HomeMy WebLinkAboutSW7970407_CURRENT PERMIT_20070620STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW ^T'�
DOGTYPE
CURRENT PERMIT
APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2Z I) � I/e,,..
YYYYMMDD
WA1'ERO
Michael F. Easley, Governor w
�QF
(i
Secretary
�O
r!J
William G. Ross Jr.,
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
DIVISION OF WATER QUALITY
June 20. 2007
Graveyard of the Atlantic Museum
Attn.: Mr..Joseph K. Schwarzer.
P.O. Box 191
Hatteras, NC 27943
Subject: Permit No. SW7970407 Renewal
Graveyard of the Atlantic Museum
High Density Stormwater Project
Dare County
Dear Mr. Schwarzer:.
The Washington Regional Office received a completed Stormwater Renewal Application for the subject
project on January 26, 2007. Staff review of the files and an on site inspection has determined that the project will
comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No.
SW7970407 dated June 20, 2007 to the Graveyard of the Atlantic Museum for three infiltration basins to serve
Graveyard of the Atlantic Museum located along the NC 12 spur, just west of NCDOT Ferry Docks, in Hatteras, NC.
This permit shall be effective from the date of issuance until June 20, 2017 and shall be subject to the
conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance
requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater
management system will result in future compliance problems. The issuance of this permit does not resolve any
previous violations of the stormwater rules for construction without a permit.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes,
and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such
demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact Samir
Dumpor or me at (252) 946-6481.
incerel
AI od e, egtonal Supervisor
Surface Water Protection Section
Washington Regional Office
cc: X/*ashington Regional Office
Central Files
North Carolina Division of Water Quality Internet: www.ncwateraualit .ore
943 Washington Square Mall Phone (252) 946-6481
Washington, NC 27889 Fax (252)946.9215
None
rthCarolina
Naturally
An Equal OpporanitylARrmative Action Employer— 50% Recycled110% Post Consumer Paper
State Stormwater Management Systems
Permit No. SW7970407
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and
other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Graveyard of the Atlantic Museum
Dare County
FOR THE
continued, operation and maintenance of stormwater management systems in compliance with the provisions of 15A
NCAC 2H.1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans
and specifications and other supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit for three infiltration basins to serve Graveyard of the Atlantic Museum
located along the NC 12 spur, just west of NCDOT Ferry Docks, in Hatteras, NC.
This permit shall be effective from the date of issuance until June 20, 2017 and shall be subject to the following
specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in the application and
other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6
of this permit. The stormwater control has been designed to handle the runoff from 101,185 square feet of
impervious area.
3. The tract will be limited to the amount of built -upon area indicated on the drainage area table of this permit, and
per approved plans.
4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded
easements. The final plats for the project will be recorded showing all such required easements, in accordance
with the approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the
permitted stormwater control system.
6. The following design criteria have been provided in the infiltration basins and must be maintained at design
condition:
Project Name:
Permit Number:
Location:
Applicant:
Mailing Address:
Receiving Stream and index No.:
Classification of Water Body:
Total Site Area:
Design Storm, inches:
Impervious area in drainage basin:
Infiltration Basin Depth:
Basin bottom elevation, FMSL:
Bypass Overflow Elevation, FMSL:
Type of Soil:
Provided Storage Volume:
Time to Draw Down:
Expected Infiltration Rate, in/hr:
DIVISION OF WATER QUALITY
PROJECT DATA
Graveyard of the Atlantic Museum
SW7970407
Dare County
Graveyard of the Atlantic Museum
P.O. Box 191, Hatteras, NC 27943
Pamlico Sound
SA
7.0 ac
1.5
Basin "1"
Basin "2"
Basin "3"
76,497 sf
6,242 sf
18,446 sf
1.0 ft
1.0 ft
1.0 ft
4.5
4.5
4.5
5.5
7.0
7.0
Newhan
Newhan
Newhan
28,764 cf
2,825 cf
4,590 cf
< 1 day
< 1 day
< 1 day
>20
>20
>20
The following items will require a modification to the permit:
a. Any revision to the approved plans, regardless of size
b. Project name change
C. Transfer of ownership
d. Redesign or addition to the approved amount of built -upon area
e. Further subdivision of the project area.
In addition, the Director may determine that other revisions to the project should require a modification to the
permit.
8. The Director may notify the permittee when the permitted site does not meet one or more of the minimum
requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written
time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of revised plans and certification in writing to the Director that the changes have been made.
SCHEDULE OF COMPLIANCE
The permittee will comply with the following schedule for construction and maintenance of the stormwater
management system.
a. The stormwater management system shall be constructed in its entirety, vegetated and operational
for its intended use prior to the construction of any built -upon surfaces except roads.
b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be
repaired immediately.
2. The facilities must be properly maintained and operated at all times. The approved Operation and
Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals.
3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted
stormwater system functions at optimum efficiency including, but not limited to:
a. Semiannual scheduled inspections (every 6 months)
b. Sediment removal
C. Mowing and revegetation of side slopes
d. Immediate repair of eroded areas
e. Maintenance of side slopes in accordance with approved plans and specifications
f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping.
4. Records of maintenance activities must be kept and made available upon request to authorized personnel of
DWQ. The records will indicate the date, activity, name of person performing the work and what actions were
taken.
5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of
this permit, the approved plans and specifications, and other supporting data.
6. Upon completion of construction and prior to operation of this permitted facility, a certification must be
received from an appropriate designer for the system installed certifying that the permitted facility has been
installed in accordance with this permit, the approved plans and specifications, and other supporting
documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall,
Washington, North Carolina, 27889, attention Division of Water Quality.
7. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of
five years from the date of the completion of construction.
III. GENERAL CONDITIONS
1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is
a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality
accompanied by an application fee, documentation from the parties involved, and other supporting materials
as may be appropriate. The approval of this request will be considered on its merits and may or may not be
approved.
2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to
enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-
215.6(a) to 143-215.6(c)..
3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules,
regulations, or ordinances which may be imposed by other government agencies (local; state, and federal)
which have jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the
Permittee shall take immediate corrective action, including those as may be required by this Division, such as
the construction of additional or replacement stormwater management systems.
5. The permitee grants DENR Staff. permission to enter the property during normal business hours for the
purpose of inspecting all components of the permitted stormwater management facility
6. The permit may be modified; revoked and reissued or terminated for cause. The filing of a request for a
permit modification, revocation and reissuance or termination does not stay any permit condition.
7. An application for permit renewal must be submitted at least 180 days prior the expiration of this permit along
with the appropriate processing fee.
Permit issued this the 20th day of June, 2007.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
� Coleen H. Sullins, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number SW7970407
08-03-2006 04:33pm From-GUIBLE&ASSOCIATES 2522611260 T-TOB P.002/002 F-938
The Graveyard of the Atlantic Museum
Dare County
Stormwater Permit No. SW7970407
Designer's Certification
1, J. VACZ;ry/FSoI, M'—
registered Professional Engineer in the State of
having been authorized to observe (periodically/u
the construction of the project, �Ftd✓F-Yjjf?p ol7tli
for
hereby state that to the best of my abilitie
diligence was used in the observation of the pro
such that the construction was observed to
substantial compliance and intent of the apt
specifications. ote zyt,,.
signature ter"
Registration Number
Date 4W-401/.,
[3
JAN 2 -0 2007
DWQ-WARD
, as a duly
North Carolina,
!ekly/full tine)
(Project)
(Project Owner)
, due care and
ect construction
built within
:)ved plans and
Permit No#
ECF.M-D
WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
,,I
Maintenance activities shall be performed as follows: JAN 2 J 2007
1. After every significant runoff producing rainfall event and at least monthly: DWQ-WARC
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition.
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occur within
2 to 5 days as designed.
2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
-- cover to maintains maximum height of six inches, and remove trash as needed. —
3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain
proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to
75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an
appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or stream, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments.
When the permanent pool depth reads feet in the main pond, the sediment shall be removed.
When the permanent pool depth reads feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(fill in the blanks)
Permanent Pool Elevation
Scdinmm l:en ucal GI. 1 7 Removal
Elevation
7i
Sediment Removal Elevation 7�
liotmm Gle miun .. � ---
---- V n )
FOREBAY
MAIN POND
Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency drain shall be minimized to the maximum extent practical.
7. All components of the wet detention basin system shall be maintained in good.working order.
81. °Remove all trees and heavy woody vegetation from the basins and dike walls.
I acknowledge and agree by my signature below that I am responsible for the performance of the eight
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party:
Printname: JOSEPH KARL SCHWARZER
Title;_ EXECUTIVE DTgEcTOR
Address: P.-O. BOX 191 HATTERAS NC 27943
Phone:
Signature:
Date: /01/24/07
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a
resident of the subdivision has been named the president.
I> a Notary Public for the State of
County of do hereby certify at h
personally appeared before me this day of , ��and acknowledge the due
execution of the forgoing wet detention basin maintena require nts. Witness my hand and offtci seal,
Seal
My commission expires �(