 amm °: �g n 0 x ?° W 0 m .7 W m 9 r0' m D m m 7 m 0 m .Q MM n m w n oD 7 V m ii C a 0 < ° O m �_ m m O 3 O .wi m =r S p 7 K f1° m� m '< o. = w 0• m m m ' a w� °° i 2m g y m n � m c to ° �� o m or =m 3 3 mcoo C C O= 0 7 m pa " m m w= m 3 m n v 0 �o 'O O », m m 7' n Q m = d m 0 3 m o w, c 3 m 3 c m m m 0 m m 3 m �m = m =g nm f m 0 mma <0 m° Om �_� v a6n m W c 3 'm -m am 0.m m 0 c g01 OL �o ° =ui� 0Q W 9.5 0 m nm m m m o m m 0 w w m n O m m �< m., r s m a m m 0 g n., (A m3 c3 =0• m c 9 <�XOg mm �a r'o'w m m o. m a m m W 2 o o m 2 3 m 00010 m�� o o O m 0 °°� y m m m m m m o m m w m o w g m w 0 3 o o c o o m 3 2 m SL m S=$:2 °�3 vat° mm > ° = 3 ° <w g m n _ m 3• w 3= m G'n m O X m O> CO m m Q .m. mm m � o �cm�3>•mw m C� o'•momo� 0<07m 0 g °mo° ='gym <� 2gv3 3 ro omxm nwmnf?m'mnQw� wm�>' 0< cc-in 335 m 3 o w mmo<i6 a sn (A gm mmv_,�53omm ° m m ° 3 3- m ro m° v 3 m o = n° m Q m= m 3 S m o 0:3 COX am- =rf f g ' =2 n w �c m m m m m Q ? o' o CL, m or m o CO o a a 3 o c o o a m 2 m °m0 m� °-' >> mmomagnm10 m-tn gw nm 7 m 8 m *°O 0 m am m 0 a N =a 0 m n S Q 0 1r 0 m n r 2 o F g m m a ic m 0 nv° m M o m f w 0 m w_ m —° 0� _ ac m° pj m m 7° Q w o. mX90 mmm 9 -3 0ar'o'9a 3gc0to CL m 3 3 0 m m m 9 m m m <= m m >; m� °< 0 2 CI RD nmi m O m° m 0 CD 0 w, am m c C D � m m w m ?m O.m to = Z n 0 0 m m m 3 g .. m o on m ° m°@ m m a m o? m m � a m c v o m ' CL w 3 m 3 m' 3 m e m Qm m 0v go co m o =3 magi m f °mmm 0 0 a m m 0 c m n g a Ca° m m m y 0 m 0M f Cc ws vvOUDw m'�mw �� Dm A. go m 3 co o �i c m m o � w m 'm m aW o m v c c m o m O 3 m m m m m 0. a So m n m m o o m ° 0 am m f= mmm x 5 r'D '�v me wmo$m =0 m m m 3 n m w m 0 m 3 m 2 mo�o m m�m m _ m mm m m m m w X j Vi= O �m — 21. z m m ° 0 0 On m 'm c m _ CD v w m a° m3 m mm CL ° xD ° 0 c 5 o = O n m w �m o n 7 0 o W O' m° t0 0 O. 0.' 0 m 2 m m ° my m f g '= w n 0m gwc 9 m m m °O�m 'oy On n40m a gm CL 0m m cm� g�I m5� 0. gF_-0 23� < m w G O. m ^O=" m w J— g m M m w c w w m �n r,m m 06 X n m m' mc 3 mm °X mw -00 o mP, m0 m+ Err 0 m m' _ w v m a 0 o3 a 9 w w o m < 2 w m o o m m o° -X m15 = 33 m 3: c-4 -4 ( n Cl) Cl) j ;13A-0 00zz9rrrr A W N c- A c- W "c------- N— v W W A W N �2252220a_M O M A W N Vt TTTTM00 A W N w D 3 N -+ W N N" N — -� N -� -�� r- -n 3 CD- 00r�nv 00-0M�zrr- MM0wDC�cocn 0 0 M 0 omvvTrMw- -10 -3 m m °' W m 0 m m c 3 c< m o o c 0 0" 0 m 3 m m 3 0 0 m 0 m p O O o y m O c 0 m m O 0 O 0 m m 2 ° m m 0 c 4 fn m 0 X x m m m 3 m x g m m 3 m 0 n m 3 0 c m m c 0 m 0 0 0 Z o 0 m D c m m 0 m o 0 c 2 m>> m m o 0 o ao 2r m - a m m m m O. Q 3 _> m =� o<i ,� m 0 m 0 - N m u+ o -, W o -, F C) w = .. n m m m C fn .. o' o0 c 7C m ai 7 o ?t m m 0 m 0 m< ® 0 V+ m a m o vZ ci m ci m z O N 0 '•••• m 0 m 0 $ c m m m m 0 0 g y m m m v => 9 0 o w Q m a .► 0 .« 0 0 0 rt � o m w m cn 0 m m m m o o, c T fn fA 3 m fq fn 0 � M m m 0. 0� m m c c c <m o �? 0 0 2 m 0°D� o T =m m 5 m '•v 0 m W N m m (7 0 m < mmm, < a. T mm "" '� m ( O C Ow inn 3 7 a 7 m3 7 w 0 m m m CL O cr m 0 W w m Co WO 0 0 2 ' m m G n m '0"' N V 0 p31 ; .m. C 7 0 a m m n m 7 ZNZZZZA DoDDDD°D W W ZPZ7, D�DooDD � _MZZ W °O MN- ZZmNZZZ- DDo DDD�O�O0 °�LONAZZOz °DDD0DoDDDA W zZZODOZO m ° -D� m r 4� m m m m�rI r r M r I�nr1 - m 0 0 W r r r r cn m m m�1 1����- I�nr 0 0 0 0 ���000 0 0 0��� 0 -<-«zz 0 0 ���� c c 0 0 M -( �� D c m r r 0) V) DDTTDND- N <[TTTT -<DDDD Z Z Z Z Z z z cn� y Z Z mZDTO ^► 0 0 v w 0 n 'Z'^ VI C 1 O Z jo C D Z M W CD 7 fD N n O 7 N c n O (D c (D n m s�0 R A�s Z 0 Jill a 0 O Z 0 O m n M Dq mIy�1 (y Cs `_ rm ° r {$O- °m 9m mo �m o M 8 0 0 -- no e O V! n O W 2 N W 60- HSd- Btf- XS3- UllZO \31' ^9- co \uo,sgo \811ZO\ , I_ o fill to CD FO rcJSr psps 4( C Z tl -- no e O V! n O W 2 N W 60- HSd- Btf- XS3- UllZO \31' ^9- co \uo,sgo \811ZO\ , AIM 0 N b v_► o c � r o ,y 0 11R_EBX_AB_PSH_05 dgn Elk �1 WOODS I� X�P21 f � S � k A 2 mc Jim M5 a os A z a _� � � -. � � -� � (�� t - 1 � -- to m c ri o W � 0 � J•e" e f 4v,>, ` N4 ' 0 00 0+ V 9 Ha n a .LS A cA I I I I I I I I I I 1I I1I 1 I I 1 I I I I 133HS 3NIlH31HDy m I I II IOU I I II I I 11 h I I 11 I Ie^ I II u Q I 111 I Q —1 --LJ1— — 0 I I H I I z+ I W I 11 1 I C/) I 1 I I C) I I 1 I U d I I a� I II I I I II I I I II I I m m m m � m m N P tD P G) aD 6P 80- HSd- Btl -XB3- 81120 \41inq_se \u6iseWiz /e \I/" f � 1 �,% � �� \/ A_i � � J � �% �� V � � ✓� � � �� � � Imo_. � � J �� I � �� �i � � J �� L _ _ �� ��% � / A_i U �J �) �. �i i � � \� A , � �, A� W p O J 1 y LU 1 f 4v,>, ` N4 ' 0 00 0+ V 9 Ha n a .LS A cA I I I I I I I I I I 1I I1I 1 I I 1 I I I I 133HS 3NIlH31HDy m I I II IOU I I II I I 11 h I I 11 I Ie^ I II u Q I 111 I Q —1 --LJ1— — 0 I I H I I z+ I W I 11 1 I C/) I 1 I I C) I I 1 I U d I I a� I II I I I II I I I II I I m m m m � m m N P tD P G) aD 6P 80- HSd- Btl -XB3- 81120 \41inq_se \u6iseWiz /e \I/" f � 1 �,% � �� \/ A_i � � J � �% �� V � � ✓� � � �� � � Imo_. � � J �� I � �� �i � � J �� L _ _ �� ��% � / A_i U �J �) �. �i i � � \� A , � �, A� 9/1 r \K1 \ estgn \es- built \0211R- EBX- AB- PSH -09 i i r F H ca O N O p W o y� 0 pp pu"Is V +" - IN;1 pC =n U 111 Bs i oX $ s$ e i r F H ca O N O p W o y� 0 pp pu"Is V +" - IN;1 A� 2 0 pC =n U 111 Bs jig g �; oX $ s$ e 1 \ OD j A W \ 1 A6;�� 1 <mZ �l CA \\ % to I I I � A� 2 0 pC =n U 111 Bs jig g �; oX $ s$ e 8 m _z 8��yQy�y �• H� FONg �< s I/ DOOM �l 06.' 1 — — en mn M1 W L k MORA oplo 0! wz� Vtl Itl a ° in M C tl � O M — — en mn M1 W L k MORA oplo 0! vn r \b2 \ esign \as- built \0211R_EBX_AB_PSH_11 O N o p� o y 0 MAT�NUN� SyF�, 1p STA 82r.� 00 Jf 1 Wo i / X- SECTION 12 ®-- --® STA 65 +38 75 I I Z \ I' � I 1 I r� 1 l O % v,= 0 1 co o 1 co A In Z z cy" CO) 1 D o 111111 --I A, +0 III lil �mz --� co I n _ -- ___ 0 4 o� tj c 0 1 / 11 1 1 1 ► 1 � 1 1 � ! 1 1 i "ou; ► � ► 1 1 ' ► 1 1 ' ► 1 1 ' 1 1 ' ► 1 1 ►i1 W! QI At � a � I , i -A , i I i \ / — - - -1 v °° CR O N r O u6p ZI HSd BV XB3 !il[Z0 \41'nq_so�u6isep��zp�� a fill d I Sea X01 -j MI �< M 1 / 11 1 1 1 ► 1 � 1 1 � ! 1 1 i "ou; ► � ► 1 1 ' ► 1 1 ' ► 1 1 ' 1 1 ' ► 1 1 ►i1 W! QI At � a � I , i -A , i I i \ / — - - -1 v °° CR O N r O u6p ZI HSd BV XB3 !il[Z0 \41'nq_so�u6isep��zp�� a "M r \ 2 \ esign \es-built \9211R- EBX- AB- PSH -13 dgn 2/26/03 B� 1 o � ti J I $ I I 0 1 .oS i o y A NE SHEET 14 STA 25+p0 00 a z � r 2 Q cz o s o 4 a o y ai$ N � �3a b o �O 6\ i F- W y 0 u6p tl- HSd -Btl- X83- id11ZO \,�linq- c2\u6icea \}IIZ@\ , r \0211W \bO .s gn \es- bwlt \021IR- EBX_AB- PSH -15 dgn 2/26/03 ca CD f Io + WOODS 2 PI CA 0 a- o T I \ \ J O / pT 20 ' I ) `\ \ < rj& I `\ v o \ w ca , o \ \ 2J. �� + o \\ � o Cl) \ \ \ �O �coC ' °° r ` z 1 I P I o I / � I .t o \ CA i� 1p jig � � 1 th WOODS 8 oD �� ao u ;� 0 8 �n utl �z Y IP-MMUM W- E, LL LL wo bw i 1 c LU I = F z r � � I I 0 N S � o 0 0 u6P 91- HSd- 8V- XB3- UIIZO \1lt "9- co \u6icel7\ I \ 2, \ es, gn \es- built \021IR_EB %_AB_PSH_17 dgn 0 N O o 3 00 N 0 Nim� VON- J C8 N i( F �jS \0 JS v � � /r C / 7 r� ✓ //7 �� \ y"`-- --�'\� �. \ �j, �� �� ✓,ter � / L - -,- � _, �� iJ --o�� U� ! �� \ ` \emu-`; CA V \ _ rn ov APPENDIX B 2009 Profile and Cross Section Data 0 0 1 M N M 1 r It cd N ;3 im o « C) _ . w °? ° • cz M co 3 °' • I cC N O CA r � M O • 4 IQ � f N 0 0 a. O 00 00 �O M O� 00 00 00 00 00 [— g (13) UOI)enalg Haw Branch, Cross Section 1, Pool u, IM s 100 v w 99 10 20 30 40 50 6 0 Width (ft) bkf As -Built Year 1 Year 2 Year 3 Year 4 Im Haw Branch, Cross Section 2, Riffle tot too 99 QN o lu 20 30 40 50 60 70 SO 90 Width (ft) fpa bkf As -Built Year I Year 2 Year 3 Year 4 Haw Branch, Cross Section 3, Riffle 101 100 c 0 w 99 �s n 10 20 30 40 50 60 70 80 90 Width (ft) fpa bkf As -Built Year I (New RPin) Year 2 Year 3 Year 4 Haw Branch, Cross Section 4, Pool loo 99 c 98 d W 97 ) 6 U l0 20 30 40 50 60 70 80 Width (ft) bkf As -Built Year 1 Year 2 Year 3 Year 4 Haw Branch, Cross Section 5, Riffle ioi loo w a $ 99 > a� Uj 9It 97 0 10 20 30 40 50 60 70 Width (ft) fpa bkf As -Built Year 1 Year 2 Year 3 Year 4 Haw Branch, Cross Section 6, Riffle Ion 99 a 0 _v LL) 98 07 0 10 20 30 40 50 60 Width (ft) — fpa bkf As -Built Year 1 Year 2 Year 3 Year 4 Haw Branch, Cross Section 7. Riffle Mo 99 w 98 a� 97 96 0 10 20 30 40 50 60 Width (ft) fpa bkf As -Built Year 1 (New Pins) Year 2 Year 3 Year 4 Haw Branch, Cross Section 8, Pool 99 98 a °— 97 ? W 96 95 0 10 20 30 40 50 6i i Width (ft) bkf As -Built Year 1 Year 2 Year 3 Year 4 Haw Branch, Cross Section 9, Mille 100 99 c 99 - a W 97 96 u 10 20 30 40 50 60 Width (ft) i fpa bk f --As-Built Year 1 Year 2 Year 3 Year 4 . Haw Branch, Cross Section 10, Riffle 97 c 0 W4 96 y; 10 20 30 40 50 60 Width (ft) fpa bkf As -Built Year 1 Year 2 Year 3 Year 4 Haw Branch, Cross Section 11, Pool 98 97 w 96 v W 94 U 10 20 30 40 50 60 'n Width (ft) bkf As -Built Year 1 Year 2 Year 3 Year 4 0 Haw Branch, Cross Section 12, Pool 97 96 95 °y W 94 93 0 10 20 30 40 50 60 70 Width (ft) bkf As -Built Year I Year 2 Year 3 Year 4 Haw Branch, Cross Section 13, Riffle 98 97 96 G 95 W 94 93 92 0 10 20 30 40 50 60 Width (ft) fpa bkf As -Built Year I Year 2 Year 3 Year 4 Haw Branch, Cross Section 14, Riffle 101 100 c 0 d w 99 98 0 5 10 15 20 25 30 35 40 45 Width (ft) fpa bkf As -Built -Yearl Year 2 Year 3 Year 4 Haw Branch, Cross Section 15, Pool 100 99- a 0 ud 98 Q7 u In 20 30 40 50 60 u Width (ft) bkf —As -Built —Yearl Year2 Year3 Year4 Haw Branch, Cross Section 16, Riffle IM 100 0 w 99 9R o 1 0 20 30 40 50 60 7O xu Width (ft) —fpa bkf As -Built Year I Year Year3 --Yem 4 Haw Branch, Cross Section 17, Pool 100 99 c 0 i3 - w 98 97 0 10 20 30 40 50 60 70 Width (ft) bkf As -Built Year 1 Year 2 Year 3 Year 4 Haw Branch, Cross Section 18, Pool 100 99 c 0 a� v w 98 97 0 10 20 30 40 50 60 -o Width (ft) bkf As -Built Year 1 Year 2 Year 3 Year 4 Haw Branch, Cross Section 19. Riffle loo 99 a� y� va 0 10 20 30 40 50 60 -o Width (ft) fpa bkf As -Built -Year] Year 2 Year 3 Year 4 Haw Branch, Cross Section 20, Pool 95 94 c93 0 R 92 W 91 90 0 10 20 30 40 50 60 Width (fl) bkf As -Built Year I Year 2 Year 3 Year 4 94 93 a 92 v W 91 Haw Branch, Cross Section 21, Riffle 90 1 ' 0 10 20 30 40 50 60 70 SO Width (ft) fpa bkf As -Built Year I Year 2 Year 3 Year 4 APPENDIX C 2009 Gauge Data I Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 1 Date Time Water Level inches dd -mmm- hh:mm:ss AW1 AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 1 -Jan-2009 06 00 00 1 -Jan-2009 12 00 00 1 -Jan-2009 18 00 00 1 -Jan-2009 24 00 00 2- Jan-2009 06 00 00 2 -Jan-2009 12 00 00 2 -Jan-2009 18 00 00 2 -Jan-2009 24 00 00 3 -Jan-2009 06 00 00 3- Jan-2009 12 00 00 3- Jan-2009 18 00 00 3 -Jan-2009 24 00 00 4- Jan-2009 06 00 00 4- Jan-2009 12 00 00 4- Jan-2009 18 00 00 4- Jan-2009 24 00 00 5 -Jan-2009 06 00 00 5 -Jan-2009 12 00 00 5 -Jan-2009 18 00 00 5 -Jan-2009 24 00 00 6 -Jan-2009 06 00 00 6 -Jan-2009 12 00 00 6- Jan-2009 18 00 00 6- Jan-2009 24 00 00 7- Jan-2009 06 00 00 7- Jan-2009 12 00 00 7 -Jan-2009 18 00 00 7- Jan-2009 24 00 00 8 -Jan-2009 06 00 00 8 -Jan-2009 12 00 00 8- Jan-2009 18 00 00 8- Jan-2009 24 00 00 9 -Jan-2009 06 00 00 9- Jan-2009 12 00 00 9 -Jan-2009 18 00 00 9 -Jan-2009 24 00 00 10- Jan-2009 06 00 00 10- Jan-2009 12 00 00 10- Jan-2009 18 00 00 10 -Jan-2009 24 00 00 11- Jan-2009 06 00 00 11- Jan-2009 12 00 00 11 -Jan-2009 18 00 00 11 -Jan-2009 24 00 00 12 -Jan-2009 06 00 00 12- Jan-2009 12 00 00 12 -Jan-2009 18 00 00 12- Jan-2009 24 00 00 13 -Jan-2009 06 00 00 13 -Jan-2009 12 00 00 1 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C rl u a Date Time Water Level inches dd -mmm- hh:mm:ss AW1 AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 13- Jan-2009 18 00 00 13- Jan-2009 24 00 00 14- Jan-2009 06 00 00 14- Jan-2009 12 00 00 14- Jan-2009 18 00 00 14- Jan-2009 24 00 00 15- Jan-2009 06 00 00 15- Jan-2009 12 00 00 15- Jan-2009 18 00 00 15 -Jan-2009 24 00 00 16 -Jan-2009 06 00 00 16 -Jan-2009 12 00 00 16- Jan-2009 18 00 00 16 -Jan-2009 24 00 00 17 -Jan-2009 06 00 00 17- Jan-2009 12 00 00 17- Jan-2009 18 00 00 17 -Jan-2009 24 00 00 18- Jan-2009 06 00 00 18- Jan-2009 12 00 00 18- Jan-2009 18 00 00 18- Jan-2009 24 00 00 19- Jan-2009 06 00 00 19- Jan-2009 12 00 00 19 -Jan-2009 18 00 00 19 -Jan-2009 24 00 00 20- Jan-2009 06 00 00 20- Jan-2009 12 00 00 20 -Jan-2009 18 00 00 20- Jan-2009 24 00 00 21 -Jan-2009 06 00 00 21- Jan-2009 12 00 00 21 -Jan -2009 18 00 00 21 -Jan-2009 24 00 00 22- Jan-2009 06 00 00 22- Jan-2009 12 00 00 22 -Jan-2009 18 00 00 22- Jan-2009 24 00 00 23- Jan-2009 06 00 00 23- Jan-2009 12 00 00 23- Jan-2009 18 00 00 23- Jan-2009 24 00 00 24- Jan-2009 06 00 00 24- Jan-2009 12 00 00 24- Jan-2009 18 00 00 24 -Jan-2009 24 00 00 25- Jan-2009 06 00 00 25 -Jan-2009 12 00 00 25- Jan-2009 18 00 00 25- Jan-2009 24 00 00 rl u a r Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 3 Date Time Water Level inches dd -mmm- hh:mm:ss AW1 AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 26- Jan-2009 06 00 00 26- Jan-2009 12 00 00 26- Jan-2009 18 00 00 26- Jan-2009 24 00 00 27- Jan-2009 06 00 00 27- Jan-2009 12 00 00 27 -Jan-2009 18 00 00 27- Jan-2009 24 00 00 28- Jan-2009 06 00 00 28- Jan-2009 12 00 00 28 -Jan-2009 18 00 00 28- Jan-2009 24 00 00 29- Jan-2009 06 00 00 29- Jan-2009 12 00 00 29 -Jan-2009 18 00 00 29- Jan-2009 24 00 00 30- Jan-2009 06 00 00 30 -Jan-2009 12 00 00 30 -Jan-2009 18 00 00 30 -Jan-2009 24 00 00 31 -Jan-2009 06 00 00 31- Jan-2009 12 00 00 31- Jan-2009 18 00 00 31 -Jan-2009 24 00 00 1- Feb -2009 06 00 00 1- Feb -2009 12 00 00 1- Feb -2009 18 00 00 1- Feb -2009 24 00 00 2- Feb -2009 06 00 00 2- Feb -2009 12 00 00 2- Feb -2009 18 00 00 2- Feb -2009 24 00 00 3- Feb -2009 06 00 00 3- Feb -2009 12 00 00 3- Feb -2009 18 00 00 3- Feb -2009 24 00 00 4- Feb -2009 06 00 00 4- Feb -2009 12 00 00 4- Feb -2009 18 00 00 4- Feb -2009 24 00 00 5- Feb -2009 06 00 00 5- Feb -2009 12 00 00 5- Feb -2009 18 00 00 5- Feb -2009 24 00 00 6- Feb -2009 06 00 00 6- Feb -2009 12 00 00 ' 6- Feb -2009 18 00 00 6- Feb -2009 24 00 00 7- Feb -2009 06 00 00 7- Feb -2009 12 00 00 3 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C I1 u �1 Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 7- Feb -2009 18 00 00 7- Feb -2009 24 00 00 8- Feb -2009 06 00 00 8- Feb -2009 12 00 00 8- Feb -2009 18 00 00 8- Feb -2009 24 00 00 9- Feb -2009 06 00 00 9- Feb -2009 12 00 00 9- Feb -2009 18 00 00 9- Feb -2009 24 00 00 10- Feb -2009 06 00 00 10- Feb -2009 12 00 00 10- Feb -2009 18 00 00 10- Feb -2009 24 00 00 11- Feb -2009 06 00 00 11- Feb -2009 12 00 00 11- Feb -2009 18 00 00 11- Feb -2009 24 00 00 12- Feb -2009 06 00 00 12- Feb -2009 12 00 00 12- Feb -2009 18 00 00 12- Feb -2009 24 00 00 13- Feb -2009 06 00 00 13- Feb -2009 12 00 00 13- Feb -2009 18 00 00 13- Feb -2009 24 00 00 14- Feb -2009 06 00 00 14- Feb -2009 12 00 00 14- Feb -2009 18 00 00 14- Feb -2009 24 00 00 15- Feb -2009 06 00 00 15- Feb -2009 12 00 00 15- Feb -2009 18 00 00 15- Feb -2009 24 00 00 16- Feb -2009 06 00 00 16- Feb -2009 12 00 00 16- Feb -2009 18 00 00 16- Feb -2009 24 00 00 17- Feb -2009 06 00 00 17- Feb -2009 12 00 00 17- Feb -2009 18 00 00 17- Feb -2009 24 00 00 18- Feb -2009 06 00 00 18- Feb -2009 12 00 00 18- Feb -2009 18 00 00 18- Feb -2009 24 00 00 19- Feb -2009 06 00 00 19- Feb -2009 12 00 00 19- Feb -2009 18 00 00 19- Feb -2009 24 00 00 I1 u �1 l ,l 1 ' 1 i Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C Date Time Water Level inches dd -mmm- hh:mm:ss AW1 AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 20- Feb -2009 06 00 00 20- Feb -2009 12 00 00 20- Feb -2009 18 00 00 20- Feb -2009 24 00 00 21- Feb -2009 06 00 00 21- Feb -2009 12 00 00 21- Feb -2009 18 00 00 21- Feb -2009 24 00 00 22- Feb -2009 06 00 00 22- Feb -2009 12 00 00 22- Feb -2009 18 00 00 22- Feb -2009 24 00 00 23- Feb -2009 06 00 00 23- Feb -2009 12 00 00 23- Feb -2009 18 00 00 -049 183 049 078 -1692 -3 17 -662 -1337 23- Feb -2009 24 00 00 -0 80 164 0 14 090 -1689 -362 -698 -1364 24- Feb -2009 06 00 00 -098 153 005 056 -1736 -320 -666 -1325 24- Feb -2009 12 00 00 -0 72 171 025 073 -1718 -408 -732 -1417 24- Feb -2009 18 00 00 -0 74 167 007 025 -1809 -378 -691 -1358 24- Feb -2009 24 00 00 -109 153 -0 18 069 -1768 -422 -728 -1390 25- Feb -2009 06 00 00 -1 19 149 -033 037 -18 17 -349 -666 -1351 25- Feb -2009 12 00 00 -097 163 -0 15 057 -1790 -437 -734 -1409 25- Feb -2009 18 00 00 -098 146 -029 044 -1854 -4 02 -691 -1375 25- Feb -2009 24 00 00 -131 129 -042 085 -1829 -4 43 -708 -1426 26- Feb -2009 06 00 00 -126 131 -039 002 -1896 -3 85 -652 -1355 26- Feb -2009 12 00 00 -1 15 129 -045 032 -1846 -4 44 -708 -14 15 26- Feb -2009 18 00 00 -1 10 126 -033 0 18 -1899 -3 86 -6 56 -1367 26- Feb -2009 24 00 00 -134 121 -028 066 -1846 -426 -6 71 -14 11 27- Feb -2009 06 00 00 -139 129 -0 23 Oil -1899 -3 95 -605 -1351 27- Feb -2009 12 00 00 -1 11 125 -011 0 14 -1884 -449 -738 -14 13 27- Feb -2009 18 00 00 -122 102 -036 031 -1901 -416 -716 -1423 27- Feb -2009 24 00 00 -132 085 -035 031 -1890 -438 -676 -1430 28- Feb -2009 06 00 00 037 126 000 -037 -1936 -019 -247 -12 15 28- Feb -2009 12 00 00 035 155 121 063 -1770 151 -163 -1072 28- Feb -2009 18 00 00 120 2 55 198 090 -1570 298 -215 -637 28- Feb -2009 24 00 00 079 270 177 128 -8 12 324 -254 -734 1 -Mar -2009 06 00 00 084 259 155 193 -7 80 3 58 -146 -609 1 -Mar -2009 12 00 00 2 11 348 320 194 -546 498 -2 00 -076 1 -Mar -2009 18 00 00 270 3 93 377 194 2 82 5 18 -190 094 1 -Mar -2009 24 00 00 245 379 249 278 376 4 19 -292 004 2 -Mar -2009 06 00 00 229 371 204 249 2 92 4 72 -175 058 2 -Mar -2009 12 00 00 234 368 188 308 349 336 -2 83 -124 2 -Mar -2009 18 00 00 2 16 353 179 191 205 3 94 -222 -153 2 -Mar -2009 24 00 00 199 331 155 252 240 295 -306 -2 97 3 -Mar -2009 06 00 00 197 3 18 156 168 1 16 3 71 -244 -2 80 3 -Mar -2009 12 00 00 2 11 320 169 246 150 266 -341 -423 3 -Mar -2009 18 00 00 199 305 171 192 -042 3 10 -2 95 -416 3 -Mar -2009 24 00 00 185 267 149 2 51 -186 174 -384 -543 4 -Mar -2009 06 00 00 165 247 120 147 -476 262 -3 01 -4 81 4 -Mar -2009 12 00 00 2 11 300 176 237 -545 162 -3 89 -5 93 5 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 4 -Mar-2009 18 00 00 177 258 137 188 -726 179 -365 -571 4 -Mar-2009 24 00 00 165 257 132 237 -791 103 -398 -628 5 -Mar-2009 06 00 00 149 235 129 171 -959 191 -283 -551 5 -Mar-2009 12 00 00 191 283 169 233 -947 047 -407 -655 5 -Mar-2009 18 00 00 165 263 164 1 89 -1103 079 -355 --619 5 -Mar-2009 24 00 00 141 243 141 260 -1101 -028 -451 -711 6 -Mar-2009 06 00 00 101 240 128 147 -1250 059 -344 -609 6 -Mar-2009 12 00 00 109 253 162 216 -1203 -098 -522 -731 6 -Mar-2009 18 00 00 075 230 139 157 -1338 -049 -438 -653 6 -Mar-2009 24 00 00 059 221 141 233 -1300 -102 -460 -703 7 -Mar-2009 06 00 00 052 223 139 176 -1380 -049 -403 -649 7 -Mar-2009 12 00 00 051 211 146 212 -1350 -193 -541 -761 7 -Mar-2009 18 00 00 046 217 145 159 -1468 -145 -461 -703 7 -Mar-2009 24 00 00 024 203 144 222 -1425 -205 -494 -763 8 -Mar-2009 06 00 00 007 203 128 153 -1500 -149 -430 -710 8 -Mar-2009 12 00 00 021 2 13 145 197 -1470 -271 -558 -778 8 -Mar-2009 18 00 00 009 209 141 171 -1538 -247 -505 -749 8 -Mar-2009 24 00 00 -018 191 139 191 -1530 -528 -8 15 9 -Mar-2009 06 00 00 -020 189 135 107 -1613 .-304 -227 -444 -723 9 -Mar-2009 12 00 00 -005 2 15 146 168 -1539 -366 -629 -833 9 -Mar-2009 18 00 00 -017 200 143 127 -1624 -362 -581 -803 9 -Mar-2009 24 00 00 -062 188 1 19 143 -1618 -407 -601 -862 10 -Mar-2009 06 00 00 -093 163 104 047 -1702 -332 -542 -819 10 -Mar-2009 12 00 00 -077 171 104 092 -1636 -478 -7 15 -950 10 -Mar-2009 18 00 00 -087 161 098 026 -1762 -376 -565 -844 10 -Mar-2009 24 00 00 -097 158 107 121 -1677 -472 -608 -946 11 -Mar-2009 06 00 00 -1 14 149 091 -009 -1791 -355 -488 -856 11 -Mar-2009 12 00 00 -074 158 127 078 -1714 -493 -701 -956 11 -Mar-2009 18 00 00 -099 157 1 11 041 -1787 -425 -581 -885 11 -Mar-2009 24 00 00 -125 140 1 10 093 -1745 -469 -600 -928 12 -Mar-2009 06 00 00 -1 19 174 125 Oil -1798 -384 -572 -836 12 -Mar-2009 12 00 00 -140 167 1 19 073 -1720 -502 -720 -941 12 -Mar-2009 18 00 00 -168 151 087 -0 15 -1812 -472 -698 -933 12 -Mar-2009 24 00 00 -183 137 073 008 -1779 -536 -716 -981 13 -Mar-2009 06 00 00 -200 1 15 048 -078 -1848 -485 -667 -929 13 -Mar-2009 12 00 00 -194 108 048 -033 -18 15 -541 -709 -1000 13 -Mar-2009 18 00 00 -207 077 0 13 -100 -1887 -488 -640 -959 13 -Mar-2009 24 00 00 -165 072 036 -059 -1857 -498 -646 -1009 14 -Mar-2009 06 00 00 -217 077 031 -125 -1912 -439 -607 -971 14 -Mar-2009 12 00 00 -210 054 025 -057 -1874 -492 -637 -1046 14 -Mar-2009 18 00 00 -183 073 054 -1 11 -1940 -400 -540 -969 14 -Mar-2009 24 00 00 -192 055 051 -042 -1881 -462 -583 -1025 15 -Mar-2009 06 00 00 -193 054 065 -097 -1937 -398 -524 -1007 15 -Mar-2009 12 00 00 -096 056 084 -079 -1923 -1 13 -239 -878 15 -Mar-2009 18 00 00 033 143 145 -095 -1890 -034 -254 -733 15 -Mar-2009 24 00 00 -012 157 125 012 -1605 -050 -299 -8 17 16 -Mar-2009 06 00 00 005 179 137 014 -1566 -058 -284 -8 18 16 -Mar-2009 12 00 00 096 181 159 039 -1535 -013 -260 -763 16 -Mar-2009 18 00 00 046 200 1.57 014 -1488 134 -186 -556 16 -Mar-2009 24 00 00 069 228 167 1 13 -1235 136 -282 -585 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 7 Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 17 -Mar -2009 06 00 00 069 227 170 109 -1080 208 -251 -599 17 -Mar -2009 12 00 00 067 225 157 203 -1028 116 -336 -733 17 -Mar-2009 18 00 00 041 216 159 1 57 -1170 142 -295 -743 17 -Mar-2009 24 00 00 053 213 145 206 -1205 055 -370 -847 18 -Mar-2009 06 00 00 028 205 131 151 -1325 121 -300 -795 18 -Mar-2009 12 00 00 063 234 171 2 13 -1289 050 340 -831 18 -Mar-2009 18 00 00 047 266 107 217 -1365 -050 -228 -856 18 -Mar-2009 24 00 00 023 239 091 254 -13 83 -070 -295 -944 19 -Mar-2009 06 00 00 -009 235 093 150 -1504 -193 -224 -887 19 -Mar-2009 12 00 00 019 249 099 2 13 -1458 -149 -362 -967 19 -Mar-2009 18 00 00 -003 234 086 173 -1540 -233 -3 14 -957 19 -Mar-2009 24 00 00 -020 230 090 197 -1536 -231 -354 -1030 20 -Mar-2009 06 00 00 -038 223 074 087 -1653 -350 -271 -940 20 -Mar-2009 12 00 00 -051 225 075 159 -1583 -282 -414 -1025 20 -Mar-2009 18 00 00 -056 234 087 101 -1671 -371 -346 -962 20 -Mar-2009 24 00 00 -095 210 056 176 -1617 -3 19 -428 -1073 21 -Mar-2009 06 00 00 -121 195 041 044 -1740 -445 -366 -1019 21 -Mar-2009 12 00 00 -098 219 044 099 -1689 -395 -5 13 -1094 21 -Mar-2009 18 00 00 -101 222 042 068 -1763 -471 -417 -1029 21 -Mar-2009 24 00 00 -139 194 021 128 -1724 -434 -474 -1123 22 -Mar-2009 06 00 00 -169 170 -015 023 -1833 -545 -3 87 -1045 22 -Mar-2009 12 00 00 -125 199 030 093 -1766 -480 -560 -1137 22 -Mar-2009 18 00 00 -151 189 001 041 -1859 -575 -462 -1061 22 -Mar-2009 24 00 00 -186 159 -019 103 -1809 -527 -507 -1143 23 -Mar-2009 06 00 00 -194 1 157 -043 007 -1893 1 -6 13 -426 -1059 23 -Mar-2009 12 00 00 -165 170 -011 056 -1830 -552 -596 -1123 23 -Mar-2009 18 00 00 -185 139 -061 027 -1901 -625 -532 -1096 23 -Mar-2009 24 00 00 -224 128 -076 067 -1868 -593 -580 -1161 24 -Mar-2009 06 00 00 -247 1 13 -095 -043 -1938 -666 -508 -1078 24 -Mar-2009 12 00 00 -231 121 -071 023 -1868 -597 -696 -1183 24 -Mar-2009 18 00 00 -252 092 -1 13 -063 -1979 1 -711 -607 -1106 24 -Mar-2009 24 00 00 -266 080 -129 007 -1904 -637 -626 -1163 25 -Mar-2009 06 00 00 -277 049 -138 -069 -1955 -690 -6 13 -1144 25 -Mar-2009 12 00 00 -271 041 -156 -079 -1952 -689 -657 -1189 25 -Mar-2009 18 00 00 -273 026 -157 -101 -1994 -733 -562 -1141 25 -Mar-2009 24 00 00 -267 019 -133 -037 -1946 -687 -596 -1221 26 -Mar-2009 06 00 00 -257 017 -1 18 -138 -2032 -775 -507 -1145 26 -Mar-2009 12 00 00 -239 013 -123 -069 -1962 -707 -280 -1151 26 -Mar-2009 18 00 00 -092 063 -017 -125 -2016 -763 -309 -1078 26 -Mar-2009 24 00 00 -159 054 012 -039 -1886 -634 -391 -1144 27 -Mar-2009 06 00 00 -182 059 017 -085 -1923 -673 -3 13 -1105 27 -Mar-2009 12 00 00 -122 060 008 -036 -1877 -630 -184 -987 27 -Mar-2009 18 00 00 -007 127 075 -022 -18 11 -566 -164 -963 27 -Mar-2009 24 00 00 -036 137 081 065 -1658 -414 -094 -739 28 -Mar-2009 06 00 00 051 2 15 1 13 045 -1569 -327 -123 -680 28 -Mar-2009 12 00 00 042 223 108 1 15 -1368 -129 -229 -841 28 -Mar-2009 18 00 00 069 201 086 098 -1433 -195 -094 -796 28 -Mar-2009 24 00 00 1 14 275 163 207 -1329 -093 -127 -568 29 -Mar-2009 06 00 00 076 264 1 11 1 179 -939 295 -1 18 -621 29 -Mar-2009 12 00 00 088 264 131 1 234 -953 279 -250 -775 7 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 29 -Mar -2009 18 00 00 066 253 123 204 -1080 150 -219 -783 29 -Mar -2009 24 00 00 012 235 085 257 -1115 113 -297 -898 30 -Mar -2009 06 00 00 -019 224 075 153 -1247 -021 -273 -910 30 -Mar -2009 12 00 00 -007 257 109 163 -1276 -052 -436 -1021 30 -Mar -2009 18 00 00 -049 228 067 115 -1391 -169 -386 -1009 30 -Mar -2009 24 00 00 -078 206 044 158 -1390 -169 -445 -1091 31 -Mar -2009 06 00 00 -096 215 041 085 -1498 -279 -382 -1041 31 -Mar -2009 12 00 00 -067 241 071 126 -1475 -259 -5 16 -1097 31 -Mar -2009 18 00 00 -093 211 036 1 17 -1539 -324 -433 -1094 31 -Mar -2009 24 00 00 -103 189 015 1 10 -1574 -361 -412 -1129 1-Apr-2009 06 00 00 -102 173 014 054 -1644 -433 -156 -1024 1 -A r -2009 12 00 00 046 203 085 147 -1554 -280 -1077 1 -A r -2009 18 00 00 019 204 080 049 -1551 .-345 -344 -210 -1005 1-Apr-2009 24 00 00 -015 206 075 1 28 -1500 -295 -294 -1064 2-Apr-2009 06 00 00 -017 213 069 060 -1606 -403 -092 -928 2-Apr-2009 12 00 00 057 222 089 126 -1481 -280 -180 -917 2-Apr-2009 18 00 00 088 239 1 11 069 -1413 -213 -145 -814 2-Apr-2009 24 00 00 069 240 104 176 -1236 -039 -182 -865 3-Apr-2009 06 00 00 057 233 091 177 -1296 -101 -192 -877 3-Apr-2009 12 00 00 071 261 129 203 -13 13 -120 -301 -949 3-Apr-2009 18 00 00 015 237 083 2 15 -1374 -183 -330 -997 3-Apr-2009 24 00 00 -024 227 071 212 -1401 -211 -423 -1084 4-Apr-2009 06 00 00 -063 228 062 120 -1512 -325 -334 -999 4-Apr-2009 12 00 00 -047 245 073 176 -1469 -283 -541 -1123 4-Apr-2009 18 00 00 -085 213 037 104 -1589 -405 -465 -1114 4-Apr-2009 24 00 00 -108 197 017 163 -1577 -395 -493 -1178 5-Apr-2009 06 00 00 -1 16 194 009 072 -1678 -498 -406 -1094 5-Apr-2009 12 00 00 -104 218 023 125 -1636 -458 -639 -1204 5-Apr-2009 18 00 00 -134 195 -025 078 -1732 -556 -525 -1173 5-Apr-2009 24 00 00 -121 176 -024 121 -1698 -524 -493 -12 15 6-Apr-2009 06 00 00 -1 15 156 -029 039 -1784 -611 -470 -12 13 6-Apr-2009 12 00 00 042 176 018 002 -1822 -651 -417 -1172 6-Apr-2009 18 00 00 -057 205 056 -003 -1799 -631 -423 -1063 6-Apr-2009 24 00 00 -135 189 023 135 -1666 -499 -524 -1172 7-Apr-2009 06 00 00 -180 169 -029 009 -1775 -610 -5 41 -1151 7-Apr-2009 12 00 00 -175 177 -022 021 -1754 -591 -674. -1214 7-Apr-2009 18 00 00 -206 181 -053 -037 -1830 -669 -609 -1178 7-Apr-2009 24 00 00 -251 131 -108 -015 -1797 -638 -648 -1249 8-Apr-2009 06 00 00 -265 131 -124 -094 -1878 -721 -558 -1157 8-Apr-2009 12 00 00 -240 139 -1 17 -013 -1823 -668 -765 -1255 8-Apr-2009 18 00 00 -247 121 -173 -069 -1923 -770 -690 -1213 8-Apr-2009 24 00 00 -287 072 -227 -021 -1883 -732 -682 -1277 9-Apr-2009 06 00 00 -229 081 -169 -1 13 -1973 -824 -589 -1180 9-Apr-2009 12 00 00 -272 091 -211 -027 -1886 -738 -860 -1267 9-Apr-2009 18 00 00 -299 050 -294 -066 -1955 -8 10 -781 -1237 9-Apr-2009 24 00 00 -349 -005 -322 -034 -1919 -776 -788 -13 17 10-Apr-2009 06 00 00 -324 -023 -300 -144 -2004 -863 -651 -1235 10-Apr-2009 12 00 00 -335 007 -3 18 -088 -1955 -8 15 -969 -13 11 10-Apr-2009 18 00 00 -384 -060 -469 -181 -2004 -867 -865 -13 17 10-Apr-2009 24 00 00 -337 -072 -351 -3 18 -19 68 -8 33 -1 64 -703 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 9 Date Time Water Level inches dd -mmm- hh:mm:ss AW1 AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 11 -A r -2009 06 00 00 029 134 072 -305 -1473 -339 -192 -727 11 -A r -2009 12 00 00 004 182 084 -126 -1299 -167 -357 -932 11 -A r -2009 18 00 00 -087 164 054 -112 -1397 -267 -350 -933 11 -A r -2009 24 00 00 -145 139 021 -001 -1378 -250 -469 -1071 12-Apr-2009 06 00 00 -186 141 -004 -103 -1538 -411 -430 -1029 12-Apr-2009 12 00 00 -179 157 026 -027 -1503 -378 -622 -1150 12-Apr-2009 18 00 00 -207 145 -011 -048 -1598 -475 -588 -1173 12-Apr-2009 24 00 00 -265 109 -070 -031 -1607 -487 -654 -1265 13-Apr-2009 06 00 00 -277 086 -101 -149 -1745 -627 -547 -1209 13-Apr-2009 12 00 00 -222 099 -065 -085 -1707 -590 -614 -1262 13-Apr-2009 18 00 00 -243 063 -102 -108 -1773 -658 -541 -1256 13-Apr-2009 24 00 00 -216 066 -078 -067 -1744 -631 -445 -1240 14-Apr-2009 06 00 00 -128 065 -051 -127 -1832 -721 -428 -1204 14-Apr-2009 12 00 00 147 147 105 -071 -1769 -660 -1 18 -278 14-Apr-2009 18 00 00 240 444 333 -004 291 1398 -010 267 14-Apr-2009 24 00 00 307 561 357 185 464 1569 -075 209 15-Apr-2009 06 00 00 304 5 17 255 285 3 19 1422 -042 238 15-Apr-2009 12 00 00 288 487 218 445 373 1474 -135 125 15-Apr-2009 18 00 00 265 455 169 360 252 1351 -109 133 15-Apr-2009 24 00 00 240 438 147 367 256 1354 -156 058 16-Apr-2009 06 00 00 228 419 146 263 1 88 1284 -105 093 16-Apr-2009 12 00 00 240 421 169 275 200 1294 -194 -010 16-Apr-2009 18 00 00 238 410 162 240 058 1150 -122 -007 16-Apr-2009 24 00 00 217 378 146 296 -040 1050 -222 -146 17-Apr-2009 06 00 00 159 338 108 156 -347 741 -175 -131 17-Apr-2009 12 00 00 163 360 152 188 -436 650 -271 -229 17-Apr-2009 18 00 00 143 342 139 191 -610 474 -241 -262 17-Apr-2009 24 00 00 107 3 12 1 13 219 -741 341 -298 -355 18-Apr-2009 06 00 00 075 295 103 1 19 -930 150 -211 -260 18-Apr-2009 12 00 00 081 3 15 127 195 -917 161 -400 -391 18-Apr-2009 18 00 00 047 293 099 138 -1089 -013 -345 -416 18-Apr-2009 24 00 00 001 263 090 175 -1126 -052 -350 -464 19-Apr-2009 06 00 00 004 270 103 1 19 -1224 -152 -296 -417 19-Apr-2009 12 00 00 -007 290 109 133 -1236 -166 -452 -506 19-Apr-2009 18 00 00 -014 246 084 097 -1330 -261 -330 -472 19-Apr-2009 24 00 00 -033 240 086 133 -1332 -266 -3 55 -542 20-Apr-2009 06 00 00 -030 241 090 062 -1427 -362 -292 -470 20-Apr-2009 12 00 00 -039 243 085 089 -1413 -350 -2 64 -451 20-Apr-2009 18 00 00 067 276 1 19 125 -1414 -305 -255 -436 20-Apr-2009 24 00 00 005 272 128 152 -1415 -224 -324 -495 21-Apr-2009 06 00 00 -026 264 121 063 -1533 -307 -276 -440 21-Apr-2009 12 00 00 -027 294 150 123 -1482 -271 -5 19 -601 21-Apr-2009 18 00 00 -075 273 1 11 081 -1574 -504 -414 -567 21-Apr-2009 24 00 00 -054 242 107 170 -1487 -419 -432 -658 22-Apr-2009 06 00 00 -085 241 1 10 -010 -1670 -529 -351 -539 22-Apr-2009 12 00 00 -1 14 281 126 101 -1575 -440 -6 13 -653 22-Apr-2009 18 00 00 -157 277 099 038 -1678 -643 -506 -669 22-Apr-2009 24 00 00 -194 217 036 032 -1660 -643 -571 -784 23-Apr-2009 06 00 00 -203 204 1 0 15 -103 -1808 -709 -476 -662 23-Apr-2009 12 00 00 -195 254 045 -011 -1727 -632 -746 -8 00 9 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) n Appendix C `) 10 Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 23-Apr-2009 18 00 00 -223 228 -0 18 -084 -1808 -866 -571 -811 23-Apr-2009 24 00 00 -247 203 -047 -093 -1796 -790 -577 -845 24-Apr-2009 06 00 00 -248 188 -051 -193 -1893 -800 -492 -741 24-Apr-2009 12 00 00 -264 211 -043 -125 -1823 -712 -780 -901 24-Apr-2009 18 00 00 -300 174 -108 -353 -1912 -972 -578 -881 24-Apr-2009 24 00 00 -273 162 -103 -529 -1876 -858 -5 82 -927 25-Apr-2009 06 00 00 -266 158 -089 -670 -1990 -868 -469 -771 25-Apr-2009 12 00 00 -307 179 -096 -581 -1872 -736 -837 -979 25-Apr-2009 18 00 00 -345 133 -189 -771 -1976 -1066 -620 -959 25-Apr-2009 24 00 00 -326 120 -174 -790 -1926 -923 -639 -987 26-Apr-2009 06 00 00 -329 097 -172 -936 -2028 -926 -543 -845 26-Apr-2009 12 00 00 -374 1 10 -197 -883 -1947 -816 -918 -1046 26-Apr-2009 18 00 00 -433 060 -324 -966 -2028 -1162 -736 -1042 26-Apr-2009 24 00 00 -4 13 023 -309 -925 -1985 -1025 -744 -1057 27-Apr-2009 06 00 00 -421 001 -282 -1043 -2075 -1026 -675 -923 27-Apr-2009 12 00 00 -471 007 -327 -1003 -2008 -946 -1042 -11 14 27-Apr-2009 18 00 00 -528 -093 -507 -1071 -2076 -1232 -916 -1120 27-Apr-2009 24 00 00 -5 17 -132 -471 -1041 -2039 -1164 -904 -1129 28-Apr-2009 06 00 00 -5 11 -151 -407 -1175 -2148 -1243 -828 -988 28-Apr-2009 12 00 00 -587 -172 -447 -11 16 -2074 -1194 -1176 -1179 28-Apr-2009 18 00 00 -612 -229 -579 -1209 -2146 -1436 -1035 -1175 28-Apr-2009 24 00 00 -601 -246 -503 -1171 -2103 -1403 -1027 -1148 29-Apr-2009 06 00 00 -625 -267 -477 -1271 -2190 -1475 -904 -10 13 29-Apr-2009 12 00 00 -653 -269 -451 -1228 -2122 -1410 -1248 -1192 29-Apr-2009 18 00 00 -735 -367 -625 -1283 -2181 -1594 -1146 -1205 29-Apr-2009 24 00 00 -762 -401 -603 -1276 -2165 -1591 -1125 -1190 30-Apr-2009 06 00 00 -774 -421 -534 -1348 -2234 -1633 -1010 -1055 30-Apr-2009 12 00 00 -785 -430 -492 -13 15 -2186 -1574 -1328 -1180 30-Apr-2009 18 00 00 -830 -489 -605 -1409 -2272 -1732 -1170 -1172 30-Apr-2009 24 00 00 -842 -5 17 -544 -1356 -2228 -1674 -1104 -1143 1 -Ma -2009 06 00 00 -843 -5 17 -480 -1414 -2274 -1709 -993 -1023 1 -Ma -2009 12 00 00 -894 -534 -525 -1380 -2234 -1660 -1416 -1251 1 -Ma -2009 18 00 00 -986 -630 -725 -1467 -23 18 -1842 -13 17 -1217 1 -Ma -2009 24 00 00 -1001 -655 -649 -1411 -2273 -1800 -1238 -1195 2-May-2009 06 00 00 -992 -658 -564 -1473 -2324 -1837 -1216 -1106 2-May-2009 12 00 00 -1059 -693 -664 -1457 -2301 -18 13 -1461 -1295 2-May-2009 18 00 00 -11 13 -759 -759 -1525 -2374 -1961 -1388 -1250 2-May-2009 24 00 00 -1139 -784 -699 -1465 -2336 -1924 -1336 -1221 3-May-2009 06 00 00 -1152 -789 -639 -1548 -2406 -1970 -13 16 -1123 3-May-2009 12 00 00 -1200 -833 -804 -1506 -2361 -1915 -1641 -1351 3-May-2009 18 00 00 -13 11 -929 -951 -1570 -2435 -21 12 -1580 -1321 3-May-2009 24 00 00 -1343 -961 -875 -1539 -2408 -2087 -1516 -1285 4-May-2009 06 00 00 -1347 -964 -768 -1621 -2475 -2150 -1522 -1199 4-May-2009 12 00 00 -1421 -1025 -971 -1596 -2460 -2128 -1773 -1405 4-May-2009 18 00 00 -1481 -1092 -1056 -1681 -2531 -2269 -1460 -1307 4-May-2009 24 00 00 -632 -327 -171 -1583 -2430 -2150 -710 -1201 5-May-2009 06 00 00 -800 -419 -184 -1726 -2493 -1924 -548 -1082 5-May-2009 12 00 00 161 176 235 -1591 -2306 -1706 -201 -323 5-May-2009 18 00 00 042 229 138 -265 -530 226 -235 -422 5-May-2009 24 00 00 -005 224 109 037 -675 202 -308 -572 10 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 11 Date Time Water Level inches dd -mmm- hh:mm:ss AW1 AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 6-May-2009 06 00 00 -035 218 114 014 -903 094 -247 -553 6-May-2009 12 00 00 -071 212 113 126 -953 126 -512 -802 6-May-2009 18 00 00 -169 189 086 053 -1140 -028 -447 -860 6-May-2009 24 00 00 -161 179 087 105 -1199 -037 -466 -925 7-May-2009 06 00 00 -158 185 091 032 -1347 -172 -073 -353 7-May-2009 12 00 00 051 247 135 132 -629 286 -296 -3 17 7-May-2009 18 00 00 007 236 126 103 -855 107 -130 -147 7-May-2009 24 00 00 052 251 155 198 -532 254 -236 -292 8-May-2009 06 00 00 018 236 132 161 -808 163 -226 -339 8-May-2009 12 00 00 -020 249 140 221 -909 178 -418 -508 8-May-2009 18 00 00 -099 209 1 14 197 -1090 048 -387 -602 8-May-2009 24 00 00 -1 11 201 108 199 -1191 018 -477 -733 9-May-2009 06 00 00 -128 204 1 14 090 -1374 -104 -465 -643 9-May-2009 12 00 00 -207 221 1 11 170 -1366 -102 -820 -904 9-May-2009 18 00 00 -284 189 056 1 15 -1509 -415 -690 -961 9-May-2009 24 00 00 -252 171 042 134 -1520 -5 06 -682 -951 10-May-2009 06 00 00 -271 163 036 049 -1632 -601 -698 -843 10-May-2009 12 00 00 -345 186 051 1 19 -1616 -602 -1000 -1040 10 -Ma -2009 18 00 00 -380 149 -004 089 -1703 -866 -849 -1029 10-May-2009 24 00 00 -353 133 -021 126 -1696 -832 -842 -1054 11 -Ma -2009 06 00 00 -353 1 16 -028 001 -1844 -892 -722 -911 11 -Ma -2009 12 00 00 -031 158 086 012 -1842 -480 -411 -747 11 -Ma -2009 18 00 00 -158 174 1 17 033 -1688 -5 10 -5 10 -719 11-May-2009 24 00 00 -253 149 089 054 -1677 -568 -634 -791 12-May-2009 06 00 00 -307 134 072 -025 -1782 -676 -595 -7 15 12-May-2009 12 00 00 -353 137 083 080 -1754 -638 -9 13 -901 12-May-2009 18 00 00 -427 109 032 048 -1847 -9 41 -871 -976 12-May-2009 24 00 00 -426 080 002 049 -1859 -9 18 -882 -979 13-May-2009 06 00 00 -429 067 005 -041 -1952 -956 -860 -853 13-May-2009 12 00 00 -494 065 -010 047 -1896 -919 -1170 -1059 13-May-2009 18 00 00 -531 001 -066 017 -1961 -11 14 -1082 -1041 13-May-2009 24 00 00 -5 15 -051 -1 15 009 -1978 -1122 -1024 -1040 14-May-2009 06 00 00 -503 -059 -1 15 -093 -2081 -1189 -934 -917 14-May-2009 12 00 00 -571 -096 -154 -006 -2019 -1145 -1170 -1021 14-May-2009 18 00 00 -561 -100 -171 -084 -21 10 -13 10 -1028 -970 14-May-2009 24 00 00 -549 -124 -168 -066 -2084 -1296 -969 -969 15-May-2009 06 00 00 -548 -137 -142 -107 -2132 -1332 -912 -890 15-May-2009 12 00 00 -641 -162 -195 -069 -2106 -1308 -1303 -1054 15-May-2009 18 00 00 -654 -201 -223 -186 -2148 -1453 -11 12 -1004 15-May-2009 24 00 00 -649 -208 -214 -202 -2140 -1428 -1070 -1016 16-May-2009 06 00 00 -668 -213 -201 -249 -2202 -1488 -1028 -905 16-May-2009 12 00 00 -786 -275 -277 -174 -2138 -1428 -666 -1030 16-May-2009 18 00 00 -438 -094 -095 -190 -2136 -13 12 -769 -986 16-May-2009 24 00 00 -522 -138 -094 -149 -2084 -1339 -829 -973 17-May-2009 06 00 00 -554 -162 -096 -216 -2134 -1276 -836 -907 17-May-2009 12 00 00 -002 035 0 13 -193 -2102 -1194 -012 -435 17-May-2009 18 00 00 210 475 397 -063 027 551 -091 241 17-May-2009 24 00 00 187 422 289 204 334 368 -124 193 18-May-2009 06 00 00 149 373 229 18 237 266 —3-2-5--F -0 93 --187 232 18-May-2009 12 00 00 163 407 1 233 246- 292 153 11 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 12 �1 r 1 Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 18-May-2009 18 00 00 120 378 173 230 220 241 -177 143 18-May-2009 24 00 00 108 367 185 243 183 232 -238 057 19-May-2009 06 00 00 093 368 167 159 036 151 -178 083 19-May-2009 12 00 00 101 375 176 219 -058 193 -265 -035 19-May-2009 18 00 00 088 362 170 213 -351 114 -220 -044 19-May-2009 24 00 00 057 336 145 251 -521 132 -268 -158 20-May-2009 06 00 00 051 341 141 153 -768 031 -248 -129 20-May-2009 12 00 00 034 324 131 177 -848 050 -361 -254 20-May-2009 18 00 00 023 296 137 167 -1020 -070 -265 -247 20-May-2009 24 00 00 035 283 138 192 -1082 -049 -320 -299 21 -Ma -2009 06 00 00 021 281 135 127 -1198 -1 18 -278 -255 21 -Ma -2009 12 00 00 005 279 139 181 -1198 -077 -474 -355 21-May-2009 18 00 00 -044 258 1 15 185 -1302 -263 -386 -379 21-May-2009 24 00 00 -038 254 125 198 -1338 -281 -409 -421 22-May-2009 06 00 00 -054 243 133 107 -1440 -371 -400 -361 22-May-2009 12 00 00 -098 246 123 145 -1451 -366 -633 -481 22-May-2009 18 00 00 -131 224 092 134 -1548 -556 -5 13 -506 22-May-2009 24 00 00 -1 16 228 098 145 -1564 -569 -498 -502 23-May-2009 06 00 00 -121 224 109 053 -1658 -611 -465 -445 23-May-2009 12 00 00 -206 215 083 080 -1647 -581 -733 -578 23-May-2009 18 00 00 -217 188 056 067 -1728 -814 -558 -586 23-May-2009 24 00 00 -170 197 055 087 -1736 -731 -538 -579 24-May-2009 06 00 00 -177 187 060 -003 -1836 -748 -500 -490 24-May-2009 12 00 00 -224 197 072 033 -1797 -7 13 -753 -645 24-May-2009 18 00 00 -263 175 047 008 -1876 -9 17 -624 -662 24-May-2009 24 00 00 -234 170 033 035 -1864 -842 -590 -662 25-May-2009 06 00 00 -231 168 031 -063 -1952 -830 -577 -569 25-May-2009 12 00 00 -306 177 009 -007 -1931 -848 -824 -718 25-May-2009 18 00 00 -339 150 -039 -022 -1989 -1038 -687 -724 25-May-2009 24 00 00 -285 147 -030 -022 -1985 -948 -628 -705 26-May-2009 06 00 00 -277 137 -018 -096 -2048 -910 -520 -597 26-May-2009 12 00 00 -294 137 -015 -060 -2014 -797 -681 -689 26-May-2009 18 00 00 -374 092 -049 -072 -2128 -956 -554 -659 26-May-2009 24 00 00 -294 084 -039 -082 -21 11 -809 -572 -680 27-May-2009 06 00 00 -321 074 -046 -138 -2175 -824 -500 -592 27-May-2009 12 00 00 -396 078 -057 -053 -21 16 -790 -901 -785 27-May-2009 18 00 00 -462 038 -102 -2 13 -2195 -11 15 -723 -778 27-May-2009 24 00 00 -413 032 -1 11 -342 -2171 -1027 -711 -778 28-May-2009 06 00 00 -417 013 -121 -467 -2260 -1019 -7 18 -701 28-May-2009 12 00 00 -546 -012 -165 -443 -2236 -1019 -1027 -874 28-May-2009 18 00 00 010 189 167 -587 -1484 526 -205 -135 28-May-2009 24 00 00 -012 199 1 15 -337 -11 10 251 -248 -249 29-May-2009 06 00 00 -001 198 120 -232 -1202 143 -225 -237 29-May-2009 12 00 00 -048 186 1 10 -047 -1253 162 -270 -387 29-May-2009 18 00 00 042 204 132 025 -1332 071 -154 -412 29-May-2009 24 00 00 041 217 145 138 -1301 127 -244 -473 30-May-2009 06 00 00 000 209 134 051 -1347 010 -236 -447 30-May-2009 12 00 00 -036 211 132 122 -1382 037 -410 -563 30-May-2009 18 00 00 -131 199 -099 121 -15 10 -107 -363 -597 30-May-2009 24 00 00 -132 176 092 198 -15 17 -1 18 -423 -649 12 �1 r 1 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 13 Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 31-May-2009 06 00 00 -147 183 098 107 -1665 -258 -408 -559 31-May-2009 12 00 00 -230 189 093 163 -1650 -284 -768 -788 31 -Ma -2009 18 00 00 -301 169 045 127 -1805 -625 -590 -824 31-May-2009 24 00 00 -263 156 037 182 -1792 -635 -600 -8 19 1 -Jun -2009 06 00 00 -290 129 021 068 -1908 -719 -636 -743 1 -Jun -2009 12 00 00 -402 129 001 099 -1902 -727 -976 -974 1 -Jun -2009 18 00 00 -426 1 11 -054 012 -2068 -1070 -769 -941 1 -Jun -2009 24 00 00 -363 089 -049 071 -2040 -973 -720 -893 2 -Jun -2009 06 00 00 -351 095 -052 002 -2109 -955 -722 -771 2 -Jun -2009 12 00 00 -495 097 -083 049 -2078 -953 -1180 -1009 2 -Jun -2009 18 00 00 -542 050 -173 032 -2171 -1285 -1045 -1036 2 -Jun -2009 24 00 00 -499 023 -185 030 -2205 -1278 -981 -992 3 -Jun -2009 06 00 00 -489 -0 15 -181 -073 -2282 -13 18 -901 -847 3 -Jun -2009 12 00 00 -597 -025 -232 -004 -2156 -1283 -1422 -1103 3 -Jun -2009 18 00 00 -699 -137 -455 -057 -2273 -1597 -1340 -1087 3 -Jun -2009 24 00 00 -645 -171 -424 -024 -2252 -1588 -1237 -1035 4 -Jun -2009 06 00 00 -637 -1 83 -3 85 -1 11 -2320 -1646 -11 14 -897 4 -Jun -2009 12 00 00 -779 -256 -503 -063 -2272 -1595 -1556 -1070 4 -Jun -2009 18 00 00 -835 -331 -642 -1 19 -2366 -1798 -1410 -1006 4 -Jun -2009 24 00 00 -776 -3 19 -528 -095 -2324 -1764 -801 -860 5 -Jun -2009 06 00 00 -426 -107 -160 -199 -2434 -1505 -790 -695 5 -Jun -2009 12 00 00 -607 -183 -192 -1 19 -2320 -1452 -1264 -914 5 -Jun -2009 18 00 00 -761 -3 13 -309 -196 -2393 -1756 -1228 -9 25 5 -Jun -2009 24 00 00 -758 -325 -3 15 -209 -2370 -1721 -522 -725 6 -Jun -2009 06 00 00 -297 -067 -041 -245 -2393 -1362 -607 -610 6 -Jun -2009 12 00 00 -434 -1 11 -027 -172 -2223 -1309 -738 -669 6 -Jun -2009 18 00 00 -5 19 -162 -045 -181 -2232 -1409 -745 -637 6 -Jun -2009 24 00 00 -539 -183 -045 -132 -2166 -1392 -792 -691 7 -Jun -2009 06 00 00 -561 -207 -070 -177 -2210 -1373 -790 -681 7 -Jun -2009 12 00 00 -651 -263 -101 -142 -2177 -1243 -1040 -802 7 -Jun -2009 18 00 00 -639 -269 -090 -156 -2247 -1387 -819 -758 7 -Jun -2009 24 00 00 -642 -274 -083 -091 -2184 -1226 -898 -803 8 -Jun -2009 06 00 00 -684 -307 -109 -186 -2256 -1298 -871 -717 8 -Jun -2009 12 00 00 -807 -388 -138 -103 -2186 -1274 -1326 -896 8 -Jun -2009 18 00 00 -878 -460 -229 -201 -2271 -1598 -1183 -943 8 -Jun -2009 24 00 00 -897 -478 -280 -294 -2261 -1619 -1177 -957 9 -Jun -2009 06 00 00 -907 -496 -288 -444 -2342 -1667 -1128 -854 9 -Jun -2009 12 00 00 -1025 -581 -395 -431 -23 14 -1645 -1627 -1076 9 -Jun -2009 18 00 00 -1147 -705 -628 -643 -2438 -1938 -297 -1009 9 -Jun -2009 24 00 00 -168 -047 044 -726 -2457 -1494 -428 -928 10 -Jun -2009 06 00 00 -285 -064 043 -634 -2410 -1468 -426 -754 10 -Jun -2009 12 00 00 -492 -126 026 -387 -2206 -1378 -782 -917 10 -Jun -2009 18 00 00 -665 -221 -0 13 -335 -2256 -1471 -801 -982 10 -Jun -2009 24 00 00 -654 -256 -029 -245 -2199 -1297 -842 -971 11 -Jun -2009 06 00 00 -669 -280 -048 -297 -2256 -1294 -862 -879 11 -Jun -2009 12 00 00 -8 11 -365 -088 -286 -2241 -1333 -1250 -1089 11 -Jun -2009 18 00 00 -962 -5 19 -203 -433 -2321 -1674 -1214 -1084 11 -Jun -2009 24 00 00 -890 -483 -222 -565 -2298 -1674 -1162 -1083 12 -Jun -2009 06 00 00 -949 -534 -273 -715 -2397 -1740 -1206 -986 12 -Jun -2009 12 00 00 -10 87 -658 -418 -761 -2399 -1768 -1707 -1210 13 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 14 Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 12 -Jun -2009 18 00 00 -1271 -839 -773 -857 -2486 -2020 -1665 -12 41 12 -Jun -2009 24 00 00 -1250 -837 -705 -862 -2468 -2021 -1599 -1201 13 -Jun -2009 06 00 00 -1269 -862 -699 -988 -2554 -2095 -1575 -1047 13 -Jun -2009 12 00 00 -1382 -983 -891 -960 -2495 -2042 -1966 -1297 13 -Jun -2009 18 00 00 -1560 -1173 -1185 -1017 -2596 -2228 -235 -1141 13 -Jun -2009 24 00 00 -349 -052 079 -792 -2543 -1846 -426 -1165 14 -Jun -2009 06 00 00 -483 -048 055 -675 -2561 -1912 -446 -1033 14 -Jun -2009 12 00 00 -636 -071 037 -493 -2464 -1861 -726 -1148 14 -Jun -2009 18 00 00 -128 019 068 -503 -25 18 -2044 -328 -922 14 -Jun -2009 24 00 00 -360 Oil 071 -432 -2423 -1655 -481 -944 15 -Jun -2009 06 00 00 -450 017 067 -391 -2400 -1457 -526 -885 15 -Jun -2009 12 00 00 -649 -024 033 -281 -2320 -13 13 -936 -1094 15 -Jun -2009 18 00 00 -803 -093 000 -372 -2392 -1560 -272 -1097 15 -Jun -2009 24 00 00 -295 008 066 -436 -2361 -1279 -522 -1052 16 -Jun -2009 06 00 00 -435 -019 050 -477 -2370 -12 71 -565 -968 16 -Jun -2009 12 00 00 -492 -045 036 -393 -2282 -1158 -212 -8 13 16 -Jun -2009 18 00 00 -057 060 090 -323 -2241 -845 -258 -616 16 -Jun -2009 24 00 00 -213 057 074 -235 -2100 -748 -356 -673 17 -Jun -2009 06 00 00 -277 051 063 -226 -2079 -796 -421 -688 17 -Jun -2009 12 00 00 -365 045 043 -163 -2026 -828 -529 -778 17 -Jun -2009 18 00 00 -371 041 048 -151 -2070 -950 -561 -8 19 17 -Jun -2009 24 00 00 -378 032 063 -103 -2051 -898 -601 -850 18 -Jun -2009 06 00 00 -397 013 044 -155 -2094 -905 -573 -794 18 -Jun -2009 12 00 00 -445 012 036 -1 12 -2081 -889 -856 -961 18 -Jun -2009 18 00 00 -548 -041 -001 -139 -2178 -1132 -794 -1013 18 -Jun -2009 24 00 00 -489 -059 -004 -142 -2160 -1078 -790 -1005 19 -Jun -2009 06 00 00 -500 -078 -023 -263 -2235 -1080 -877 -950 19 -Jun -2009 12 00 00 -709 -154 -049 -280 -2220 -1133 -1276 -1142 19 -Jun -2009 18 00 00 -828 -294 -145 -450 -23 13 -1421 -1240 -1237 19 -Jun -2009 24 00 00 -781 -309 -180 -571 -2302 -1441 -1182 -1213 20 -Jun -2009 06 00 00 -765 -3 10 -196 -756 -2397 -15 19 -1195 -1084 20 -Jun -2009 12 00 00 -948 -432 -276 -761 -2367 -1505 -1641 -1309 20 -Jun -2009 18 00 00 -11 11 -609 -534 -833 -2452 -1764 -1671 -1409 20 -Jun -2009 24 00 00 -11 12 -622 -580 -855 -2478 -1829 -1582 -1337 21 -Jun -2009 06 00 00 -1142 -663 -597 -943 -2535 -1873 -1584 -1235 21 -Jun -2009 12 00 00 -1275 -823 -827 -952 -2523 -1859 -2017 -1466 21 -Jun -2009 18 00 00 -1507 -1091 -1229 -10 19 -2619 -2124 -2073 -1540 21 -Jun -2009 24 00 00 -1566 -1144 -1125 -1023 -2633 -2191 -2049 -1448 22 -Jun -2009 06 00 00 -1602 -1211 -1091 -1123 -2696 -2264 -2073 -1334 22 -Jun -2009 12 00 00 -1704 -1329 -13 15 -1147 -2691 -2270 -2287 -1498 22 -Jun -2009 18 00 00 -1842 -1482 -1473 -1198 -2774 -2436 -2324 -1573 22 -Jun -2009 24 00 00 -1890 -1545 -1380 -1207 -2774 -2477 -23 16 -1503 23 -Jun -2009 06 00 00 -1923 -1591 -13 12 -1291 -2855 -2556 -2274 -1375 23 -Jun -2009 12 00 00 -1964 -1643 -15 17 -1293 -2825 -2526 -2505 -1520 23 -Jun -2009 18 00 00 -2084 -1776 -1644 -1350 -2906 -2654 -2526 -1550 23 -Jun -2009 24 00 00 -2130 -1837 -1593 -1353 -2908 -2699 -2523 -1471 24 -Jun -2009 06 00 00 -2156 -1882 -1575 -1434 -2970 -2759 -2530 -1390 24 -Jun -2009 12 00 00 -2185 -1924 -1699 -1457 -2979 -2762 -2670 -1562 24 -Jun -2009 18 00 00 -22 70 -2034 -1803 -1499 -30 18 -2839 -2689 -1609 24 -Jun -2009 24 00 00 -2300 -2082 -1751 -14 77 -29 92 -28 40 -27 15 -15 62 14 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 15 Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 25 -Jun -2009 06 00 00 -2334 -2115 -1758 -1590 -3098 -2939 -2703 -1673 25 -Jun -2009 12 00 00 -2462 -2284 -1960 -1581 -3058 -2924 -2904 -1771 25 -Jun -2009 18 00 00 -2507 -2345 -1960 -1629 -3099 -2974 -2902 -1687 25 -Jun -2009 24 00 00 -2529 -2373 -1932 -1642 -3111 -3008 -2929 -1553 26 -Jun -2009 06 00 00 -2551 -2394 -2022 -1749 -3196 -31 10 -2884 -1765 26 -Jun -2009 12 00 00 -1380 -1153 -033 -1717 -3156 -3066 -3020 -1033 26 -Jun -2009 18 00 00 -1417 -1097 -058 -1691 -2963 -2752 -1144 -1127 26 -Jun -2009 24 00 00 -1464 -1105 -114 -343 -2944 -2190 -1279 -1130 27 -Jun -2009 06 00 00 -1533 -1218 -209 -202 -2943 -2203 -1357 -1322 27 -Jun -2009 12 00 00 -1699 -1410 -556 -120 -2886 -2190 -1737 -1395 27 -Jun -2009 18 00 00 -1746 -1432 -726 -202 -2943 -2341 -18 13 -1391 27 -Jun -2009 24 00 00 -1795 -1477 -857 -335 -2906 -2356 -1906 -1334 28 -Jun -2009 06 00 00 -1855 -15 42 -1097 -437 -2961 -2460 -1935 -1487 28 -Jun -2009 12 00 00 -1981 -1713 -1372 -426 -2957 -2480 -2156 -1630 28 -Jun -2009 18 00 00 -2049 -1770 -1321 -693 -3009 -2593 -2254 -1609 28 -Jun -2009 24 00 00 -2076 -1804 -1338 -841 -3020 -2634 -2364 -1455 29 -Jun -2009 06 00 00 -2106 -1847 -15 18 -1023 -31 16 -2772 -2298 -1679 29 -Jun -2009 12 00 00 -2223 -2003 -1707 -1008 -3058 -2735 -2526 -1778 29 -Jun -2009 18 00 00 -2293 -2070 -1678 -1120 -3161 -2880 -2596 -1745 29 -Jun -2009 24 00 00 -23 19 -21 15 -1674 -1108 -3125 -2886 -2676 -1603 30 -Jun -2009 06 00 00 -2357 -2154 -1848 -1249 -3208 -2999 -2658 -1822 30 -Jun -2009 12 00 00 -2487 -2341 -2043 -1283 -3196 -3000 -2874 -1921 30 -Jun -2009 18 00 00 -2561 -2413 -2041 -1350 -3274 -3133 -2974 -1879 30 -Jun -2009 24 00 00 -2588 -2440 -2043 -1371 -3272 -3168 -3030 -1738 1 -Jul -2009 06 00 00 -2619 -2489 -2152 -1457 -3346 -3246 -2997 -1924 1 -Jul -2009 12 00 00 -2696 -2596 -2255 -1445 -3306 -3224 -31 64 -1996 1 -Jul -2009 18 00 00 -2754 -2625 -2196 -1525 -3380 -3336 -3183 -1981 1- Jul -2009 24 00 00 -2749 -2619 -2146 -1499 -3338 -3293 -3200 -1816 2- Jul -2009 06 00 00 -2767 -26 51 -2235 -1621 -3432 -3406 -3134 -1982 2 -Jul -2009 12 00 00 -2839 -2758 -2380 -16 15 -3382 -3360 -3298 -2057 2- Jul -2009 18 00 00 -2901 -2802 -2368 -1702 -3483 -3458 -3297 -2053 2 -Jul -2009 24 00 00 -2925 -2830 -2381 -1669 -3435 -3427 -3396 -1904 3 -Jul -2009 06 00 00 -2947 -2850 -2431 -1779 -3525 -3527 -3336 -2049 3 -Jul -2009 12 00 00 -3005 -2925 -2506 -1762 -3470 -3480 -3763 -2147 3 -Jul -2009 18 00 00 -3073 -2989 -25 15 -1840 -3550 -3580 -3477 -2150 3 -Jul -2009 24 00 00 -3120 -3035 -2533 -1840 -3546 -3580 -3550 -2001 4 -Jul -2009 06 00 00 -31 15 -30 15 -2543 -1955 -3636 -3676 -3501 -21 14 4 -Jul -2009 12 00 00 -3164 -3065 -2608 -1914 -3593 -3641 -3520 -2224 4 -Jul -2009 18 00 00 -3233 -3142 -2626 -1989 -3648 -3659 -3494 -2212 4 -Jul -2009 24 00 00 -3249 -3148 -2617 -1984 -3652 -3635 -3554 -2066 5 -Jul -2009 06 00 00 -3279 -3167 -2655 -2059 -3731 -3668 -3501 -2176 5 -Jul -2009 12 00 00 -3307 -3198 -2687 -2062 -3692 -3608 -3530 -2253 5 -Jul -2009 18 00 00 -33 51 -3231 -2681 -2107 -3758 -3642 -3528 -2194 5 -Jul -2009 24 00 00 -3373 -3246 -2686 -2125 -3766 -3628 -3553 -2081 6 -Jul -2009 06 00 00 -3399 -3270 -2718 -2178 -3804 -3652 -35 18 -1901 6 -Jul -2009 12 00 00 -3351 -3143 -2521 -2188 -3804 -3634 -3562 -1787 6 -Jul -2009 18 00 00 -3282 -3049 -2459 -2249 -3858 -3676 -3498 -1829 6 -Jul -2009 24 00 00 -3245 -2999 -2446 -2226 -3802 -3613 -3558 -1761 7 -Jul -2009 06 00 00 -3222 -3003 -2482 -2301 -3879 -3658 -3505 -1927 7 -Jul -2009 12 00 00 -3257 -3067 -2589 -2291 T78 31 -36 17 -35 34 1 -20 33 15 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 16 Date Time Water Level inches dd -mmm- hh:mm:ss AW1 AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 7 -Jul -2009 18 00 00 -3326 -3131 -2629 -2334 -3888 -3632 -3505 -2025 7 -Jul -2009 24 00 00 -3362 -3175 -2632 -2334 -3879 -3606 -3542 -1940 8- Jul -2009 06 00 00 -3378 -3191 -2706 -2397 -3930 -3636 -35 13 -2080 8 -Jul -2009 12 00 00 -3420 -3256 -2784 -2387 -3903 -3601 -3560 -2150 8 -Jul -2009 18 00 00 -3447 -3289 -2783 -2473 -3983 -3659 -35 17 -2162 8 -Jul -2009 24 00 00 -3482 -33 13 -2794 -2441 -3970 -36 18 -3538 -2059 9 -Jul -2009 06 00 00 -3500 -3335 -2843 -2501 -4018 -3660 -35 17 -2086 9 -Jul -2009 12 00 00 -35 16 -3357 -2886 -2489 -3998 -3616 -3540 -2167 9 -Jul -2009 18 00 00 -3558 -3401 -2904 -2530 -4040 -3634 -3477 -2217 9 -Jul -2009 24 00 00 -3587 -3436 -2910 -2523 -4012 -3592 -3550 -2089 10 -Jul -2009 06 00 00 -3607 -3443 -2947 -2619 -4090 -3668 -3469 -2192 10 -Jul -2009 12 00 00 -3630 -3469 -30 11 -2566 -4020 -3586 -3507 -2324 10 -Jul -2009 18 00 00 -3669 -35 10 -3000 -2608 -4050 -3622 -35 13 -2373 10 -Jul -2009 24 00 00 -3701 -3537 -3000 -2645 -4049 -3628 -3566 -2223 11 -Jul -2009 06 00 00 -3701 -3533 -3022 -2729 -4104 -3683 -3482 -23 18 11 -Jul -2009 12 00 00 -3732 -3565 -3078 -2673 -4018 -3605 -3520 -2362 11 -Jul -2009 18 00 00 -3756 -3595 -3057 -2742 -4060 -3641 -3475 -2396 11- Jul -2009 24 00 00 -3795 -36 10 -3066 -2705 -3990 -3589 -3535 -2329 12 -Jul -2009 06 00 00 -3803 -3630 -3108 -2788 -4055 -3656 -35 19 -2419 12 -Jul -2009 12 00 00 -3825 -3647 -3131 -2778 -4022 -3620 -3536 -2481 12 -Jul -2009 18 00 00 -3877 -3705 -3157 -28 15 -4048 -3637 -3505 -2535 12 -Jul -2009 24 00 00 -3888 -3712 -3143 -2819 -4034 -3618 -3568 -2456 13 -Jul -2009 06 00 00 -3909 -3683 -3088 -2877 -4074 -3665 -3536 -1850 13 -Jul -2009 12 00 00 -3829 -3550 -2854 -2893 -4052 -3638 -3578 -1701 13 -Jul -2009 18 00 00 -3732 -3407 -2760 -2094 -4058 -3676 -35 14 -1781 13 -Jul -2009 24 00 00 -3655 -3293 -2719 -1729 -4022 -3610 -3547 -1733 14 -Jul -2009 06 00 00 -36 13 -3251 -2731 -1829 -4066 -3654 -3475 -1873 14 -Jul -2009 12 00 00 -3585 -3239 -2781 -1828 -3988 -3574 -3541 -1941 14 -Jul -2009 18 00 00 -3585 -3244 -2777 -1966 -4058 -3650 -3500 -1993 14 -Jul -2009 24 00 00 -3600 -3262 -2794 -1967 -4012 -3607 -3573 -1903 15 -Jul -2009 06 00 00 -3569 -3258 -2806 -2089 -4079 -3673 -3508 -2024 15 -Jul -2009 12 00 00 -3590 -3299 -2884 -2053 -4000 -3581 -3528 -2123 15 -Jul -2009 18 00 00 -3643 -3360 -2911 -2135 -4040 -3642 -3506 -2159 15 -Jul -2009 24 00 00 -3667 -3394 -2919 -2157 -4014 -3612 -3559 -2071 16 -Jul -2009 06 00 00 -3665 -3390 -2949 -2244 -4073 -3658 -3520 -2225 16 -Jul -2009 12 00 00 -3727 -3460 -30 18 -2248 -4024 -36 19 -3565 -2273 16 -Jul -2009 18 00 00 -3749 -3491 -3022 -2356 -4085 -3683 -3543 -2261 16 -Jul -2009 24 00 00 -3787 -35 11 -3034 -2374 -4059 -3647 -3572 -2156 17 -Jul -2009 06 00 00 -3809 -3546 -3071 -2433 -4077 -3678 -35 18 -2270 17 -Jul -2009 12 00 00 -3823 -3567 -3093 -2405 -4017 -3608 -3603 -2251 17 -Jul -2009 18 00 00 -3042 -2673 -1097 -25 15 -4091 -3689 -3474 -1436 17 -Jul -2009 24 00 00 -2343 -1959 -1055 -2335 -3951 -3571 -2594 -1483 18 -Jul -2009 06 00 00 -23 18 -1920 -1290 -577 -3765 -3674 -2388 -1705 18 -Jul -2009 12 00 00 -2384 -2026 -1521 -047 -3708 -3606 -2547 -1777 18 -Jul -2009 18 00 00 -2418 -2076 -1542 -076 -3810 -3670 -2590 -1834 18 -Jul -2009 24 00 00 -2437 -21 13 -1585 -006 -3768 -3589 -2684 -1777 19 -Jul -2009 06 00 00 -2466 -2160 -1686 -064 -3797 -3616 -2677 -1893 19 -Jul -2009 12 00 00 -25 14 -2277 -1821 001 -3743 -3563 -2793 -1958 19 -Jul -2009 18 00 00 -2559 -2331 -1830 -067 -3791 -3629 -28 53 -19 52 19 -Jul -2009 24 00 00 -25 71 -2349 -1841 -065 -3765 -3604 -29 24 -18 70 16 Haw Branch Mitigation Site Annual Monitoring Report for 2009 fYear 4) Appendix C Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 20 -Jul -2009 06 00 00 -2616 -2409 -1887 -099 -3782 -3650 -2905 -1953 20 -Jul -2009 12 00 00 -2646 -2457 -1966 -067 -3744 -36 16 -3000 -1959 20 -Jul -2009 18 00 00 -2672 -2485 -1981 -192 -3801 -3670 -3007 -1977 20 -Jul -2009 24 00 00 -2697 -2508 -2014 -256 -3771 -36 11 -3088 -1897 21 -Jul -2009 06 00 00 -2714 -2539 -2049 -371 -3820 -3674 -3052 -2007 21- Jul -2009 12 00 00 -2753 -2597 -2131 -287 -3752 -3606 -3160 -2059 21 -Jul -2009 18 00 00 -2805 -2657 -21 83 -636 -3824 -3652 -3160 -2096 21 -Jul -2009 24 00 00 -2837 -2691 -2197 -785 -3806 -3608 -3243 -2017 22 -Jul -2009 06 00 00 -2874 -2730 -2253 -886 -3867 -3664 -3247 -2108 22 -Jul -2009 12 00 00 -2898 -2764 -2296 -790 -3830 -3618 -3324 -2087 22 -Jul -2009 18 00 00 -2943 -2790 -23 14 -923 -3880 -3649 -3277 -2151 22 -Jul -2009 24 00 00 -2969 -2820 -2337 -969 -3845 -3586 -3393 -2044 23 -Jul -2009 06 00 00 -2981 -2844 -2376 -1123 -3927 -3665 -3369 -2177 23 -Jul -2009 12 00 00 -1635 -1264 -058 -1150 -3878 -36 13 -3484 -484 23 -Jul -2009 18 00 00 -1557 -1199 -061 -1272 -3992 -3683 -1323 -807 23 -Jul -2009 24 00 00 -1640 -1163 -1 13 -589 -3347 -1530 -1368 -989 24 -Jul -2009 06 00 00 -1266 -545 036 -444 -33 18 -1846 -1480 -689 24 -Jul -2009 12 00 00 -635 -211 066 -3 13 -3207 -1960 -632 -699 24 -Jul -2009 18 00 00 -768 -292 033 -246 -3094 1 -1476 -440 -951 24 -Jul -2009 24 00 00 -797 -305 Oil -095 -2734 -967 -710 -1017 25 -Jul -2009 06 00 00 -900 -417 -007 -0 15 -2579 -991 -758 -1229 25 -Jul -2009 12 00 00 -986 -499 -048 093 -2393 -952 -1004 -1294 25 -Jul -2009 18 00 00 -1005 -492 -084 092 -2396 -1056 -1100 -1388 25 -Jul -2009 24 00 00 -1021 -5 13 -1 13 1 13 -2336 -1022 -1188 -1394 26 -Jul -2009 06 00 00 -1188 -667 -193 044 -2380 -1067 -1234 -1564 26 -Jul -2009 12 00 00 -1425 -928 -5 13 071 -2360 -1100 -1688 -1666 26 -Jul -2009 18 00 00 -1487 -947 -615 033 -2482 -1424 -1797 -1693 26 -Jul -2009 24 00 00 -15 11 -966 -652 032 -2447 -1489 -1860 -1639 27 -Jul -2009 06 00 00 -1608 -1125 -837 -029 -2490 -16 18 -1864 -1714 27 -Jul -2009 12 00 00 -1645 -1149 -880 023 -2476 -1652 -2028 -1708 27 -Jul -2009 18 00 00 -1687 -1174 -897 -040 -2560 -1854 -2062 -1636 27 -Jul -2009 24 00 00 -1705 -1198 -888 -057 -2571 -1879 -2050 -1754 28 -Jul -2009 06 00 00 -1767 -1302 -1019 -028 -2559 -1909 -2262 -1588 28 -Jul -2009 12 00 00 -1667 -11 17 -803 -037 -2655 -2021 -2079 -1603 28 -Jul -2009 18 00 00 -1698 -1197 -853 -043 -2655 -1991 -2132 -1558 28 -Jul -2009 24 00 00 -1736 -1243 -888 -093 -2710 -2053 -2145 -1702 29 -Jul -2009 06 00 00 -1829 -1415 -11 13 -061 -2690 -2054 -2335 -1756 29 -Jul -2009 12 00 00 -1821 -1367 -1019 -1 13 -2772 -21 84 -2269 -1745 29 -Jul -2009 18 00 00 -1857 -1431 -1060 -093 -2758 -2178 -2325 -1701 29 -Jul -2009 24 00 00 -1886 -1485 -11 10 -147 -2804 -2222 -2346 -1834 30 -Jul -2009 06 00 00 -1979 -1585 -1308 -106 -2786 -2228 -2534 -1886 30 -Jul -2009 12 00 00 -2075 -1744 -1461 -167 -2900 1 -2400 -2580 -1933 30 -Jul -2009 18 00 00 -2126 -1798 -1446 -160 -2874 -2390 -2662 -1831 30 -Jul -2009 24 00 00 -2145 -1824 -1432 -263 -2956 -2470 -2625 -1989 31 -Jul -2009 06 00 00 -2203 -19 15 -1561 -227 -2924 -2453 -2775 -1895 31 -Jul -2009 12 00 00 -2203 -1866 -1360 -394 -3042 -2603 -2558 -1796 31 -Jul -2009 18 00 00 -1811 -1321 -640 -214 -2970 -2417 -2215 -1713 31 -Jul -2009 24 00 00 -1809 -13 69 -793 -233 -3074 -2393 -2169 -1807 1 -Au -2009 06 00 00 -1848 -1493 -952 -160 -3000 -2334 -2388 -1844 1 -Au -2009 12 00 00 -2006 -16 95 -12 81 -192 -3078 -25 00 -24 55 -1889 17 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 18 Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 1 -Au -2009 18 00 00 -2060 -1747 -1287 -198 -3036 -2492 -2540 -1820 1-Aug-2009 24 00 00 -2077 -1786 -1296 -291 -3107 -2582 -2532 -1058 2-Aug-2009 06 00 00 -2139 -1872 -1435 -258 -3056 -2554 -1417 -643 2-Aug-2009 12 00 00 -356 -089 099 -196 -2454 151 -403 -877 2-Aug-2009 18 00 00 -416 -047 044 007 -1881 049 -620 -835 2-Aug-2009 24 00 00 -299 -013 041 0 15 -1827 -078 -502 -988 3-Aug-2009 06 00 00 -458 -004 023 073 -1706 -066 -249 -1095 3-Aug-2009 12 00 00 -147 055 059 087 -1566 -058 -391 -1234 3 -Au -2009 18 00 00 -263 045 049 121 -1505 -096 -564 -1261 3-Aug-2009 24 00 00 -299 039 029 066 -15 83 -214 -652 -1382 4-Aug-2009 06 00 00 -439 024 019 086 -1659 -325 -1009 -1478 4-Aug-2009 12 00 00 -469 -021 -039 095 -1840 -643 -938 -1562 4-Aug-2009 18 00 00 -434 -018 -036 121 -1852 -640 -991 -1525 4-Aug-2009 24 00 00 -449 -031 -060 014 -1946 -740 -1030 -1619 5-Aug-2009 06 00 00 -619 -099 -096 039 -1940 -752 -1406 334 5-Aug-2009 12 00 00 155 469 537 035 -2078 -1038 -190 185 5-Aug-2009 18 00 00 063 347 213 276 375 426 -324 158 5-Aug-2009 24 00 00 027 259 125 237 224 352 -328 -009 6-Aug-2009 06 00 00 -042 194 080 205 206 269 -6 33 -043 6-Aug-2009 12 00 00 -121 152 059 121 040 1 12 -568 -236 6-Aug-2009 18 00 00 -145 156 063 168 010 160 -670 -257 6-Aug-2009 24 00 00 -157 146 067 075 -250 059 -620 -453 7-Aug-2009 06 00 00 -254 141 051 128 -406 086 -987 -598 7-Aug-2009 12 00 00 -335 109 -009 090 -788 -095 -916 -715 7-Aug-2009 18 00 00 -297 105 -009 098 -920 -155 -925 -703 7-Aug-2009 24 00 00 -287 092 -009 038 -1072 -282 -908 -885 8-Aug-2009 06 00 00 -433 067 -051 1 10 -11 18 -302 -1404 -1042 8-Aug-2009 12 00 00 -503 029 -133 047 -1379 -652 -1344 -1123 8-Aug-2009 18 00 00 -431 017 -155 038 -1457 -702 -1262 -1047 8-Aug-2009 24 00 00 -428 -004 -157 -024 -1551 -750 -1156 -1181 9-Aug-2009 06 00 00 -577 -040 -205 044 -1536 -701 -1671 -1299 9-Aug-2009 12 00 00 -672 -173 -384 -007 -1722 -1024 -1611 -1301 9-Aug-2009 18 00 00 -600 -173 -387 005 -1781 -926 -1503 -1234 9-Aug-2009 24 00 00 -608 -190 -372 -030 -1828 -884 -1504 -1359 10-Aug-2009 06 00 00 -829 -335 -527 -017 -1838 -929 -1929 -1431 10-Aug-2009 12 00 00 -966 -5 14 -773 -042 -2016 -1226 -1894 -1421 10-Aug-2009 18 00 00 -950 -508 -700 -028 -2024 -1163 -1798 -1322 10-Aug-2009 24 00 00 -973 -533 -643 -091 -2070 -1226 -18 10 -1461 11 -Au -2009 06 00 00 -1167 -723 -856 -063 -2062 -1260 -2170 -580 11 -Au -2009 12 00 00 -824 -427 -665 -145 -2235 -1566 -1646 -1 16 11 -Au -2009 18 00 00 -1 17 -035 041 -004 -1340 084 -798 -208 11 -Au -2009 24 00 00 -325 -076 014 -012 -866 134 -853 -362 12-Aug-2009 06 00 00 -5 11 -133 -010 069 -977 125 -1030 -363 12-Aug-2009 12 00 00 -161 -047 025 079 -1164 053 -686 -479 12-Aug-2009 18 00 00 -366 -076 023 108 -1095 071 -834 -532 12-Aug-2009 24 00 00 -4 13 -082 017 054 -1262 -036 -866 -587 13-Aug-2009 06 00 00 -3 85 -088 020 081 -1278 -046 -938 -590 13-Aug-2009 12 00 00 -483 -131 -007 067 -13 83 -150 -954 -689 13-Aug-2009 18 00 00 -485 -150 -031 1 17 -1384 -187 -1002 3 86 13-Aug-2009 24 00 00 -491 -177 -045 055 1 -14 87 -3 20 -093 309 18 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 19 Date Time Water Level inches dd -mmm- hh:mm:ss AW1 AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 14-Aug-2009 06 00 00 156 465 380 235 456 602 -291 311 14-Aug-2009 12 00 00 103 326 252 397 322 600 -266 201 14-Aug-2009 18 00 00 060 247 194 363 297 506 -355 227 14-Aug-2009 24 00 00 024 211 145 219 194 280 -303 119 15-Aug-2009 06 00 00 -029 173 103 212 199 278 -568 134 15-Aug-2009 12 00 00 -104 159 099 161 055 156 -488 026 15-Aug-2009 18 00 00 -101 167 107 205 -036 172 -554 059 15-Aug-2009 24 00 00 -146 134 095 1 13 -293 076 -524 -053 16-Aug-2009 06 00 00 -212 135 096 163 -410 098 -807 -062 16-Aug-2009 12 00 00 -222 1 14 061 121 -720 -014 -644 -129 16-Aug-2009 18 00 00 -209 1 11 086 151 -821 -035 -644 -106 16-Aug-2009 24 00 00 -228 103 091 092 -959 -121 -667 -248 17-Aug-2009 06 00 00 -333 102 057 1 19 -1038 -162 -1048 -272 17-Aug-2009 12 00 00 -377 057 0 15 060 -1287 -436 -910 -3 14 17-Aug-2009 18 00 00 -327 051 017 078 -1340 -481 -865 -271 17-Aug-2009 24 00 00 -3 19 056 027 037 -1402 -5 14 -866 -376 18-Aug-2009 06 00 00 -467 043 007 089 -1408 -490 -1305 -419 18-Aug-2009 12 00 00 -5 19 -016 -045 044 -1611 -770 -1184 -447 18-Aug-2009 18 00 00 -432 -033 -054 074 -1624 -718 -1086 -380 18-Aug-2009 24 00 00 -444 -048 -063 026 -1683 -708 -1040 -5 17 19-Aug-2009 06 00 00 -614 -108 -101 043 -1682 -716 -1569 -559 19-Aug-2009 12 00 00 -671 -220 -198 -024 -1877 -998 -1426 -602 19-Aug-2009 18 00 00 -608 -204 -202 025 -1865 -869 -1335 -485 19-Aug-2009 24 00 00 -613 -223 -213 -051 -1934 -864 -1248 -611 20-Aug-2009 06 00 00 -824 -348 -292 030 -1888 -829 -1752 -665 20-Aug-2009 12 00 00 -957 -498 -477 -039 -2027 -1106 -1670 -687 20-Aug-2009 18 00 00 -927 -481 -469 006 -2021 -1019 -1552 -591 20-Aug-2009 24 00 00 -9 15 -491 -414 -072 -2098 -1006 -1500 -263 21-Aug-2009 06 00 00 -089 -045 -072 -041 -2058 -970 -736 -299 21 -Au -2009 12 00 00 -450 -189 005 -034 -1876 -476 -868 -400 21-Aug-2009 18 00 00 -543 -223 -017 023 -1782 -533 -9 13 -362 21-Aug-2009 24 00 00 -559 -231 -019 -039 -18 16 -610 -890 142 22-Aug-2009 06 00 00 -711 -323 -054 027 -1769 -562 -153 224 22-Aug-2009 12 00 00 001 221 174 099 -141 431 -195 105 22-Aug-2009 18 00 00 010 218 157 218 -035 301 -288 099 22-Aug-2009 24 00 00 -035 198 132 132 -287 175 -292 -004 23-Aug-2009 06 00 00 -092 150 104 173 -437 179 -435 -040 23-Aug-2009 12 00 00 -095 151 1 11 129 -597 109 -374 -146 23-Aug-2009 18 00 00 -135 145 105 157 -737 1 13 -459 -177 23-Aug-2009 24 00 00 -153 140 098 1 15 -884 043 -469 -349 24-Aug-2009 06 00 00 -240 123 051 132 -966 023 -658 -392 24-Aug-2009 12 00 00 -272 1 17 -023 157 -1235 -1 14 -649 -364 24-Aug-2009 18 00 00 -241 1 11 -013 1 17 -1307 -1 98 -627 -501 24-Aug-2009 24 00 00 -242 109 -009 156 -1334 -224 -1057 -569 25-Aug-2009 06 00 00 -3 63 097 -036 092 -1528 -498 -948 -593 25-Aug-2009 12 00 00 -415 056 -079 102 -1568 -521 -877 -543 25-Aug-2009 18 00 00 -354 057 -082 072 -1614 -560 -834 -683 25-Aug-2009 24 00 00 -335 044 -085 1 13 -1605 -538 -1390 -723 26-Aug-2009 06 00 00 -509 023 -126 043 -1786 -847 -1244 -775 26-Aug-2009 12 00 00 -560 -053 -208 0 77 -17 97 -7 43 -1146 -689 19 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) 1 � Appendix C ' 20 Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 26-Aug-2009 18 00 00 -482 -065 -214 033 -1851 -740 -1078 -825 26-Aug-2009 24 00 00 -480 -063 -210 069 -1829 -737 -1609 -873 27-Aug-2009 06 00 00 -644 -142 -263 -007 -1997 -1036 -1443 -903 27-Aug-2009 12 00 00 -740 -273 -4 13 050 -1974 -895 -1342 -775 27-Aug-2009 18 00 00 -673 -252 -402 -006 -2042 -872 -1257 -881 27-Aug-2009 24 00 00 -697 -273 -393 051 -2001 -846 -660 -670 28-Aug-2009 06 00 00 -866 -387 -503 007 -2109 -948 -249 -555 28-Aug-2009 12 00 00 -024 043 025 123 -1698 -210 -3 15 -469 28-Aug-2009 18 00 00 031 077 062 067 -1572 -180 -3 12 -583 28-Aug-2009 24 00 00 -089 090 037 155 -1466 -139 -5 11 -634 29-Aug-2009 06 00 00 -195 083 -011 101 -1623 -354 -538 -705 29-Aug-2009 12 00 00 -279 089 -025 156 -1622 -368 -589 -661 29-Aug-2009 18 00 00 -275 083 -016 080 -1707 -457 -582 -820 29-Aug-2009 24 00 00 -293 075 -021 137 -1677 -430 -988 -579 30-Aug-2009 06 00 00 -428 054 -049 049 -1887 -754 -334 -361 30-Aug-2009 12 00 00 -471 032 -1 18 141 -1638 -103 -241 -200 30-Aug-2009 18 00 00 033 097 012 145 -1186 143 -1 14 -170 30-Aug-2009 24 00 00 -006 163 054 236 -702 3 17 -288 -173 31-Aug-2009 06 00 00 035 199 1 10 158 -765 181 -264 -346 31-Aug-2009 12 00 00 000 186 079 212 -854 193 -370 -334 31-Aug-2009 18 00 00 -033 181 081 145 -994 1 15 -3 28 -466 31-Aug-2009 24 00 00 -054 162 061 198 -1041 131 -638 -507 1-Sep-2009 06 00 00 -140 145 044 140 -1260 Oil -5 17 -591 1 -Se -2009 12 00 00 -186 129 021 165 -1284 -004 -543 -574 1 -Se -2009 18 00 00 -187 129 027 108 -1367 -095 -542 -679 1 -Se -2009 24 00 00 -186 139 037 171 -1344 -084 -795 -694 2-Sep-2009 0600-00 -273 1 10 -004 1 13 -1524 -277 -674 -790 2-Sep-2009 12 00 00 -279 108 -0 15 140 -1539 -322 -703 -747 2-Sep-2009 18 00 00 -261 103 -0 15 080 -1610 -410 -668 -829 2-Sep-2009 24 00 00 -269 089 -0 13 127 -1578 -394 -967 -806 3-Sep-2009 06 00 00 -371 077 -040 065 -1732 -599 -808 -860 3-Sep-2009 12 00 00 -378 055 -053 125 -1698 -553 -795 -837 3-Sep-2009 18 00 00 -339 065 -041 054 -1781 -608 -835 -937 3-Sep-2009 24 00 00 -351 061 -042 095 -1763 -605 -1171 -955 4-Sep-2009 06 00 00 -483 023 -082 051 -1914 -809 -1034 -997 4-Sep-2009 12 00 00 -506 -019 -120 092 -1904 -730 -998 -938 4-Sep-2009 18 00 00 -461 -025 -1 15 031 -1959 -754 -962 -1039 4-Sep-2009 24 00 00 -480 -035 -127 089 -1900 -728 -1441 -1078 5-Sep-2009 06 00 00 -631 -087 -174 036 -2056 -1006 -13 17 -1153 5-Sep-2009 12 00 00 -696 -197 -253 066 -2058 -895 -1239 -1070 5-Sep-2009 18 00 00 -659 -196 -269 -025 -2147 -905 -1164 -11 12 5-Sep-2009 24 00 00 -656 -199 -275 027 -2090 -853 -1573 -11 41 6-Sep-2009 06 00 00 -798 -271 -324 003 -2180 -1087 -1482 -1161 6-Sep-2009 12 00 00 -918 -382 -449 017 -2186 -1056 -1354 -598 6-Sep-2009 18 00 00 -893 -363 420 -012 -2211 -10 42 -170 -200 6-Sep-2009 24 00 00 -137 -055 -142 123 -1665 037 -182 -209 7-Sep-2009 06 00 00 030 103 060 210 -1050 222 -246 -382 7-Sep-2009 12 00 00 -013 138 059 194 -1006 199 -325 -406 7-Sep-2009 18 00 00 -051 144 048 152 -1125 1 19 -308 -584 7-Sep-2009 24 00 00 -083 155 049 2 06 -1174 142 -5 52 -625 20 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C Date Time Water Level inches dd -mmm- hh:mm:ss AW1 AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 8-Sep-2009 06 00 00 -159 132 020 113 -1409 -034 -480 -713 8-Sep-2009 12 00 00 -201 119 002 177 -1408 -002 -500 -713 8-Sep-2009 18 00 00 -195 128 023 139 -1469 -0 73 -468 -845 8-Sep-2009 24 00 00 -209 131 008 185 -1463 -091 -823 -909 9-Sep-2009 06 00 00 -299 115 023 103 -1658 -346 -704 -997 9-Sep-2009 12 00 00 -359 104 -040 146 -1664 -373 -699 -952 9-Sep-2009 18 00 00 -305 099 -027 099 -1724 -446 -639 -1001 9-Sep-2009 24 00 00 -321 075 -042 137 -1703 -442 -789 -965 10 -Se -2009 06 00 00 -335 066 -035 091 -1785 -532 -734 -1041 10-Sep-2009 12 00 00 -369 071 -055 132 -1755 -500 -768 -986 10-Sep-2009 18 00 00 -353 074 -054 071 -1824 -565 -762 -1105 10-Sep-2009 24 00 00 -366 059 -065 134 -1799 -540 -1129 -1123 11 -Se -2009 06 00 00 -485 030 -079 060 -1944 -800 -986 -1149 11 -Se -2009 12 00 00 -5 17 -011 -136 091 -1937 -708 -940 -1089 11 -Se -2009 18 00 00 -465 -016 -132 069 -1967 -706 -885 -1205 11 -Se -2009 24 00 00 -468 -035 -136 095 -1950 -696 -13 56 -1199 12-Sep-2009 06 00 00 -621 -077 -180 014 -2094 -973 -1138 -1219 12-Sep-2009 12 00 00 -623 -149 -246 056 -2081 -829 -1066 -1138 12-Sep-2009 18 00 00 -599 -131 -240 021 -21 12 -805 -1040 -1270 12-Sep-2009 24 00 00 -614 -145 -246 050 -2085 -798 -15 18 -1250 13-Sep-2009 06 00 00 -789 -233 -294 -0 15 -2213 -1056 -1357 -1259 13-Sep-2009 12 00 00 -879 -3 16 -419 053 -2174 -942 -1308 -1166 13-Sep-2009 18 00 00 -861 -292 -402 -009 -2212 -1002 -1267 -13 13 13-Sep-2009 24 00 00 -891 -328 -421 039 -2164 -1000 -1760 -1339 14-Sep-2009 06 00 00 -1067 -445 -540 -036 -2297 -13 13 -1644 -1345 14-Sep-2009 12 00 00 -1221 -591 -730 017 -2261 -1291 -1584 -1253 14-Sep-2009 18 00 00 -1238 -575 -652 -047 -23 14 -1346 -1508 -1389 14-Sep-2009 24 00 00 -1257 -605 -607 -006 -2271 -13 14 -1953 -1395 15-Sep-2009 06 00 00 -1367 -739 -765 -095 -2402 -1577 -1854 -1405 15-Sep-2009 12 00 00 -1491 -874 -916 -034 -2367 -1540 -1773 -1297 15-Sep-2009 18 00 00 -15 13 -846 -799 -082 -2405 -1578 -1710 -1406 15-Sep-2009 24 00 00 -1508 -859 -732 -051 -2387 -1547 -2043 -1387 16-Sep-2009 06 00 00 -1595 -1002 -943 -1 14 -2469 -1718 -1897 -1376 16-Sep-2009 12 00 00 -1657 -1045 -931 -064 -2451 -1684 -1843 -1292 16-Sep-2009 18 00 00 -1644 -1003 -838 -1 17 -2494 -1704 -1754 -1351 16-Sep-2009 24 00 00 -1640 -1000 -766 -059 -2448 -1649 -2055 -1349 17-Sep-2009 06 00 00 -1674 -1065 -798 -154 -2549 -1792 -1993 -1355 17-Sep-2009 12 00 00 -1745 -1164 -1005 -109 -2508 -1770 -1936 -1292 17-Sep-2009 18 00 00 -1749 -1155 -906 -166 -2543 -1780 -1867 -1360 17-Sep-2009 24 00 00 -1733 -1139 -838 -139 -2519 -1750 -21 18 -1363 18-Sep-2009 06 00 00 -1755 -1206 -877 -246 -2636 -1900 -2072 -1358 18-Sep-2009 12 00 00 -1830 -1290 -1063 -259 -2604 -1867 -2029 -1305 18-Sep-2009 18 00 00 -1814 -1285 -942 -329 -2632 -1885 -1993 -1408 18-Sep-2009 24 00 00 -1825 -12 93 -897 -295 -2612 -1848 -2278 -1449 19-Sep-2009 06 00 00 -1880 -1375 -1085 -591 -2700 -2014 -2238 -1483 19-Sep-2009 12 00 00 -1956 -1482 -1203 -705 -2666 -2000 -2217 -1395 19-Sep-2009 18 00 00 -1963 -1499 -1127 -769 -2729 -2044 -2158 -1490 19-Sep-2009 24 00 00 -1973 -15 11 -1077 -719 -2697 -1994 -2425 -15 09 20-Sep-2009 06 00 00 -20 23 -1583 -1248 -916 -2780 -2142 -23 92 -15 39 20-Sep-2009 12 00 00 -20 96 -1675 -13 63 -9 59 -27 58 -2138 -23 83 -15 29 21 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 22 0 a Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 20-Sep-2009 18 00 00 -2108 -1705 -1257 -1066 -28 17 -2200 -2448 -15 15 20-Sep-2009 24 00 00 -2111 -1726 -1219 -1063 -2856 -2237 -25 11 -1533 21-Sep-2009 06 00 00 -2763 -1797 -1302 -1060 -2890 -2272 -2479 -1216 21-Sep-2009 12 00 00 -3366 -1869 -1379 -1061 -2865 -2267 -1096 -472 21-Sep-2009 18 00 00 -3156 -1540 -543 -895 -2574 -355 -236 -380 21-Sep-2009 24 00 00 -1197 038 107 -462 -1901 146 -165 -320 22-Sep-2009 06 00 00 -1058 105 108 -232 -1409 241 -205 -502 22-Sep-2009 12 00 00 -1145 155 126 -058 -1169 220 -210 -537 22-Sep-2009 18 00 00 -1183 164 093 -001 -1221 152 -192 -752 22-Sep-2009 24 00 00 -1155 169 093 139 -1188 223 -417 -8 03 23-Sep-2009 06 00 00 -1215 164 089 074 -1461 043 -3 64 -890 23-Sep-2009 12 00 00 -1266 149 080 168 -1457 077 -399 -910 23-Sep-2009 18 00 00 -1277 152 090 176 -1496 026 -3 84 -1077 23-Sep-2009 24 00 00 -1298 144 095 192 -1523 006 -727 -1136 24-Sep-2009 06 00 00 -13 83 122 062 1 13 -1728 -197 -5 72 -1193 24-Sep-2009 12 00 00 -14 15 1 10 047 192 -1727 -228 -566 -1165 24-Sep-2009 18 00 00 -13 87 1 16 042 131 -1775 -3 14 -548 -1269 24-Sep-2009 24 00 00 -13 93 108 056 174 -1767 -323 -644 -939 25-Sep-2009 06 00 00 -1481 098 035 074 -19 17 -462 -2 06 -979 25-Sep-2009 12 00 00 -1079 150 120 193 -1554 -018 -3 13 -923 25-Sep-2009 18 00 00 -1196 152 1 14 146 -1582 -096 -180 -9 62 25-Sep-2009 24 00 00 -1068 159 127 185 -1430 022 -2 85 -662 26-Sep-2009 06 00 00 -1172 169 1 16 170 -1466 -029 -135 -433 26-Sep-2009 12 00 00 -1005 185 155 204 -718 287 -180 -4 64 26-Sep-2009 18 00 00 -1082 233 207 253 -676 1 2 56 -196 -629 26-Sep-2009 24 00 00 -1098 221 2 01 295 -567 272 -345 -634 27-Sep-2009 06 00 00 -11 16 2 18 192 187 -936 139 -252 -794 27-Sep-2009 12 00 00 -1169 194 144 289 -941 226 -338 -759 27-Sep-2009 18 00 00 -1189 191 155 188 -1102 140 -278 -957 27-Sep-2009 24 00 00 -1224 186 144 257 -1103 178 -6 03 -1029 28-Sep-2009 06 00 00 -1304 165 129 137 -1373 -011 -5 07 -1082 28-Sep-2009 12 00 00 -1340 156 1 16 2 15 -1377 025 -5 07 -1064 28-Sep-2009 18 00 00 -1334 152 120 170 -1452 -040 -5 19 -1233 28-Sep-2009 24 00 00 -1359 152 1 10 187 -1468 -067 -8 91 -1226 29-Sep-2009 06 00 00 -1469 123 077 085 -1697 -335 -710 -1285 29-Sep-2009 12 00 00 -15 03 1 14 050 155 -1670 -338 -718 -1225 29-Sep-2009 18 00 00 -1471 103 057 084 -1751 -431 -668 -1334 29-Sep-2009 24 00 00 -1479 104 050 1 14 -1751 -424 -1035 -1307 30-Sep-2009 06 00 00 -1581 084 021 059 -1908 -652 -866 -1360 30-Sep-2009 12 00 00 -1591 072 0 13 123 -1876 -5 93 -867 -1262 30-Sep-2009 18 00 00 -1567 063 0 14 055 -1946 -641 -7 81 -1389 30-Sep-2009 24 00 00 -1565 062 001 1 13 -1905 -588 -1182 -1391 1- Oct -2009 06 00 00 -1665 031 -021 039 -2055 -835 -1008 -1449 1- Oct -2009 12 00 00 -1687 0 12 -065 104 -2009 -714 -975 -1355 1- Oct -2009 18 00 00 -1657 -009 -047 030 -2075 -726 -885 -1432 1- Oct -2009 24 00 00 -1659 -006 -047 087 -2027 -682 -1122 -1387 2- 00-2009 06 00 00 -1746 -048 -088 025 -2126 -829 -940 -1401 2- Oct -2009 12 00 00 -17 18 -046 -0 64 075 -2080 -7 15 -878 -13 11 2- Oct -2009 18 00 00 -16 93 -040 -052 029 -21 10 -706 -846 -1449 2- Oct -2009 24 00 00 -17 11 -047 -040 074 -2060 -688 -1326 -14 74 22 0 a Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 23 Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 3- Oct -2009 06 00 00 -1856 -090 -078 007 -2189 -952 -1154 -1480 3- Oct -2009 12 00 00 -1922 -142 -136 049 -2144 -821 -1104 -1370 3- Oct -2009 18 00 00 -1889 -136 -107 003 -2170 -799 -1035 -15 15 3- Oct -2009 24 00 00 -1928 -144 -107 055 -2109 -731 -1435 -1540 4- Oct -2009 06 00 00 -2054 -216 -161 -015 -2220 -991 -13 16 -1531 4- Oct -2009 12 00 00 -2142 -271 -227 018 -2201 -896 -1231 -1421 4- Oct -2009 18 00 00 -2148 -276 -222 -005 -2228 -9 13 -487 -1349 4- Oct -2009 24 00 00 -2100 -258 -167 007 -22 13 -497 -574 -1168 5- Oct -2009 06 00 00 -1572 -069 026 008 -2152 -485 -246 -1132 5- Oct -2009 12 00 00 -1374 -017 1 13 093 -1972 -161 -3 16 -1041 5- Oct -2009 18 00 00 -1295 021 1 16 066 -1858 -137 -301 -1121 5- Oct -2009 24 00 00 -1307 047 129 122 -1719 -108 -424 -1123 6- Oct -2009 06 00 00 -1435 032 092 101 -1726 -206 -403 -1209 6- Oct -2009 12 00 00 -1473 047 090 122 -17 13 -211 -496 -1106 6- Oct -2009 18 00 00 -1470 056 101 1 14 -1720 -258 -417 -1285 6- Oct -2009 24 00 00 -1481 061 1 10 173 -1668 -227 -721 -1324 7- Oct -2009 06 00 00 -15 17 055 071 071 -1847 -473 -680 -1367 7- Oct -2009 12 00 00 -1597 051 071 122 -1826 -455 -734 -1305 7- Oct -2009 18 00 00 -1611 055 073 084 -1878 -509 -718 -1469 7- Oct -2009 24 00 00 -1638 037 055 140 -1851 -499 -1069 -1461 8- Oct -2009 06 00 00 -1741 001 032 049 -2009 -761 -910 -1529 8- Oct -2009 12 00 00 -1779 -039 -007 141 -1938 -638 -919 -1394 8- Oct -2009 18 00 00 -1735 -033 013 042 -2046 -697 -818 -1577 8- Oct -2009 24 00 00 -1752 -066 -003 103 -1984 -628 -1225 -1583 9- Oct -2009 06 00 00 -1879 -1 14 -027 037 -2134 -894 -1016 -1558 9- Oct -2009 12 00 00 -1913 -153 -052 080 -2104 -774 -925 -1486 9- Oct -2009 18 00 00 -1868 -138 -037 044 -2136 -746 -919 -1625 9- Oct -2009 24 00 00 -1836 -149 -035 074 -21 10 -731 -13 18 -1573 10- Oct -2009 06 00 00 -1993 -209 -071 031 -2207 -950 -11 18 -1563 10- Oct -2009 12 00 00 -2023 -225 -100 069 -2175 -834 -11 16 -1473 10- 00-2009 18 00 00 -2041 -225 -090 009 -2219 -858 -1105 -1552 10- Oct -2009 24 00 00 -2085 -249 -123 078 -2153 -797 -1329 -15 16 11- Oct -2009 06 00 00 -2124 -282 -126 013 -2249 -961 -1238 -15 10 11- Oct -2009 12 00 00 -2198 -337 -201 057 -2201 -900 -1234 -1472 11- Oct -2009 18 00 00 -2197 -330 -187 019 -2241 -954 -1210 -1489 11- Oct -2009 24 00 00 -2233 -352 -195 048 -2195 -947 -1292 -1491 12- Oct -2009 06 00 00 -2249 -382 -214 023 -2229 -1013 -969 -1337 12- Oct -2009 12 00 00 -2049 -279 -144 038 -2214 -874 -459 -1283 12- Oct -2009 18 00 00 -1373 -045 014 029 -2177 -606 -530 -1443 12- Oct -2009 24 00 00 -1619 -093 083 077 -2072 -569 -927 -1475 13- Oct -2009 06 00 00 -1779 -174 049 -003 -2199 -858 -855 -1490 13- Oct -2009 12 00 00 -1902 -221 035 035 -2134 -752 -894 -1449 13- Oct -2009 18 00 00 -1908 -217 037 020 -21 50 -736 -888 -1485 13- Oct -2009 24 00 00 -1952 1 -264 Oil 059 -21 14 -697 -751 -1023 14- Oct -2009 06 00 00 -1919 -255 007 002 -2162 -648 -162 -953 14- Oct -2009 12 00 00 -1086 029 131 141 -1798 -028 -250 14- Oct -2009 18 00 00 -1105 072 151 163 -1540 038 -222 14- Oct -2009 24 00 00 -1187 1 10 134 215 -1416 082 -379 A-1138 15 -Oct -2009 06 00 00 -12 80 093 1 16 129 -1520 -041 -3 1 15- Oct -2009 12 00 00 -13 22 109 1 11 225 -1458 001 -406 23 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 24 0 r7 Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 15- Oct -2009 18 00 00 -1320 111 120 151 -1570 -103 -385 -1243 15- Oct -2009 24 00 00 -1356 116 110 249 -1508 -053 -495 -1247 16- Oct -2009 06 00 00 -1376 109 107 145 -1653 -211 -502 -1264 16- Oct -2009 12 00 00 -1407 095 092 176 -1650 -234 -534 -1251 16- Oct -2009 18 00 00 -1415 102 091 153 -1710 -3 19 -522 -1371 16- Oct -2009 24 00 00 -1441 097 089 204 -1684 -3 11 -724 -13 15 17- Oct -2009 06 00 00 -1489 081 073 134 -18 18 -487 -584 -1417 17- Oct -2009 12 00 00 -1489 091 077 224 -1746 -413 -685 -1370 17- Oct -2009 18 00 00 -1479 096 075 121 -1853 -5 17 -667 -1454 17- Oct -2009 24 00 00 -1507 087 062 155 -1840 -5 18 -770 -1384 18- Oct -2009 06 00 00 -1527 068 056 089 -1949 -623 -716 -1474 18- Oct -2009 12 00 00 -1559 060 038 174 -1887 -553 -8 11 -1406 18- Oct -2009 18 00 00 -1539 063 054 092 -1980 -648 -777 -1561 18- Oct -2009 24 00 00 -1586 049 017 144 -1931 -593 -1070 -1558 19- Oct -2009 06 00 00 -1656 020 -005 074 -2070 -792 -949 -1559 19- Oct -2009 12 00 00 -1668 012 -023 128 -2015 -712 -945 -1472 19- Oct -2009 18 00 00 -1664 002 -023 081 -2072 -721 -878 -1613 19- Oct -2009 24 00 00 -1681 003 -023 131 -2030 -676 -1198 -1615 20 -Oct -2009 06 00 00 -1765 -051 -075 053 -2145 -870 -1050 -1611 20- Oct -2009 12 00 00 -1785 -073 -096 107 -2097 -776 -1065 -1532 20- Oct -2009 18 00 00 -1787 -083 -099 068 -2151 -796 -996 -1677 20- Oct -2009 24 00 00 -1806 -097 -102 095 -21 11 -732 -1341 -1657 21- Oct -2009 06 00 00 -1893 -155 -149 041 -2206 -943 -1170 -1684 21- Oct -2009 12 00 00 -1944 -193 -167 098 -2151 -841 -1161 -1593 21- Oct -2009 18 00 00 -1951 -207 -177 037 -2216 -9 18 -1081 -1713 21- Oct -2009 24 00 00 -1967 -231 -173 083 -2171 -882 -1434 -1694 22- Oct -2009 06 00 00 -2035 -267 -209 031 -2266 -1108 -1252 -1699 22- Oct -2009 12 00 00 -2083 -306 -232 089 -2196 -1024 -1201 -1585 22- Oct -2009 18 00 00 -2075 -300 -208 030 -2267 -1068 -1104 -1760 22- Oct -2009 24 00 00 -2072 -306 -186 081 -2208 -1025 -1525 -1754 23- Oct -2009 06 00 00 -2163 -395 -249 006 -2324 -1253 -1377 -1730 23- Oct -2009 12 00 00 -2249 -453 -3 13 055 -2283 -1201 -1280 -1634 23- Oct -2009 18 00 00 -2228 -431 -270 003 -2331 -1218 -1208 -1781 23- Oct -2009 24 00 00 -2192 -417 -221 054 -2264 -1188 -1590 -1732 24- Oct -2009 06 00 00 -2288 -5 10 -293 -025 -2378 -1376 -1416 -1714 24- Oct -2009 12 00 00 -2325 -545 -330 025 -2338 -13 19 -1383 -1651 24- Oct -2009 18 00 00 -2328 -529 -294 -015 -2366 -1343 -1425 -1745 24- Oct -2009 24 00 00 -2335 -545 -303 031 -2326 -13 14 -1651 -1688 25- Oct -2009 06 00 00 -2421 -6 15 -447 -022 -2396 -1445 -1593 -1749 25- Oct -2009 12 00 00 -2473 -676 -533 020 -2364 -1423 -1651 -1619 25- Oct -2009 18 00 00 -2489 -688 -529 -063 -2447 -1504 -1300 -1592 25- Oct -2009 24 00 00 -2510 -714 -507 017 -2402 -1357 -1202 -15 16 26- Oct -2009 06 00 00 -2280 -557 -265 -027 -2434 -1265 -1123 -1479 26- Oct -2009 12 00 00 -2125 -453 -171 006 -2387 -1195 -888 -1431 26- Oct -2009 18 00 00 -2018 -387 -127 005 -2384 -1102 -903 -1496 26- Oct -2009 24 00 00 -1928 -341 -103 047 -23 10 -1064 -1021 -1451 27- Oct -2009 06 00 00 -1938 -375 -1 12 -017 -2333 -1158 -996 -1526 27 -Oct -2009 12 00 00 -1977 -409 -120 037 -2274 -1126 -1028 -1461 27- Oct -2009 18 00 00 -1945 -396 --108 -047 -2326 -1184 -972 -1605 27- Oct -2009 24 00 00 -1928 -402 -1 17 015 -2256 -1159 -1413 -1610 24 0 r7 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 25 Date Time Water Level inches dd -mmm- hh:mm:ss AW1 AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 28- Oct -2009 06 00 00 -2060 -489 -127 -046 -2355 -1409 -1371 -1640 28- Oct -2009 12 00 00 -2225 -603 -207 0 18 -2290 -1357 -1425 -1563 28- Oct -2009 18 00 00 -2271 -622 -257 -042 -2342 -1397 -1389 -1669 28- Oct -2009 24 00 00 -2309 -648 -303 006 -2292 -1356 -1636 -1627 29- Oct -2009 06 00 00 -2395 -725 -3 81 -053 -2392 -1523 -1573 -1659 29- Oct -2009 12 00 00 -2449 -761 -471 -005 -2360 -1488 -1549 -1567 29- Oct -2009 18 00 00 -2453 -759 -456 -049 -2393 -1505 -1453 -1637 29- Oct -2009 24 00 00 -2447 -755 -431 -001 -2351 -1429 -1450 -1555 30- Oct -2009 06 00 00 -2387 -712 -333 -091 -2435 -1495 -1381 -1611 30- Oct -2009 12 00 00 -2369 -725 -345 -007 -2370 -1412 -1401 -15 19 30- Oct -2009 18 00 00 -2341 -703 -325 -078 -2417 -1444 -1320 -1636 30- Oct -2009 24 00 00 -2325 -683 -3 11 -013 -2354 -13 85 -1587 -1583 31- Oct -2009 06 00 00 -2364 -760 -351 -084 -2438 -1537 -1411 -1586 31- Oct -2009 12 00 00 -2373 -747 -375 -031 -2390 -1458 -1390 -1544 31- Oct -2009 18 00 00 -2354 -714 -340 -053 -2415 414 44 -1346 -13 72 31- Oct -2009 24 00 00 -23 12 -700 -3 17 -042 -2399 -1421 -734 -1331 1- Nov -2009 06 00 00 -2149 -379 -183 -0 13 -2381 -884 -812 -1429 1- Nov -2009 12 00 00 -1784 -263 003 048 -2242 -872 -952 -1385 1- Nov -2009 18 00 00 -1845 -3 17 001 -016 -2246 -964 -964 -1474 1- Nov -2009 24 00 00 -1880 -348 -007 042 -2154 -850 -1105 -1453 2- Nov -2009 06 00 00 -1921 -400 -041 -015 -2200 -864 -997 -1496 2- Nov -2009 12 00 00 -1975 -436 -067 027 -2144 -742 -1094 -1447 2- Nov -2009 18 00 00 -1908 -401 -043 -015 -2166 -756 -1078 -1577 2- Nov -2009 24 00 00 -1975 -437 -059 048 -2082 -698 -1357 -1570 3- Nov -2009 06 00 00 -2040 -492 -095 -055 -2226 -922 -1340 -1606 3- Nov -2009 12 00 00 -2129 -559 -144 -003 -2169 -862 -1398 -1549 3- Nov -2009 18 00 00 -2179 -592 -190 -053 -2213 -943 -1348 -1661 3- Nov -2009 24 00 00 -2217 -616 -249 014 -2165 -9 18 -1594 -1598 4- Nov -2009 06 00 00 -2286 -683 -3 18 -076 -2292 -1145 -1488 -1619 4- Nov -2009 12 00 00 -2327 -720 -369 005 -2199 -1055 -1510 -1553 4- Nov -2009 18 00 00 -2341 -720 -394 -060 -2256 -1127 -1471 -1672 4- Nov -2009 24 00 00 -2358 -738 -423 -006 -2208 -1085 -1737 -1677 5- Nov -2009 06 00 00 -2408 -801 -471 -095 -2332 -1309 -1717 -1693 5- Nov -2009 12 00 00 -2503 -883 -657 -057 -2300 -1276 -1754 -1631 5- Nov -2009 18 00 00 -2534 -891 -660 -105 -2340 -1322 -1724 -1744 5- Nov -2009 24 00 00 -2564 -919 -684 -081 -2325 -1307 -1908 -1696 6- Nov -2009 06 00 00 -2618 -994 -757 -183 -2422 -1454 -1845 -1727 6- Nov -2009 12 00 00 -2658 -1032 -835 -144 -2381 -1406 -1893 -1642 6- Nov -2009 18 00 00 -2678 -1059 -8 10 -235 -2436 -1468 -18 14 -1745 6- Nov -2009 24 00 00 -2702 -1081 -821 -183 -2372 -1392 -1994 -1736 7- Nov -2009 06 00 00 -2720 -1127 -822 -365 -2492 -1553 -1952 -1735 7- Nov -2009 12 00 00 -2761 -1181 -874 -342 -2465 -1522 -1953 -1660 7- Nov -2009 18 00 00 -2763 -1201 -834 -393 -2494 -1537 -1897 -1772 7- Nov -2009 24 00 00 -2773 -1221 -817 -3 58 -2445 -1481 -2090 -1744 8- Nov -2009 06 00 00 -28 16 -1265 -883 -540 -2562 -1648 -2036 -1772 8- Nov -2009 12 00 00 -2844 -1307 -928 -528 -25 17 -1592 -2058 -1654 8- Nov -2009 18 00 00 -2845 -1330 -887 -606 -2576 -1625 -1958 -1743 8- Nov -2009 24 00 00 -2861 -1350 -877 -544 -25 17 -1544 -21 18 -1699 9- Nov -2009 06 00 00 -2874 -1379 -865 -631 -2612 -16 75 -20 17 -1714 9- Nov -2009 12 00 00 -2889 -1407 -881 -545 -2567 -1603 -1999 -1653 25 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C FIR 0 a Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 9- Nov -2009 18 00 00 -2870 -1396 -792 -574 -2601 -1622 -1905 -1755 9- Nov -2009 24 00 00 -2853 -1407 -733 -508 -2565 -1574 -2084 -559 10- Nov -2009 06 00 00 -2874 -1432 -749 -491 -2656 -16 93 -126 -507 10- Nov -2009 12 00 00 -1080 -003 116 251 -1164 138 -261 -039 10- Nov -2009 18 00 00 -1121 165 1 73 201 -911 175 -1 14 277 10- Nov -2009 24 00 00 -1025 198 163 3 14 199 433 034 465 11- Nov -2009 06 00 00 -876 447 495 696 427 1138 188 334 11- Nov -2009 12 00 00 -684 795 668 1309 744 1838 044 320 11- Nov -2009 18 00 00 -667 696 554 1237 657 1764 052 208 11- Nov -2009 24 00 00 -704 593 451 1080 625 1668 -062 235 12- Nov -2009 06 00 00 -747 524 356 852 482 1422 -052 172 12- Nov -2009 12 00 00 -781 476 353 761 447 1212 -1 11 219 12- Nov -2009 18 00 00 -792 476 360 674 368 964 -067 1 18 12- Nov -2009 24 00 00 -8 11 458 353 687 396 876 -157 101 13- Nov -2009 06 00 00 -830 433 303 530 260 692 -176 070 13- Nov -2009 12 00 00 -863 380 266 458 214 604 -2 13 098 13- Nov -2009 18 00 00 -879 347 246 329 1 11 434 -194 016 13- Nov -2009 24 00 00 -876 3 13 227 338 175 426 -268 031 14- Nov -2009 06 00 00 -888 281 197 203 019 248 -240 -010 14- Nov -2009 12 00 00 -911 257 183 239 003 283 -264 021 14- Nov -2009 18 00 00 -9 15 236 199 189 -148 226 -234 -085 14- Nov -2009 24 00 00 -929 209 174 242 -252 263 -362 -043 15- Nov -2009 06 00 00 -955 177 155 175 -482 179 -298 -093 15- Nov -2009 12 00 00 -960 171 174 218 -544 216 -342 15- Nov -2009 18 00 00 -993 156 159 163 -705 160 15- Nov -2009 24 00 00 -1038 151 139 16- Nov -2009 06 00 00 16- Nov -2009 12 00 00 16- Nov -2009 18 00 00 16- Nov -2009 24 00 00 17- Nov -2009 06 00 00 17- Nov -2009 12 00 00 17- Nov -2009 18 00 00 17- Nov -2009 24 00 00 18- Nov -2009 06 00 00 18- Nov -2009 12 00 00 18- Nov -2009 18 00 00 18- Nov -2009 24 00 00 19- Nov -2009 06 00 00 19- Nov -2009 12 00 00 19- Nov -2009 18 00 00 19- Nov -2009 24 00 00 20- Nov -2009 06 00 00 20- Nov -2009 12 00 00 20- Nov -2009 18 00 00 20- Nov -2009 24 00 00 21- Nov -2009 06 00 00 21- Nov -2009 12 00 00 21- Nov -2009 18 00 00 21- Nov -2009 24 00 00 FIR 0 a Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 27 Date Time Water Level inches dd -mmm- hh:mm:ss AW1 AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 22- Nov -2009 06 00 00 22- Nov -2009 12 00 00 22- Nov -2009 18 00 00 22- Nov -2009 24 00 00 23- Nov -2009 06 00 00 23- Nov -2009 12 00 00 23- Nov -2009 18 00 00 23- Nov -2009 24 00 00 24- Nov -2009 06 00 00 24- Nov -2009 12 00 00 24- Nov -2009 18 00 00 24- Nov -2009 24 00 00 25- Nov -2009 06 00 00 25- Nov -2009 12 00 00 25- Nov -2009 18 00 00 25- Nov -2009 24 00 00 26- Nov -2009 06 00 00 26- Nov -2009 12 00 00 26- Nov -2009 18 00 00 26- Nov -2009 24 00 00 27- Nov -2009 06 00 00 27- Nov -2009 12 00 00 27- Nov -2009 18 00 00 27- Nov -2009 24 00 00 28- Nov -2009 06 00 00 28- Nov -2009 12 00 00 28- Nov -2009 18 00 00 28- Nov -2009 24 00 00 29- Nov -2009 06 00 00 29- Nov -2009 12 00 00 29- Nov -2009 18 00 00 29- Nov -2009 24 00 00 30- Nov -2009 06 00 00 30- Nov -2009 12 00 00 30- Nov -2009 18 00 00 30- Nov -2009 24 00 00 1- Dec -2009 06 00 00 1- Dec -2009 12 00 00 1- Dec -2009 18 00 00 1- Dec -2009 24 00 00 2- Dec -2009 06 00 00 2- Dec -2009 12 00 00 2- Dec -2009 18 00 00 2- Dec -2009 24 00 00 3- Dec -2009 06 00 00 3- Dec -2009 12 00 00 ' 3- Dec -2009 18 00 00 3- Dec -2009 24 00 00 4- Dec -2009 06 00 00 4- Dec -2009 120 00 27 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 28 Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 4- Dec -2009 18 00 00 4- Dec -2009 24 00 00 5- Dec -2009 06 00 00 5- Dec -2009 12 00 00 5- Dec -2009 18 00 00 5- Dec -2009 24 00 00 6- Dec -2009 06 00 00 6- Dec -2009 12 00 00 6- Dec -2009 18 00 00 6- Dec -2009 24 00 00 7- Dec -2009 06 00 00 7- Dec -2009 12 00 00 7- Dec -2009 18 00 00 7- Dec -2009 24 00 00 8- Dec -2009 06 00 00 8- Dec -2009 12 00 00 8- Dec -2009 18 00 00 8- Dec -2009 24 00 00 9- Dec -2009 06 00 00 9- Dec -2009 12 00 00 9- Dec -2009 18 00 00 9- Dec -2009 24 00 00 10- Dec -2009 06 00 00 10- Dec -2009 12 00 00 10- Dec -2009 18 00 00 10- Dec -2009 24 00 00 11- Dec -2009 06 00 00 11- Dec -2009 12 00 00 11- Dec -2009 18 00 00 11- Dec -2009 24 00 00 12- Dec -2009 06 00 00 12- Dec -2009 12 00 00 12- Dec -2009 18 00 00 12- Dec -2009 24 00 00 13- Dec -2009 06 00 00 13- Dec -2009 12 00 00 13- Dec -2009 18 00 00 13- Dec -2009 24 00 00 14- Dec -2009 06 00 00 14- Dec -2009 12 00 00 14- Dec -2009 18 00 00 14- Dec -2009 24 00 00 15- Dec -2009 06 00 00 15- Dec -2009 12 00 00 15- Dec -2009 18 00 00 15- Dec -2009 24 00 00 16- Dec -2009 06 00 00 16- Dec -2009 12 00 00 16- Dec -2009 18 00 00 4 d 16- Dec -2009 24 00 00 28 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C Date Time Water Level inches dd -mmm- hh:mm:ss AW1 AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 17- Dec -2009 06 00 00 17- Dec -2009 12 00 00 17- Dec -2009 18 00 00 17- Dec -2009 24 00 00 18- Dec -2009 06 00 00 18- Dec -2009 12 00 00 18- Dec -2009 18 00 00 18- Dec -2009 24 00 00 19- Dec -2009 06 00 00 19- Dec -2009 12 00 00 19- Dec -2009 18 00 00 19- Dec -2009 24 00 00 20- Dec -2009 06 00 00 20- Dec -2009 12 00 00 20- Dec -2009 18 00 00 20- Dec -2009 24 00 00 21- Dec -2009 06 00 00 21- Dec -2009 12 00 00 21- Dec -2009 18 00 00 21- Dec -2009 24 00 00 22- Dec -2009 06 00 00 22- Dec -2009 12 00 00 22- Dec -2009 18 00 00 22- Dec -2009 24 00 00 23- Dec -2009 06 00 00 23- Dec -2009 12 00 00 23- Dec -2009 18 00 00 23- Dec -2009 24 00 00 24- Dec -2009 06 00 00 24- Dec -2009 12 00 00 24- Dec -2009 18 00 00 24- Dec -2009 24 00 00 25- Dec -2009 06 00 00 25- Dec -2009 12 00 00 25- Dec -2009 18 00 00 25- Dec -2009 24 00 00 26- Dec -2009 06 00 00 26- Dec -2009 12 00 00 26- Dec -2009 18 00 00 26- Dec -2009 24 00 00 27- Dec -2009 06 00 00 27- Dec -2009 12 00 00 27- Dec -2009 18 00 00 27- Dec -2009 24 00 00 28- Dec -2009 06 00 00 28- Dec -2009 12 00 00 28- Dec -2009 18 00 00 28- Dec -2009 24 00 00 29- Dec -2009 06 00 00 29- Dec -2009 12 00 00 29 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 30 Date Time Water Level inches dd -mmm- hh:mm:ss AWl AW2 AW3 AW4 AW5 AW6 AW7 REF -BP 29- Dec -2009 18 00 00 29- Dec -2009 24 00 00 30- Dec -2009 06 00 00 30- Dec -2009 12 00 00 30- Dec -2009 18 00 00 30- Dec -2009 24 00 00 31- Dec -2009 06 00 00 31- Dec -2009 12 00 00 31- Dec -2009 18 00 00 31- Dec -2009 24 00 00 30 I Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 31 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 1- Jan-2009 324 1 -Jan-2009 1 -Jan-2009 1- Jan-2009 2- Jan-2009 2- Jan-2009 2 -Jan-2009 2 -Jan-2009 3 -Jan-2009 3 -Jan-2009 3 -Jan-2009 3- Jan-2009 4 -Jan-2009 4 -Jan-2009 4 -Jan-2009 4- Jan-2009 5- Jan-2009 5 -Jan-2009 5 -Jan-2009 5 -Jan-2009 6- Jan-2009 007 6 -Jan-2009 6 -Jan-2009 6- Jan-2009 7 -Jan-2009 018 7- Jan-2009 7- Jan-2009 7- Jan-2009 8 -Jan-2009 8- Jan-2009 8- Jan-2009 8 -Jan-2009 9- Jan-2009 9- Jan-2009 9 -Jan-2009 9 -Jan-2009 10- Jan-2009 10 -Jan-2009 10- Jan-2009 10- Jan-2009 11 -Jan-2009 003 11- Jan-2009 11 -Jan-2009 11- Jan-2009 12- Jan-2009 12- Jan-2009 12 -Jan-2009 12- Jan-2009 13- Jan-2009 070 13- Jan-2009 31 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) 32 Appendix C Weatherstation Rainfall Data Date On -site Ram au a Hoffmann (NHOF) Dail Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 13- Jan-2009 13 -Jan-2009 14- Jan-2009 001 14 -Jan-2009 14- Jan-2009 14- Jan-2009 15 -Jan-2009 15- Jan-2009 15 -Jan-2009 15 -Jan-2009 16 -Jan-2009 16- Jan-2009 16- Jan-2009 16 -Jan-2009 17- Jan-2009 17 -Jan-2009 17- Jan-2009 17- Jan-2009 18 -Jan-2009 046 18 -Jan-2009 18- Jan-2009 18- Jan-2009 19 -Jan-2009 001 19 -Jan-2009 19- Jan-2009 19- Jan-2009 20- Jan-2009 007 20- Jan-2009 20- Jan-2009 20 -Jan-2009 21 -Jan-2009 015 21- Jan-2009 21- Jan-2009 21- Jan-2009 22 -Jan-2009 22 -Jan-2009 22 -Jan-2009 22- Jan-2009 23- Jan-2009 23- Jan-2009 23- Jan-2009 23- Jan-2009 24- Jan-2009 24- Jan-2009 24 -Jan-2009 24- Jan-2009 25- Jan-2009 25- Jan-2009 25 -Jan-2009 25- Jan-2009 32 Appendix C Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 33 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 26- Jan-2009 26- Jan-2009 26- Jan-2009 26- Jan-2009 27 -Jan-2009 001 27- Jan-2009 27- Jan-2009 27- Jan-2009 28 -Jan-2009 029 28- Jan-2009 28 -Jan-2009 28 -Jan-2009 29 -Jan-2009 025 29 -Jan-2009 29- Jan-2009 29- Jan-2009 30 -Jan-2009 30 -Jan-2009 30- Jan-2009 30- Jan-2009 31 -Jan-2009 31- Jan-2009 31- Jan-2009 31- Jan-2009 223 1- Feb -2009 1- Feb -2009 1- Feb -2009 1- Feb -2009 2- Feb -2009 2- Feb -2009 2- Feb -2009 2- Feb -2009 3- Feb -2009 3- Feb -2009 3- Feb -2009 3- Feb -2009 4- Feb -2009 4- Feb -2009 4- Feb -2009 4- Feb -2009 5- Feb -2009 5- Feb -2009 5- Feb -2009 5- Feb -2009 6- Feb -2009 6- Feb -2009 6- Feb -2009 6- Feb -2009 7- Feb -2009 7- Feb -2009 33 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) 34 Appendix C Weatherstation Rainfall Data Date On -site Ram au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 7- Feb -2009 7- Feb -2009 8- Feb -2009 8- Feb -2009 8- Feb -2009 8- Feb -2009 9- Feb -2009 9- Feb -2009 9- Feb -2009 9- Feb -2009 10- Feb -2009 10- Feb -2009 10- Feb -2009 10- Feb -2009 11- Feb -2009 11- Feb -2009 11- Feb -2009 11- Feb -2009 12- Feb -2009 12- Feb -2009 12- Feb -2009 12- Feb -2009 13- Feb -2009 13- Feb -2009 13- Feb -2009 13- Feb -2009 14- Feb -2009 003 14- Feb -2009 14- Feb -2009 14- Feb -2009 15- Feb -2009 001 15- Feb -2009 15- Feb -2009 15- Feb -2009 16- Feb -2009 16- Feb -2009 16- Feb -2009 16- Feb -2009 17- Feb -2009 17- Feb -2009 17- Feb -2009 17- Feb -2009 18- Feb -2009 088 18- Feb -2009 18- Feb -2009 18- Feb -2009 19- Feb -2009 023 19- Feb -2009 19- Feb -2009 19- Feb -2009 34 Appendix C I � I r � Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 35 Weatherstation Rainfall Data Date On -site Ra►n au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 20- Feb -2009 20- Feb -2009 20- Feb -2009 20- Feb -2009 21- Feb -2009 21- Feb -2009 21- Feb -2009 21- Feb -2009 22- Feb -2009 002 22- Feb -2009 22- Feb -2009 22- Feb -2009 23- Feb -2009 23- Feb -2009 23- Feb -2009 -2973 000 040 23- Feb -2009 -2996 24- Feb -2009 -2989 24- Feb -2009 -3016 24- Feb -2009 -2992 24- Feb -2009 -3004 25- Feb -2009 -3013 25- Feb -2009 -3020 25- Feb -2009 -2998 25- Feb -2009 -3033 26- Feb -2009 -3011 26- Feb -2009 -3038 26- Feb -2009 -30 19 26- Feb -2009 -30 11 27- Feb -2009 -3001 27- Feb -2009 -3035 27- Feb -2009 -3059 27- Feb -2009 -3031 28- Feb -2009 -3008 0 63 28- Feb -2009 -2915 28- Feb -2009 -2457 28- Feb -2009 -2315 180 1 -Mar -2009 -23 80 070 1 -Mar -2009 -1649 1 -Mar -2009 -1093 1 -Mar -2009 -1412 2 -Mar -2009 -1556 002 2 -Mar -2009 -1721 2 -Mar -2009 -1807 2 -Mar -2009 -1957 3 -Mar -2009 -2027 001 3 -Mar -2009 -2151 3 -Mar -2009 -2201 3 -Mar -2009 -2295 4 -Mar -2009 -2338 4 -Mar -2009 -2386 35 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) 36 Appendix C Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GCl CG2 4 -Mar -2009 -2439 4 -Mar -2009 -2485 5 -Mar -2009 -2492 5 -Mar -2009 -2511 5 -Mar -2009 -2521 5 -Mar -2009 -2560 6 -Mar -2009 -2576 6 -Mar -2009 -2595 6 -Mar -2009 -2611 6 -Mar -2009 -2623 7 -Mar -2009 -2602 7 -Mar -2009 -2648 7 -Mar -2009 -2637 7 -Mar -2009 -2649 8 -Mar -2009 -2641 8 -Mar -2009 -2649 8 -Mar -2009 -2635 8 -Mar -2009 -2674 9 -Mar -2009 -2659 9 -Mar -2009 -2668 9 -Mar -2009 -2675 9 -Mar -2009 -2705 10 -Mar -2009 -2723 10 -Mar -2009 -2750 10 -Mar -2009 -2728 10 -Mar -2009 -2770 11 -Mar -2009 -2744 11 -Mar -2009 -2761 11 -Mar -2009 -2737 11 -Mar-2009 -2776 12 -Mar-2009 -2731 12 -Mar -2009 -2756 12 -Mar -2009 -2755 12 -Mar -2009 -2792 13 -Mar-2009 -2797 13 -Mar-2009 -2811 13 -Mar-2009 -2818 13 -Mar-2009 -2827 14 -Mar-2009 -2821 14 -Mar-2009 -2847 14 -Mar-2009 -2813 14 -Mar-2009 -2835 15 -Mar-2009 -2812 016 15 -Mar-2009 -2834 15 -Mar-2009 -2648 15 -Mar-2009 -2618 16 -Mar-2009 -2621 060 16 -Mar-2009 -2620 16 -Mar-2009 -2534 16 -Mar-2009 -2361 36 Appendix C Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 37 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 17 -Mar-2009 -2333 008 17 -Mar-2009 -2431 17 -Mar-2009 -2487 17 -Mar-2009 -2547 18 -Mar-2009 -2594 18 -Mar-2009 -2620 030 060 18 -Mar-2009 -2648 18 -Mar-2009 -2701 19 -Mar-2009 -2713 19 -Mar-2009 -2739 19 -Mar-2009 -2763 19 -Mar-2009 -2775 20 -Mar-2009 -2785 20 -Mar-2009 -2812 20 -Mar-2009 -2789 20 -Mar-2009 -2835 21 -Mar-2009 -2831 21 -Mar-2009 -2837 21 -Mar-2009 -2830 21 -Mar-2009 -2873 22 -Mar-2009 -2855 22 -Mar-2009 -2860 22 -Mar-2009 -2857 22 -Mar-2009 -2901 23 -Mar-2009 -2875 23 -Mar-2009 -2875 23 -Mar-2009 -2895 23 -Mar-2009 -2923 24 -Mar-2009 -2917 24 -Mar-2009 -2909 24 -Mar-2009 -2905 24 -Mar-2009 -2936 25 -Mar -2009 -2930 25 -Mar-2009 -2945 25 -Mar-2009 -2932 25 -Mar-2009 -2951 26 -Mar-2009 -2939 023 26 -Mar-2009 -2960 26 -Mar-2009 -2913 26 -Mar-2009 -2908 27 -Mar-2009 -2902 001 27 -Mar-2009 -2906 27 -Mar-2009 -2779 27 -Mar-2009 -2828 28 -Mar-2009 -2521 1 19 28 -Mar-2009 -2519 28 -Mar-2009 -2609 28 -Mar-2009 -2359 29 -Mar-2009 -2419 014 29 -Mar-2009 -2476 37 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) 38 Appendix C Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GCl CG2 29 -Mar-2009 -2530 29 -Mar-2009 -2621 30 -Mar-2009 -2672 30 -Mar-2009 -2713 30 -Mar-2009 -2763 30 -Mar -2009 -2818 31 -Mar-2009 -2823 31 -Mar-2009 -2824 31 -Mar-2009 -2858 31 -Mar-2009 -2923 3 85 1 -A r -2009 -2900 025 1 -A r -2009 -2899 1 -A r -2009 -2829 1 -A r -2009 -2825 2-Apr-2009 -2828 046 2-Apr-2009 -2762 2-Apr-2009 -2667 2-Apr-2009 -2689 3-Apr-2009 -2678 002 3-Apr-2009 -2708 3-Apr-2009 -2758 3-Apr-2009 -28 13 4-Apr-2009 -28 18 4-Apr-2009 -2846 4-Apr-2009 -2879 4-Apr-2009 -2918 5-Apr-2009 -2902 5-Apr-2009 -2935 5-Apr-2009 -2943 5-Apr-2009 -2956 6-Apr-2009 -2967 022 6-Apr-2009 -2991 6-Apr-2009 -2918 6-Apr-2009 -2949 7-Apr-2009 -2951 7-Apr-2009 -2971 7-Apr-2009 -2965 7-Apr-2009 -30 17 8-Apr-2009 -2992 8-Apr-2009 -2999 8-Apr-2009 -3001 8-Apr-2009 -3043 9-Apr-2009 -3015 9-Apr-2009 -3020 9-Apr-2009 -3039 9-Apr-2009 -3077 10-Apr-2009 -3045 10-Apr-2009 -3035 10-Apr-2009 -3093 10 -A r -2009 -3100 38 Appendix C Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 39 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Dail Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GCl CG2 11 -A r -2009 -2583 034 11 -A r -2009 -2627 11 -A r -2009 -2707 11 -A r -2009 -2783 12-Apr-2009 -2801 12-Apr-2009 -2842 12-Apr-2009 -2899 12-Apr-2009 -2961 13-Apr-2009 -2947 13-Apr-2009 -3003 13-Apr-2009 -3055 13-Apr-2009 -3011 14-Apr-2009 -3015 120 14-Apr-2009 -2919 14-Apr-2009 -1054 14-Apr-2009 -743 15-Apr-2009 -855 002 15-Apr-2009 -1060 15-Apr-2009 -1291 15-Apr-2009 -1498 16-Apr-2009 -1622 16-Apr-2009 -1751 16-Apr-2009 -1868 16-Apr-2009 -2002 17-Apr-2009 -2074 17-Apr-2009 -2151 17-Apr-2009 -2217 17-Apr-2009 -2307 18-Apr-2009 -2325 18-Apr-2009 -2375 18-Apr-2009 -2449 18-Apr-2009 -25 13 19-Apr-2009 -2485 19-Apr-2009 -2530 19-Apr-2009 -2579 19-Apr-2009 -2620 20-Apr-2009 -2591 055 - -- 20 -A r -2009 -2705 20-Apr-2009 -2648 20-Apr-2009 -2603 21 -A r -2009 -2660 21 -A r -2009 -2705 21-Apr-2009 -2753 21-Apr-2009 -2713 22-Apr-2009 -2735 004 22-Apr-2009 -2783 22-Apr-2009 -2839 22-Apr-2009 -2797 23-Apr-2009 -2829 001 23-Apr-2009 -2896 39 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) 40 Appendix C Weatherstat►on Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GCl CG2 23-Apr-2009 -2918 23-Apr-2009 -2864 24-Apr-2009 -2906 24-Apr-2009 -2973 24-Apr-2009 -2966 24-Apr-2009 -2885 25-Apr-2009 -2961 25-Apr-2009 -3035 25-Apr-2009 -3019 25-Apr-2009 -2968 26-Apr-2009 -2998 26-Apr-2009 -3088 26-Apr-2009 -3079 26-Apr-2009 -3004 27-Apr-2009 -3045 27-Apr-2009 -3133 27-Apr-2009 -3134 27-Apr-2009 -3068 28-Apr-2009 -3105 28-Apr-2009 -3194 28-Apr-2009 -3160 28-Apr-2009 -3079 29-Apr-2009 -3110 29-Apr-2009 -3236 29-Apr-2009 -3214 29-Apr-2009 -31 15 30-Apr-2009 -3088 30-Apr-2009 -3184 30-Apr-2009 -3173 30-Apr-2009 -3059 256 1 -Ma -2009 -3139 1 -Ma -2009 -3274 1 -Ma -2009 -3243 1 -Ma -2009 -3146 2-May-2009 -3247 051 2-May-2009 -3297 2-May-2009 -3266 2-May-2009 -3184 3-May-2009 -3268 001 3-May-2009 -3362 3-May-2009 -3339 3-May-2009 -3261 4-May-2009 -3352 005 4-May-2009 -3430 4-May-2009 -34 15 4-May-2009 -3232 5-May-2009 -2545 140 5-May-2009 -2377 5-May-2009 -2451 5-May-2009 -2474 40 Appendix C l i Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 41 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 6-May-2009 -2623 6-May-2009 -2764 6-May-2009 -28 13 6-May-2009 -2837 7-May-2009 -2218 033 7-May-2009 -2323 7-May-2009 -2192 7-May-2009 -2249 8-May-2009 -2374 8-May-2009 -2546 8-May-2009 -2639 8-May-2009 -2639 9-May-2009 -2773 9-May-2009 -2930 9-May-2009 -2951 9-May-2009 -2911 10-May-2009 -2978 10 -Ma -2009 -3079 10 -Ma -2009 -3082 10 -Ma -2009 -3037 11 -Ma -2009 -2941 0 1 l 11 -Ma -2009 -2827 11 -Ma -2009 -2816 11 -Ma -2009 -2794 12-May-2009 -2883 12-May-2009 -2995 12-May-2009 -2990 12-May-2009 -2943 13-May-2009 -3032 13-May-2009 -3099 13-May-2009 -3081 13-May-2009 -3014 14-May-2009 -3050 14-May-2009 -3043 14-May-2009 -30 11 14-May-2009 -2933 15-May-2009 -2998 003 15-May-2009 -3077 15-May-2009 -3041 15-May-2009 -2972 16-May-2009 -3028 Oil 16-May-2009 -3044 16-May-2009 -3007 16-May-2009 -2963 17-May-2009 -3061 185 17-May-2009 -1441 17-May-2009 -1251 17-May-2009 -1231 18-May-2009 -1282 024 18-May-2009 -1495 41 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 42 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) _Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 18-May-2009 -1640 18-May-2009 -1739 19-May-2009 -1862 19-May-2009 -1979 19-May-2009 -2104 19-May-2009 -2134 20-May-2009 -2245 009 20-May-2009 -2321 20-May-2009 -2359 20-May-2009 -2342 21-May-2009 -2405 001 21-May-2009 -25 12 21-May-2009 -2540 21-May-2009 -25 15 22-May-2009 -2573 22-May-2009 -2662 22-May-2009 -2660 22-May-2009 -2631 23-May-2009 -27.01 23-May-2009 -2779 23-May-2009 -2746 23-May-2009 -2703 24-May-2009 -2770 001 24-May-2009 -2860 24-May-2009 -2841 24-May-2009 -2773 25-May-2009 -2849 25-May-2009 -2933 25-May-2009 -2885 25-May-2009 -2813 26-May-2009 -2889 030 080 26-May-2009 -2843 26-May-2009 -2792 26-May-2009 -2861 27-May-2009 -2985 27-May-2009 -2942 27-May-2009 -2877 27-May-2009 -29 89 28-May-2009 -2369 28-May-2009 -23 14 28-May-2009 -2267 28-May-2009 -2392 29-May-2009 -2509 009 29-May-2009 -25 12 29-May-2009 -2521 29-May-2009 -2575 30-May-2009 -2697 009 30-May-2 09 -2720 30-May-2009 -2692 30-May-2009 -28 13 42 i� i Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 43 Weatherstat►on Rainfall Data Date On -site Ra►n au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GCl CG2 31 -Ma -2009 -2951 000 31 -Ma -2009 -2939 31 -Ma -2009 -2885 31 -Ma -2009 -2999 493 1 -Jun -2009 -3100 000 1 -Jun -2009 -3022 1 -Jun -2009 -2953 1 -Jun -2009 -3056 2 -Jun -2009 -3171 000 2 -Jun -2009 -3125 2 -Jun -2009 -3038 2 -Jun -2009 -3117 3 -Jun -2009 -3230 000 3 -Jun -2009 -3206 3 -Jun -2009 -3097 3 -Jun -2009 -3185 4 -Jun -2009 -3238 000 4 -Jun -2009 -3196 4 -Jun -2009 -3014 4 -Jun -2009 -3017 5 -Jun -2009 -3103 116 5 -Jun -2009 -3039 5 -Jun -2009 -2885 5 -Jun -2009 -2830 6 -Jun -2009 -2804 002 6 -Jun -2009 -2805 6 -Jun -2009 -2821 6 -Jun -2009 -2876 7 -Jun -2009 -2914 007 7 -Jun -2009 -2907 7 -Jun -2009 -2851 7 -Jun -2009 -2937 8 -Jun -2009 -3050 000 8 -Jun -2009 -3044 8 -Jun -2009 -2979 8 -Jun -2009 -3071 9 -Jun -2009 -3189 013 9 -Jun -2009 -3080 9 -Jun -2009 -2924 9 -Jun -2009 -2981 10 -Jun -2009 -3100 001 10 -Jun -2009 -3064 10 -Jun -2009 -3001 10 -Jun -2009 -3113 11 -Jun -2009 -3223 006 11 -Jun -2009 -3215 11 -Jun -2009 -3125 11 -Jun -2009 -3244 12 -Jun -2009 -3386 002 12 -Jun -2009 -3355 43 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) 44 Appendix C ; c `J i � J �J �l f `y l i Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GCl CG2 12 -Jun -2009 -3251 12 -Jun -2009 -33 56 13 -Jun -2009 -3491 018 13 -Jun -2009 -3440 13 -Jun -2009 -3268 13 -Jun -2009 -3290 14 -Jun -2009 -3272 068 14 -Jun -2009 -3129 14 -Jun -2009 -3004 14 -Jun -2009 -3111 15 -Jun -2009 -3244 002 15 -Jun -2009 -3220 15 -Jun -2009 -3086 15 -Jun -2009 -3039 16 -Jun -2009 -2861 038 16 -Jun -2009 -2773 16 -Jun -2009 -2763 16 -Jun -2009 -2813 17 -Jun -2009 -2870 009 17 -Jun -2009 -2890 17 -Jun -2009 -2875 17 -Jun -2009 -2929 18 -Jun -2009 -3052 047 18 -Jun -2009 -3044 18 -Jun -2009 -2996 18 -Jun -2009 -3113 19 -Jun -2009 -3277 000 19 -Jun -2009 -3275 19 -Jun -2009 -3190 19 -Jun -2009 -3320 20 -Jun -2009 -3501 000 20 -Jun -2009 -3491 20 -Jun -2009 -3439 20 -Jun -2009 -3545 21 -Jun -2009 -3676 000 21 -Jun -2009 -3655 21 -Jun -2009 -3596 21 -Jun -2009 -3700 22 -Jun -2009 -3771 000 22 -Jun -2009 -3758 22 -Jun -2009 -3699 22 -Jun -2009 -3755 23 -Jun -2009 -38 19 000 23 -Jun -2009 -3787 23 -Jun -2009 -3730 23 -Jun -2009 -3805 24 -Jun -2009 -3883 000 24 -Jun -2009 -3855 24 -Jun -2009 -3783 24 -Jun -2009 -3915 44 Appendix C ; c `J i � J �J �l f `y l i Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 45 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GCl CG2 25 -Jun -2009 -4040 000 035 282 000 25 -Jun -2009 -4006 25 -Jun -2009 -3979 25 -Jun -2009 -4082 26 -Jun -2009 -3850 076 26 -Jun -2009 -3639 26 -Jun -2009 -3439 26 -Jun -2009 -3399 27 -Jun -2009 -3553 001 27 -Jun -2009 -3525 27 -Jun -2009 -3455 27 -Jun -2009 -3557 28 -Jun -2009 -3771 000 28 -Jun -2009 -3799 28 -Jun -2009 -3748 28 -Jun -2009 -3848 29 -Jun -2009 -3983 000 29 -Jun -2009 -4031 29 -Jun -2009 -3982 29 -Jun -2009 -4058 30 -Jun -2009 -4198 000 30 -Jun -2009 -4173 30 -Jun -2009 -4112 30 -Jun -2009 -4204 406 1 -Jul -2009 -4294 000 1 -Jul -2009 -4315 1 -Jul -2009 -4232 1 -Jul -2009 -4311 2 -Jul -2009 -4396 001 2 -Jul -2009 -4382 2 -Jul -2009 -4312 2 -Jul -2009 -4389 3 -Jul -2009 -4485 000 3 -Jul -2009 -4450 3 -Jul -2009 -4387 3 -Jul -2009 -4447 4 -Jul -2009 -4539 000 4 -Jul -2009 -4507 4 -Jul -2009 -4417 4 -Jul -2009 -4527 5 -Jul -2009 -4593 000 5 -Jul -2009 -4508 5 -Jul -2009 -4438 5 -Jul -2009 -4445 6 -Jul -2009 -4371 084 6 -Jul -2009 -4293 6 -Jul -2009 -4211 6- Jul -2009 -4273 7 -Jul -2009 -4415 001 7 -Jul -2009 -4395 45 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 46 0 a Weatherstation Rainfall Data Date On -site Ram au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 7 -Jul -2009 -4323 7 -Jul -2009 -4378 8 -Jul -2009 -45 13 000 8 -Jul -2009 -4479 8 -Jul -2009 -4418 8- Jul -2009 -4427 9 -Jul -2009 -4516 000 9- Jul -2009 -4504 9 -Jul -2009 -4429 9 -Jul -2009 -4519 10 -Jul -2009 -4641 000 10 -Jul -2009 -4594 10 -Jul -2009 -4510 10 -Jul -2009 -4570 11 -Jul -2009 -4665 000 11 -Jul -2009 -4642 11 -Jul -2009 -4553 11 -Jul -2009 -4678 12 -Jul -2009 -4753 000 12 -Jul -2009 -4714 12 -Jul -2009 -4648 12 -Jul -2009 -4517 13 -Jul -2009 -4365 078 13 -Jul -2009 -4259 13 -Jul -2009 -4148 13 -Jul -2009 -4114 14 -Jul -2009 -4155 001 14 -Jul -2009 -4135 14 -Jul -2009 -4099 14 -Jul -2009 -4112 15 -Jul -2009 -4249 000 15 -Jul -2009 -4283 15 -Jul -2009 -4237 15 -Jul -2009 -4292 16 -Jul -2009 -4425 000 16 -Jul -2009 -4395 16 -Jul -2009 -4340 16 -Jul -2009 -4367 17 -Jul -2009 -4455 158 17- Jul -2009 -4183 17 -Jul -2009 -3964 17 -Jul -2009 -3875 18 -Jul -2009 -3829 027 18 -Jul -2009 -3787 18 -Jul -2009 -3715 18 -Jul -2009 -3757 19 -Jul -2009 -3857 001 19 -Jul -2009 -3871 19 -Jul -2009 -3837 19 -Jul -2009 -38 38 46 0 a Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 47 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 20- Jul -2009 -3872 001 20 -Jul -2009 -3868 20- Jul -2009 -3842 20 -Jul -2009 -3861 21 -Jul -2009 -3959 000 21 -Jul -2009 -3994 21 -Jul -2009 -3969 21- Jul -2009 -4018 22- Jul -2009 -4063 000 22 -Jul -2009 -4066 22 -Jul -2009 -4049 22- Jul -2009 -4085 23 -Jul -2009 -2926 020 23 -Jul -2009 -2757 23 -Jul -2009 -2768 23 -Jul -2009 -2732 24 -Jul -2009 -2565 096 24 -Jul -2009 -2632 24 -Jul -2009 -2705 24 -Jul -2009 -2859 25 -Jul -2009 -2968 088 25 -Jul -2009 -2999 25 -Jul -2009 -3008 25 -Jul -2009 -3124 26 -Jul -2009 -3283 000 26 -Jul -2009 -3319 26 -Jul -2009 -3291 26 -Jul -2009 -3371 27 -Jul -2009 -3344 000 040 521 000 27 -Jul -2009 -3323 27 -Jul -2009 -3412 27 -Jul -2009 -3413 28 -Jul -2009 -33 16 002 28 -Jul -2009 -3247 28- Jul -2009 -3334 28 -Jul -2009 -3413 29 -Jul -2009 -3403 012 29 -Jul -2009 -3379 29 -Jul -2009 -3472 29 -Jul -2009 -35 86 30 -Jul -2009 -3583 000 30 -Jul -2009 -3549 30 -Jul -2009 -3650 30 -Jul -2009 -3697 31 -Jul -2009 -3670 006 31 -Jul -2009 -3571 31 -Jul -2009 -3559 31 -Jul -2009 -3651 576 1 -Au -2009 -36 14 0 13 1 -Au -2009 -3567 47 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 48 0 r Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GCl CG2 1 -Au -2009 -3677 1 -Au -2009 -2475 2-Aug-2009 -2495 093 2-Aug-2009 -2477 2-Aug-2009 -2595 2-Aug-2009 -2668 3-Aug-2009 -2745 092 3-Aug-2009 -2807 3-Aug-2009 -2962 3-Aug-2009 -3089 4-Aug-2009 -3110 000 4-Aug-2009 -3113 4-Aug-2009 -3193 4-Aug-2009 -392 5-Aug-2009 -587 000 5-Aug-2009 -814 5-Aug-2009 -1190 5-Aug-2009 -1552 6-Aug-2009 -1787 016 6-Aug-2009 -1922 6-Aug-2009 -2134 6-Aug-2009 -2354 7-Aug-2009 -2445 001 7-Aug-2009 -25 15 7-Aug-2009 -2656 7-Aug-2009 -2824 ~ 8-Aug-2009 -2857 000 8-Aug-2009 -2863 8-Aug-2009 -2937 8-Aug-2009 -3075 9-Aug-2009 -3098 000 9-Aug-2009 -3077 9-Aug-2009 -3167 9-Aug-2009 -3299 10 -Au -2009 -3272 000 10-Aug-2009 -3217 10-Aug-2009 -3305 10-Aug-2009 -3195 11 -Au -2009 -1893 014 11 -Au -2009 -1989 11 -Au -2009 -2193 11-Aug-2009 -2216 12-Aug-2009 -2309 184 12-Aug-2009 -2353 12-Aug-2009 -2440 12-Aug-2009 -25 10 13-Aug-2009 -2589 026 13-Aug-2009 -2597 13-Aug-2009 -107 13-Aug-2009 -337 48 0 r Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 49 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 14-Aug-2009 -622 079 14-Aug-2009 -824 14-Aug-2009 -1118 14-Aug-2009 -1445 15-Aug-2009 -1645 000 15-Aug-2009 -1760 15-Aug-2009 -1911 15-Aug-2009 -2072 16-Aug-2009 -2137 000 16-Aug-2009 -2169 16-Aug-2009 -2294 16-Aug-2009 -2438 17-Aug-2009 -2445 000 17-Aug-2009 -2469 17-Aug-2009 -2542 17-Aug-2009 -2655 18-Aug-2009 -2649 000 18 -Au -2009 -2631 18-Aug-2009 -2717 18-Aug-2009 -28 13 19-Aug-2009 -2799 000 19-Aug-2009 -2747 19-Aug-2009 -2823 19-Aug-2009 -2925 20-Aug-2009 -2896 000 20-Aug-2009 -2843 20-Aug-2009 -2751 20-Aug-2009 -2569 21-Aug-2009 -2560 035 21-Aug-2009 -2534 21-Aug-2009 -2655 21-Aug-2009 -1360 22-Aug-2009 -1485 018 22-Aug-2009 -1623 22-Aug-2009 -1795 22-Aug-2009 -1917 23-Aug-2009 -2068 006 23-Aug-2009 -2140 23-Aug-2009 -2402 23-Aug-2009 -2458 24-Aug-2009 -2470 055 130 834 022 24-Aug-2009 -2571 24-Aug-2009 -2691 24-Aug-2009 -2717 25-Aug-2009 -2696 001 25-Aug-2009 -2768 ' 25-Aug-2009 -2877 25-Aug-2009 -2861 26-Aug-2009 -2812 000 26-Aug-2009 -2909 49 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 50 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GCl CG2 26-Aug-2009 -2993 26-Aug-2009 -2954 27-Aug-2009 -2918 000 27-Aug-2009 -2985 27-Aug-2009 -2917 27-Aug-2009 -2812 28-Aug-2009 -2668 012 28-Aug-2009 -2720 28-Aug-2009 -2801 28-Aug-2009 -2809 29-Aug-2009 -2803 144 29-Aug-2009 -2899 29-Aug-2009 -2991 29-Aug-2009 -2691 30-Aug-2009 -2446 012 30-Aug-2009 -2134 30-Aug-2009 -2168 30-Aug-2009 -2261 31-Aug-2009 -2337 0 13 31 -Au -2009 -2463 31 -Au -2009 -2584 31 -Au -2009 -2631 781 1-Sep-2009 -2651 000 1-Sep-2009 -2725 1 -Se -2009 -2788 1-Sep-2009 -2829 2-Sep-2009 -2817 000 2-Sep-2009 -2887 2-Sep-2009 -2923 2-Sep-2009 -2920 3-Sep-2009 -2891 000 3-Sep-2009 -2965 3-Sep-2009 -3009 3-Sep-2009 -2981 4-Sep-2009 -2963 000 4-Sep-2009 -3041 4-Sep-2009 -3107 4-Sep-2009 -3097 5-Sep-2009 -3041 000 5-Sep-2009 -3094 5-Sep-2009 -3171 5-Sep-2009 -3141 6-Sep-2009 -3053 000 6-Sep-2009 -2475 6-Sep-2009 -2182 6-Sep-2009 -2261 7-Sep-2009 -2336 298 7-Sep-2009 -2471 7-Sep-2009 -2597 7-Sep-2009 -2649 50 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 51 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 8-Sep-2009 -2681 000 8-Sep-2009 -2785 8-Sep-2009 -2869 8-Sep-2009 -2893 9-Sep-2009 -2913 000 9-Sep-2009 -2920 9-Sep-2009 -2948 9-Sep-2009 -2955 10-Sep-2009 -2949 000 10-Sep-2009 -3004 10-Sep-2009 -3076 10-Sep-2009 -3065 11 -Se -2009 -3031 000 11 -Se -2009 -3099 11 -Se -2009 -3173 11 -Se -2009 -3137 12-Sep-2009 -3094 042 12-Sep-2009 -3166 12-Sep-2009 -32 15 12-Sep-2009 -3189 13-Sep-2009 -3127 000 13-Sep-2009 -3217 13-Sep-2009 -3284 13-Sep-2009 -3277 14-Sep-2009 -3220 000 14-Sep-2009 -3289 14-Sep-2009 -3359 14-Sep-2009 -3334 15-Sep-2009 -3281 000 15-Sep-2009 -3357 15-Sep-2009 -3376 15-Sep-2009 -33 17 16-Sep-2009 -3271 000 16-Sep-2009 -3273 16-Sep-2009 -3338 16-Sep-2009 -3289 17-Sep-2009 -3253 000 17-Sep-2009 -3263 17-Sep-2009 -3331 17-Sep-2009 -3278 18-Sep-2009 -3239 000 18-Sep-2009 -3325 18-Sep-2009 -3407 18-Sep-2009 -3401 19-Sep-2009 -3339 001 19-Sep-2009 -3407 19-Sep-2009 -3463 19-Sep-2009 -3441 20-Sep-2009 -3454 000 20-Sep-2009 -3458 51 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) _ 52 Appendix C Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 20-Sep-2009 -35 13 20-Sep-2009 -3452 000 000 247 21-Sep-2009 -2549 062 21-Sep-2009 -2438 21-Sep-2009 -2165 21-Sep-2009 -2294 22-Sep-2009 -2390 055 22-Sep-2009 -2529 22-Sep-2009 -2655 22-Sep-2009 -2741 23-Sep-2009 -2780 0 19 23-Sep-2009 -2890 23-Sep-2009 -2977 23-Sep-2009 -3003 24-Sep-2009 -2993 000 24-Sep-2009 -3074 24-Sep-2009 -2983 24-Sep-2009 -2795 25-Sep-2009 -2797 051 25-Sep-2009 -2773 25-Sep-2009 -2723 25-Sep-2009 -2242 26-Sep-2009 -2301 029 26-Sep-2009 -23 89 26-Sep-2009 -2525 26-Sep-2009 -2612 27-Sep-2009 -2655 001 27-Sep-2009 -2799 27-Sep-2009 -2902 27-Sep-2009 -29 19 28-Sep-2009 -2927 000 28-Sep-2009 -3045 28-Sep-2009 -3109 28-Sep-2009 -3100 29-Sep-2009 -3101 29-Sep-2009 -3152 29-Sep-2009 -3182 29-Sep-2009 -3190 30-Sep-2009 -3157 30-Sep-2009 -3227 30-Sep-2009 -3256 30-Sep-2009 -3278 558 1- Oct -2009 -3201 1- Oct -2009 -3267 1- Oct -2009 -3265 1- Oct -2009 -3225 2- Oct -2009 -3202 001 2- Oct -2009 -3279 2- Oct -2009 -3317 2- Oct -2009 -3284 52 Appendix C Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 53 Weatherstation Rainfall Data Date On -site Ram au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 3- Oct -2009 -3262 009 3- Oct -2009 -3338 3- Oct -2009 -3380 3- Oct -2009 -3379 4- Oct -2009 -3341 001 4- Oct -2009 -3309 4- Oct -2009 -3171 4- Oct -2009 -3037 5- Oct -2009 -2918 02 5- Oct -2009 -2947 5- Oct -2009 -2953 5- Oct -2009 -2944 6- Oct -2009 -2954 002 6- Oct -2009 -3044 6- Oct -2009 -3101 6- Oct -2009 -3116 7- Oct -2009 -31 16 001 7- Oct -2009 -3202 7- Oct -2009 -3255 7- Oct -2009 -3250 8- Oct -2009 -3227 8- Oct -2009 -3305 8- Oct -2009 -3346 8- Oct -2009 -3350 9- Oct -2009 -3305 9- Oct -2009 -3376 9- Oct -2009 -3392 9- Oct -2009 -3375 10- Oct -2009 -3340 004 10- Oct -2009 -3338 10- Oct -2009 -3350 10- Oct -2009 -3321 11- Oct -2009 -3322 11- Oct -2009 -3327 11- Oct -2009 -3309 11- Oct -2009 -3273 12- Oct -2009 -3159 014 12 -Oct -2009 -3188 12- Oct -2009 -3235 12- Oct -2009 -3241 13- Oct -2009 -3237 001 13- Oct -2009 -3281 13- Oct -2009 -3159 13- Oct -2009 -2869 14- Oct -2009 -2726 053 14- Oct -2009 -2788 14- Oct -2009 -2810 14- Oct -2009 -2891 15- Oct -2009 -2905 004 15- Oct -2009 -2985 53 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 54 _% .J 1 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GCl CG2 15- 00-2009 -2997 15- Oct -2009 -3020 16- Oct -2009 -3025 16- Oct -2009 -3095 16- Oct -2009 -3088 16- Oct -2009 -3148 17- Oct -2009 -3146 17- Oct -2009 -3176 17- Oct -2009 -3177 17- Oct -2009 -3191 18- Oct -2009 -3203 18- Oct -2009 -3274 18- 00-2009 -3277 18- Oct -2009 -3272 19- 00-2009 -3259 19 -Oct -2009 -3331 19- Oct -2009 -3344 19- Oct -2009 -3355 20- Oct -2009 -3325 20- Oct -2009 -3385 20- 00-2009 -3393 20- 00-2009 -3423 21- Oct -2009 -3392 21- Oct -2009 -3442 21- Oct -2009 -3451 21- Oct -2009 -3435 22 -Oct -2009 -3405 22- Oct -2009 -3460 22- Oct -2009 -3471 22 -Oct -2009 -3485 23 -Oct -2009 -3437 23- Oct -2009 -3472 23- Oct -2009 -3489 23- Oct -2009 -3483 24- Oct -2009 -3449 24- Oct -2009 -3499 24- Oct -2009 -3477 24- Oct -2009 -3487 25- Oct -2009 -3455 25- Oct -2009 -3435 25 -Oct -2009 -3344 25- Oct -2009 -3308 26- Oct -2009 -3235 034 26- Oct -2009 -3236 26- Oct -2009 -3187 26- Oct -2009 -3209 27- Oct -2009 -3219 005 27- Oct -2009 -32 45 27- Oct -2009 -3279 27- Oct -2009 -3299 54 _% .J 1 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 55 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 28- Oct -2009 -3305 009 28- Oct -2009 -3367 28- Oct -2009 -3320 28- Oct -2009 -3345 29- Oct -2009 -3320 29- Oct -2009 -3345 29- Oct -2009 -3292 29- 00-2009 -3295 30- Oct -2009 -3279 30- Oct -2009 -3321 30- Oct -2009 -3297 30- Oct -2009 -3292 31- Oct -2009 -3273 31- Oct -2009 -3289 31- 00-2009 -3147 31- Oct -2009 -3128 164 1- Nov -2009 -3111 013 1- Nov -2009 -3151 1- Nov -2009 -3141 1- Nov -2009 -3166 2- Nov -2009 -3158 2- Nov -2009 -3207 2- Nov -2009 -3229 2- Nov -2009 -3235 3- Nov -2009 -3248 001 3- Nov -2009 -3293 3- Nov -2009 -3277 3- Nov -2009 -3292 4- Nov -2009 -3287 4- Nov -2009 -3328 4- Nov -2009 -3329 4- Nov -2009 -3351 5- Nov -2009 -3345 5- Nov -2009 -3394 5- Nov -2009 -3370 5- Nov -2009 -3374 6- Nov -2009 -3359 6- Nov -2009 -3399 6- Nov -2009 -3406 6- Nov -2009 -3407 7- Nov -2009 -3362 7- Nov -2009 -3431 7- Nov -2009 -3410 7- Nov -2009 -3419 8- Nov -2009 -3395 8- Nov -2009 -3427 8- Nov -2009 -3425 8- Nov -2009 -3405 9- Nov -2009 -3377 9- Nov -2009 -3419 55 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 56 0 Weatherstation Rainfall Data Date On -site Ram au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GCl CG2 9- Nov -2009 -3059 9- Nov -2009 -2207 10- Nov -2009 -21 19 050 10- Nov -2009 -479 10- Nov -2009 -022 10- Nov -2009 -064 11- Nov -2009 -129 353 11- Nov -2009 -344 11- Nov -2009 -556 11- Nov -2009 -675 12- Nov -2009 -808 257 12- Nov -2009 -1028 12- Nov -2009 -1245 12- Nov -2009 -1430 13- Nov -2009 -1573 009 13- Nov -2009 -1729 13- Nov -2009 -1798 13- Nov -2009 -1868 14- Nov -2009 -1930 002 14- Nov -2009 -2026 14- Nov -2009 -2037 14- Nov -2009 -2092 15- Nov -2009 15- Nov -2009 15- Nov -2009 15- Nov -2009 100 140 942 16- Nov -2009 16- Nov -2009 16- Nov -2009 16- Nov -2009 17- Nov -2009 17- Nov -2009 17- Nov -2009 17- Nov -2009 18- Nov -2009 191 18- Nov -2009 18- Nov -2009 18- Nov -2009 19- Nov -2009 058 19- Nov -2009 19- Nov -2009 19- Nov -2009 20- Nov -2009 20- Nov -2009 20- Nov -2009 20- Nov -2009 21- Nov -2009 21- Nov -2009 21- Nov -2009 21- Nov -2009 56 0 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 57 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 22- Nov -2009 032 22- Nov -2009 22- Nov -2009 22- Nov -2009 23- Nov -2009 014 23- Nov -2009 23- Nov -2009 23- Nov -2009 24- Nov -2009 24- Nov -2009 24- Nov -2009 24- Nov -2009 25- Nov -2009 25- Nov -2009 25- Nov -2009 25- Nov -2009 26- Nov -2009 26- Nov -2009 26- Nov -2009 26- Nov -2009 27- Nov -2009 27- Nov -2009 27- Nov -2009 27- Nov -2009 28- Nov -2009 28- Nov -2009 28- Nov -2009 28- Nov -2009 29- Nov -2009 29- Nov -2009 29- Nov -2009 29- Nov -2009 30- Nov -2009 30- Nov -2009 30- Nov -2009 30- Nov -2009 980 1- Dec -2009 1- Dec -2009 1- Dec -2009 1- Dec -2009 2- Dec -2009 2- Dec -2009 2- Dec -2009 2- Dec -2009 3- Dec -2009 3- Dec -2009 3- Dec -2009 3- Dec -2009 4- Dec -2009 4- Dec -2009 57 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C ) 58 Weatherstation Rainfall Data Date On -site Ram au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GCl CG2 4- Dec -2009 4- Dec -2009 5- Dec -2009 5- Dec -2009 5- Dec -2009 5- Dec -2009 6- Dec -2009 6- Dec -2009 6- Dec -2009 6- Dec -2009 7- Dec -2009 7- Dec -2009 7- Dec -2009 7- Dec -2009 8- Dec -2009 8- Dec -2009 8- Dec -2009 8- Dec -2009 9- Dec -2009 9- Dec -2009 9- Dec -2009 9- Dec -2009 10- Dec -2009 10- Dec -2009 10- Dec -2009 10- Dec -2009 11- Dec -2009 11- Dec -2009 11- Dec -2009 11- Dec -2009 12- Dec -2009 12- Dec -2009 12- Dec -2009 12- Dec -2009 13- Dec -2009 13- Dec -2009 13- Dec -2009 13- Dec -2009 14- Dec -2009 14- Dec -2009 14- Dec -2009 14- Dec -2009 15- Dec -2009 15- Dec -2009 15- Dec -2009 15- Dec -2009 16- Dec -2009 16- Dec -2009 16- Dec -2009 16- Dec -2009 58 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Appendix C 59 Weatherstation Rainfall Data Date On -site Ram au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GC1 CG2 17- Dec -2009 17- Dec -2009 17- Dec -2009 17- Dec -2009 18- Dec -2009 18- Dec -2009 18- Dec -2009 18- Dec -2009 19- Dec -2009 19- Dec -2009 19- Dec -2009 19- Dec -2009 20- Dec -2009 20- Dec -2009 20- Dec -2009 20- Dec -2009 21- Dec -2009 21- Dec -2009 21- Dec -2009 21- Dec -2009 22- Dec -2009 22- Dec -2009 22- Dec -2009 22- Dec -2009 23- Dec -2009 23- Dec -2009 23- Dec -2009 23- Dec -2009 24- Dec -2009 24- Dec -2009 24- Dec -2009 24- Dec -2009 25- Dec -2009 25- Dec -2009 25- Dec -2009 25- Dec -2009 26- Dec -2009 26- Dec -2009 26- Dec -2009 26- Dec -2009 27- Dec -2009 27- Dec -2009 27- Dec -2009 27- Dec -2009 28- Dec -2009 28- Dec -2009 28- Dec -2009 28- Dec -2009 29- Dec -2009 29- Dec -2009 59 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) _ Appendix C 60 0 0 Weatherstation Rainfall Data Date On -site Rain au a Hoffmann (NHOF) Daily Rainfall Hoffmann Monthly Rainfall dd -mmm- REF -WO GCl CG2 29- Dec -2009 29- Dec -2009 30- Dec -2009 30- Dec -2009 30- Dec -2009 30- Dec -2009 31- Dec -2009 31- Dec -2009 31- Dec -2009 31- Dec -2009 000 60 0 0 APPENDIX D 2009 Site Photos Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) SPA 1 — Beaver dam in channel @ Sta. 10 +50 (UT I -A) SPA 2 — Beaver dam in channel @ Sta. 12 +20 (UT I -A) Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) SPA 3 — Mowing inside easement @ Sta. 14 +50 (UT 1 -B) SPA 4 — Deteriorated root wad @ Sta. 30 +30 (UT 1 -B) db Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) SPA 5 - Deteriorated root wad @ Sta. 42 +50 (UT I -B) SPA 6 - Settled ditch plug @ Sta. 12 +00 (UT3) Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) SPA 7 — Beaver dam in channel & Sta. 14 +40 (UT3) SPA 8 — Bank erosion due to frequent ATV traffic @ Sta. 14 +50 (UT3) 4 Haw Branch Mitigation Site Annual Monitoring Report, for 2009 (Year 4) Vegetation Plot 1 Vegetation Plot 2 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Vegetation Plot 3 Vegetation Plot 4 0 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Vegetation Plot 5 Vegetation Plot 6 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Vegetation Plot 7 Vegetation Plot 8 0 0 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Vegetation Plot 9 Vegetation Plot 10 Haw Branch Mitigation Site Annual Monitoring Report.for 2009 (Year 4) Vegetation Plot 1 1 Ve,-,etation Plot 12 Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Vegetation Plot 13 Vegetation Plot 14 a Haw Branch Mitigation Site Annual Monitoring Report_ for 2009 (Year 4) Vegetation Plot 15 Ve 'letation Plot 16 12 a -0sk Haw Branch Mitigation Site Annual Monitoring Report for 2009 (Year 4) Vegetation Plot 17 Vegetation Plot 18 13 Haw Branch Mitigation Site Annual Monitoring Report,for 2009 (Year 4) Vegetation Plot 19 Vegetation Plot 20 14