Loading...
HomeMy WebLinkAbout20211478 Ver 1_10 - ORM_Upload_Sheet_Consolidated_NWPR_20200626 (2021.052) (8).xlsm - Impacts (1)_20211008a ers_ ame I Name I — Activity I Resource —Type WA WA Discharge of fill material Non -Tidal Wetland WA WA Discharge of fill material Non -Tidal Wetland S1 Tributary B Discharge of fill material River/Stream lPermanent_Lossllmpact_Durationl Amount Type (Amount Unitsl Initially_Proposed_llnitially_Proposed_I YES Permanent 0.146 0.146 NO Temporary 0.35 0.35 YES Permanent 119 119 I nitially_Proposed_ I Proposed_ I Proposed_ I Proposed_ I Authorized I Authorized_ I Authorized_ I Debits 0.146 0.35 119 Notes