Loading...
HomeMy WebLinkAboutSW7130603_HISTORICAL FILE_20130613STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW__ ? DOGTYPE ❑ CURRENT PERMIT APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Pat McCrory Governor L�"r ..,v NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Thomas A. Reeder Activitv Director June 13, 2013 Mr. Dominick Piccolomini, Authorized Representative Virginia Electric and Povv fr Co. (Dominion NC Power) 701 East Carry Street, 12 h Floor Richmond, VA 23219 John E. Skvarla, III Subject: Request for Additional Information Stormwater Permit No. SW7130603 Dominion NC Power—Winfall Substation Perquimans County Dear Mr. Piccolomini: The Washington Regional Office received a Coastal Stormwater Permit Application for the Dominion NC Power — Winfall Substation project on June 6, 2013. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please revise or clarify the Calculations and the Sand Filter Supplement to reflect correct impervious areas. The requested information should be received in this Office prior to June 20, 2013, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject. to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (252) 948-3959 or email me at Samir.Dumpor@ncdenr.gov. Sincerely, Samir Dumpor Environmental Engineer CC: Chris Soldan, ARCADIS-US (1100 Welborne Dr., Suite 100, Richmond, VA 23229) Washington Regional Office North Carolina Division of Water Quality Internet: wwetncwaterquality.org 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27889 FAX 252-946-9215 NorthCarolina An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper Natural& Dumpor, Samir From: Soldan, Chris <Chris.Soldan@arcadis-us.com> Sent: Tuesday, June 18, 2013 3:17 PM To: Dumpor, Samir Subject: RE: SW7130603 - Dominion NC Power - Winfall Substation - additional iformation request Attachments: VNCP Winfall_Sand Filter Drainage Area 06-18-2013.pdf Samir, Attached is the requested sub -drainage area for the sand filter. Let me know if you require any additional information. Thanks again for your help with this project. Thanks, Chris Chris Soldan, PE I Staff Environmental Engineer I chris.soldan anarcadis-us com ARCADIS U.S., Inc. 11100 Welborne Drive, Suite 1001 Richmond, VA 23229 T. 804.665.1095 1 F. 804.740.1053 www.arcadis-us.com Professional Registration/PE-VA, 0402048566 i °125q ro1 From: Dumpor, Samir fmailto•samir dumporCalncdenr govl Sent: Thursday, June 13, 2013 1:59 PM To: Soldan, Chris Subject: SW7130603 - Dominion NC Power - Winfall Substation - additional iformation request Chris, Attached is the additional information request for the Winfall Substation project. Please note the due date (June 20, 2013) for the additional information. If you have any questions, please feel free to contact me. Thanks Samir Samir Dumpor, P.E., Environmental Engineer Division of Water Quality Surface Water Protection Section Washington Regional Office North Carolina Department of Environment and Natural Resources (252) 948-3959 Office (252) 946-9215 Fax Email correspondence to and from this address may be subiect to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other reaulatlon :Jui; ,uA�t pe gizc�a�a4 t� i!!i�q pulse ruIccaa ;uc f ouzo I; i; is uzv:vo; rn itFIiMW M. ci;t.ci-ieanjaslbi �:u�ll co: per}Fri'ui;auc� ioiJua tanu: tllia sygw,,3z :.u•.?r� pu anPrci 3o y}:s woliP C3' o1!U, bnPFc B0.N�,a`rsn1 Ms) an-aw wn, (ses) 6Q$`3a2a , olrr. j70:;!! Campus nGbsUwnt;V;Eu„ WUUI a suo PUMIgJW20n yea Aezfnu3tcu isregoual p!t'CO3 2n Is"> iJ:`-Rel t,�o;o^c{jGu asrl;Du w,up (7ntubOI b•g" 71"W0,40 �IJWI ELI ! " nl 29111 P. it I4l' N. JOi3);Ui;Vs f4j'-jI owi jU;Ol.wwjou' it •AOII IMAC ;IiA iln0?lJOU?' b1squ jc.Gl ,LGf- to cc ul9cl UJG• yrig , jJ(-q Iz qJr, ggq!L!"wgi LG1 AbY PL IPG MIUEvlI 2npa.lspou b_o ,, cr by sec wra;p5 qnr llvta nnua 30' L042 a (;?JHC.j- 2J lilj, 3 F03 - 'DDIAN U Eli. OM fA!1 ,911 2nR?,Vi: ' J - :. D(IIpOU91 !LO'.W-,fO: LG&G@; j0: �Ojti3Ll' ! !iL12 ,.L u r Drwbo ' Pg% °:1Csc;:uJ utxc P, "Ch ,44!u(s�(?v;'9 E!I;a pLsla0135 t IGU-0i'-:d �013-bql Ledne?t 2npj U: oG'-'Ph1TX0 03 ;)OU1'OW WC WIN- (gVIV; In ;3;IOU 'sciag Ou;j qc U,ja;IUU o: Iin-40L' i 9Wil. 2cu;: tl,GPIPA' In;,,; 7$' 3073 3'Ts LIA! w1 am: ?D;'j0U' (:IJLj2 . ojrisuli>vi t.SO�z . ?•coo t ,r-:.�..�eaCtS:-•sGnc xZ� xaFT-Yn ��-cS�tswaz�.:�Y;:r�,-.�"�z.:avrZrra��xzvr's:s.^a^v_:._^-sa.-Z¢:"cr..zxmx�xeauc-am.::�7.w:au:.t-:.rz,rcm�f�¢a x5 .OW OMO"5 W. WI. NS MD . TE ISL In X11 em B 201 u. 28 PC cvMEEl,30 x/ OB ]O1 a J'1a O. ] WINFµL woE ]e uM N0. ] an !/ /� PAR✓yIIETOKNBXV OMN$ :1 11 gMNUN �.. 553, FENGIIMIJ6 COI.NiY �! ` BYS ITL CgICPfIE VBgfl iGW110F VM1VFNt �/� /],J-]A 4YATr [9,It _ l •� SEE EASEMENT 7B'tYl� E szm W, Is rJ•� al K ffi'[_d J • �' 11'', :/.v NR `'. 1-T NIBOL Q / 1,' 1 to _ NWSE Fi"r3el ii II ]]AC ..V^ :.'J •...,•/ / FF. I.N �r �Oi � / �F O •�Y o'Fas . r, Icrec SE B-PvL INV IN •JJJB.B2 O S- PK' IN/V W] B))B2ti �=L \ 3 .oOOFY Pole fir•.) G- cN[rt MflnS 11GIvu EL AN POWE Is y I $ 'i ffF1Y PIAi 0[ 1.trvh h!E$., 1 Pi •'J(^� �` �//J v muvn .B1v0=bpi `a1Tw� 115NF1 P / /1 SAND FILTER DRAINAGE AREA = 15,999 SF EN IMPERVIOUS: D .W Q BMS GRAVEL DRIVE CC5,459 SF / �6�0 ! GRAVEL PAD = 3,448 SF 5-00 \ TOTAL IMP. = 8,907 SF VIRGINA NORTH CAROLINA POWER WINFALL SUBSTATION NORTH POST -DEVELOPMENT DRAINAGE PLAN (NO SCALE) _ ii�i�7 1/1L.vr F 2{iC,P._l.viIUIII, i A160:31Md J!CiViH C, VIL4 0 r I VIN b0AkAE--:i .r' I For DENR Use ONLY North Carolina Department of Environment and Reviewer: �•1 Natural Resources submit: NCDENR Request for Express Permit Review Time: confirm: FILL-IN all the information below and CHECK the Permits) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application ap ckaoe of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alison.davidson@ncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee@ncdenr.gov • Mooresville & Winston Salem Region - Patrick Grogan 704-235.2107 or patrick.grogan@ncdenr i • Washington Region -Lyn Hardison 252-948.3842 or Iyn.hardison@ncdenr.gov • Wilmington Region -Janet Russell910-796.7302 orjaneLrussell@ncdenr.gov • Wilmington Region -Cameron Weaver910-796.7303orcameron.weaver@ncdenr.gov NOTE: Project application received after 12 rioon will be stamped in the following work day. Enter Related SW Permits of Request SW _ SW_ SW _ SW _ SW Project Name: DOMINION NORTH CAROLINA POWER - WINFALL SUBSTATION County: PERQUIMANS Applicant: WILLIE BARRETT Company: DOMINION NORTH CAROLINA POWER Address: 701 EAST CARY STREET: 12TH FLOOR City: RICHMOND, State: VA Zip: 23219 Phone: 804-771-6082, Fax: _ _-_, Email: willie.barrett@dom.com Physical Locatiori MILE DESERT ROAD ISR1218)WINFALL PERQUIMANS COUNTY Project Drains into MILL CREEK/PEROUIMANS RIVER waters — Water classification SC (please visit here to look up stream classification) Project Located in PASQUOTANK River Basin. Is project draining to class ORW waters? N, within Y2 mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N ""`-kEngineer/Consultant: CHRIS SOLDAN Company: ARCADIS-US .p y Dp Address: 1100 WELBORNE DR. SUITE 100 City: RICHMOND, State: VA Zip: 23229 Phone:804-740-0181, Fax:804-740-1053, Email: chris.soldan@ARCADIS-US.COM JUN — 6 2013 SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWO, ❑ DCM, ❑ DLR, ❑ OTHER: _ y�� SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMI (#r t+ Q- Y% % AR0 ❑ 401 Unit ❑ Stream Origin Determination: _ it of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ It of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear It or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site (SW _ (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ® High Density -Infiltration 1 #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems /❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit n) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 4 acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ® Yes ❑ No Buffer Impacts: ® No ❑ YES: _acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit Received from US ACOE ❑ Yes ❑ No For DFNIt use only Fee Split for multiple permits: (Check# 1 Total Fee Amount S SUBMITTAL DATES Fee I SUBMITTAL DATES Fee CAMA $ Variance (❑ Mai; El Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 34YJ0 1 401: $ LGS $ /per I Stream Deter,_ $ NCDENR EXPRESS June 2011 P'l 0 ARCADIS InfrastructureWater Environment Buildings Mr. Samir Dumpor, PE Washington Regional Office NC DENR — Surface Water Protection 943 Washington Square Mall, Washington, NC 27889 b Z01 JUN � ,3 AND p,.ECT ION N RetiONt,L OFFICE WpSHINGf Subject: Dominion North Carolina Power— Winfall Substation Expansion Dear Mr. Dumpor: Please find attached the Express Review permit application for the Winfall Substation. The check for the Stormwater Express Review is attached. A separate check for Erosion Control has been submitted to Richard Peed. Two copies of the plans have been provided for your review. We have revised the plans to provide a sand filter located on the western side of the site, in lieu of the previously shown infiltration trench. We will be treating runoff from the existing built -upon area on at least a 1:1 basis with proposed additional built - upon area. Feel free to contact me with any questions or concerns. Sincerely, ARCADIS U.S., Inc. a Al�_ Chris Soldan Staff Engineer Copies: Scott Vinson Imagine the result E:cEiVED JUN - 6 2013 ARCADIS U.S., Inc. 1100 Welborne Drive Suite 100 Richmond Virginia 23229 Tel 804 740 0181 Fax 804 740 1053 www.areadis-us.com Water Division Date: June 4, 2013 Contact: Chris Soldan Phone: 804-665-1095 Email: chris.soldan @ arcadis- us.com Our ref: 04314054.0000 [)QWARO gipmject5\04314 dominion\054- winlall substation\corlas\dumpors 06 04 13 sw express review.docx RC •®I S Infrastructure Water Environment Buildings ARCADIS U.S., Inc. 1100 W elborne Drive RECEIVE® Suite100 Richmond J U N - 6 2013 Virginia 23229 Mr. Samir Dumpor, PE Tel 804 740 0181 Fax 804 740 1053 Washington Regional Office ��% ARo w .arcadis-us.com NC DENR — Surface Water Protection [)WQ— V Y 943 Washington Square Mall, Washington, NC 27889 Water Division Subject: Dominion North Carolina Power— Winfall Substation Expansion Dear Mr. Dumpor: Date: June 4, 2013 Please find attached the Express Review permit application for the Winfall Substation. The check for the Stormwater Express Review is attached. A separate Contact: check for Erosion Control has been submitted to Richard Peed. Two copies of the Chris Soldan plans have been provided for your review. Phone; 804-665-1095 We have revised the plans to provide a sand filter located on the western side of the site, in lieu of the previously shown infiltration trench. We will be treating runoff from Email: the existing built -upon area on at least a 1:1 basis with proposed additional built- chris.soldan@arcadis- upon area. us.com Feel free to contact me with any questions or concerns. our ref 04314054.0000 Sincerely, ARCADIS U.S.,�, Inc. Chris Soldan Staff Engineer Copies: Scott Vinson Imagine the result g',\projects\04314 dominiom054 - winfall substaronicorNtrS\dumpors 06 04 13 sw express review.docx VIRGINIA ELECTRIC AND POWER COMPANY Secretary's Certificate I, the undersigned, hereby certify that I am Assistant Corporate Secretary of Virginia Electric and Power Company (the "Company'), a Virginia public service corporation. I further certify that "Dominion North Carolina Power" is a fictitious name under which the Company conducts business. IN WITNESS WHEREOF, I have hereunto set my hand and have affixed the corporate seal of said Company this day of May, 2013. Sha n CORPORATE SEAL G �`i, OL'GVE® JUN - 6 2013 VIRGINIA ELECTRIC AND POWER COMPANY Assistant Secretary's Certificate JUN - 6 2013 ^k J € u- WAR O� I, the undersigned, hereby certify that I am Assistant Corporate Secretary of Virginia Electric and Power Company, a Virginia public service corporation. I further certify that the signature -and delegation of authority (Attachment 1) has not been amended or revoked and that the same is now in full force and effect until revoked. I further certify that the below named person has been duly authorized by said corporation and is the incumbent of the respective office below set opposite his name, and that the signature set opposite his name is his genuine signature: Dominick F. Piccolomini off/ �Z pt_c�_ Authorized Representative IN WITNESS WHEREOF, I have hereunto set my hand and have affixed the corporate seal of said Company this I &*i1day of 2013. ?Mron L. Burr r ATTACHMENT 1 VIRGINIA ELECTRIC AND POWER COMPANY Excerpt From Records Effective April 26, 2011 I hereby delegate to Dominick F. Piccolomini and Angelita D. Gardner-Kittrell (each an "Authorized Representative") the authority to enter into, execute, acknowledge, deliver and accept, in the name and on behalf of Virginia Electric and Power Company (the "Company") any and all contracts, agreements, easements, instruments, waivers, licenses, consents and any other documents that are related to the use of property for the installation, operation and maintenance of electrical equipment and related facilities. Each Authorized Representative shall observe all limitations on the authority delegated as established from time to time by the Company's approval policies. These delegations of authority shall be effective as of the date of electronic acceptance hereof. Any acts consistent with these delegations prior to the effective date are hereby ratified and confirmed. These delegations shall not restrict or limit my authority, and may be revoked at any time by written instrument or electronic transmission. Unless earlier revoked, these delegations shall terminate upon the termination of the Authorized Representative's employment with the Company. /s/ Scot C. Hathaway Scot C. Hathaway Vice President —Transmission 0, ARCADIS RECEIVED fN}asrrucrure• Vlater• Environment• 806igs JUN - 6 2013 Imagine the result Dominion North Carolina Power - Winfall Substation Detail Project Narrative WQ WAR0 Dominion North Carolina Power operates a power transmission substation on a 4.07 acre parcel in Winfall, North Carolina in Perquimans County on Two Mile Desert Road (SR 1218). The substation site is currently mostly covered with gravel roads, the substation stone yard (uncompacted gravel pad), and some grassy areas. High voltage electrical transmission lines traverse the site along with multiple pieces of electrical equipment like transformers and switchgear. This project consists of installation of new electrical substation equipment; expansion of the fenced area, gravel roads and gravel pad; and applying new gravel to the existing gravel pad and driveways. The total area of disturbance will be 3.89 acres. The built -upon area will have a net increase of 4,721 square feet and from approximately 46% to approximately 49% impervious. The front of the site drains into an existing roadside grass -lined ditch where stormwater runoff is split with some flow exiting the property to the north and some flow discharging to the south. Stormwater runoff from the back of the site exits the property to an existing grass -lined ditch that flows parallel to a railroad track. There is a small wetland area on the southeast corner of the parcel which will not be impacted by the proposed improvements. The site is surrounded by residential properties with agricultural land to the north, woods to the south, NC DOT State Route 1218 to the west, and the Norfolk and Southern Railway to the east. There are no off -site land -disturbing activities anticipated in association with this project. Soils in the project area are listed in the NRCS Web Soil Survey for Perquimans County as Tomotley Fine Sandy Loam (Hydrologic Soil Group "B/D"). Tomotley has a K factor of 0.20 (low erodibility). Land disturbance activities include fine grading over the site to promote even drainage. A new layer of gravel will be added to the substation's gravel pad. Temporary erosion and sediment controls planned for this project include installation of construction entrances, silt fence with stone filter drains along the limits of disturbance, check dams, soil stabilization matting in the adjacent ditch, and temporary and permanent seeding for establishment of vegetation. Due to the large amount of impervious area on the site from the substation's uncompacted gravel pad, the project is considered a High Density development. An open basin sand filter has been selected as the Best Management Practice to treat stormwater runoff from the added impervious area of the site. It will capture the runoff for the first 1%z inch of rainfall from existing impervious areas of the site on a 1:1 basis with the proposed impervious area. Due to the location of the wetlands and topography of the site, the sand filter is located along the western property line adjacent to the roadside ditch. The outlet pipe will discharge to the existing ditch and is sized to limit post -development discharge to pre -development conditions for the 1-year 24-hour design storm event. For storms greater than the 1-year design storm, the runoff will exit the site in sheet flow into the existing rass-lin ditches l CGC/Gu�c.-Yj�r�s GQone �y C/Sti�yG os�� /Q br � �JroVE� rX/itl� ) J�U% %'0- F�o`^�) /`tio/t ✓ cl ,Sri✓» e �rGSS /rJ' WIIGgg ti�S fZ.G�iseril /S G ol/'r�-�n�cje_ ar-LS 511.E tk ill J6 �G/GS OK- -