HomeMy WebLinkAboutNCC215583_Site Plan or Location Map_20211012E
cb
N
0
0
INDEX OF SHEETS
Cover Sheet
1
General Notes and Standards
2
Storm Drainage Structure Table
3A-3C
Typical Sections and Details
4
Plan and Profile
5-7
Omitted
8
Plan and Profile
9-17
Omitted
18
Plan and Profile
19-29
Channel Design (Wildlands)
CI-05
Omitted
C6
Channel Design (Wildlands)
C7-C12
Details
DI-D12, D14-D17
Headwall Grading
D13
Erosion Control Plans
EC1-EC10
Water and Sewer Permits
UTA
Sewer Relocation Plan/Profile
U1-U6
Traffic Control Plans
TCP1
Pavement Plan
PPI-PP2
Sidewalk Ramp Design
CDOT1-CDOT2
TOTAL SHEETS 80
SURVEY PREPARED BY:
EXISTING CONDITIONS TAKEN FROM GROUND SURVEY BY
SURVEY AND MAPPING CONTROL, INC.
ESTABLISHED BY: NCGS MONUMENT OR CONTROL POINT
WITH NAD 83(2011) STATE PLANE COORDINATES.
VERTICAL DATUM: NAVD 88
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL
DISTANCES. DATE OF SURVEY: 2/25/2013
PLANS PREPARED BY:
.Armstrong C�Cen, P.C.
9731—L Southern Pine Boulevard
P.O. Box 7326
Charlotte, NC 28241
Phone: 704-529-0345
Fax: 704-529-0493
VICINITY MAP
NTS
_-------------
O
7
PLAN/PROFILE-STORM DRAIN
r----1
CHANNEL DESIGN (C SHEETS)
L__J
1
Charlotte -Mecklenburg
iervices
CHARLOTTEM
ENGINEERING & PROPERTY
MANAGEMENT
Construction Plans of Proposed
iinsdale-Tinkerbell Storm Drainage
J
Improvement Project
Project No. 671-12-015
Project Features
Storm Drain, Utility Relocation, Curb & Gutter,
Sidewalk, Asphalt Paving, Stream Stabilization Features,
and Traffic Control
I oribTYr Y ra1►lmuk i AWE
3U'A]Lr.: I'' = 4uu'
NOTE: SHEET 8,18 AND C6 HAS BEEN OMITTED FROM SET
GRAPHIC SCALES
20 40 60
Plan View .................
20 40 60
Horz. Profile ............
Vert. Profile .............
0
PE SEAL
Record Drawings
CONTAINS SENSITIVE
UTILITY INFORMATION
DO NOT DUPLICATE
RECOMMENDED
FOR CONSTRUCTION
Contract Administration Eol wa.ro� Maf,,L y 8/2-5/2-02-0, by ew�ai l
Storm Water Construction Loga4-vOUver4113/202-0, by ewta.0
CONVENTIONAL SIGNS
ProposedProperty Line ..................................
Existing Property Line ...................................
Maintained as R/W Line ................................ R
ExistingStructures .........................................
Proposed Edge of Pavement ..........................
Fence.............................................................
ExistingEasement ..........................................
Temporary Construction Easement .............
Proposed Utility Easement ...........................
StormDrainage Easement ............................
SanitarySewer Easement ..............................
ExistingGas Line ........................................... G -
ExistingWater Line ....................................... W -
ExistingSanitary Sewer ................................ SS -
Existing Underground Telecommunications
Existing Overhead Telecommunications ...... oT -
11
E
e
PUE
SDE
SSE
UT
G
W
SS
GT
Existing Underground Electric ..................... UE
Proposed Limits Of Disturbance .................. LOD
Existing Storm Drainage
ProposedStorm Drainage .............................
Proposed Handrail
Existing Overhead Electric .......................... of
of
Proposed Sanitary Sewer SS
SS
PipeRemoval ................................................
Proposed High Hazard Silt Fence ...............
StormDrainage Plug ....................................
Proposed Guardrail M
SiltFence ....................................................... SF --AN-SF All— SF 11—
Special Sediment Control Fence ..................
TreeProtection................................................................................
ExistingTree...........................................................................................4
ExistingWater Meter.............................................................................
WM
❑
ExistingWater Valve.............................................................................
WV
>a
ExistingGas Valve.................................................................................
GV
>a
ExistingSanitary Sewer Manhole .........................................................
S
S
Proposed Sanitary Sewer Manhole
ExistingStorm Drain Manhole..............................................................
ProposedStorm Drain Manhole...........................................................
ProposedWater Meter...........................................................................
❑
ExistingCatch Basin..............................................................................
ProposedCatch Basin........................................................................... B
ProposedJunction Box.........................................................................0
ExistingLight Pole.................................................................................
.
ExistingUtility Pole................................................................................
.a
GuyWire............................................................................................
ProposedUtility Pole...............................................................................W
IronPin....................................................................................................
OO
ExistingFire Hydrant............................................................................ . 6-
ExistingDrop Inlet..................................................................................0
Proposed Drop Inlet................................................................................ El
AccessibleRamp................................................................................... ACc
Proposed Curb & Gutter, Conc. Drive, Sidewalk ...................
lob
ProposedAsphalt Pavement........................................................
ProposedRip Rap Ditch..............................................................
0 0
ProposedGravel...........................................................................
o 0
ProposedPavement Removal ......................................................
Proposed Sidewalk Bridging Tree Roots ..................................
Landscape Management Craig Mo*wo-e,411s/z02-0, bq uwaU
Utility Coordinator Ta4e 05,1;), vo e, 10/13/2020, I,,y ewla•U
CDOT - Design Erivv Praft-4115/z02-0, bq ewLaU CHARLOTTE,.
CDOT - Implementation 13UL Greer 4115/2-02-0, by uma.i,(, ENGINEERING & PROPERTY
MANAGEMENT
Charlotte Water 6 L Deal, q/3/2020, lyy evLo-U
Storm Water Project Manager
Bid Set No.
JO+L*v Kukv. 8/25/2020 APPROVED bq &mv-Lt
Eri vv SkaM�ge - 8/25/2A2A, bq ew-& STORM WATER SERVICES
10/0q/2020
DATE
License #: C-1856
NCDOT 2018 STANDARD SPECIFICATIONS
Cross Section ...........
Water Quality