Loading...
HomeMy WebLinkAboutNC0027103_Facility Update_20100721Lopez, Dale From: Lopez, Dale Sent: Wednesday, July 21, 2010 10:17 AM To: Henson, Belinda; Rawls, Paul; Allen, Trent; Brantley, Mark; Lawyer, Mike; Danny Strickland; Herndon, Mason; Turlington, Chad; White, Hughie Cc: Lopez, Dale Subject: Pembroke WWTP Rhonda Locklear phoned today to report that they will be starting work today for the installation of the new influent control panel. The footing will be worked today, approximately 60 feet away from the present location. The junction boxes will be stainless steel. Slow flow conditions in certain parts of the collection system have led to corrosive conditions at the influent lift station. All three influent pumps are presently operational, and later only one at a time will be transferred to the new control panel. Rhonda said that there is nothing in the area that might be accidentally hit when digging, so she doesn't expect any problems with something going down because of the digging. 1 Lopez, Dale From: Rhonda Hagan Locklear [rhlocklear@bellsouth.net] Sent: Wednesday, July 21, 2010 10:37 AM To: Henson, Belinda Cc: Lopez, Dale Subject: Town of Pembroke Influent Hi Belinda, We have been the ground breaking for the influent control. There should be no problems but just wanted to make aware. I will update date you on the progress. Rhonda Hagan Locklear Town of Pembroke Water and Wastewater Director Email: rhlocklear@,bellsouth.net Phone: 910-521-2989 Fax: 910-521-2343 i