Loading...
HomeMy WebLinkAboutSWA000115_Application Form_20211007 DEMLR USE ONLY Fee Paid Date ReceivedPermit Number SW Program(s):CoastalSA-HQWCoastalSA-ORWCoastalFW-ORWCoastalOther Non-coastal HQWNon-coastal ORWUrbanizing Areas USMP NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER FAST TRACK PROCESS: “AUTHORIZATION TO CONSTRUCT” (ATC) PERMIT APPLICATION FORM Link to Application Instructions A.ELIGIBILITY FOR FAST-TRACK PERMITTING To be considered for a Fast Track ATC Permit, allof the items below must be checked. If any item cannot be checked, then the project must apply under the Standard Permitting Process. The project and all SCMs (including existing SCMs associated with the project) will meet all applicable requirements of 15A NCAC 02H .1000 - .1062, including the Minimum Design Criteria (MDC), upon project completion. The project is not proposing an alternative design. The project is not claiming an exemption from the MDC based on vested rights, a waiver or a Director’s Certification. The project is not out of compliance with an existing stormwater permit or any other environmental permit. The project is not applying for an offsite permit, an exemption, or a minor modification (as defined in 15A NCAC 02H .1002(25)) to an existing state stormwater permit. The project application bears the signature and seal of a professional licensed pursuant to either Chapter 89A or 89C of the NC General Statutes. I understand that at project completion, an application with the as-built stormwater plans (as described in 15A NCAC 02H .1044 must be submitted, and DEQ will review the as-built stormwater plans to confirm compliance with the MDC. Approval of the as-built stormwater plans will be required before the Erosion and Sedimentation Control Plan for the project may be closed out. I understand that the Fast Track ATC Permit will expire five years after the date of issuance. B.GENERAL INFORMATION 1 Project Name: TANGLEWOOD 2. Previous Project Name (if applicable): 3. Location of Project (street address): 7.9 ACRES 0 WILMA STREET City:ANGIER County:HARNETT Zip:27501 4. Directions to project (from nearest major intersection): NC 55 (RALEIGH STREET) AND NC 210 (E DEPOT ST) GO EAST ON NC 210 (W DEPOT STREET) TOWARD N BROAD STREET W FOR 0.5 MILES TURN RIGHT ONTO S WILMA ST PROPERTY IS 0.5 MILES ON THE RIGHT 5. Latitude:35 29’ 58” N Longitude:78 43’ 54” W of the main entrance to the project. C. PERMIT INFORMATION 1. Specify whether project is (check one): New, no previous application New, replacing a previous Fast Track ATC Permit -- provide previous permit number: SWA By choosing this option, you are also requesting that DEQ rescind the previous Fast Track ATC Permit upon issuance of the new Fast Track ATC Permit. Stormwater Fast Track ATC Application Form Page 1 of 9 Feb. 10. 2018 Major Modification, replacing an existing stormwater permit – provide existing permit number: SW Status of construction? Not Started Partially Completed Completed Major modifications must be submitted by the original permittee and are allowed only if the SW permit is not expired. Minor modifications must use Standard Permitting Process. By choosing this option, you are also requesting that DEQ rescind the previous SW Permit upon issuance of the new Fast Track ATC Permit. Transfer of existing Fast Track ATC Permit – provide existing ATC permit number: SWA 2.Applicable state stormwater program(s) (check all that apply): Coastal SA-HQW Urbanizing Areas (Phase 2) CoastalSA-ORWNon-Coastal HQW Is any portion of the project within 575 feet of SA-ORW waters? Yes No Non-Coastal ORW Coastal Freshwater ORW USMP Coastal – Other 3.Other Permits (as applicable; write “NA” for those permit types that are notapplicable): Project Name Permit/Appl Issue Date Other Information No. CAMA Major NA Erosion & Disturbed Area TANGLEWOOD Sedimentation Control 6.0 acre NPDES Industrial NA Stormwater 404/401 Permit Proposed Impacts lf/ac 4.Local jurisdiction for building permits: ANGIER Point of Contact:SEAN JOHNSONPhone #: (919 ) 331-6702 D.CONTACT INFORMATION 1.Applicant/Financially Responsible Party (may be an Organization): Signing Official Name & Title: Street Address: City: State: Zip: Mailing Address (if different): City: State: Zip: Phone: ( ) Fax: ( ) Email: 2.If the Applicant is a Corporation or LLC (Address must match address on file with NC Dept of the Secretary of State): Name of Registered Agent: Mailing Address: City: State: Zip: Phone: ( ) Fax: ( ) Email: Stormwater Fast Track ATC Application Form Page 2 of 9 Feb. 10, 2018 3.The Applicant is the (check all that apply): Property Owner Lessee (Attach a copy of the lease agreement & complete Item 4.) Purchaser (Attach a copy of the pending sales agreement & complete Item 4.) Developer (Attach a copy of the development agreement & complete Item 4.) 4.If the Applicant is NOT the Property Owner (skip to Item 5 if the Applicant IS the Property Owner): Property Owner Name/Organization: Signing Official & Title: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 5.The licensed Design Professional that will be retained for the duration of the project, who may provide information on the Applicant’s behalf, and who will prepare and certify the as-built package: Consulting Engineer/Landscape Architect:MICHAEL STEWART Consulting Firm: STEWART-PROCTOR PLLC Mailing Address:319 CHAPANOKE ROAD - SUITE 106 City:RALEIGH State:NC Zip:27603 Phone: (919 ) 779-1855 Fax: (919) 779-1661 Email:STEWARTPE@AOL.COM 6.\[OPTIONAL\] If you would like to designate another person to answer questions about the project: Name & Title:EMILY WILLIAMSON Organization: STEWART-PROCTOR PLLC Mailing Address:319 CHAPANOKE ROAD - SUITE 106 City:RALEIGH State:NC Zip:27603 Phone: (919 )779-1855Fax: (919) 779-1661 Email:EWILLIAMSONPE@GMAIL.COM E.PROJECT INFORMATION 1.Specify the type of project (check one):Low Density High Density 2.Briefly summarize how the stormwater runoff will be treated/conveyed: STORMWATER WILL BE GATHERED INTO CATCH BASINS AND RUN THROUGH DRAINAGE SYSTEM TO WET POND #1, RUNOFF THAT BYPASSES ROADWAY DRAINAGE SYSTEM WILL BE CONVEYED BY A DIVERSION BERM ON THE SOUTHERN PROPERTY LINE TO WET POND #1 3.Stormwater runoff from this project drains to the CAPE FEAR River basin(s). 4.Receiving water information (i f more than 3 receiving waters, provide additional information on an attached sheet): Receiving Receiving Receiving Water 1Water 2 Water 3 Receiving Stream NameBLACK RIVER Stream Classification C; SW Stream Index Number 18-68-12-1 Stormwater Fast Track ATC Application Form Page 3 of 9 Feb. 10, 2018 5.Project area and density information: Total Property Area 313,174 sf Total Surface Water Area 5,351 (CREEK) + Considered to include: 10,547 the normal pool of impounded structures; (MAIN the area between the banks of streams and rivers;and POOL) = the area below the Normal High Water (NHW) line or Mean High Water (MHW) line. 15,898 sf Total Coastal Wetlands Area 0 sf Considered to include: coastal wetlands landward from the NHW (or MHW) line. Total Project Area 297,276 sf Excludes the surface water area and coastal wetland area identified above. May or may not be the same as Property Area. Built-Upon Area (BUA) associated with Existing Development 0 sf “Existing development” means those projects that are built or those projects that have established a vested right under North Carolina law as of the effective date of the state stormwater program or applicable local government ordinance to which the project is subject. Proposed New BUA 129,476 sf Includes proposed new BUA that is not associated with existing development. “BUA” is defined in N.C.G.S. 143-214.7(b2). It includes, but is not limited to: buildings, roads, parking areas, sidewalks, and some gravel areas. The design volume of SCMs must take into account the runoff from build out from all surfaces draining to the SCM in accordance with 15A NCAC 02H .1050(1). Project Density w/ Existing Development: Project Density = \[New BUA\]/\[Total Project Area – Existing BUA\] x 100 or 41.34 % w/o Existing Development:Project Density = \[New BUA\]/Total Project Area\] x 100 6.Anticipated construction start date 11-01-2021 7.Is the project located within 5 miles of a public airport? No Yes If ‘Yes,’ see S.L. 2012-200, Part VI: http://www.ncleg.net/Sessions/2011/Bills/Senate/PDF/S229v6.pdf and DEQ Stormwater Design Manual Chapter E-4 Airports. 8.For projects in Union County: Contact DEMLR Central Office Stormwater staff at 919-707-9200 to determine if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements per 15A NCAC 02B .0600. Stormwater Fast Track ATC Application Form Page 4 of 9 Feb. 10, 2018 I. PROPERTY OWNER’S AUTHORIZATION (IF APPLICANT IS NOT THE PROPERTY OWNER) I, (print or type name of the Property Owner) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of Applicant) with (print or type name of Applicant’s organization) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: I, _____________________________________, a Notary Public for the State of ____________________, County of ____________________, do hereby certify that ______________________________________ personally appeared before me this day of _________________, _______, and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, _________________________________________________ SEAL My commission expires Stormwater Fast Track ATC Application Form Page 8 of 9 Feb. 10, 2018 J.CERTIFICATION OF CURRENT PERMITTEE (COMPLETE ONLY IF PERMIT TRANSFER IS REQUESTED) I, (print or type name of the Current Permittee) , am submitting this request for a transfer of Fast Track ATC permit # SWA . With the submission of this transfer request I am providing a copy of the most recent permit, all related documents and as- built plans certified by my design professional in hard copy and electronic format to the Proposed Permittee/Applicant identified in Section G of this application and to DEMLR . I further attest that this request for a permit transfer is accurate and complete to the best of my knowledge. I assign all rights and obligations as permittee to the proposed permittee named in Section G of this form. Signature: Date: I, _____________________________________, a Notary Public for the State of ____________________, County of ____________________, do hereby certify that ______________________________________ personally appeared before me this day of _________________, _______, and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, _________________________________________________ SEAL My commission expires Stormwater Fast Track ATC Application Form Page 9 of 9 Feb. 10, 2018