HomeMy WebLinkAboutNC0025321_DWI Funding Approval_20210921ROY COOPER Governor ELIZABETH S. BISER secretary SHADIESKAF Director Mr. Rob Hites, Town Manager Town of Waynesville PO Box 100 Waynesville, NC 28786 Dear Mr. Hites: NORTH CAROLINA Environmental Quality September 21, 2021 Subject: Plans and Specifications Funding Approval Town of Waynesville Wastewater Treatment Plant Improvements Phase I Project No. CS370930-01 The Division of Water Infrastructure (Division) has concluded its review of the project construction plans and specifications for the subject project. Based on this review, the Division has determined that the project is eligible for funding as follows: Eligible Demolition of existing headworks and two (2) primary clarifiers; installation of 24" parshall flume; replacement of headworks structure to include dual mechanical bar screens and a grit removal system each rated for 15 MGD at peak hourly flow; installation of three (3) 7.5 MGD primary disc filters, an influent pump station consisting of four (4) 3,472 GPM pumps with VFDs, and an electricaliblower building with four (4) 2,330 SUM blowers; rehabilitation of aeration basins to replace aeration assembly with fine bubble disc diffusers; installation of two (2) 100 foot diameter, 15 foot side -water depth secondary clarifiers and scum transfer pump station consisting of two (2) 30 GPM pumps; repurposing the intermediate pump station to RAS/WAS pump station to include two (2) 520 GPM WAS pumps on VFDs, and blower building to chemical feed facility to include installation of two (2) 4,000 gallon sodium hypochlorite and two (2) 500 gallon sodium bisulfite storage tanks, two (2) 40 GPH sodium hypochlorite metering pumps, two (2) 10 GPH sodium bisulfite metering pumps, and two (2) 50 GPM sodium hypochlorite recirculation pumps; modifications of chlorine contact basins to convert gas disinfection system to liquid system; installation of effluent reuse pump station to include two (2) 750 GPM pumps; installation of primary sludge pump station with two (2) 225 GPM primary sludge pumps; rehabilitation of gravity sludge thickeners to replace sludge thickening equipment, influent feed well, bridges, walkway, handrail, scum baffle, DEQ�� North Carolina Department of Environmental Quality I Division of Water Infrastructure 512 N. Salisbury Street 11633 Mail Service Center I Raleigh, North Carolina 27699-1633 MMiiHCAIpLWA o.nwoMi siun,onms.oia�,r� /"� 919.707.9160 Mr. Rob Hites, Town Manager September 21, 2021 Page 2 of 4 scraper cone; installation of one (1) 1000 gallon scum holding tank, replacement of belt filter press with one (1) 2-meter belt filter press rated for 2,000 dry pounds per hour, installation of septage receiving station with manual rake bar screen and two (2) 30 GPM grinder pumps; replacement of two (2) 600 kW backup generators; electrical, controls, valves, vaults, yard piping and associated appurtenances. Alternate Bid Demolition of RAS/WAS pump station and chlorine storage building; recoating pumps and piping in intermediate pump station, sludge handling building and aeration splitter box; improvements of lime stabilization system within sludge handling building to include replacement of thermo blender and rehabilitation of conveyor; installation of metal roof for blower building and primary filtration building. Note: The funding eligibility of primary disc filters was previously determined. Procurement documents for these items are reviewed and approved separately in an email dated August It, 2021. Non Eligible Spare parts, service contracts, maintenance contracts, and extended warranties. Change orders caused by subsurface conditions that could have been reasonably discovered as part of an investigation may not be eligible for funding. Please note that funding is contingent on meeting the schedule provided in your Letter of Intent to Fund, or approved extension, as tabulated below: Milestone Date Advertise Project, Receive Bids, Submit Bid December 16, 2021 Information, and Receive Authority To Award Execute Construction Contract(s) March 16, 2022 Submit any addenda for the subiect project plans and specifications no less than seven days before the bid opening. You must receive all encroachments and permit approvals prior to opening bids. Attached is one copy of the Project Bid Information Form. The form must be submitted to your assigned DWI, Grant Management Unit (GMU) project manager. Contact Mark Hubbard if you do not know who your GMU project manager is. Upon review and approval of this information, the Division will authorize you to make the proposed award by issuing the Authority to Award. Do not proceed with construction until you have received the Authority to Award. Mr. Rob Hites, Town Manager September 21, 2021 Page 3 of 4 If the bids received exceed the amount established through the funding offer, and local funds are not adequate to award contract(s), it will be necessary to consider all alternatives including bid negotiations, requesting additional funds, redesign, and rebidding. You must consult with the Division prior to rejecting all bids. If additional funds are required to complete a project, they may be provided with a loan or increase. Change order eligibility will be limited to those items necessary to complete the scope of work in the executed contract. You must comply with all applicable SRF requirements included in the approved bid documents. Please note the following Davis -Bacon requirements: 1. If a new wage determination becomes available ten or more days before bid opening, you must issue an addendum incorporating it into the bid documents. 2. If it takes longer than 90 days to execute contracts and the wage determination changes, then you must incorporate the new wage determination into the contract. Projects funded through the CWSRF program must comply with the federal Brooks Act for the selection of architectural, surveying, and engineering services. CWSRF projects cannot be exempted from qualification based selection of these services under N.C.G.S. 143-64.32. You must submit the Professional Engineering Services Procurement Certification on our website to document compliance for any services to be reimbursed. Any services that were not selected in compliance with federal requirements are not eligible for reimbursement. Neither the State nor Federal Government, nor any of its departments, agencies or employees is or will be a party to the invitation to bids, addenda, any resulting contracts or contract negotiations/changes. Attached is one set of the final approved plans and specifications to you. One set of plans and specifications identical to the approved set must be available at the project site at all times. The Division Construction Manager assigned to this project is Matthew B. Rushing, who can be reached by phone at (919) 707-9060 or by email at matthew.rushing@ncdenr.gov. Please contact him to schedule the preconstruction meeting. If you have any questions, please contact Trupti Desai, PE by phone at (919) 707-9166 or by email at trupti.desai@ncdenr.gov. Sincerely, ate-// 1 Gam_ Ken Pohlig, PE, Supervisor Wastewater Projects Unit Attachments: Approved Plans and Specifications Project Bid Information Form Mr. Rob Hites, Town Manager September 21, 2021 Page 4 of 4 cc: MIChen, PE, McGill Associates, PA, Asheville, NC Ken Pohlig, PE, (via email) Mark Hubbard, PE (via email) Trupti Desai, PE (via email) Matthew Rushing (via email) SRF File (PS/PSAL)