Loading...
HomeMy WebLinkAboutNCC204771_NOT Closeout Documents_20211006From: Shook, Eric A To: Mason, Kevin Tate Subject: Re: [EXTERNAL] Construction Stormwater Permit Annual Fee - NCC204771 Date: Friday, October 1, 2021 8:31:43 AM Closed out on 4/14/21 8:281 .i1 LTE W 04-14-2021 Closure Inspection Report (FCRSY-2020-019) T PDF - 248 KB North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Forsyth Project: Northern Beltway Transmission Line River basin: Yadkin-PeeDee Person financially- responsible: Duke Energy - Randy N Velvi Project #: FORSY-2020-019 Address: 526 S. Chmch St, PO Box 1007, Charlotte, NC 28202 1. Protect Location: US Hwy 52, Winston-Salem Pictures: Yes -Digital 2. Weather and soil conditions: Sunny, Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S. P.C.A. and rules? Yes If no, check violations below: S. Violations: 6. Is the site in compliance with NPDES Permit NCGOI OOOO Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: S. Contact made with (name): Ryan Swaim Inspection report. Sent Report 4. Corrective action needed: Title: Field Superintendent Date givculsent: April 16, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections an: required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the pertnince via a Notice of Termination (NOT). The NOT is available at: https:!ledocs.deq.nc.gov/Fonns/NCGOI-Temuination. Please note that this correspondence must be uploaded as par of completing the NOT process. Reported by: Tyler Pearson Others present: Date of inspection: April 14, 2421 Time arrking on site: qy �O AM Time leaving site: 10:15 AM CC: E Get Outlook for iOS From: Mason, Kevin Tate <Kevin.Mason @duke-energy.com> Sent: Friday, October 1, 2021 8:13:28 AM To: Shook, Eric A <Eric.Shook@duke-energy.com> Subject: FW: [EXTERNAL] Construction Stormwater Permit Annual Fee - NCC204771 Is Northern Beltway ready to be closed out? From: Veltri, Randy N <Randy.Veltri@duke-energy.com> Sent: Friday, October 1, 2021 7:07 AM To: Mason, Kevin Tate <Kevin.Mason @duke-energy.com>; Goto, Jeff <Jeff.Goto@duke- energy.com>; Clary, Christopher <Christopher.Clary2@duke-energy.com> Subject: FW: [EXTERNAL] Construction Stormwater Permit Annual Fee - NCC204771 Not sure who is the Northern Beltway ? From: laserficheC@ncdenr.gov <laserficheC@ncdenr.gov> Sent: Friday, October 1, 2021 6:22 AM To: Veltri, Randy N <Randy.VeltriCa�duke-energy.com> Cc: Shook, Eric A <Eric.ShookCa�duke-energy.com>; aziza.selkanec@ncdenr.gov; bethank.georgouliasCo�ncdenr.gov Subject: [EXTERNAL] Construction Stormwater Permit Annual Fee - NCC204771 Attached is the 2021 annual fee invoice for your Construction Stormwater NPDES permit, COC no. NCC204771. When using the ePayment website, be sure to enter ONLY the COC number (not the invoice number with "-2021" after it). Please contact Aziza Selkane at aziza.selkaneC@ncdenr.gov or (919) 707-3710 with any questions. If this project has been closed out, you must submit a Notice of Termination (NOT) request here: https://edocs.deq.nc.gov/Forms/NCG01-Termination Sincerely, The DEMLR Stormwater Program This email was automatically generated by Loserfiche. Please do not respond to this email address, os responses ore not monitored.