Loading...
HomeMy WebLinkAbout20211255 Ver 1_PCN revision SAW-2021-01812_20210831Strickland, Bev From: wyatt brown <brownenvgrp@gmail.com> Sent: Tuesday, August 31, 2021 9:10 PM To: Hopper, Christopher D CIV (USA); Cohn, Colleen M Subject: [External] Pine Crest PCN revision, SAW-2021-01812 Attachments: Revised PCN impact sheet.pdf; Revised EMAIL -IMPACT MAP (4).pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Chris, Colleen I hope y'all are doing well, please find attached a revised impact sheet and revised plans reflecting an increase in permanent impact of 0.001 acres. This increase is needed since riprap placed flush in a wetland is now considered a permanent impact by the Corps. If you have any questions please don't hesitate. Colleen, I'm thinking this permit might not require a 401. Please let me know your opinion. thanks Wyatt Wyatt Brown, LSS, CPESC Brown's Environmental Group, Inc 919-524-5956 1 "W." will be used in the table below to represent the word "wetland". x Reasonx x 2b. Impact type 2,_of W. x x x 2d. W. name 2e. Forested 21. Ju d cltlOn*''' Impact i construction impact _Type - - - - T Small -Basin Wetland - JWetland A Yes Bo[h 0.001 Mpact 2 construction impact T Small -Basin Wetland Wetland A T--fth F,11113)----_ Impart 2 culvert, P Sntall•Basin Wetland Wetland A Yes Both 0.018 (acres) 2g. Total Temporary Wetland Impact (All revisions in red by Wyatt Brown, 8/31121). 0.004 2g. Total Permanent Wetland Impact 2g. Total Wetland Impact e:aai 0,022 2i. Comments: Welland 1 actual temporary impact is listed in impact table as 0.00007 acres, I entered impact as 0.001 acres. The permanent impact for impact 2 is revised increasing the impact b iv 0.001 acres to reflect the rip rap in the wetland. The rip rap was not included in the original submittal. The total permanent wetland impact is now 0.022 acres. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. "S." will be used in the table below to represent the word "stream". 3a. Reason for impact* 36.Impact type'` 3c. Type of impact* F1 3d. S. name * 3e. Stream Type * 3f. Type of Jurisdiction * 3g. S. width * 3h. Impact length S1 . Setter line install Temporary Stabili7ation Stream 1 Perennial Both 24 Avenge lfedl 19 jFxxv tea) -All Perennial or Intermittent streams must be verified by DWR or delegated local novernment. 3i. Total jurisdictional ditch impact in square feet: 0 3L Total permanent stream impacts: 0 3i. Total temporary stream impacts: 19 3i. Total stream and ditch impacts: 19 3j. Comments: Moccasin Creek (Stream 1) is 24 tt (23.98 h) feet Wde at the utility line crossings. The impact (0.01 acre) is temporary since the utility lines Wit be installed in the dry by using a pump around and the disturbed area Will be. restored to its original contours. The engineer states there is no permanent maintenance oacomoM ;inco the utillfy lines urn being laid in the DOT right of way. 6. Buffer Impacts (for DWR) If projectwill impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project Is in which protect basin(s)7* 0-dk al that apply. V %use r Tar-Pandico r Catawba r Randleman r Goose Creek r Jordan Lake r- other fib. Impact T * " p Type 6c. Per or Temp *' 6d. Stream name * 6e. Buffer mitigation required7* 6f. Zone 1 impact* 6g. Zone 4 impact* Movable �Slreaml fb - 1,218 (sWxefeet) --- 7squaefet) �, 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 1,218.00 779.00 S/D n RAINS BCAl�7TA7 PINECREST WETLAND IMPACT SUMMARY PERMANENT IMPACT TEMPORARY CONSTRUCTION IMPACT WETLAND IMPACT 1 0.00007 AC - WETLAND I M PACT 2 0.018 AC 0.003 AC BUFFER IMPACT 20 SF ZONE 1: 1218 SF, ZONE 2: 779 SF STREAM I M PACT - 0.11 AC, L:19.10 LF, W:23.98 LF E ' A�1111S AARY C RAD RD I ACi 21N 1 UU ib C1 TAG 12N'�0036D, IN2�420-91-9204 44r`t 263400- 0552 9 156 ,PG 133 �' \� NitVG RA UREN EW -QB 630 G 61 4 1$ 79 +AC y�Ly N Z6 &10 e ✓ r 13 . e� m NTSwow - _ 3 77 ¢ � -(16TIME � RrN r GW Pueu /� w 51 / PR�P�S � 50 _ � 16k^ 20 _� ti � � .� 6�•one.` J` ��! �m 34 2,N 1003, 4_� z d 54� 12624 0-80 rs a D c RA Fr 22� `s 23_m �q r� �. m9 a . , r � _ T�I � �r � � I TA1fVtidQ02 y 11 7 T `pROPOSEDcSANI SANITARY SEWER r J.;�Y; PROPOSED 1 �� 37 r 3 �1 s ✓ WETLAND 5 d° 16 8 1 _ �� m F� IMPACT1 c 5615 A l ��?,. BORE UNDER WETLANDS (t180LF) :�a 25 a 33 �,; ' �;. , , (NO IMPACT) PROPOSED SANITARY EWER AERIAL PIPE J STREAM CROSSI G .N' �r ;F�� �'''" •' ;;�, ,� ; 100 YEAR FLOOD LINE °`• ` -, "� ° ; 1" 1 �l ° '}g i F a Lt F ��� � � �9 .• .. .-„ . :�� •' � s ' PROPOSED WATERMAI R q / ' / a •• �� �•,• .� •SQ2•• '`' "GSA• g6Ti'` ` ' u :..`...... �STREAM CROSSING N 'A( �r PROPOSED WETLAND IMPACT 2 ee c . F . ; .... , ..: , . ; . , V� :si..:'' "/.� �"'/ �J B' " Lvs�i WETLANDS i I/) �y�166! ••,• �.; •; ,�/, f�� •�. ''�°j•, •; •', a°•}•�• "� _ice•.. �� 00 1 k S 1 i ' o • b 0 r \ °J�`.°` _-. ,�.� .t'y��_.'. Fo '�' °pi .;6��'.'"•'1� '�'�.'. h,�. ''•'�h'''t!'. -BB,T' A',1,� .�.•. � �' � � ' �i r a J X. '•`q ° �:•tea-:y��'„!v', •`�',�'.N,. �,s=�: �'� •�,;i'�, � % �' h 4.44�• o ; ti7: i t INC�1 - 3- S JAL a 5 Pr:ter: 2141 1C 011 DB 3596P 1 6..8�(� ��,ry `��� \�� •,• � 1�f.`•'�..i"� � q�� �" Sri° / % �,-�" r_......,, -. ESTATES, PHASE ONE �I VICINITY MAP � s �s / ya / � 1 / WATTLE (TYP.) li DA M AM (TYP.) � 53 � WETLAND IMPACT SEQUENCE OF 2r CONSTRUCTION w 1 \ 2. OBTAIN NCDENR EROSION CONTROL APPROVAL. SILT FENCE OUTLET (TYP.) THIS PROJECT IS DIVIDED INTO TWO (2) STAGES. STAGE 1 - CLEARING & INSTALLING EROSION CONTROL MEASURES. STAGE 2 - INSTALLING STORM DRAIN AND GRADING THE ARC INLET PROTECTION O 1 SITE. A BEGIN STAGE 1 3. INSTALL EROSION CONTROL MEASURES. ONLY CLEAR ENOUGH TO INSTALL THESE ME STREE BEGIN STAGE 2 �B��c R'w P4. INSTALL STORM DRAIN. �OPOSED� 5� P 5. INSTALL EROSION CONTROL MEASURES SPECIFIC TO STORM DRAIN. I.E. ARC INLET n PROTECTION, INLET PROTECTION, ETC. ' 6. BEGIN GRADING SITE. o+ o s J - o M „s 50_ss S 0o LL SKIMMER BASIN (TYP.) a 1 0 ) J ` �° \ DISSIPATOR PAD SILT FENCE (TYP.) V LENGTH - 9' WIDTH - 10.5' �38D L DEPTH - 9" ) STONE - CLASS B / 1 \\ (SEE RIP RAP DETAIL 54 �� ON SHEET 9) \ J / 0 E80HN WETLANDS i - ±20.23 ACRES (WITHIN N -� PROJECT BOUNDARY), WETLAND IMPACT TEMPORARY PERMANENT CONSTRUCTION IMPACT IMPACT WETLAND IMPACT 1 0.00007 AC - PERMANENT IMPACT I- U) 0 W z U� W ~ Z z E O Q 0 a H W i M LL L0 r W W M W L7 ou 0IL =0211 Nz Qw 0 Q WETLAND IMPACT TEMPORARY PERMANENT CONSTRUCTION IMPACT IMPACT WETLAND IMPACT 2 0.018 AC--] 0.003 AC WETLAND IMPACT SEQUENCE OF CONSTRUCTION 1. OBTAIN 401 & 404 PERMITS. 2. OBTAIN NCDENR EROSION CONTROL APPROVAL. / THIS PROJECT IS DIVIDED INTO TWO (2) STAGES. STAGE 1 - CLEARING & INSTALLING EROSION CONTROL MEASURES. STAGE 2 - INSTALLING STORM DRAIN AND GRADING THE / SITE. r BEGIN STAGE 1 1�y 3. INSTALL EROSION CONTROL MEASURES. ONLY CLEAR ENOUGH TO INSTALL THESE MEASURES. BEGIN STAGE 2 \ f 4. INSTALL STORM DRAIN. g ` 5. INSTALL EROSION CONTROL MEASURES SPECIFIC TO STORM DRAIN. I.E. ARC INLET PROTECTION, INLET PROTECTION, ETC. 6. BEGIN GRADING SITE. saw PROFILE OF ST-7 155 155 6 M � O VERTICAL SCALE: 1" = 4' WETLAND IMPACT TEMPORARY CONSTRUCTION IMPACT W�° Z U v QZ m v � O E °' N (n � m ly Q Q >- m Z w J dU LL '1 U a O M �W U 2 U w O ou wzIL Z O w FL O 3:2 C7 z_ 0 W =O �W Z Q W 13 N U z Q J Mw � J LL Q O co CD CD � co Z 4 H = U w C Q - _ �o RIPARIAN BUFFER ` % "" '" 50' FROM TOP OF BANK �u day (APPROXIMATE) 138 m PROPOSED 8" WATERMAb w v 110' DRAINAGE (SEE WATER NOTE) -'�.� .y .� EASEMENT lk w PLAT BOOK 16, y', v PAGE 61 i a 1 I� 5 MOCCASIN CREEK STREAM INDEX: 27-53-(0.5) f o \f t' CLASSIFICATION: C;NSW I Q /Z� W .v � W W W W W 7 EXISTING MANHOLE SS LENGTH O)F) W SYf STREAM W IMPACT: �9.10 /Mss 38�cJ Q , W L EXISTING $ SANITARY _ SEWER SS W= 55 „ . 2 SS 8" W L 8' W o (1 AC 133 PROPOSED 8" SANITARY SEWER 1 10' MINIMUM 1 SEPARATION p�NECRE6 PUBLIC RNA 1 — 14r EXISTING BRIDGE WITH HEADWALLS 3' WIDE CUT IN STREAM z WATERMAIN SEQUENCE OF CONSTRUCTION 1. STREAM CROSSING SHALL BE PERFORMED AT A TIME WHEN WATER FLOW IS AT A MINIMUM. 2. INSTALL TEMPORARY SILT FENCING ADJACENT TO STREAM CROSSING. 3. INSTALL DIKES AND PUMP AROUND APPARATUS AS SHOWN IN DETAIL ON SHEET DT1.02. 4. ONCE INSTALLATION IS COMPLETE REMOVE DIKES AND PUMP AROUND APPARATUS, SHAPE UP STREAM BANKS, ENSURE THAT SILT FENCING HAS BEEN INSTALLED DOWN SLOPE FROM ALL DISTURBED AREAS INSIDE THE 1 10'DRAINAGE EASEMENT. 5. IMMEDIATELY SEED AND MULCH SLOPES AND ALL DISTURBED AREAS. PERMANENT BUFFER IMPACT (ZONE 2 - MH-01) TEMPORARY BUFFER CONSTRUCTION IMPACT (ZONE 2) TEMPORARY BUFFER CONSTRUCTION IMPACT (ZONE 1) TEMPORARY STREAM CONSTRUCTION IMPACT 1 145 140 I L TOP OF BANK I I \ 11 . 11 11 5 IP—M W co oco AERIAL PIPE SUPPORTS (TYP.) (SEE DETAILS ON SHEET DT1.05) m� 130 U o M 5' 00 6) cM., N Oco z D O + NMI �2>O M M ? (n Z Z 8" WE ZZ BELOW > > 5' COVER U) z z z STREAM BED -0+50 10+00 10+50 VERTICAL SCALE: IMPACT PERMANENT IMPACT TEMPORARY CONSTRUCTION IMPACT BUFFER (ZONE 1) - 1218 SF BUFFER (ZONE 2) 20 SF (MH-01) 779 SF STREAM - 0.011 AC, 458 SF, LENGTH: 19.10 LF WIDTH: 23.98 LF 150 E w O N60 u)N O W ZU �2v QZ_cchU N O E (U Z W J o°'L` o U n co �W I— U _ ~ EXISTING GRADE �Jw (if Z Elu 140 PROPOSED 8" DIP w z 0 a WATERMAIN (SEE WATER NOTE) Z � Q 0 ft 3: PROPOSED 8" Z PVC (SDR-28) z it i 135 z = O W 0) W INSTALL 40LF 16" STEEL CASING CENTERED ON Z 2Z STREAM WITH 2 SPIDERS PER JOINT W 130 Q z �U Q 11+00 11+50 125 SEWER NOTES: 1. REGULAR AND PROPER INSPECTION AND MAINTENANCE OF THE STREAM CROSSING SHALL BE PROVIDED BY TOWN OF PINE LEVEL TO ENSURE THAT THE STREAM FLOW IS NOT IMPEDED AND THAT NO DAMAGE WILL BE CAUSED TO UPSTREAM OR ADJACENT PROPERTIES. 2. HIGH PRIORITY LINES SHALL BE INSPECTED BY THE PERMITTEE OR ITS REPRESENTATIVE AT LEAST ONCE EVERY SIX MONTHS AND INSPECTIONS DOCUMENTED PER 15A NCAC 02T.0403(a)(5) OR THE PERMITEE'S INDIVIDUAL SYSTEM -WIDE COLLECTION PERMIT. 3. PRIOR TO INSTALLATION A LICENSED NC PROFESSIONAL ENGINEER SHALL PROVIDE THE TOWN UTILITY DIRECTOR AND THE ENGINEER WITH THE NECESSARY STRUCTURAL DESIGN OF THE PIER SUFFICIENT TO RESIST THE FORCES ACTING ON THE PIER/PIPE SYSTEM. SEE DETAILS ON SHEET DT1.05 FOR MORE INFORMATION. WATER NOTES: 1. WATERMAIN IS TO BE CONSTRUCTED WITH 8" DIP IN LOCATIONS WHERE THE HORIZONTAL SEPARATION BETWEEN THE GRAVITY SEWER AND WATERMAIN IS LESS THAN 101 . 2. WATERMAIN IS TO BE INSTALLED IN AN OPEN CUT METHOD. SEE CONSTRUCTION SEQUENCE. zp Q 0-1 U 0 � z Q Q W z I)f Q � �cl) W LU Q 3:U) cM W r J LL Q O U w O z� W a c LLI _ = 0o W BORE AND JACK ±180 LF OF 16" STEEL CASING WITH 8" C-900 CARRIER PIPE v W_ W— W W W W W\ W W W W W W W W W W /W W 1 W 1 1 1 W W W/ W W \ W W W W W W W! M z SANITARY SEWER WETLAND BORE w�° 'j) p M Z U - v Qz_cchU N O � Z w J M C �W I— U w° 2 ~ 0 w z v a 0� z cola Z o co z o w w z E9 22 Qw z U) U) ^ vJ ON UC) Q � H Q z Lu I C/) U cy') W T— J ILL Q O U w o Lo za u � = c Lu a - LL ] cT (� o n) TEMPORARY SEEDING RECOMMENDATIONS FOR Seeding mixture Species Rye (grain) Rate (Iblacre) 120 Seeding dates Mountains —Aug. 15 - Dec. 15 Coastal Plain and Piedmont —Aug. 15 - Dec. 30 Soil amendments Follow soil tests or apply 2,000 Iblacre ground agricultural limestone and 1.000 Iblacre 10-10-10 fertilizer. Mulch Apply 4,000 Iblacre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. APPLY ASPHALT TACK AT A RATE OF 400 GALLONS PER ACRE. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50 Iblacre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 Iblacre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. TEMPORARY SEEDING RECOMMENDATIONS FOR SUMMER Seeding mixture Species German millet Rate (Iblacre) 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50 Iblacre. Seeding dates Mountains —May 15 -Aug. 15 Piedmont —May 1 -Aug. 15 Coastal Plain —Apr. 15 -Aug. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 Iblacre ground agricultural limestone and 750 Iblacre 10-10-10 fertilizer. Mulch Apply 4,000 Iblacre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. TEMPORARY SEEDING RECOMMENDATIONS FOR LATE WINTER AND EARLY SPRING Seeding mixture Species Rate (Iblacre) Rye (grain) 120 Annual lespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual lespedeza when duration of temporary cover is not to extend beyond June. Seeding dates Mountains —Above 2500 feet: Feb. 15 - May 15 Below 2500 feet: Feb. 1- May 1 Piedmont —Jan. 1 - May 1 Coastal Plain —Dec. 1 -Apr. 15 Soil amendments Follow recommendations of soil tests or apply 2,000 Iblacre ground agricultural limestone and 750 Iblacre 10-10-10 fertilizer. Mulch Apply4,000 Iblacre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. APPLY ASPHALT TACK AT A RATE OF 400 GALLONS PER ACRE. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. SECTION E: GROUND STABILI7-4TION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than SO' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days far Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization sha€1 be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with ar reinforcement matting withouttemporary grass seed • Hydroseeding • Appropriately applied straw or other mulch ■ Shrubs or other permanent plantings covered • Plastic sheeting with mulch • uniform and evenly distributed ground cover sufficient to restrain erosion ■ Structural methods such as concrete, asphalt or retaining walls ■ Rolled erosion control products with grass seed a w0° F- � "6 N W U) N p Z U �2 v N (� O (6 Z w J M 0 o J M C U) W �W 2 Z 0 V wz Z o a O ., = 13 Z O 07 Z 11 W W 2 o U) W Z 2E9 2 Q W co J_ Q H LU 0 Z _O 07 0f I 'LL ch w T_ J LL Q O U w o v Z� W d c LLI (if = 0o STEEL FENCE POST HARDWARE CLOTH FILTER OF #57 WASHED STONE 18" MIN. AT FACE OF HARDWARE CLOTH T FILTER FABRIC ON GROUND 8' MAX. 4' MAX. m. SILT FENCE BURY WIRE FENCE AND HARDWARE CLOTH i i BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH FRONT VIEW � � D BURY WIRE FENCE, FILTER FABRIC, AND HARDWARE LI MAINTENANCE CLOTH IN TRENCH INSPECT WIRE AND WASHED STONE OUTLETS AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME (APPROX 50% OUTLET COVERAGE) FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE OUTLET DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. STEEL POST WIRE FENCE 24 8' MAX. STANDARD STRENGTH FABRIC W/ "RE FENCL__ 6' MAX. EXTRA STRENGTH FABRIC W/O "RE FENCE 1 FABRIC MAINTENANCE WIRE AND WASHED STONE OUTLET NOT TO SCALE WIRE FENCE FILTER _ FABRIC III BACKFILLTRENCH —III- AND COMPACT PLASTIC OR — III —III I—, THOROUGHLY ,WIRETIES I —I I El I B I El I i 1 I I- I I I El I I —I I I —I I I I I I I'8• MIN NATU I I II I I —I I I-1 I I-1 I MIN DL GRO — I II 1—�—III—I I II III -III; POST INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERTY STABILIZED. STANDARD TEMPORARY SILT FENCE NOT TO SCALE 5' METAL POSTS 2' INTO GROUND GALVANIZED HARDWARD WIRE EXTENDS TO TOP OF BOX (3/8" MESH) o }� o 000 0°� O o° ° —� o ° 0 o 0 o �� yyo-u� n ° �JO-O O--t�00-60 �0000-CY.�O COOOOCCSyJ — o MAINTENANCE N 57 WASHED STONE INSPECT WIRE AND WASHED STONE INLETS AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME (APPROX 50% OUTLET COVERAGE) FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE INLET DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERTY STABILIZED. INLET TEMPORARY PROTECTION - NO SCALE I- E Lu w o 0 0 � C -N W (nN OMB Z U v Qz cco M -'t N O E CY z w J ca v CJ o J M C 0 wz U} w� Zz 0-0 N W J LLJ 0 z 0 L.1_ LLJ C'7 T- LL 0 ti H LLJ LLJ W M4 ol W L9 0u 0° =.{z WW Nz 2 E9 Qw 0 Q INFLOW _ STRUCTURE AVERAGE AREA' WIDTH W L • AREA OF BASIN WATER SURFACE AT TOP OF PRINCIPAL SPILLWAY ELEVATION INFLOW STRUCTURE DEWATERING ZONE FILTER FABRIC SEDIMENT STORAGE ZONE PLAN VIEW SKIMMER DEWATERING DEVICE BAFFLES 4'x4'x6" BED NO, 57 WASHED STONE UNDER SKIMMER DEWATERING DEVICE CLASS I RIP RAP EMERGENCY SPILLWAY EMBANKMENT 1' FREEBOARD BAFFLES ":�EMERGENCY �6" MIN. INVE T ELEVATION OF SPILLWAY EMERGENCY SPILLWAY 12" LAYER OF CLASS I RIP RAP W/ GEO—LINER 4'x4'x6" BED 57 WASHED CROSS—SECTION VIEW OF N UNDER SKMMERSTONE DEWATERING DEVICE SEDIMENT BASIN W/ SKIMMER ••• Tr• • r NOT TO SCALE INSPECT BAFFLES AT LEAST ONE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE DEPOSITS WHEN IT REACHES HALF FULL TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE. AND STABILIZE IT. 'I tl class s kiprop Pipe nvert, 3 " ■ Flow Flaw Natural Ground Riprap Headwall, l' min 1' 3' height from road shoulder - 2 r ■e Figure C65a Rock pipe inlet protection plan view and cross-section view Maintenance ]nspeet rock pipe inlet protection at least weekly and after each significant inch or greater] rainfall event and repair immediately. Remove sediment and restore [lie sediment storage area to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that is removed in the designated disposal area and replace the contaminated part of the gravel facing. Check the structure for damage. Any riprap displaced from the stone horseshoe must be replaced immediately. After all the sediment -producing areas have been permanently stabilized, remove the structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and provide permanent ground cover (Surface Slabilization). ARC INLET PROTECTION NOT TO SCALE I— E w�0 Of U) O-� Z U -C v Qz cco N U)O C6 Z w J co J M C I— U wN LL �W 2 ~ Z 0 U w z z O IQ O T (7 i ? Z O Z W o W z 2_ E9 2 Q M J Q w Z 0 U) o LU Icy) w T_ J LL Q O U) w U) o v 00 Z o I I s W d c LLl of = C� o VELOCITY DISSIPATION AREA. wiSE LENGTH sTREAM i FLOV B WOf LENGTH NOT TO 1, PUMPS SHALL DISCHARGE ONTO SANDBAGS OR RIP RAP TO DISSIPATE VELOCITY DOWNREACH SEDIMENT DIKE TO FORM VELOCITY DISSIPATION POOL DEWATERING BAG T- DISCHARGE HOSES STREAM DIVERSION PUMP PUMP A-.A—..—� I INTAKE HOSE � 1. / INTAKE DIKE —� HOSE CLEAN WATER DIKE ' SUMP HOLE K AREA I OR POOL p' I (12 TO 18" EXCEED DEEP, 2� DIA) PUMP AROUND APPARATUS NOT TO SCALE f'ly\vi'maillil PROVIDE HIGH STRENGTH JOuBLE STITCHED J TYPE SEAMS SEWN IN SPOUT HIGH STRENGTH STRAPPING FOR HOLDING HOSE i IN PLACE WATER FLOW FROM PUMP OPENING TO ACCOMODATE UP TO 4-INCH DISCHARGE HOSE r AGGREGATE UNDERLAYMENT (3-IN THICK NCDOT NO, 57 STONE) NOTES: 1. THE DEWATERING BAG SHALL BE MADE OF NON -WOVEN GEOTEXTILE WITH A MIN. SURFACE AREA OF 225 SQUARE FEET PER SIDE. 2. ALL STRUCTURAL SEAMS SHALL BE SEWN WITH A DOUBLE STITCH USING A DOUBLE NEEDLE MACHINE WITH HIGH STRENGTH THREAD. 3. THE SEAM STRENGTH SHALL WITHSTAND 100 LB/IN USING ASTM D-4884 TEST METHOD. 4, THE GEOTEXTILE FABRIC SHALL BE A 10 OZ NON —WOVEN FABRIC. 5. DISCHARGE FROM THE DEWATERING BAG SHALL BE DIRECTED SUCH THAT PRE —DISTURBANCE HYDROLOGY IS NOT CHANGED. DEWATERING BAG I- E WUO I- � O N W cn N O M Z U 7 v m v ZG E N I— m — Q Q Q L Z w dU U a ^ M � U) 0 w z U� w ~ Z Z EL 0 Z O U) Z O U) J Q H Lu r) z O U) 0 Lu co LL. O O� W TWT '1 vJ W L7 ou 0IL =.{z Ww Nz Qw 0 Q t2- LI ANCHOR BOLT DETAIL ti S. ANCHOR SOLT W1 .X PROJECTIONS NUT EMBED INTO COHC. PROVIDE 11. MIN. BEARING - T MIN. FOOTING REHAB 4'{P o.Q. PIPE ATLT� 1. THE CONTRACTORS OPTION IN LIEU OF FORMING THE 120' CONC SADDLE, A STAINLESS STEEL PIPE SADDLE MAY BE PROVIDED. a EA N4 BARS WRT. 2, SITE SPECIFIC DESIGN CRFTERIA EQUALLY SPACED SHOULD BE CONSIDERED WHEN DESIGNING AERIAL CROSSINGS. p3 BARS 3. PATCH SNAP TIES. 1Y D.C. 4. CONCRETE FOOTING SHALL HAVE X4' CHAMFER EDGES. — 5. REINFORCING STEEL AS SHONlN IS MINIMUM ALLOWED. DESIGN ENGINEER SHALL COMPLETE AN SECTION A -A INDEPENDENT STRUCTURAL ANALYSIS AND OEWON. BASED ON SUBGRAOE ANALYSIS LOAD. 8. TWO SPIDERS AT EVERY JOINT WITHIN CASING PIPE. 7. ALL JOINTS SHALL HE RESTRAINED JOINTS BETWEEN MANHOLES- r Y- % P- S.8. STRAP W1 ZS' LEG D JNPT BERESTRAINED MANHOLES Y3'LY BARS IT O.C. STYROFOAM PLUG VARIABLE I NONSHRINK GROU g,-0, RL7X SEAL END LOWEST {BOTTOM OF PIPE MIN, 1' ABOVE 25 YR. FLOOD A IT A r , ELEVATION} r �I I� c ImIn.I END VIEW t� IT 12' L s Imnl SIDE VIEW AERIAL PIPE SUPPORTS DETAIL NOT TO SCALE PAGE JOHNSTON COUNTYW_wrl SANITARY SEWER 38 ca�nma..a PWlr:uel�STANDARD DETAIL P.a. eua z2sa Aerial Pipe Supports SmnMdq NC 2i5l1 NOTES FOR AERIAL CROSSING: 1, STEEL CASING PIPE SHALL BE SPIRAL WELDED OR SMOOTH WAIL SEEMLESS WITH A MIN. YIELD STRENGTH OF 35,000 PSI. REQUIREMENTS SHOWN IN TABLE BELOW: ALLOWABLE SPANS FOR 2, RESTRAIN EO JOINT PIPE AND FRTI NGS SHALL CONSIST OF BOLTED RETAINER RINGS AND WELDER RETAINER BARS OR SOLTLESS TYPE W HICH INCLUDE DUCTILE IRON LOCKING SEGMENTS AND RUBBER RETAINERS. RESTRAINED PIPE AND FITTINGS MEET REpuIREME NTS SET IN JOHNSTON COUNTY STAN DAR D SPECIFICATIONS. 3. CONCRETE PROPERTIES SHALL BE AS FOLLOWS: CONCRETE COMPRESSIVE STRENGTH = 4MO PSI NOM I NAL SLUMP w4 INCHES WATERICEMENTITOUS MATE RIAL RATIO — 0.45 MAX AIR CONTENT = MIN 6%, MAX 7.5% CONCRETE SHALL BE TYPE Illl OR 1NACCOR DANCE WITH ASTM C-150. 4- ALL EXPOSED CONCRETE CORNERS SHALL BE CHAMFERED 314' 5. CONVENTIONAL REINFORCING STEEL SHALL CONFORM TO ASTM A615 GRADE 60 AND SHALL BE PLACE IN ACCORDANCE WITH "THE RECOMMENDED PRACTICE FOR PLACING REINFORCING BARS" I LAT EST EDITION AS PUBLISHED BY THE CONCRETE REINFORCING INSTITIUTE. SPLICES SHALL BE CLASS B CONFORMING TO ACI 3 18 OF "BU I LOI INS CODE REQUIRE M E NTS FOR REIN FORCED CONCRETE. 6. NEOPRENE BEARING PADS SHALL BE FORMED FROM PREVIOUSLY UNVULCANIIED, 1DO%VIRGIN NEOPRENE WITH OUROMETER HARDN ES5 OF SO- 7. IF ENGINEERED DESIGN REQUIRES PILES, THE CALCULATIONS AND ALTERNATE DESIGN MUST BE SUBMITTED FOR APPROVAL PRIOR TO INSTALLATION. Nam Dots Organ BY PAGE Clocked B : JOHNSTON COUNTY SANITARY SEWER A B : DevenmemxlwlalA.tw III STANDARD DETAIL 39B Scale: P.o-e mm 1 �� Aerial Pipe Supports SmVnnw. NC 7"" U) STEEL CASING PIPE CARRIER PIPE, RJ DIP CASNG PIPE, STEEL MIN. CASING PIPE WALL ALLOWABLE SPAN {FT1 DIAMETER (1N} DIAMETER (IN) THICKNE55jIN) fi 14 0.3750 40 8 Ifi 0.3750 45 10 17 03750 SQ 12 20 0.3750 50 14 24 0.3750 SS 16 28 Q375p 55 18 30 0.3750 60 20 32 0.3750 60 24 36 0.4375 65 30 42 0.4375 65 36 48 015000 65 40 Sfi 0.5000 65 I 3(a 0) W 2: :0 2 E W N ai U cr) N "O M W Z U - v Q Z M U Luv� N U 0 (SS m 22 ��LL W M C U W 2 W Z O U wZa Z D O w I..L O Y Z O W O f� Y Z Q a w W VJ ''^^ (n J_ Q aw Z 'Q vJ Lu l' J T_ LJ_ J LL U U) o O 0o II U W < 2 �" r �I I� c ImIn.I END VIEW t� IT 12' L s Imnl SIDE VIEW AERIAL PIPE SUPPORTS DETAIL NOT TO SCALE PAGE JOHNSTON COUNTYW_wrl SANITARY SEWER 38 ca�nma..a PWlr:uel�STANDARD DETAIL P.a. eua z2sa Aerial Pipe Supports SmnMdq NC 2i5l1 NOTES FOR AERIAL CROSSING: 1, STEEL CASING PIPE SHALL BE SPIRAL WELDED OR SMOOTH WAIL SEEMLESS WITH A MIN. YIELD STRENGTH OF 35,000 PSI. REQUIREMENTS SHOWN IN TABLE BELOW: ALLOWABLE SPANS FOR 2, RESTRAIN EO JOINT PIPE AND FRTI NGS SHALL CONSIST OF BOLTED RETAINER RINGS AND WELDER RETAINER BARS OR SOLTLESS TYPE W HICH INCLUDE DUCTILE IRON LOCKING SEGMENTS AND RUBBER RETAINERS. RESTRAINED PIPE AND FITTINGS MEET REpuIREME NTS SET IN JOHNSTON COUNTY STAN DAR D SPECIFICATIONS. 3. CONCRETE PROPERTIES SHALL BE AS FOLLOWS: CONCRETE COMPRESSIVE STRENGTH = 4MO PSI NOM I NAL SLUMP w4 INCHES WATERICEMENTITOUS MATE RIAL RATIO — 0.45 MAX AIR CONTENT = MIN 6%, MAX 7.5% CONCRETE SHALL BE TYPE Illl OR 1NACCOR DANCE WITH ASTM C-150. 4- ALL EXPOSED CONCRETE CORNERS SHALL BE CHAMFERED 314' 5. CONVENTIONAL REINFORCING STEEL SHALL CONFORM TO ASTM A615 GRADE 60 AND SHALL BE PLACE IN ACCORDANCE WITH "THE RECOMMENDED PRACTICE FOR PLACING REINFORCING BARS" I LAT EST EDITION AS PUBLISHED BY THE CONCRETE REINFORCING INSTITIUTE. SPLICES SHALL BE CLASS B CONFORMING TO ACI 3 18 OF "BU I LOI INS CODE REQUIRE M E NTS FOR REIN FORCED CONCRETE. 6. NEOPRENE BEARING PADS SHALL BE FORMED FROM PREVIOUSLY UNVULCANIIED, 1DO%VIRGIN NEOPRENE WITH OUROMETER HARDN ES5 OF SO- 7. IF ENGINEERED DESIGN REQUIRES PILES, THE CALCULATIONS AND ALTERNATE DESIGN MUST BE SUBMITTED FOR APPROVAL PRIOR TO INSTALLATION. Nam Dots Organ BY PAGE Clocked B : JOHNSTON COUNTY SANITARY SEWER A B : DevenmemxlwlalA.tw III STANDARD DETAIL 39B Scale: P.o-e mm 1 �� Aerial Pipe Supports SmVnnw. NC 7"" U) STEEL CASING PIPE CARRIER PIPE, RJ DIP CASNG PIPE, STEEL MIN. CASING PIPE WALL ALLOWABLE SPAN {FT1 DIAMETER (1N} DIAMETER (IN) THICKNE55jIN) fi 14 0.3750 40 8 Ifi 0.3750 45 10 17 03750 SQ 12 20 0.3750 50 14 24 0.3750 SS 16 28 Q375p 55 18 30 0.3750 60 20 32 0.3750 60 24 36 0.4375 65 30 42 0.4375 65 36 48 015000 65 40 Sfi 0.5000 65 I 3(a 0) W 2: :0 2 E W N ai U cr) N "O M W Z U - v Q Z M U Luv� N U 0 (SS m 22 ��LL W M C U W 2 W Z O U wZa Z D O w I..L O Y Z O W O f� Y Z Q a w W VJ ''^^ (n J_ Q aw Z 'Q vJ Lu l' J T_ LJ_ J LL U U) o O 0o II U W < 2 �" U) STEEL CASING PIPE CARRIER PIPE, RJ DIP CASNG PIPE, STEEL MIN. CASING PIPE WALL ALLOWABLE SPAN {FT1 DIAMETER (1N} DIAMETER (IN) THICKNE55jIN) fi 14 0.3750 40 8 Ifi 0.3750 45 10 17 03750 SQ 12 20 0.3750 50 14 24 0.3750 SS 16 28 Q375p 55 18 30 0.3750 60 20 32 0.3750 60 24 36 0.4375 65 30 42 0.4375 65 36 48 015000 65 40 Sfi 0.5000 65 I 3(a 0) W 2: :0 2 E W N ai U cr) N "O M W Z U - v Q Z M U Luv� N U 0 (SS m 22 ��LL W M C U W 2 W Z O U wZa Z D O w I..L O Y Z O W O f� Y Z Q a w W VJ ''^^ (n J_ Q aw Z 'Q vJ Lu l' J T_ LJ_ J LL U U) o O 0o II U W < 2 �" E W N ai U cr) N "O M W Z U - v Q Z M U Luv� N U 0 (SS m 22 ��LL W M C U W 2 W Z O U wZa Z D O w I..L O Y Z O W O f� Y Z Q a w W VJ ''^^ (n J_ Q aw Z 'Q vJ Lu l' J T_ LJ_ J LL U U) o O 0o II U W < 2 �" l' J T_ LJ_ J LL U U) o O 0o II U W < 2 �" I-- E ALL WETLANDS WILL BE SHOWN ON FINALuj F 04 04 "6 co N CORECORDED MAP. THE CORPS OF co ENGINEERS MUST BE CONTACTED z N N BEFORE ANY WETLAND IS IMPACTED. < �~ EE °' w �mw_ z ,L J co °' LL 0 o J co c O Lr-W 1 N w0 1 c,1 I 36 1 P �M� 13f Z 0 C) IL POTENTIAL 12' 1 3:0 DRIVEWAYO LOCATION / U Q (TYP.) // POTENTIAL z Z HOME O LOCATION 0 I 11 (TYP.) I W 1 1 PROPOSED WETLAND IMPACT / j / = W 1 —1 0Nz 2 E9 Q co ,3,1�� co _ 1 co D — ! /60 1 1 cr Q — La I I LuI 32 31 ' 1 J / IL Q C) z� 1 1 9 E80HNui w � n28 ALL WETLANDS WILL BE SHOWN ON FINAL RECORDED MAP. THE CORPS OF i ENGINEERS MUST BE CONTACTED BEFORE ANY WETLAND IS IMPACTED. 1 � / 50 POTENTIAL 12' / DRIVEWAY LOCATION (TYP.) / POTENTIAL 1 HOME \ LOCATION —� (TYP.) , N - W ol 49 41 I-- E wC0 04 F- W (nN OMB Z U � �2 v Qz cc') N Ocu E z w J Mom" U o �J/ M � L.1.. a U� wz 0 wzIL z O o 3:13 z ? O � W Z W O '2 u 22 Q W 0 06 co w LL a O U) C) CV CD Z a u W of m ALL WETLANDS WILL BE SHOWN ON FINAL RECORDED MAP. THE CORPS OF ENGINEERS MUST BE CONTACTED BEFORE ANY WETLAND IS IMPACTED. 06 111 \ / \ � o / � o / N > , 00 Z6 POTENTIAL 12' _ DRIVEWAY / T LOCATION / / \ POTENTIAL I HOME LOCATION / 54 9 I 56 1 / A 5 1 1 1 m> m> 1 ELLIC SHERI NCI E84 V N I-- E wC0 04 F- 04 "6 N W (nN 0�2 Z U � � v Qz cc') N O E w J z cu LL U oJ co c O/ L r- �W U W Oz 0 v wz a Z O o-o 3:0 Z co W z NW O '2 u 22 Q W H 0 a J o , T- w LL Q O U) o v ('') CD Z a Lu Lu _ m