Loading...
HomeMy WebLinkAboutSW7130611_CURRENT PERMIT_20130723STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW :26I� DOC TYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 1) YYYYMMDD 1� Pat McCrory Governor ��A ��_ NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Thomas A. Reeder Mr. Donald Bass, Chairman of Deacons Rocky Hock Baptist Church 113 Rocky Hock Church Road Edenton, NC 27932 Dear Mr. Bass: Director John E. Slvarla, III Subject: Stormwater Permit No. SW7130611 Rocky Hock Baptist Church Addition High Density Commercial Wet Pond Project Chowan County The Washington Regional Office received a complete Stormwater Management Permit Application for the Rocky Hock Baptist Church Addition project on June 19, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7130611 dated July 23, 2013, for the construction of the subject project. This permit shall be effective from the date of issuance until July 23, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the: Operation and Maintenance requirements in this permit. Failure to establish an adequate: system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Samir Dumpor at (252) 946-6481. Sincerely, Iz Thomas A. Reeder Division of Water Quality AA/ sd: K:\WQS\STORMWATER\SD\SW7130611 cc: Steve Janowski, PE, J.S. Janowski Engineering, PA (PO Box 30906, Greenville, NC 27833-0906) Chowan County Building Inspections ✓Washington Regional Office North Carolina Division of Water Quality Internet: www.ncwaleraualilv.ore 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27889 FAX 252-946-9215 North Carofiina An Equal Opportunity/Affirmative Action Employer- 50%Regded/10% Post Consumer Paper Natutnl& State Stormwater Management Systems Permit No. SW7130611 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Rocky Hock Baptist Church Rocky Hock Baptist Church Addition Chowan County FOR THE construction, operation and maintenance of one wet detention pond in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until July 23, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 192,797 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section I. of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of thi;c project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent surface waters. . 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: Page 2 of 7 State Stormwater Management Systems Permit No. SW7130611 a. Drainage Area, ftZ: 303,178 b. Total Impervious Surfaces, ftZ: 192,797 C. Design Storm, inches: 1.5 d. Pond Depth - average, feet: 5.7 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 15.00 g. Permanent Pool Surface Area required, ftZ: 11,976 h. Permanent Pool SurfacsArea , ft : 19,414 i. Min. Volume required, ft : 23,584 j. Permitted Storage Volume, ft3: 28,823 k. Temporary Storage Elevation, FMSL: 16.21 I. Controlling Orifice: 2.00" 0 pipe M. Permitted Forebay Volume, ft': 15,943 n. Receiving Stream/River Basin: Rocky Hock Creek/Chowan River Basin o. Stream Index Number: 25-22 p. Classification of Water Body: "B;NSW" II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. Access to the stormwater facilities shall be maintained via appropriate easements at all times. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 3 of 7 State Stormwater Management Systems Permit No. SW7130611 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to thy; Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee mu:;t submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved The permittee is responsible for compliance with all permit conditions until e;uch time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Qualify, in accordance with North Carolina General Statute 143-215.6A to 143-215.6(:. Page 4 of 7 State Stormwater Management Systems Permit No. SW7130611 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from the date of issuance until July 23, 2021. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 23rd day of July, 2013. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION (: for I-homas A. Ree er, Acting Director Division of Water Quality By Authority of the Environmental Management Commission Stormwater Permit No. SW7130611 Page 5 of 7 State Stormwater Management Systems Permit No. SW7130611 Rocky Hock Baptist Church Addition Stormwater Permit No. SW7130112 Chowan County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to tha best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW7130611 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. , 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Chowan County Building Inspections Page 7 of 7 State Stormwater Management Systems Pen -nit No. SW7130611 Rocky Hock Baptist Church Addition Stormwater Permit No. SW71301061( Chowan County Designer's Certification / / in the 1, �� as a duly registered ' State of North arolina, having been authorized to obse a (�wi wee ly/ full time) the construction of the project, for 14" *1��r + Z, (Project owner) hereby state that, to the best of my abiliti s, due care arfd diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans d specification: fGYCrJ A�4jl#j &A, *//* �'b� Date Page 6 of 7 OQ,QOF�SSIOIq�. 9 2/c U��• 4 • 2aZ R•,�'�PMEN �P`�� Certification Requirements: %11 State Stormwater Management Systems Permit No. SW7130611 The drainage area to the system contains approximately the permitted acreage. The drainage area to the system contains no more than the permitted amount of built -upon area. All the built -upon area associated with the project is graded such that the runoff drains to the system. All roof drains are located such that the runoff is directed into the system. The outlet/bypass structure elevations are per the approved plan. The outlet structure is located per the approved plans. Trash rack is provided on the outlet/bypass structure. All slopes are grassed with permanent vegetation. Vegetated slopes are no steeper than 3:1. The inlets are located per the approved plans and do not cause short- circuiting of the system. The permitted amounts of surface area and/or volume have been provided. Required drawdown devices are correctly sized per the approved plans. All required design depths are provided. All required parts of the system are provided, such as a vegetated shelf, and a forebay. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Reoional Office Chowan County Building Inspections Page 7 of 7 IJANOWSKI ENGINEERING. PA CJ754 PO Box 30906 Greenville, NC 27833.0906 (252)714-3002 Rocky Hock Church Additions 4/11/2014 8 toot deep Average Permanent Pool Depth Calculation Using Option 2 OPTION 2 Area1,,,,,,,,,Sh01l �Areaa�,,,,,»sV'n+Arecr w...,,,r....d * Depth ( JI + p rr: = 0.25* I 1 + Area 2 lr r„� r�„i Permanent Pool Elev = 15 Top of Sediment Poo'_8 ITEM AREA DEPTH W ft Areap..p a 19414 Areaeouomshw 15310 Areaeo,t.ca„ a 5952 Depth 7.00 I.S. JANOWSKI _. ENGINEERING. PA C4754 PO Box 30906 Gr4enville, NC 27833.0906 (252)714.3002 Rocky Hock Church, Chowan County 4111/2014 8 foot deep Storage Volume FOREBAY VOLUME surface diff. accum. Elevation area elev stomps storage Elevation Stage 5.00 5.90 1.00 6,00 6.00 1.00 414 7.00 828 414 7.00 1.0 1.00 942 8.00 1056 1,356 8.00 2.0 1,00 1,178 9.00 1300 2.534 9.00 3.0 1,00 1,430 10,00 1560 3,964 10.00 4.0 1.00 1.698 11.00 1836 5,662 11,00 5.0 1.00 1.982 12.00 2128 7,644 12.00 6.0 1.00 2,282 13.00 2436 9,926 13,00 7.0 1,00 2,598 14.00 2760 12,524 14.00 8.0 0.50 1,422 14.50 292B 13,946 14.50 8.5 050 1.689 15.00 3828 15,635 15.00 9,0 MAIN POND VOLUME surface diff. accum. Elevation rea elev storage storage Elevation Stage 5.00 - 5.00 1.00 6,00 - 6,00 1.0 1.00 1,957 7.00 3,914 1,957 7.00 2.0 1.00 4.405 8.00 4.896 6,362 8.00 3.0 1.00 5,408 9.00 5,920 11.770 9.00 4.0 1,00 6,452 10.00 6,984 18,222 10.00 5.0 1.00 7,537 11.00 8,090 25,759 11,00 6.0 1.00 8,663 12.00 9,236 34,422 12.00 7.0 - 1.00 9.902 13.00 10.568 44.324 13.00 Bo 1,00 11.110 14,00 -11.652 55,434 14.00 9.0 050 6.009 14.50 12.382 61,443 14.50 es 0.50 6.992 ' 15.00 15.686 68,435 16.00 10.0 J.S. )ANOWSKI F.NGINIi Ii RING. PA cnu wads.... ad..er.xc n.»bm. deq ruaeM Rocky Hock Church Addition a row a..a r.tl.fw aurlu.A.ma..'WAA.RN.IR nr. Pad 9¢wmA[I'F.Wawad rna Po\Ilnl R.R..EIIn.n:Yn W Lw41 .pon NW rN npuna.W.n.�.. tkuYtM ITi1�N uW..lo M Wab.E NM gnrwMq Wd.Mbn IX.Mp.>�..• eN Am. b b bd 8A IE!I Obl ON OA OH 0Y OA Ob OT 8A141 Tl.fl tp MJ ,0.p1 166,5 t].]W?.r] 10.bU 6211 n.PW 10T r63. wp...ry n'a•M of .D]n a•%e.ss.a 4vv• sb.l. by 4lsora'.w 8eW moee.m. fw Pena oleo m .a Rvaos•oagp MW w In R.nwwnw• Sap Naa I. ]251 M av%.. 013 Rv.OR..aaHl1 Rr� VI%�wNl 3M]5 Rv aM nelvwan.. VWm. mtlrtWbM40..e vo-u.. lo.w•n.a.gmMa.•w•u..l _ _ %Q O.Mw�u�3.mvY..YId VOYM OL aN d v WMmq..b neM _ il�. pwl.id l.Pppuw.MlyrN NNmmb4WNw. yyp p%. �b eM dal w.In. M pwm.M pOd M.Mmn PW.0... Vdvm CM�WEBIpM}]0 P.n�dn.nl PodEMM+ te. wr GP. FNVNM el.w pxm led teN IB.H 15 f0 SSW :J.em ow Ib,Ms fO.Nr .sM as low ".Ms OW qo am lem to frao pew W n.am 5om5 n.W pe lean 31.41 O PY wmx 1eW eo Srorw•.MewQmNrxm ae,.p•wae.• lepl aw m�w..e.• men N .A I.. rdN .00 V. iW.ary 15,M1d A.w.p.0.pT .M II Pd.0 w leaox r Dumpor, Samir From: J Stephen Janowski <jstephenjanowski@jsjengineering.com> Sent: Tuesday, November 18, 2014 3:47 PM To: Dumper, Samir Subject: Rocky Hock Church Attachments: Storm Water Certification Rocky Hock 001.pdf Samir I have attached the certification for the stormwater permit at Rocky Hock Church. The depth of the pond could only be dug to elevation 7 due to the running sands. This dropped the average depth by 0.7' but the surface area provided for this pond still greatly exceeds that of the required surface area. I noted that on the certification Steve J.S. J,ANOWSM ENGINEERING PA Off: PO Box 30906, Greenville, NC 27833-0906 Res: PO Box 2074, Angier, NC 27501 252-714-3002 jstephenjanowski *siengincerin4 Coln www.is'itnowskiengincering.com LA�G'�_ (�Ii DWQ USE ONLY Date Received Fee Paid Permit Number '61i 9 // 3 05-015, s Applicable Rules: ❑ Coastal SW - 1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources R �b Division of Water Quality C E I V E STORMWATER MANAGEMENT PERMIT APPLICATION FOR IUN 1 9 2013 This form may be photocopied for use as an original �l I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent withllu'oj QrrWAR® specifications, letters, operation and maintenance agreements, etc.): Rocky Hock Baptist Church Addition 2. Location of Project (street address): 113 Rocky Hock Church City:Edenton County:Chowan Zip:27932 3. Directions to project (from nearest major intersection): At the intersection of Rockv Hock Road and Evans Bass Road 4. Latitude:36° 9' 40" N Longitude:-76° 41' 2" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 5.0 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: FormSWU-101 Version07Jun2010 Page Iof6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Rocky Hock Baptist Church Signing Official & Title:Donald Bass, Chairman of Deacons b. Contact information for person listed in item 1a above: Street Address:113 Rocky Hock Church road City:Edenton Mailing Address (if applicable): Phone: Email:lbunch@rockyhockbaptistchurch.org State:NC Zip:27932 State: Zip: Fax: ( 1 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:Rockv Hock Baptist Church Signing Official & Title:Donald Bass Chairman of Deacons b. Contact information for person listed in item 2a above: Street Address:113 Rocky Hock Church Road City:Edenton Mailing Address (if applicable): Phone: (252 ) 221-4133 Email:lbunch@rockyliockbaptistchurch.org State:NC Zip:27932 State: Zip: Fax: (252 1 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:]. Stephen Janowski PE Signing Official & Title:]. S. Janowski Engineering, PA b. Contact information for person listed in item 3a above: Mailing Address:PO Box 30906 City:Creenville State:NC Zip:27833-0906 Phone: (252 ) 714-3002 Fax: ( ) Email:isteRhenianowski@isiengineering.com 4. Local jurisdiction for building permits: Chowan County Planning and Inspections Point of Contact:Landin Holland Phone #: ( ) (252) 482-5618 Fortn SWU-101 Version 07Jun2010 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The storm water will be treated in a Wet Detention pond design for 90 % TSS removal 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Chowan River River basin. 4. Total Property Area: 6.96 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:6.96 acres Total project area shall be calculated to exclude the following the normal pool of imppounded structures, the area betzoeen the banks of streams and rivers, the area below the Normal High Water (N;q line or Mean High Water (MHW) line, and coastal wetlands landzoard from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal zetlands landzoard of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 63.59 9. How many drainage areas does the project have?2 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information' Draina e Ar`ea 1 Drainage Area 2„ ;Drainage Area _ ,Drainage Area Receiving Stream Name Rocky Hock Ck Stream Class * B,NSW Stream Index Number * 25-22 ✓ Total Drainage Area (so 303178 E `16 }c On -site Drainage Area (so 251341 Off -site Drainage Area (so 51837 Proposed Imervious Area* (so 1 192797 Impervious Area* total 63.59 Impervious** Surface Area ,. ',Drainage: Area .:. Drainage Area + 0raina eArea,"' Draina e°Area._; On -site Buildings/Lots (so 24448 On -site Streets (so 0 On -site Parking (so 52143 ✓ On -site Sidewalks (so 4200 ✓ Other on -site (so 0 Future (so 43561 ✓ Off -site (so 772 Existing BUA*** (so 60725 ✓ Total (so: 192797 Stream Class and Index Number can be determined at: http://portal.ncdenr.or web/wq(ps/csu/classifications Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sulcivalks, gravel areas, etc. Form SWU-10I Version 07Jun20 10 Page 3of6 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Survey and Computer calcualtions Proiects in Union County: Contact DWQ Central Ofjlce staffto check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http:ZZ12ortal.nedenr.orgZweb/wq/ws/suZbml2-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/suZstatesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://vortal.ncdenr.ore;/web/ wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each Item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal. ncdenr ore/web/wq/ws/su/statesw/forms does, Original and one copy of the Stormwater Management Permit Application Form. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. ll Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer tcC http://www.envhelp.org/p gesZonestopexpresshtml for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. A USCS map identifying the site location. If the receivingstream is reported as class SA or receiving stream drains to class SA waters within 1h mile of the site boundary, include the'L mile radius on the map. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: Va. Development/Project name. fb. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. / e. North arrow. ✓ I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. / j. Site Layout with all BUA identified and dimensioned. / k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. Form SWU-101 Version 07Jun2010 Page 4 of 6 n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. /o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHVVT prior to subrnittal, (910) 796-7378.) /10. A copy of the most current property deed. Deed book: 249 Page No: 657 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Cor2orations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http:ZZportal.ncdenr.org/web/wq/ws/suZstatesw/forms dots. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:). Stephen Janowski, PE Consulting Firm:]. S. Janowski Engineering, PA Mailing Address:PO Box 30906 City:Greenville Phone: (252 1 714-3002 Emaii:istephenianowski@isiengineering.com State:NC Zip:27833-0906 Fax: ( 1 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact o In rmation, item la f ) with (print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07Jun2010 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise l will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of County of do hereby certify that before me this _ day of personally appeared . and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION 1, (print or type name ofperson listed in Contact Information, item la) Donald Bass Chairan of Deacons certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 21-1.1000, SL 2006-246 (Ph. 11- Post Construction) or SL 2008-211. Date: /p -- ?,— I, f 0 a N tary Pu�IblQQic for the State of - wicw 1 M 6 - , County of do hereby certify that N��P�TA UtL� personally appeared before me this day of 013 , and acknowledg the due execution of the application for a stornwater permit. Witness my hand and official seal, Aria SEAL My commission expires r� I 1113 Form SWU-101 Version 07Jun2010 Page 6 of 6 q p0 / ®Permit No. Ito be prowled by DWQ) AS" NCDENR Project name Contact person Phone number Date Drainage area number JUN 19 2013 STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. J, 02Of W A TFgOG > y O lqiiii� , Site Characteristics / 1'1 Drainage area 303,178 fe 1�/y/ �SW Impervious area, post -development 192,797 rye 1 °,6 impervious 63.59 % Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required 0 k3 Insufficient required volume. Volume provided 0 ff3 Do NOT fill out BOTH Non -SR and SR data. OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters �. 1.5" runoff volume 23,584 it, Pm-development 1-yr, 24-hr runoff 20,754 ff3 Post -development 1-yr, 24-hr runoff 48,402 n3 i Minimum volume required 27,648 h3 Volume provided 28 823 rya �Do NOT fill out BOTH Non -SA and SA data. Peak Flow Calculations Is the prelliDst control of the lyr 24hr storm peak flow required? y (Y or N) 1-yr, 24-hr rainfall depth 1.5 in Rational C, pre -development 0.37 limitless) Rational C, post -development 0.68 limitless) Rainfall intensity: 1-yr, 24-hr stonn 4.81 irVhr OK Pre -development 1-yr, 24-hr peak flow 6.06 ft /sec Post -development l-yr, 24-hr peak flow 12.13 elsec �'• ti tit7�� PrelPost 1-yr, 24-hr peak flow control 6.07 83lsec a%,Q r CAR' Elevations �� xPEH •.J^ / Temporary pool elevation 16.21 fmsl <� Permanent pool elevation 15.00 fmsl ✓ = SF AL SHW T elevation (approx. at the pen. pool elevation) 15A0 fmsl — — ; LIC. L ° _324 Y e Top of tOfl vegetated shelf elevation Bottom 1011 15.50 fmsl fmsl•'•.!'/GINEE P ` of vegetated shelf elevation 14.50 ••' �� Sediment clearout, topttom of pond) Sediment clea out, bottomelevationtio 5.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state-requird temp. pool? n (Y or N) Elevation of the top of the additional volume 16.2 fmsl OK �e,f-0.6 223I Form SW401-Wet Detention Basin-Reva-RM7109 Parts I. & II. Design Summary, Page 1 of 2 Permit No. - (to be provided by DWQ) r II. DESIGN INFORMATION Surface Areas Area, temporary pool 26,220 %' Area REQUIRED, permanent pool 11,976 %' SAIDA ratio 3,95 limitless) Area PROVIDED, permanent pool, A._pw 19,414 %` OK Vz Area, bottom of 10% vegetated shelf, Ayd s� 15,310 It, Area, sediment cleanout, top elevation (bottom of pond), A,., 3,588 %` Volumes Volume, temporary pool Volume, permanent pool, Vim,,, PW Volume, forebay (sum of forebays if more than one forebay) Forebay %of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? MountainlPiedmonl SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, V� Area provided, permanent pool, A, v� Average depth calculated Average depth used in SAIDA, d„, (Round to nearest 0.5%) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, A.. Area, bottom of 10% vegetated shelf, Aw mml 28,823 %3 �.4/OK 85,864 %3 15,943 %3 18.6% % ✓1 /OK 90 % " / y (YorN) V n (YorN) 3.95 (unitless) n (YorN) t/ 85,864 W 19,414 %e 5.69 it OK 5.7 OK ( / y YorN) 19,414 %' 15,310 f Area, sediment cleanout, top elevation (bottom of pond), A,,,. 3,588 %z 'Depth' (distance btw bottom of 10%shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d„, (Round to nearest 0.511) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of onfice (if -non -circular) Coefficient of discharge (CD) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head(H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume dmwdown time 8.50 It 5.69 % OK 5.7 fi OK y (YorN) 2.00 in in, 0.60 (unless) , 1.10It ✓ n (YorN) (unitless) limitless) it it 6.06 %3lsec 12.13 %3lsec ✓✓j 0.07 1131sec 4.14 days VOK, draws down in 2-5 Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 ✓ OK Vegetated shelf width Length of flowpath to width rafio Mu % ✓ 6 :1 / OK / Length to width ratio 5.8 :1 V OOK K / Trash rack for overflow & orifice? y (Y or N) OK ✓ Freeboard provided 1.8 If OK Vegetated filter provided? n (Y or N) OK Recorded drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build -out? y (Y or N) OK Drain mechanism for maintenance or emergencies is: Pump Out Foam SW<01-Wet Detention Basin-Rev.&91W/09 Pans I. a II. Design Summary. Pape 2 of 2 Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is providerinrZECEI\ /E C This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. JUN 19 2013 This system (check one): � /i P��y � f�® R El does ❑ does not incorporate pretreatment other than a foreba 1! V V V Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long Maintain vegetation at a height of approximately six inches. Form SW401-Wet Detention Basin O&M-Rcv.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: The inlet device: pipe or Swale Potential problem: The pipe is clogged. How I will remediate the problem: Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or otherwise damaged. Replace the pipe. Erosion is occurring in the Swale. Regrade the Swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid The forebay Sediment has accumulated to future problems with erosion. Search for the source of the a depth greater than the original design depth for sediment storage. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on The vegetated shelf Best professional practices show that pruning is needed to maintain optimal plant the plants rather than spraying. Prune according to best professional practices health. Plants are dead, diseased or Determine the source of the dying problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by The main treatment area Sediment has accumulated to hand. If pesticide is used, wipe it on the plants rather than s ra ing. Search for the source of the a depth greater than the original design sediment storage depth. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over 50% of the area. Consult a professional to remove and control the algal growth. Cattails, phragmites or other invasive plants cover 50% of the basin surface. Remove the plants by wiping them with pesticide (do not spray). Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 9 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 9 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blankv) Permanent Pool Elevation 15.0 Sediment Removal .6 1- Pe maven Pool Volume Sediment Removal Elevation 6 1 Voluma Bottom Elevatio 5 ft Min. Sediment Bottom Elevation 5 1 _ft Storage Sedimn FOREBAY MAIN POND Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Rocky Hock Church Baptist Church Additions BMP drainage area number: Print name:Donald Bass Chairman Title:Chairman of Deacons Address:113 Rocky Hoc k Church Road Edenton NC 27932 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of do hereby certify that &" �p pgi personally appeared before me this day o p 13 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, f, SEAL My commission expires 9 113 Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4