HomeMy WebLinkAbout20130999 Ver 1_Major Variance_20130916NCDEE R
North Carolina Department of Environment and Natural Resources
Division of water Quality
Pat McCrory Thomas A. Reeder
Governor Acting Director
Variance Request Form
(For Minor and Major Variances)
Protection and Maintenance of Riparian Areas Rules
NOTE., Thisform may be phorocopiedfor use as an original.
Check the appropriate box below:
❑ Major Variance
EV Minor Variance
John Skvada
Secretary
RECEIVED
SEP 16 2013
DWQ -WARD ,
\-; � - pan
Please identify which Riparian Area Protection Rule applies (Note-this must be one of
North Carolina's four buffered river basins. The River Bain map is available at
http://h2o.enr.state.ne.us/admin/mao.)
1� Neuse River Basin: Nutrient Sensitive Waters Management Strategy
Protection and Maintenance of Riparian Areas Rule (15A NCAC 02B.0233)
o Tar - Pamlico River Basin: Nutrient Sensitive Waters Management Strategy
Protection and Maintenance of Riparian Areas Rule (15A NCAC 02B.0259)
Part 1: General Information
(Please include attachments if the room provided is insufficient.)
1. Applican 's name ( corporation, individual, etc. who owns the property):
2. Print owner /Signing official (person h
Name:
Title: own
ow of
Street address:
City, State, Zip: —Awe.-
e.— L
Telephone: (/pl -
Fax: t . ... 1... .
esponsible for the property and its compliance)
3. Contact person who can answer questions about the proposed project:
Version 6: July 2009
Name:
Fax:
Email:L^L��!CXcti
4. Project name (Subdivision, facility, or establishment name -consistent with project name on
plarippecifi9pti9nsp le , oyeration and maintenance agreements, etc.): + ��
ra r. /
5. Project location:
Street address:
City, State, Zip:
County: _� Y_lt.Y_ L N..--
Latitude /longitude: -_ . ..., 4?p3__1O)jJ
6. Date property was purchased: _ !�ZJ `/ 2
7. Directions to site from nearest major intersection (Attach an 8 %2 x I I copy of the U SGS
topograp is map indicating the location of the site).
8. Stream to be impacted by the proposed activity:
Str name (for unnamed stream 1 bel as " UT to the nearest name stream):
�g/C
9. Which of the following permits /approvals will be required or have been received already for this
project?
Required: Received: Date received: Permit Type:
CAMA Major
CAMA Minor
401 Certification/404 Permit
_... _ On -site Wastewater Permit
_ NPDES Permit (including stormwaler)
_.. ✓. —_ Non- discharge Permit
Water Supply Watershed Variance
- -- Erosion/Sedimentation Control
Others (specify)
Part 2: Proposed Activity
(Please include attachments if the room provided is insu)Jr1cient.)
1. Description of proposed activity (Also, please attach a map of sufficient detail (such as a plat map
or site plan in Adobe (pdf) format) to accurately delineate the boundaries of the land to be utilized
in carrying out the activity, the location and dimension of any disturbance in the riparian buffers
associated with the activity, and the extent of riparian buffers on the land. Include the area of
buffer impact in
lit c1 k c�� ircro65 L,124-..._o -+ sun�oo�ar , lJ�clJ�,aav
Variance Request Form, page 2
Version.6 July 2009
5e
k7a✓'v— t OC–+st je_ aC odi s r v r
2. Fill in the table below to identify the square footage of impact to Zones I & 2 in the protected
riparian buffers and the required mitigation (Fill in the impacts portion of the table, even if
mitigation is not required):
'Zone 1 extends out 30 feet perpendicular from the most landward limit of the top of bank or the rooted herbaceous
vegetation; Zone 2 extends an additional 20 feet from the edge of Zone I.
3. State reasons why this plan for the proposed activity cannot be practically accomplished, reduced
or reconfigured to better minimize or eliminate disturbance to the riparian buffers:
4. Description of any best management practices to be used to control impacts associated with the
proposed activity (i.e., control of runoff from impervious surfaces to provide diffuse flow, re-
planting vegetation or en�haancem leqnt of existing vegetation, a��c /)1 /
dec 5 __�¢" �hot�e ql �e K /i f Fi t. r�,j
5. Please provide an explanation of the following:
(1) The practical difficulties or hardships that would result
the strict application of this Rule.
(2) How these difficulties or hardships result from conditions that are unique to the property
involved.
V aHanee Request Form, page 3
Version 6 July 2009
Buffer Impact
Zone of
Impact in
Number
Purpose for
Multiplier
Required
Impact
Square Feet
(Indicate on
the Impact
Mitigation
Plan Sheet
Zone 1
0
3
�
Zone '2
15
Total
'Zone 1 extends out 30 feet perpendicular from the most landward limit of the top of bank or the rooted herbaceous
vegetation; Zone 2 extends an additional 20 feet from the edge of Zone I.
3. State reasons why this plan for the proposed activity cannot be practically accomplished, reduced
or reconfigured to better minimize or eliminate disturbance to the riparian buffers:
4. Description of any best management practices to be used to control impacts associated with the
proposed activity (i.e., control of runoff from impervious surfaces to provide diffuse flow, re-
planting vegetation or en�haancem leqnt of existing vegetation, a��c /)1 /
dec 5 __�¢" �hot�e ql �e K /i f Fi t. r�,j
5. Please provide an explanation of the following:
(1) The practical difficulties or hardships that would result
the strict application of this Rule.
(2) How these difficulties or hardships result from conditions that are unique to the property
involved.
V aHanee Request Form, page 3
Version 6 July 2009
(3) If economic hardship is the major consideration, then include a specific explanation of the
economic hardships and the proportion of the hardship to the entire value of the project.
Part 3: Stormwater
1. Provide a description of all best management practices (BMPs) that will be used to control
nutrients and sedimentation impacts associated with the proposed activity. Please ensure to
include all applicable operation& maintenance agreements and worksheets for the pro ose
BMPs. Also, include the B�'� ?n your Ian she
2. Attach a description of how diffuse flow will be maintained through the protected riparian
buffers. Please ensure to include all applicable operation & maintenance agreements and
worksheets for the proposed diffuse flow measure(s). Also, include the diffuse flow measure(s)
on your plan sheets. See I" r iv 3r
3. What will be the annual nitrogen load contributed by this site after development in pounds per
acre per year without structural BMPs (stormwater pond, wetland, infiltration basin, etc)? Attach
a detailed plan for all proposed structural stormwater BMPs.
Drainage
basin
Site of
drainage
basin
(ac)
Post - development
nitrogen° loading
rate without BMPs'
Obs/ae/yr)
BrMP trilmSend
removal
efficiency'
00
Final
nitrogen`
loading rate
(Ibslacfyr)
Final
nitrogen'
loading
from
drainage
basin !bs
I
GL
yl ww-
y16Yte
$K—
n 6`,�
2
3
4
S
Atlach calculations and references.
r Attach calculations and references.
6Include Phosphorus in the Tar - Pamlico Basin
4. Attach all applicable supplement'form(s) and Inspection and Maintenance (I &M) Form(s)to this
completed application. The applicable supplemental form(s) and,I &M form(s) for the proposed
BMPs noted in your application can be downloaded from the following website:
http : / /h2o,enr.state.ne.us /su /bmn forms.htm �
Variance Request Form, page 4
Version 6 July 2009
�Vsrt 4: Proposed Impacts and,Mitigation
Provide a description of how mitigation will be achieved at your site pursuant to 15A NCAC 2B.0242
fbi the Neuse Basin and 15A NCAC 213.060 for the Tar - Pamlico Basin.
If buffer restoration is the method you are requesting, be sure to include a detailed planting plan to
include plant type, date of plantings, the date of the one -time fertilization in the protected riparian
buffers and a plan sheet showing the proposed location of the plantings. A guide to buffer restoration
can be downloaded at the following website: httn: / /riww.neeeo.net/news /reports /buffers.pdf
If payment into a buffer restoration fund is how you plan to achieve your mitigation requirement, then
include an acceptance letter from the mitigation bank you propose to use stating they have the
mitigation credits available for the mitigation requested.
Part 5: Deed Restrictions
By your signature in Part 6 of this application, you certify that all structural stormwater BMPs
required by this variance shall be located in recorded stormwater easements, that the easements will
run with the land, that the easements cannot be changed or deleted without concurrence from the
State, and that the easements will be recorded prior to the sale of any lot.
Part 6: Applicant's Certification
1, _ W ✓ 5 c -- _ _ (print or type name of person listed in
Part 1, Item 2), certi that the informa ion included on this permit application form is correct, that the
project will be constructed in conformance with the approved plans and that the deed restrictions in
accordance with Part 5 of thi>*5f o- will be pl:6 ded with all required permit conditions.
Signature; Date:
Title: 3.... -...— -- -- -- — ....,....._....
Part 7: Plan Sheets
Be sure to include a copy of all of your completed application form, plan sheets and maps in Adobe
(pol) format on a CD or floppy disk.
Variance Request Fmm, page 5
Version 6 July 2009
Part 8: Checklist
A complete application submittal consists of the following components. Incomplete submittals will
be returned to the applicant. The complete variance request submittal must be received 90 days prior
to the EMC meeting at which you wish the request to be heard. Initial below to indicate that the
necessary information has been provided.
Applicant's
Ioitis[s
- )
Item
• Original and two copies of the Variance Request Form and the attachments
listed below. .
• A vicinity map of the project (see Part 1, Item 5)
• Narrative demonstration of the need for a variance (see Part 2)
• A detailed narrative description of stormwater treatment/management (see Part
4)
Calculations supporting nitrogen (phosphorus in the Tar - Pamlico Basin)
loading estimates (see Part 4)
Calculations and references supporting nitrogen (phosphorus in the Tar -
Pamlico Basin) removal from proposed BMPs (see Part 4)
Location and details for all proposed structural stormwater BMPs (see Part 4)
Three copies of the applicable Supplement Form(s) and I &M Form(s) for each
BMP and/or narrative for each innovative BMP (see Part 4)
Three copies of plans and specifications, including:
0 Development/Project name
0 Engineer and firm
0 Legend and north arrow
0 Scale (I"= 50' is preferred)
0 Revision number & date
0 Mean high water line (if applicable)
0, Dimensioned property/project boundary
.0 Location map with named streets or NC State Road numbers
4 Original contours, proposed contours, spot elevations, finished floor
elevations
-0 Details of roads, parking, cul -de -sacs, sidewalks, and curb and gutter
0
0
r!
0
-0
Variance Request Form, page 6
Version 6 July 2009
Footprint of any proposed buildings or other structures
Wetlands delineated, or a note on plans that.none exist
Existing drainage (including off - site), drainage easements, pipe sizes,
runoff calculations
Drainage basins delineated
Perennial and intermittent streams, ponds, lakes, rivers and estuaries
Location of forest vegetation along the streams, ponds, lakes, rivers and
estuaries
6-108 Casticlon Ct, New Bern, NC 28560 Directions, Location and Map I MapQuest Page I of I
Notes
mapquest'
Map of:
6108 Castleton Ct
New Bern, NC 28560-7173
BOOK TRAVEL with mapquest• (877) 577-5766
AR 2� 4P
,
' W'W
.Z
RP
Wh
3�11
64 R
mkv
f N
or
'Ili mor��%
W013 mwou ft. UmddrYetl0lp.Nm.P.'. .u) btlf0W4PQU,StTr Imuft
YOU Mume SO nU 0 UN. V, Tem, 94 U
http://www.mapquest.com/print?a=app.core.aebd21 dd22badb9cc9dla5d0 9/12/2013
,A
O
OD >
Pj
I
ITI
-A
I
Rl RI x
.4gil
JUN
Kr
O
IOM i
IT si
v.
ji
1( 7
t.)
00,
WIM
t �
lf-�
i TI
C�
ip
v.
ji
1( 7
t.)
00,
WIM
t �
lf-�
i TI
lit
L CD
is
TY,
Scheller, Roberto
From: Connie Simpson [nc6108 @gmail.com]
Sent: Thursday, September 12, 2013 12:03 PM
To: Scheller, Roberto
Subject: Re: Deck Construction within Neuse Riparian Buffer
Attachments: Variance6.jpg; Map.jpg; PlotPlanl.jpg; P1otP1an2.jpg, Variancel.jpg; Variance2.jpg;
Variance3.jpg; Variance4.jpg, Variance5.jpg
Hello Roberto,
Attached is the completed application (Variance 1 thru 6), plus a copy of our plot plan (in 2 parts) and a map of
the area.
Unfortunately, I am unable to send these in PDF format due to computer /printer constraints. Due to this, there
are several attachments.
Please call me if you have any questions.
Wray Simpson
614 -406 -8599
On Mon, Sep 9, 2013 at 4:36 PM, Scheller, Roberto <roberto.schellern,ncdenr.aov> wrote:
Mr. Simpson:
Attached to this email should be a copy of a Variance Request form. Please complete and return to me. We will
also need a copy of your deed or plat showing the date of when property was recorded as residential property.
If your lot was recorded before August 1, 2000 you may be eligible for Session Law 2012 -200 which would
permit you to construct your proposed deck, or even a larger deck, within Zone 2 of the riparian buffer. Please
give me a call so can further discuss your project.
Thank you
RL Scheller
Division of Water Quality
Surface Water Protection Section
Washington Regional Office
252 -948 -3940
* *E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law
and may be disclosed to third parties. **