Loading...
HomeMy WebLinkAboutSW6210601_Design Calculations (Culvert 3)_20211008Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, May 27 2021 PIPE 3 Invert Elev Dn (ft) = 190.95 Calculations Pipe Length (ft) = 74.00 Qmin (cfs) = 1.13 Slope (%) = 1.76 Qmax (cfs) = 1.13 Invert Elev Up (ft) = 192.25 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 1.13 No. Barrels = 1 Qpipe (cfs) = 1.13 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 0.96 Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) = 3.02 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) = 191.90 HGL Up (ft) = 192.65 Embankment Hw Elev (ft) = 192.78 Top Elevation (ft) = 194.79 Hw/D (ft) = 0.35 Top Width (ft) = 47.00 Flow Regime = Inlet Control Crest Width (ft) = 10.00 eer (t) 195.00 194A0 193.00 192.00 191 AO 190.00 PIPE 3 H a Depth (x) 2.75 1.75 075 -025 -125 -225 109A0 i i i i i i i i i i i i i i i i i i i i-3.25 0 5 115 225 335 4� 45 5� 55 s0 85 7 75 885 ..,. a Circular Culvert HGL Embank Reach Iftl