Loading...
HomeMy WebLinkAboutNCC215583_Site Plan or Location Map_20211012E cb N 0 0 INDEX OF SHEETS Cover Sheet 1 General Notes and Standards 2 Storm Drainage Structure Table 3A-3C Typical Sections and Details 4 Plan and Profile 5-7 Omitted 8 Plan and Profile 9-17 Omitted 18 Plan and Profile 19-29 Channel Design (Wildlands) CI-05 Omitted C6 Channel Design (Wildlands) C7-C12 Details DI-D12, D14-D17 Headwall Grading D13 Erosion Control Plans EC1-EC10 Water and Sewer Permits UTA Sewer Relocation Plan/Profile U1-U6 Traffic Control Plans TCP1 Pavement Plan PPI-PP2 Sidewalk Ramp Design CDOT1-CDOT2 TOTAL SHEETS 80 SURVEY PREPARED BY: EXISTING CONDITIONS TAKEN FROM GROUND SURVEY BY SURVEY AND MAPPING CONTROL, INC. ESTABLISHED BY: NCGS MONUMENT OR CONTROL POINT WITH NAD 83(2011) STATE PLANE COORDINATES. VERTICAL DATUM: NAVD 88 ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES. DATE OF SURVEY: 2/25/2013 PLANS PREPARED BY: .Armstrong C�Cen, P.C. 9731—L Southern Pine Boulevard P.O. Box 7326 Charlotte, NC 28241 Phone: 704-529-0345 Fax: 704-529-0493 VICINITY MAP NTS _------------- O 7 PLAN/PROFILE-STORM DRAIN r----1 CHANNEL DESIGN (C SHEETS) L__J 1 Charlotte -Mecklenburg iervices CHARLOTTEM ENGINEERING & PROPERTY MANAGEMENT Construction Plans of Proposed iinsdale-Tinkerbell Storm Drainage J Improvement Project Project No. 671-12-015 Project Features Storm Drain, Utility Relocation, Curb & Gutter, Sidewalk, Asphalt Paving, Stream Stabilization Features, and Traffic Control I oribTYr Y ra1►lmuk i AWE 3U'A]Lr.: I'' = 4uu' NOTE: SHEET 8,18 AND C6 HAS BEEN OMITTED FROM SET GRAPHIC SCALES 20 40 60 Plan View ................. 20 40 60 Horz. Profile ............ Vert. Profile ............. 0 PE SEAL Record Drawings CONTAINS SENSITIVE UTILITY INFORMATION DO NOT DUPLICATE RECOMMENDED FOR CONSTRUCTION Contract Administration Eol wa.ro� Maf,,L y 8/2-5/2-02-0, by ew�ai l Storm Water Construction Loga4-vOUver4113/202-0, by ewta.0 CONVENTIONAL SIGNS ProposedProperty Line .................................. Existing Property Line ................................... Maintained as R/W Line ................................ R ExistingStructures ......................................... Proposed Edge of Pavement .......................... Fence............................................................. ExistingEasement .......................................... Temporary Construction Easement ............. Proposed Utility Easement ........................... StormDrainage Easement ............................ SanitarySewer Easement .............................. ExistingGas Line ........................................... G - ExistingWater Line ....................................... W - ExistingSanitary Sewer ................................ SS - Existing Underground Telecommunications Existing Overhead Telecommunications ...... oT - 11 E e PUE SDE SSE UT G W SS GT Existing Underground Electric ..................... UE Proposed Limits Of Disturbance .................. LOD Existing Storm Drainage ProposedStorm Drainage ............................. Proposed Handrail Existing Overhead Electric .......................... of of Proposed Sanitary Sewer SS SS PipeRemoval ................................................ Proposed High Hazard Silt Fence ............... StormDrainage Plug .................................... Proposed Guardrail M SiltFence ....................................................... SF --AN-SF All— SF 11— Special Sediment Control Fence .................. TreeProtection................................................................................ ExistingTree...........................................................................................4 ExistingWater Meter............................................................................. WM ❑ ExistingWater Valve............................................................................. WV >a ExistingGas Valve................................................................................. GV >a ExistingSanitary Sewer Manhole ......................................................... S S Proposed Sanitary Sewer Manhole ExistingStorm Drain Manhole.............................................................. ProposedStorm Drain Manhole........................................................... ProposedWater Meter........................................................................... ❑ ExistingCatch Basin.............................................................................. ProposedCatch Basin........................................................................... B ProposedJunction Box.........................................................................0 ExistingLight Pole................................................................................. . ExistingUtility Pole................................................................................ .a GuyWire............................................................................................ ProposedUtility Pole...............................................................................W IronPin.................................................................................................... OO ExistingFire Hydrant............................................................................ . 6- ExistingDrop Inlet..................................................................................0 Proposed Drop Inlet................................................................................ El AccessibleRamp................................................................................... ACc Proposed Curb & Gutter, Conc. Drive, Sidewalk ................... lob ProposedAsphalt Pavement........................................................ ProposedRip Rap Ditch.............................................................. 0 0 ProposedGravel........................................................................... o 0 ProposedPavement Removal ...................................................... Proposed Sidewalk Bridging Tree Roots .................................. Landscape Management Craig Mo*wo-e,411s/z02-0, bq uwaU Utility Coordinator Ta4e 05,1;), vo e, 10/13/2020, I,,y ewla•U CDOT - Design Erivv Praft-4115/z02-0, bq ewLaU CHARLOTTE,. CDOT - Implementation 13UL Greer 4115/2-02-0, by uma.i,(, ENGINEERING & PROPERTY MANAGEMENT Charlotte Water 6 L Deal, q/3/2020, lyy evLo-U Storm Water Project Manager Bid Set No. JO+L*v Kukv. 8/25/2020 APPROVED bq &mv-Lt Eri vv SkaM�ge - 8/25/2A2A, bq ew-& STORM WATER SERVICES 10/0q/2020 DATE License #: C-1856 NCDOT 2018 STANDARD SPECIFICATIONS Cross Section ........... Water Quality