Loading...
HomeMy WebLinkAboutSW6210601_Plansheet (C-3.0 - C-3.4) - Grading/Drainage Plan_20211008a 0 VICINITY MAP NOT TO SCALE LEGEND: "'Z ECM -EXISTING CONCRETE MONUMENT EIP 00 EIP-EXISTING IRON PIPE EIR 00 EIR-EXISTING IRON ROD ERBO ERB-EXISTING REBAR c COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE — OPL — — — OLD PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY - — — — -SETBACK LINE SD STORM DRAINAGE w WATER LINE TREE LINE 210MAJOR CONTOUR 207 MINOR CONTOUR x 208.47' SPOT ELEVATION BENCHMARK EEE SIGN M� MAILBOX ❑T TELEPHONE PEDESTAL FIRE HYDRANT ASPHALT 0 WETLANDS SURFACE WATER — HOC— HOC— LIMITS OF CONSTRUCTION — SF — SF — SILT FENCE LINE — iN — iN — JUTE NETTING — DIV — ory — DIVERSION BERM 0INLET PROTECTION EROSION CONTROL NOTES CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. CONTROL MATTING, AND/OR SODDING AND STAKING IN SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP GREEN SPACE AREAS AND OTHERWISE APPROPRIATE AND INLET PROTECTION DEVICES WHEN THE STORAGE MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL AREAS TO BE PAVED. WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT FINAL STABILIZATION AND PERMANENT VEGETATION HAS BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ FENCE WILL BE REPAIRED AS NEEDED TO MAINTAIN A APPROVE THE ACTION PRIOR TO REMOVAL. PROPER BARRIER. 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF ACTIVITY. AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION OR AT THE EARLIEST POSSIBLE POINT DURING ACTIVITIES. CONSTRUCTION. 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR PERFORMING WORK ON THIS PROJECT. SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY DESIGN MANUAL. RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. rH LAND DISTURBING ACTIVITIES. 910-433-3300 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR SLOPES AND FILLS SHALL BE NO GREATER THAN THE OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS OTHER ADEQUATE EROSION CONTROL DEVICES OR WHEN TRACKING OCCURS. STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. OR OTHER MEANS. CONTROL EROSION FROM ALL PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN MUST BE NO LESS THAN FIVE FEET FROM THE 90 CALENDAR DAYS FOLLOWING COMPLETION OF DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT CONSTRUCTION OR DEVELOPMENT. MORE THAN 24 HOURS. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHOWN AND ANY ADDITIONAL CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT THE COURSE OF CONSTRUCTION. TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR NECESSARY, AND MULCHED ACCORDING TO THE DETAILS ROTTED EROSION CONTROL DEVICES IMMEDIATELY. HEREIN. 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT AREAS WHICH HAVE BEEN FINISH GRADED, AND ALL ARISE ON SITE IS CHRIS PARKER. CONTACT 910-850-3437. DENUDED AREAS IN WHICH GRADING OR SITE BUILDING \ BOBBY L. �McDOWELL DB 122, PG 358 \ \ \ N 440,437.585 \ E 1,975,251.943 ❑ NC GRID NAD 83 \ (2011) \ f 1 1 /4" EIP O N/F \ WILLARD F. PAGE & WIFE, BERYL R. PAGE DB 286, PG 365 \ 15 14 5/8, Lam(? tOC'OC ERB ,,. �� 187 186 lgs / N/F 0 r DAVID MICHAEL THOMPSON & WIFE, ROBBIE FUMAROLA ^ DB 252, PG 135 O 1c N/F 1 /2' ERB,If�I o ERIC HILL, STEPHANIE THOMPSON & �Lc , ROBBIE THOMPSON DB 1148, PG 775 19 . 7J 1/2 ERB f 2 N/F SNO DAVID G. ROCKWELL & WIFE, ELIZABETH G. ROCKWELL DB 1240, PG 162 PB 4077, PG 4 I. RB J 1 , /2„' ERB N/F I ROBERT G. ROCKWELL & WIFE, N/F ROBIN S. ROCKWELL WILLARD F. PAGE & WIFE, DB 240, PG 513 BERYL R. PAGE PB 4077, PG 4 TRACT 2 OF DB 365, PG 173 r` N/F WILLARD F. PAGE & WIFE,", BERYL R. PAGE TRACT 1 OF DB 365, PG 173 185(3 t J 11 CD WN NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: GRADING NOTES THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO �' /'ERB 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES \ BENCHMARK AND MUST BE VERIFIED BY THE GENERAL INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE ' i CONTRACTOR.ALL SPOT ELEVATIONS ARE TO THE FINISHED THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING \ GRADE OF THE CURB, UNLESS OTHERWISE NOTED. FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS 2. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES TOOK EFFECT OCTOBER 1, 2010. \ SHALL HAVE A CROSS SLOPE NO STEEPER THAN 2% AND ' / LONGITUDINAL SLOPE NO STEEPER THAN 5%. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES 3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL SELF -MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY WITH THE APPROVED EROSION AND SEDIMENTATION SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM 1/2" % ,° AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL CAN BE ACCESSED AT: HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION ERB BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND ��p,Ol �' __ ,, `'' ' ^� \ HAS BEEN COMPLETED IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT G`A r� 2 "` 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE THE FAYETTEVILLE REGIONAL OFFICE AT (910) 433-3300. G�Vv�--� i CONTRACTOR AND THE OWNER TO PROTECT ADJACENT 37 36 91,711. 35 0 ' N /F PROPERTY THE PUBLIC AND UTILITIES DURING GRADING NG� C R�`N , ' OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR GRACELAND THE UNDERGROUND UTILITY PIPES, CONDUITS, OR (MP UBv _ DEVELOPMENT, INC. QA� r 1/2' STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN 1�13 l 3 �� DPB1 4145,PPG939 ��� �� 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY SR �� THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE N/F N/F AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE \ \ GRACELAND 1 ' �' BARBARA JONES RICHARDSON, PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE DEVELOPMENT, INC. LAURA ELIZABETH JONES, TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS 4 ; DB 1327, PG 939 LINDSAY KATHLEEN JONES, OPERATION. \ PB 4145, PG 6 \ / , ` '� MATTHEW THOMAS JONES, 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH N/F JUDITH JONES TURNAGE & HUSBAND, DURING AND AFTER GRADING BY THE CONTRACTOR TO / LEONARD RUDOLPH TURNAGE --^ GRACELAND f / )";, 1 DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT 6 Y2 / � ,,... ESTATE 12-E-145 IS DETERMINED THAT THERE IS A SLOPE STABILITY f DEVELOPMENT, INC.\ �' PB 4141, PG 8 PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 1/2" ��_�� \ �� 5 ^� DB 1327, PG 939 HERB / \ ERB N/F �_--/ PB 4145, PG 6 �l v 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT o� \ \ GRACELAND N/F —.Or — oz ^ SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED \ �. � � BY SILT FENCE. DEVELOPMENT, INC. GRACELAND 1/2 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL DB 1327, PG 939 f'�r ERB> 1/2, DEVELOPMENT, INC. " Y, PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS PB 4145, PG 6 DB 1327, PG 939 ERB ""�'""" IN PROGRESS. PB 4145, PG 6 ao' �F 10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE I / \ ERB, " yp 1". 3Q„ , SHALL REMAIN IN A CONDITION SUCH THAT THEY CAN ■ TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO � � '� � � , , OS 3 HANDLE THE STORM WATER ARE CONSTRUCTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE I# L DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. \ ,.. / 67 68 69 4 P ',? 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN n SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR 1/2',•, „ TO IMPLEMENTATION OF THE CHANGE. ■ ER �„.* � �� � � / � •,y �� 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL BE LINED WITH NORTH AMERICAN GREENS75 O TEMPORARY EROSION CONTROL BLANKET OR EQUAL •P ^' k ■ .� 66 / UOC hOC L, SUBSTITUTE. ■ 2' 1/2"' 18 ��-I�� 13. STORM PIPE DISTANCES SHOWN ARE TO THE CENTER OF HERB ERB '� �77 �" 70 THE BOX FOR ALL STRUCTURES UNLESS OTHERWISE NOTED. 14. ALL STORM PIPE TO BE CLASS III RCP UNLESS OTHERWISE -.. NOTED. '" f J ROAD C 18 ��9 I 15. DRAINAGE SYSTEMS AND ASSOCIATED EASEMENTS OUTSIDE /� / ( U %, 1�8 OF NCDOT R/W TO BE MAINTAINED BY HOA. 50' R/W P BLIC) I O O / �� L ❑ CV ^°' f o CONSTRUCTION SEQUENCE ■; i ■ p 64 63 62 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND O O O O HOLD PRE CONSTRUCTION CONFERENCE. O 2. INSTALL STONE CONSTRUCTION ENTRANCES, TEMPORARY SILT FENCE, AND DIVERSION BERMS WHERE SPECIFIED. — n 13. CONSTRUCTION TEMPORARY SKIMMER & SEDIMENT BASINS. — J 4. CLEAR AND GRUB THE SITE AS NEEDED. 179 `b ' 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO AREAS REMAIN GRASSED. N I r 6. INSTALL TEMPORARY CHECK DAMS IN SWALES AS SHOWN. c� I O 73 7. INSTALL UTILITIES. 0, n 8. INSTALL INLET PROTECTION ON ALL NEW STORM WATER INLETS. - I� 9. PERFORM FINE GRADING. I U 10. INSTALL AND PREPARE BASE COURSE. 11. PAVE ROADWAYS. J 12. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED IiC11 74 13 UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE ALL TEMPORARY MEASURES. h 58 U 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED �" - - Z ��� of o AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND �, . . W o ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. o 15. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL �� � I STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST 180,- 78 p, ; " U'••w..... 75 BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF f If d SAILFISH PLACE 8¢ A f,� o °O TERMINATION (NOT). THE NOT IS AVAILABLE AT: --177� 175 -.. ;, o°• l' 50 R/W (PUBLIC) �' HTTPS: //EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION. ",..:..,"179 �� PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT V a4� MUST BE UPLOADED AS PAT OF COMPLETING THE NOTICE ( ,R CQ� ' I OF TERMINATION PROCESS. 1 w O r' J 76 / N 442,326.554 f r e. E 1,974,539.510 d6 U NC GRID NAD 83 T D _j (2011) ' co)L), 1 _ o 56 55 oO l Q) fig■■�■■�■■�■■� I I 183 _ 182 ^� I 00 o I �I 39 40 41 42 O f I I 7 I%11r- J . Lbw 183 � LOC 'J 185 184� 18 182 art- 0 44 J 25 J r O n I o o O Si f ERe `� 23 24 � ..,,. ..,. 45 � � � 48 ' 47 46 � 81 aee. GROUND STABILIZATION CHART . ; o J ` J SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2: 1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) '8� 22 OE _ U ., ECM , �. n 1 / a INV ■ ,,.w. Ol OOl �. 001.E 180.06 , , gy ,� „, ,, R �OAD> �LO L Know a .: 60' PUBLIC R/W .................. o0 _ _ what'sW. � Call before ig.--- -- -- -- -- -- -- -- you ERB TBM I INV EIP 4D DISK #1 179.52 N 441,505.605 E 1,975,913.607 ■ ELEV 187.80 ❑ ■ ❑ NC GRID NAD 83 I (2011) GRAPHIC SCALE NAVD 88 ■ 100 0 50 100 200 ■ I ( IN FEET ) ■ ■ 1 inch = 100 ft. I THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 400 11 IIII ■ SolutuonS ciD s im t e vil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com SEA 0274 111111111► REVISIONS PROJECT NAME GRACELAND SUBDIVISION OVERALL GRADING AND EROSION CONTROL PLAN CLIENT CHRIS PARKER PO Box 531 Parkton, North Carolina 28371 Phone: (910) 850-3437 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1656 DRAWING SCALE HORIZONTAL: 1 "=100' DATE RELEASED SEPTEMBER 30, 2021 SHEET NUMBER C-3mO N/F BOBBY L. McDOWELL DB 122, PG 358 1) O DIVERSION BERM TO BE SEEDED WITHIN 7 DAYS (TYP) )C Lt3C LOE DI�F DI�F D 1 1 �1 �1 r 1 1 l;. TEMPORARY SKIMMER BASIN #3I 1 L=70', W=30', D=3' 1 SIDE SLOPES= 2:1 TOP OF BASIN: 174.50' D BOTTOM OF BASIN: 171.50' n 10' EMERGENCY SPILLWAY: 173.50' _ INVERT OF SKIMMER: 171.50' SIDE SLOPES OF BASIN ARE TO z BE SEEDED WITHIN SEVEN DAYS. m **ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) 1 WITH 1.0" ORIFICE FOR DEWATERING THE SEDIMENT BASIN DURING CONSTRUCTION. I cn m "-� RIP RAP cy� ' L=10' W=5'/10' I Dw--8" DMNr-12" fm CLASS B 18" THICK �DlDlv- Dlv" fll DI F " LeefSF oC r 186.07 186 �5.44 lg lg 180 17g"? s 4 2s.00 LF 0.50% 18' RCP 182 EMILY LANE 181 N 50' R/W (PUBLIC) 26.00 LF @ 0.50% 18" RCP RIP RAP DISSIPATER 185.66 185.44 184.42 179.45 178.98 ��.. L=9' W=4.5'/10.5' 184.54 179.22 HP CI-47 CI-58 HP Dw=8" DrA:=12' , CLASS B 18" THICK �� OQ� �♦ o 184.44 /� 001.-. �� ` Z.-..�01.-..�Ol.�.00�..-.0(..-..1.. 291"-"" ^OR-0 ��- 1179�01 �7" 1 ���- .. -QOL .. aQ1-.. - ..�.. - .. a01.. - .. O. �'1 -00� - .00� - :� .. �) CI 70P. 100.00 LF @ 0.50% 18" RCP FES 72� ' l 184.44 185.92 �� o" (DOUBLE) . e 10' UTILITY 00 20' DRAINAGE EASEMENT 0 N/F J 187.81 ^ / EASEMENT 00 A 26.00 LF @ 0.50% 18" RCP � -mo b M V o D i r IA14 �� �S - -- DAVID MICHAEL THOMPSON &WIFE I. c� c� s ROBBIE FUMAROLA HP / / I �r I I o o) I I o o) DI o I 3 001 001 p01 001 - DITCH FO DB 252, PG 135 / I ) c> J I TO BE REINFORCED '''. LU I o WITH NAG S75 MATTIN I J J m LU U Tl 10' UTILITY rJ IMMEDIATELY UPON CONSTRUC' I D �J o 0 0` I I of I o m I m cl EASEMENT O STAPLE PATTERN D J / J L� O O i I cn o- I I c� d- �I I N a ,ram O o�Wo. o m 0 CJ I J ) (jam J I Z �r r, SF ,,,. � J 0 �o . 0 I o p l- p" (U FES-48 z J o J z I ,� 29 I y�r 30 31 0 32 33 I < w� 10' UTILITY I" 28 O cal O O FES-59 0 O c� Q EASEMENT ! W I m n 'r% n O 1 V �� QZ RIP RAP DISSIPATER %����,; �" �, o : 0 1 Uj Z - L=9' W=4.5'/10.5' W RIP RAP DISSIPATER , RAP DISSIPATER Iv>n TEMPORARY SEDIMENT BASIN #4 I o c� r- "' LU � I I L m I L=9' W=4.5' 10.5' I 2 _9' W=4.5' 10.5' I 07 L=205' W=50' D=4.5' o '�' o CI Y CI-44 �� Dw=8" DMA,�12 I I / c� �RLI� / - _ 1 J Ql0 J I CLASS B 18" THICK c m Dw=8" DNA,�12" o r Dw=8" DMA1=12" SIDE SLOPES= 2:1 1ERB Q 16 V �✓ FES-52 �00 -zi" CCLASS B 18" THICK J (CLASS B 18" THICK o TOP OF BASIN: 179.00' �. �. 26.00 LF @ 0.50% 18" RCP ;, DITCH #110r BOTTOM OF BASIN: 174.50' I 0 26.00 LF @ 0.50% 18" RCP TO BE SEEDED o DITCH #12 15' EMERGENCY SPILLWAY: 173.50' c� o r 'u a I I I o cv o DITCH #18 WITHIN 7 DAYS I TO BE SEEDED I I v_ . TOP OF RISER: 177.50 I0 CHECK DAM -� � � `- TO BE SEEDED ��� � WITHIN 7 DAYS � o. � I '� INVERT OF SKIMMER: 174.50' ' WITH WEIR WITHIN 7 DAYS of J on o ��`" SIDE SLOPES OF BASIN ARE TO TYP J o I " II r BE SEEDED WITHIN SEVEN DAYS. N "AT TACH ATTACH A 2.0" FAIRCLOTH SKIMMER (OR EQUAL) 1 0Ij I I o WITH 1.8" ORIFICE FOR DEWATERING THE11 0 ' L 0 I DITCH 13 < J C) l ter` i nr v am # I I o SEDIMENT BASIN DURING CONSTRUCTION. LOC Lp�20' DRAINAGE EASEMENTo o TO BE REINFORCED c� 185RA RIP RAP DISSIPATER I WITH NAG S75 MATTING I I DITCH #14 L=9' W=4.5'/10.5' �C LOC T, LaC, LOC LOC LOC J LOC LO STAPLE PATTERN D USE NC TO BE REINFORCED ., LOC L LOC LOC LOC 182 I 81 LOC LOC LO 18a L 1 _ HW 838.01 Dw=8 DMAx-12 1so WITH NAG S75 MATTING ♦ CLASS B 18 THICK ,:. 30 DRAINAGE EASEMENT 1so I 17 STAPLE PATTERN D 1 1 177 176 17 0. LEGEND. LF INV. 174.50;, 30 RAINAGE E 637 RCP PO 75 i Ecl� ECM -EXISTING CONCRETE MONUMENT MATCH LINE - SEE SHEET C-3.3 ` 0EIP-EXISTING IRON PIPE EIP ......",,� EIR Oa EIR-EXISTING IRON ROD *ALL STORM PIPE TO BE CLASS III RCP UNLESS OTHERWISE NOTED. ERBO ERB-EXISTING REBAR c COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE - oPL - - - OLD PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY SETBACK LINE So STORM DRAINAGE tick, w WATER LINE � TREE LINE 9p, 210MAJOR CONTOUR ��20 207 MINOR CONTOUR �J O , x 208.47' SPOT ELEVATION � BENCHMARK _ 0 SIGN � � sic" 77 M� MAILBOX CO ❑T TELEPHONE PEDESTAL S C3.2 ) FIRE HYDRANT No,L�O GRAPHIC SCALE ASPHALT 40 0 20 40 80 WETLANDS %, Know what's below. SURFACE WATER 0 C3.3 �m��� Call before you dig. C3.4 ) - LOC- LOC- LIMITS OF CONSTRUCTION ( IN FEET 1 inch = 40 ft. - SF - SF ILFENCELIN -.N -.N -JUTE NETTING SHEET KEY - Dlv - Dry - DIVERSION BERM 0INLET PROTECTION THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 160 11 iiii solutions D Is im t e e�ivil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com IIOAR9 �% Q'.• ss •. 1. • 4� SEA • 0274 //'0 1 1111g���``` REVISIONS PROJECT NAME GRACELAND SUBDIVISION DETAILED GRADING AND EROSION CONTROL PLAN CLIENT CHRIS PARKER PO Box 531 Parkton North Carolina 28371 Phone: (910) 850-3437 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1656 DRAWING SCALE HORIZONTAL: 1 "=40' DATE RELEASED SEPTEMBER 30, 2021 SHEET NUMBER O ` 1 2 TEMPORARY SKIMMER BASIN �� ^ r a�Re� RIP RA3 DISSIP3ATER SIDE SLOPES- 2.1 -° TOP OF BASIN: 175.00' - _ / /�, p 8" Drex=12" �;r- ` BOTTOM OF BASIN: 172.00' so= - 10' EMERGENCY SPILLWAY: 174.00' sr CLASS B 18" THICK INVERT OF SKIMMER: 172.00' OOl" 00,1 SIDE SLOPES OF BASIN ARE TO BE SEEDED WITHIN SEVEN DAYS. .00 // "ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) 0 J a �5° WITH 1.1" ORIFICE FOR DEWATERING THE / \ j /' SEDIMENT BASIN DURING CONSTRUCTION. n rA,/ "c % h ci) ,, yp DITCH #6 \ / TO BE REINFORCED ,/ ,,r' WITH NAG S75 MATTING ^,r ^" 1 /2, r% IMMEDIATELY UPON CONSTRUCTIONER STAPLE PATTERN D � RIP RAP DISSIPATER/ L=9' W=4.5/10.5' RA RIP 12Dso=8Dreg ?L=10 W=5 10' /f/f/ CLASS B 18" THICK Dso=8" Dr 12' SF SF-7 \ cn SILT FENCE ' OUTLET (TYP) -n RIP RAP DISSIPATER r L=3' W=1 /3' STOCKPILE Dso=8" D-12" In AREA ` CLASS B 18" THICK _n rn �C TEMPORARY SKIMMER BASIN #1 - L=100', W=50', D=3' ^� SIDE SLOPES= 2:1 l SILT FENCE C 8' CK ^`O TOP OF BASIN: 173.00 (TYP) o�J , g r TH G,� �' LASS I 66 LIMITS OF CONSTRUCTION -' FES 21 3P VO 10' EMERGENBOTTOM CCY SPILLWAY: 01072.00' ,' DIVERSION BERM 20' DRAINAGE - C� 15.2 AC 0 INVERT OF SKIMMER: 170.00' �' ( ) � TO BE SEEDED EASEMENT , a � , � L 3 WITHIN 7 DAYS (TYP) SIDE SLOPES OF BASIN ARE TO 1 Re �J BE SEEDED WITHIN SEVEN DAYS. ' ��ao O� INLET � o "ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) a 1 /2" 177 i ""° WITH 1.0" ORIFICE FOR DEWATERING THE ERe PROTECT ��ION CONSTRUCTION. _ O J � � \ SEDIMENT BASIN DURING CONS cj 0 0�7 DI11'D DIV �� 177.28 DITCH #22 180.07 - - - r - a „ - �� TO BE REINFORCED .. �,,, 26.00 LF @ 0.54% 18" RCP 177.82 WITH NAG S75 MATTING HP "" IMMEDIATELY UPON CONSTRUCTION , 7 7�9 177.71 I„ STAPLE PATTERN D /r,� a 179.89 � ROAD C �... k �8r �80 >>8 CI-19 . ° 1.2/ . HP8� 177.71< L,... ... ] � CI-18 ' 180.07 (DOUBLI p„ 17 00 LF C� 5.44% 15 RCP • �n DI-17 LOC LO JC LOC 4l(DOUBLE) " NAG S75 MATTING TTI N t, 30' VEGET/ATED) 1 a` BUFFER OC'�_ v ' I 0 I / I �I Co O rl U LOC , / RIP RAP DISSIPATER SF L= 3, W=1 3 l � I I LLJ D-8" p-12" z ^ CLASS „B 18" THICK" O Ou t LLJ LLJ DITCH #23 0 0 �.,,,.,. TO BE REINFORCED � " `6. w WITH NAG S75 MATTING D IMMEDIATELY UPON CONSTRUCTION D z �� `b ✓ STAPLE PATTERN D "M J Z D r CHECK DAM ! Jp� � NTH WEIR ''' j� (TYP Lz a� o fi 6% DITCH #5 ' �,.�' TO BE REINFORCED �0 ' J©� NTH NAG S75 MATTING V `IMMEDIATELY UPON CONSTRUCTION o" STAPLE PATTERN D r ION .,� ,,,-'� G d ' �+ O �" ".,. " �0 0 ��' RIP RAP DISSIPATER N \L=7.5' W=3.75' 8.8' �� '�� / RIP RAP DISSIPATER I G Dso= .. Dre>r12' L=9' W=4.5' 10.5' 8 o O CLASS B 18" THICK / �. P �8� , , ", Dso=8" Dr12" M a, CLASS B 18" THICK n 25 LF RIP JIj FES-15 ` I RAP D -10" TO BE INSTALLED 'IMMEDIATELY UPON SS \�� �A9� 00 a ti CONSTRUCTION 2 - Of v 58 0 9c . 4Q 1 DITCH #16 ..... �.... ..� ..�... - � � � 'Lj.. �� � TO BE REINFORCED ems•. pV � TH NAG S75 MATTING , � WI�. 24" RCP ��" IMMEDIATELY UPON CONSTRUCTION \.' ♦ oo )j a" J 0] o� J L LL Z aLO I I I I I I � E-2 O of 0 J r U 0 0 I J 72 ' U U J DITI H #21 TO BE SEEDED WITHIN 7 DAYS L O J 0 73 J U O J 0 O 5 X5' CONCRETE SPLASH PAD 0 74 10' UTILITY EASEMENT O ' J J /r M I p STAPLE PATTERN D C� 1.5% MIN " "� n �, i..� t� �� OOT.O� .. — .. 0 0 183.37 I J l / �CI-27 183.10 is �S �S �S i < / LP ` � 183.52 RIP RAP DISSIPATER KI 0 75 L=16' W=6'/18' �:;, I� �. �84 �184.05 184 ICI-14 183.75 - - - - p= -•• I .,.,,.I I 1 10' UTILITY EASEMENT a 0 -6QC LOX �C / U 0 J U � O Co 0 J I L MATCH LINE — SEE SHEET C-3.4 N 442,326.554 E 1,974,539.510 1'- NC GRID NAD 83 *ALL STORM PIPE TO BE CLASS III RCP UNLESS OTHERWISE NOTED. tic's Rips... ya 8 3�2o,J LEGEND: ECMZ ECM -EXISTING CONCRETE MONUMENT EIP (0 EIP-EXISTING IRON PIPE EIR Oa EIR-EXISTING IRON ROD ERBO ERB-EXISTING REBAR o COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE — OPT — — —OLD PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY - — — — -SETBACK LINE So STORM DRAINAGE w WATER LINE TREE LINE 210 MAJOR CONTOUR 207 MINOR CONTOUR x 208.47' SPOT ELEVATION BENCHMARK IsEl SIGN MAILBOX ❑T TELEPHONE PEDESTAL AFIRE HYDRANT ASPHALT 0 WETLANDS SURFACE WATER — Loc— Loc— LIMITS OF CONSTRUCTION — sF — sF —SILT FENCE LINE — JN — JN —JUTE NETTING — Dlv — Dry — DIVERSION BERM 0INLET PROTECTION SHEET KEY Know what's below. Call before you dig. GRAPHIC SCALE 40 0 20 40 80 160 ( IN FEET ) 1 inch = 40 ft. THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 41111DSUN I' I sol utions e�ivil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com IIOAR9 310�•;`9� SEA 0274 ••......• 0�-30-2/ REVISIONS PROJECT NAME GRACELAND SUBDIVISION DETAILED GRADING AND EROSION CONTROL PLAN CLIENT CHRIS PARKER PO Box 531 Parkton, North Carolina 28371 Phone: (910) 850-3437 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1656 DRAWING SCALE HORIZONTAL: 1 "=40' DATE RELEASED SEPTEMBER 30, 2021 SHEET NUMBER C-302 O DITCH #1 DI-39 o HOC= LOC" 1 co"', f-%3s.s7 LOCH 2.26 'L b' RCP LO C r TO BE SEEDED I WITHIN 7 DAYS • �I-3s MATCH LINE — SEE SHEET C-3.1 c� (DOUBLE) l I l ri_d� FES-43: 78 11 iiii D s im t e e iviso. gnI land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com IICAR9 �% • 4� SEA • 0274 REVISIONS PROJECT NAME GRACELAND SUBDIVISION DETAILED GRADING AND EROSION CONTROL PLAN CLIENT CHRIS PARKER PO Box 531 Parkton, North Carolina 28371 Phone: (910) 850-3437 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1656 IMR/0111908 I I I I I I11111Ilmllllllllllllllllllllllll DRAWING SCALE HORIZONTAL: 1 "=40' 11I1I1IIIIIIIIIIIIIIIIIIIIIIIII DATE RELEASED SEPTEMBER 30, 2021 11I1I1IIIIIIIIIIIIIIIIIIIIIIIII SHEET NUMBER C-3m3 MATCH LINE — SEE SHEET C-3.2 iiii■ iiii■ ■�� iiii■ i■). o IIPY � s RIP RAP DISSIPATER TEMPORARY SKIMMER BASIN #2 L=3' W=1 /3' L=70'. W=30', D=3' D� 8" D�� 12" SIDE SLOPES= 2:1 � 0 TOP OF BASIN: 1 4 50' i CLASS B 18 THICK 8 (� ;J� BOTTOM OF BASIN: 181.50' Cn n 10' EMERGENCY SPILLWAY: 183.50' DITCH F15 INVERT OF SKIMMER: 181,50' TO BE REIN ORCED SIDE SLOPES OF BASIN ARE TO WITH NAG S75 MATTING C l ;�, a) BE SEEDED WITHIN SEVEN DAYS, STAPLE PATTERN D " 06 **ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) U)� WITH 0.8" ORIFICE FOR DEWATERING THE r '�) SEDIMENT BASIN DURING CONSTRI lcTlnry o11 � °' RIP RAP DISSIPATER L=9' W=4.5'/10.5' NDITCH #4 ' Dw=8" DwAx=12" i 7a.,, `�• TO BE REINFORCED„CLASS B 18" THICK �? WITH NAG S75 MATTING 8Q IMMEDIATELY UPON CONSTRUCTION 'N STAPLE PATTERN D� , FES-25" O� 1f lig. DIVERSION BERI i" 50 o� oo TO BE SEEDEI i 9`SF,'WITHIN 7 DAYS (TYP OS �........ �® �To o 59 IrIQ o�,� i CI-24 DOUBLE 186.43 LP r fw ,b11.86.76 olINLET PROTECTION,. L (TYP) 10 or 10' UTILITY EASEMENT LLJ N/F Al z ELAND DEVELOPMENT, INC." �� �, 49 LIMITS OF CONSTRUCTION U 1 DB 1327, PG 939 (15.2 AC) PB 4141, PG 8 %. L ' w 30' VEGETATED - Un J r � BUFFER�� 1 1 i y � r 1 a f r � u o% 1 a' i INV ., ,. ' r y 180.06 u b I I �I I 52 53 � O 1 . II F' �I r �I �J SILT FENCE (TYP) A . �_..�Q—.. ...—. — — a\ l� AIa Al A10� 0 A10 CCAYDEN PLACE / �9 50' R/W (PUBLIC) vim..—..LaC G� r 0 t7 10'X70' SIGHT TRAINGLE INV 190 95 192 � 192 inn— '_._ _-_ ✓1 HP a" J m 0 � J W � L z Of W p aLn TAT T� ' U 0 ,.. J DITCH #20 TO BE REINFORCED WITH NAG S75 MATTING STAPLE PATTERN D 0 J 5'X5' CONCRETE SPLASH PAD �. 11 0 ' J I o I I Q I U N o l ASS OO�IV RCP'LOC , M 1/2" EIP N /F DANIELS. SNAVE & WIFE, ELIZABETH A. SNAVE DB 993, PG 691 INV _ ---�- 5/8" 179.52 _ �_ _ - — - ERB -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- � 1 1. EIP 1 1 1 *ALL STORM PIPE TO BE CLASS III 1 RCP UNLESS OTHERWISE NOTED. 1 1 I LEGEND: ECMZ ECM -EXISTING CONCRETE MONUMENT 210 MAJOR CONTOUR EIP O EIP-EXISTING IRON PIPE 207 MINOR CONTOUR EIR Oa EIR-EXISTING IRON ROD x 208.47' SPOT ELEVATION cQip ERGO ERB-EXISTING REBAR BENCHMARK a COMPUTED POINT SIGN SIGN 3(10 N/F - NOW OR FORMERLY M� MAILBOX �� ,� • R/W - RIGHT OF WAY ❑T TELEPHONE PEDESTAL PROPERTY LINE AFIRE HYDRANT, Cl) C3'1 C3.2 —oPL— — —OLD PROPERTY LINE ASPHALT m © GRAPHIC SCALE ADJACENT PROPERTY LINE 0 WETLANDS CO - - RIGHT-OF-WAY A0 ao 0 20 ao ao 160 � SURFACE WATER SN01 1-C3.3 - -SETBACK LINE—Loc—Loc— LIMITS OF CONSTRUCTION �'��KnOW what's beI0V1/. SD STORM DRAINAGE —sr —5F —SILT FENCE LINE Call before OU CiI ( IN FEET ) Y 9 w WATER LINE — aN — dN —JUTE NETTING = TREE LINE — ow — ow — DIVERSION BERM 1 inch 40 ft. 0INLET PROTECTION SHEET KEY THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 11 IIII solutions D Is im t e e ivil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME GRACELAND SUBDIVISION DETAILED GRADING AND EROSION CONTROL PLAN CLIENT CHRIS PARKER PO Box 531 Parkton, North Carolina 28371 Phone: (910) 850-3437 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1656 DRAWING SCALE HORIZONTAL: 1 "=40' DATE RELEASED SEPTEMBER 30, 2021 SHEET NUMBER C-304