HomeMy WebLinkAboutNC0027103_Facility Update_20100721Lopez, Dale
From: Lopez, Dale
Sent: Wednesday, July 21, 2010 10:17 AM
To: Henson, Belinda; Rawls, Paul; Allen, Trent; Brantley, Mark; Lawyer, Mike; Danny Strickland;
Herndon, Mason; Turlington, Chad; White, Hughie
Cc: Lopez, Dale
Subject: Pembroke WWTP
Rhonda Locklear phoned today to report that they will be starting work today for the installation of the new influent
control panel. The footing will be worked today, approximately 60 feet away from the present location. The junction
boxes will be stainless steel. Slow flow conditions in certain parts of the collection system have led to corrosive
conditions at the influent lift station. All three influent pumps are presently operational, and later only one at a time
will be transferred to the new control panel. Rhonda said that there is nothing in the area that might be accidentally
hit when digging, so she doesn't expect any problems with something going down because of the digging.
1
Lopez, Dale
From: Rhonda Hagan Locklear [rhlocklear@bellsouth.net]
Sent: Wednesday, July 21, 2010 10:37 AM
To: Henson, Belinda
Cc: Lopez, Dale
Subject: Town of Pembroke Influent
Hi Belinda,
We have been the ground breaking for the influent control. There should be no problems but just wanted to
make aware. I will update date you on the progress.
Rhonda Hagan Locklear
Town of Pembroke Water and Wastewater Director
Email: rhlocklear@,bellsouth.net
Phone: 910-521-2989
Fax: 910-521-2343
i