Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW7130602_CURRENT PERMIT_20130621
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATEj% YYYYMMDD :i ...,..._'fir NCDENR North Carolina Department of Environment and Division of Water Quality Pat McCrory Thomas A. Reeder Governor Actinq Director ne Mr. Robert M. Broadway, Manager The Broadway Group, LLC 132 Homes Avenue NW Huntsville, AL 35802 •'/ Natural Resources John E. Skvarla, III Subject: Stormwater Permit No. SW7130602 New Retail Store No. 6339 — Edenton High Density Commercial Wet Pond Project Chowan County Dear Mr. Broadway: The Washington Regional Office received a complete Stormwater Management Permit Application for the New Retail Store No. 6339 — Edenton project on June 3, 2013 and additional information on June 13, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7130602 dated June 21, 2013, for the construction of the subject project. This permit shall be effective from the date of issuance until June 21, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Samir Dumpor at (252) 946-6481. Sincerely, Thomas `A. Reeder Division of Water Quality AA/ sd: K:\WQS\STORMWATER\SD\SW7130602 cc: -/'Jerry, M. Cargile, PE, 4 Site Inc. (7500 South Memorial Parkway, Suite 209, Huntsville, AL 35802) Beaufort County Building Inspections Harry Davis, Manager, Northeastern Regional Airport Edenton, (113 Airport Dr., Edenton, NC 27932) /Washington Regional Office North Carolina Division of Water Quality Internet www.ncwmergualitv.ore 943 Washington Square Mall Phone: 252-946-6481 7�TOne L, 7 Washington, NC 27889 FAX 252-946-9215 1N orth C�'pptroliina An Equal OpportunitylAfrnative Action Employer -50%Recycled/10% Post Consumer Paper Natutlal& A State Stormwater Management Systems Permit No. SW7130602 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO The Broadway Group, LLC New Retail Store No. 6339 - Edenton Chowan County FOR THE construction, operation and maintenance of one wet detention pond in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 21, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. . This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the. runoff from 38,392 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section I. of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent surface waters. Page 2 of 7 State Stormwater Management Systems ti Permit No. SW7130602 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, ft2: 55,098 b. Total Impervious Surfaces, ft2: Design 38,392 C. Storm, inches: 1.5 d. Pond Depth - average, feet: 4.43 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 13.50 g. Permanent Pool Surface Area required, ft2: 3,306 h. Permanent Pool Surface Area, ft : 8,269 i. Min. Volume required, ft : 4,663 j. Permitted Storage Volume, ft3: 5,158 k. Temporary Storage Elevation, FMSL: 14.05 I. Controlling Orifice: 1.50"0 pipe M. Permitted Forebay Volume, ft3: 3,210 n. Receiving Stream/River Basin: Queen Anne Creek/Chowan River Basin o. Stream Index Number: 26-1-2 P. Classification of Water Body: "C;NSW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and . specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. Access to the stormwater facilities shall be maintained via appropriate easements at all times. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other Page 3 of 7 State Stormwater Management Systems Permit No. SW7130602 supporting data. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may Page 4 of 7 State Stormwater Management Systems Permit No. SW7130602 subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from the date of issuance until June 21, 2021. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 21 st day of June, 2013. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION V) ire/'"l c U for Thomas A. Ree r, 'Acting Dctor Division of Water Quality By Authority of the Environmental Management Commission Stormwater Permit No. SW7130602 Page 5 of 7 State Stormwater Management Systems Permit No. SW7130602 New Retail Store No. 6339 - Edenton Stormwater Permit No. SW7130602 Chowan County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW7130602 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Chowan County Building Inspections Page 7 of 7 DWQ USE ONLY _ e Fee Paid Permit Number Applicable Rules: ❑ Coastal SW —1995 ❑ Coastal SW — 2008 ❑ Ph II - Post Construction (select all I r(2l5fiU•�imon-Coastal SW- HQW /ORW Waters ❑ Universal Stormwater Management Plan 9dai�C d E ther WQ M mt Plan: State of North Carolina VJ Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Edenton, NC New Retail Store No. 6339 / 2. Location of Project (street address): Lot 2, Boswell Chappell Tract, North side of North Broad Street, East of Coke Ave City:Edenton County: Chowan Zip: 27932 3. Directions to project (from nearest major intersection): From NC Hwy 17 & Paradise Road Intersection travel south on Paradise Rd for 3200 feet to North Broad Street, Turn East on North Broad Street, Travel east for 1800 feet to project site on the left 4. Latitude:36° 04' 33" N Longitude:76° 35' 40" W of the main entrance to the project. IL PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modification} *Renewals foitli modifications also requires S WU-102—Reneuml Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the Stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 2.33 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of apublic airport? ❑No ®Yes If yes, see S.L. 2012-200, Part Vl: http://portal.ncdenr.org/web/wq/ws/su/statesw/rules laws FormSWU-101 Version06Aug2012 Page I of III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the protect): Applicant/Organization: The Broadway Group LLC Signing Official & Title: Robert M. Broadway, Manager b.Contact information for person listed in item la above: Street Address: 132 Holmes Ave NW City: Huntsville State: AL Zip: 35802 Mailing Address (if applicable): City: State Phone: ( 256 ) 533-7287 Fax: Email: melissa.ballard@broadwaygroup.net c. Please check the appropriate box. The applicant listed above is: The property owner (Skip to Contact Information, item 3a) —n Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ® Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ® Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Anna W. Ragland Trust Signing Official & Title:W. Trent Ragland, III, Executor b.Contact information for person listed in item 2a above: Street Address:305 Transylvanis Ave. City:Raleigh State:NC Zip:27609 Mailing Address (if applicable) City: Phone: ( ) Email: 3.a. (Optional)Pi person who c State: Fax: ( ) Other Contac gctr �` Hon ?✓x Signing Offici cam` - 7A,- b.Contact infori Mailing Addr City: Hunstv l� o C 27 / Phone: 2( 56 Email: meliss 4. Local jurisdict PointofConta /"/ 4 vy(eU✓lam ( Q5✓ee n�^� f� �� Form SWU-101 Version 06Aug2012 Page 2 of 7 so or other 4Vr PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. A) Site Description ✓ The subject property consists of 2.027 (88,295 sq. ft.) acres and is covered primarily in woods. The site has an existing small drainage channel flowing from northwest to the south east to an existing 15" corrugated plastic pipe. This pipe discharges to the existing roadway ditch along the north side of North Broad Street. This ditch flows southeast approximately 350 feet and discharges to a roadway pipe draining south under North Broad Street and to an existing drainage ditch flowing south-southeast for approximately 2700 feet to an Un-named tributary to Queen Anne Creek. This UT flows southeast for approximately 1400 feet to Queen Anne Creek. B) Proposed Improvements / This site will be covered by 40,751 sq. ft. of new impervious cover (46.3%) of property. The construction will consist of a new 9100 sq. ft. retail store with 35 parking spaces. A new 5' wide concrete sidewalk will be constructed from the building entrance to North Broad Street and along North Broad Street frontage just inside the highway right-of-vva . C) Proposed Stormwater Management & Water Quality The existing offsite runoff from the north side of the property will be diverted into a new concrete lined channel flowing from the northwest corner of the subject property to the southeast corner of the property. The existing 15" corrugated plastic pipe is located just off the subject property. A grading easement is currently being acquired by The Broadway Croup to construct the new concrete channel off the subject property. All slormwater runoff will be directed to a new Wet Pond located at the Northeast corner of the property. This Wet pond normal pool elevation will be slightly above the seasonal high water table thus creating the need for the pond to possibly have a clay liner per NCDENR requirements. The seasonal high water table for this site has been calculated to be approximately 3'-6" below the existing topology. See attached PDF's for more 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUDApproval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW —1995 ❑ Ph II — Post Construction 3. Stormwater runoff from this project drains to the Chowan River basin. 4. Total Property Area: 2.03 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) — Total Coastal Wetlands Area (5) — Total Surface Water Area (6) = Total Project Area': 2.03 acres Total project area shall be calcidated to exclude the following: the normal pool of impounded structures, the area between the banks of streants and rivers, the area beloro the �lornral High Water (NHW) line or Mean High Water (MHW) line, and coastal Wetlands landroard from the NFIW (or MHW) line. The resultant projorect area is used to calculate overall percent built upon area (BUA). Non -coastal Wetlands landward of the NHW (MHW) line may be included in the total project area. Form SWU-101 Version 06Aug2012 Page 3 of $. *Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = ((0.94/2.03)*100)=46.3 '70 9. How many drainage areas does the project have? 4 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use I for the inhale property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area I Drainage Area 2 Drainage Area 3 Draina e Area 4 Receiving Stream Name Queen Anne Cr. Queen Anne Cr. Queen Anne Cr. Queen Anne Cr. Stream Class * C, NSW C, NSW C, NSW C, NSW Stream Index Number * 26-1-2 26-1-2 26-1-2 26-1-2 Total Drainage Area (sf) 367276 204630 55098 17230 On -site Drainage Area (sf) 4831 26236 55098 2217 Off -site Drainage Area (sf) 362445 1 178394 1 0 1 15013 Proposed Impervious Area** (sf) 0 1699 38392 858 % Impervious Area** (total) 4.01 0.83 69.68 4.98 Impervious— Surface Area Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 On -site Buildings/Lots (sf) 0 0 9100 0 On -site Streets (sf) 0 0 0 0 On -site Parking (sf) 0 0 27363 628 On -site Sidewalks (sf) 0 0 1210 230 Other on -site (sf) 0 1699 (Flume) 719 0 Future (sf) 0 1 0 0 0 Off -site (sf) 14717 0 0 2540 Existing BUA*** (sf) 0 0 0 4955 Total (sf): 14717 1699 38392 8353 Stream Class and Index Number con be determined at: http:llportal.ticdetir.org/Tueb/7vqlps/Csii/Classifications Inn pervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Report ordy that amount of existing BUA that Will remain after development. Do not report any existing BUA that is to be removed and714101 will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. All off -site impervious areas (pavement from North Broad Street Road) were determine using existing survey Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to nmre stringent storunrater requirements as per I5A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from httD://Dortal.ncdenr.ore/web/wo/ws/su/bMD-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://12ortal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at httl2://portal.ncdertr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://12ortal.ncdenr.org/web/wq/ws/su/statesw/forms does. Initials Form SWU-101 Version 06Aug2012 Page 4 of 7 4. 5. c! O Original and one copy of the Stormwater Management Permit Application Form. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part Vll beloeo) Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.htmI for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. Sealed, signed and dated calculations (one copy). Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. q f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NFIW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. e i. Dimensioned property/project boundary with bearings & distances. 0 j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. ,Q I. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. G n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) d'10. A copy of the most current property deed. Deed book: 835 Page No: 453 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 21-I.7003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. ham: / / www.secreta ry.sta te. nc. u s/ Corporations/ CSearch.aspx Form SWU-101 Version 06Au1-2012 Page 5 of VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. V III. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: Jerry M. Cargile Consulting Firm: 4 Site Incorporated Mailing Address: 7500 South Memorial Parkway, Suite 209 City: Huntsville State: AL Zip: 35802 Phone:( 256 ) 539-1221 Fax: ( 256 ) 539-1220 Email: icargile©4siteinc.biz IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled ont, complete this section) I, (print or type name of person listed in Contact Information, item 2a) Anna W. Ragland Trust , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) Robert M. Broadway with (print or hjpe name of organization listed in Contact Information, item 7a) The Broadman Group, LLC to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 06Aug2012 Page 6 of 7 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of ci it penalties f up o $2 000 per day, pursuant to NCGS 143-215.6. Sign%ature: I (Date: 2$ 3 Cl' m' l a Notary Public for the State of I v G County of LV 0. do hereby certify that I I i um �(�` Cl(1� personally appeared before me this D76 day of Ak&q 2013 , aanddaackwledge the due xecution f the application for a stormwater permit. Witness my hand and official seal;--- J!e&"y7&- KIESHARA POWELL Notary Public Wake County North Carolina Commission Ezpires May 20. 2014 SEAL My commission expires Ry 2 Q\ 2D ly X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, itent la) Robert M. Broadwag, Manager of The Broadwni Group, LLC certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protectiv o nan I recorded, and that the proposed project complies with the requirements of the applicable storm a r rules u de 15A NCAC 21-I .1000 and any other applicable state stormwater requirements. Signature: Date: $11q l l3 1, rAe.1Li�sc.--hJS&11&rJ a Notary Public for the State of Ala -be M A- , County of nXr'A�su.-� do hereby certify that RoNatri PA. IS r-bddIJAi_ personally appeared before me this �.9 day of MILL a013 , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, — :.Wv4UA� � U = > �p1 kqY o r 'OUDL\G i C) .-",4 STATE F.x``• SEAL My commission 31IS 11-1 Form SWU-101 Version 06Aug2012 Page 7 of 7 PA Permit Number: JUN 0 3 2013 (to be provided by DWQ) W� Drainage Area Number. U �Ption Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): does ® does not incorporate a vegetated filter at the outlet. This system (check one): does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — . Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection, activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detenlion Basin O&M-Rev.4 Page I of 4 Permit Number: (to be provided bly DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to Swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DVVQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 6.50 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 1.50 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM (fill in the blanks) 12.00 I Pc manen` --------- -- Volume 11 00 -it Min. Sediment Storage FOREBAY Permanent Pool Elevation 13.50 Pool \-_--_-Sediment Removal Elevation 7.00------------ Volunu Bottom Elevation MAIN POND I-ft n. Sediment Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided hp DWQ I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Edenton, NC New Retail Store No. 6339 BMP drainage arect number: Dev-3 Print name: The Broadway Group, LLC Title: Robert M. Broadway, Manager Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. YKpIA~ sf'—b.—�AIIlk rc1 a Notary Public for the State of MO-6 r. C- , County of Ha,l.,s m., , do hereby certify that -�zlayd rYh rvaW personally appeared before me this %41 `-I- day of �t a u 1 3 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL S TATE P \.�` /J r..... 110 My commission expires Form SW40I-Wet Detention Basin O&M-Rev.4 Page of 4 Permit No. no be provided by DWO) TIAR WATFRO NCDEN�A STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be tilled out, printed and submitted. The Required Items Checklist (Part ill) must be printed, titled out and subminedalong with all of the required information. I. PROJECT, INFORMATIONI —_ �. —. _ -' _ _-:_- , ._.i.�� _,_, _.... _._� Project name EDENTON, NC NEW RETAIL STORE NO.6339 Contact person - MA77HEW S. GILLESPIE Phone number 256 539-1221 Date OW2013 Drainage area number DEV-3 Ill. ]DESIGN INFORMATION;, -_ _ She Characteristics Drainage area Impervious area, post -development % Impervlous Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr ninon Post -development l-yr, 24-hr runon Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the tyr 24hr storm peak flow required? 1 •yr, 24-hr rainfall depth Rational C, pre -development Rational C. post -development Rainfall Intensity: 1-yr, 24hr storm Pre -development 1-yr, 24-hr peak flaw Post -development 1-yr, 24-hr peak flow PrWPost 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approt at the perm. pool elevation) Top of 101 vegetated shell elevation Bottom of I OR vegetated shelf elevation Sediment cleanout, lop elevation (bottom of pond) Sediment deanout, bottom elevation Sediment storage provided Is there atld4ional volume stored above the state -required temp. pool? Elevation of the top of the atldlional volume 55,098 1s 38,392 nT 69.68 % 1.5 In 4,663 is 5,158 h' OK, volume provided Is equal to or in excess of volume required. h' Y (Y or N) 3.4 in 0.29 (unfless) 0.34 (unitess) 3.751r1hr OK 8.09 h'/sac 6.58 n'lasc -1.51 n3/sec 14.05 Irnsl 13.50 nmsl 10.00 nnsl 14.00 nnsl 13,00 Intel 7.00 trial 6.00 fmsl 1.00 it Y (Y or N) 14.1 fmsl OK \ri,i ll 111 // %\' f\ CARp��i�� �� �.• SS/•yyyy. �y ��: _� ••�� 1 44 St -AL •-/ /11111\\\ KCCEv\/G_ C-1 Form SW401-Wer Daranuon BaslmRev.9-4r1Mt2 Pine r, a II. Design Summary, Page I or 2 Permit No. -- (to be pmvdad by DWO) II:ADESIGN..,INFOflMATIOi.-:_-_-----_._.. Surfs" Areas Area, temporary pool lum Ae Area REQUIRED, perrlanem pool 3.306 Ae SAIDA ratio 6 00 (unNless) Area PROVIDED, permanent pool, A s,mmo 8,269 1? OK Area, bottom of IOfl vegetated shell, A,." 6,465 ff? Area, sediment cieanou, top elevation (bottom of pond), Aw�d 447 A' Volumes Volume, temporary pool 5,158 Ae OK Volume, permanent pool, Vm,,�y 14,790 0 Volume, forebay (sum of forebays If more than one frsbay) 3,210 to Forebay % of permanent pool volume 21.7% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or NI MountalNPiedmont SAIDA Table Used? N (Y or N) SAIDA ratio 6.00 (unkless) Average depth (used In SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, V.,, 14,790 tie Area provided, permanent pool, Arms y 8,269 tte Average depth calculated A Need 3 it min. Average depth used in SAIDA, d,,, (Round to nearest 0.5A) It Calculation option 2 used? (See Figue 10-2b) y (Y or N) Area provided, permanent pool, A ,,,_pw 8,269 tl' Area, bottom of 10A vegetated shelf, Aga, 6,465 is Area, sediment cieenout, top elevation (bottom of pond), A,. 447 rye 'Depth' (dktance b/w bottom of 10A shelf and top of sediment) 6.00 A Average depth calculated 4.43 A OK Average depth used in SAIDA, d,,,(Bound to down to nearest 0.511) A Drawdown Calculations Drawdown though orifice? Y (Y orM Diameter of orifice (it circular) 1.50 In Area of orifice (If -non -circular) ins Coefficient of discharge (Cg) 0.60 (unNess) Driving head (1-14) 0.49 A Drawdown through weiO N )Y or N) Weir type (unAiess) Coefficient of discharge (C,) (unAless) Length of weir (L) fl Driving head(H) Pre -development 1-yr, 24 m peak flow 8.09 A'/sec Post -development 1-yr, 24-hr peak flow 6.58 01sec Storage volume discharge rate fthrough discharge orifice or weir) 0.02 Aslsec Storage volume drawdowm time 2.50 days Additional Information Vegetated side slopes 3 :1 Vegetated shelf slope 10 :1 Vegetated shelf width 10.0 A Length of flowpath to width ratio 3 :1 Length to width ratio 2.0 :1 Trash rack for overflow 6 orifice? Y - (Y or N) Freeboard provided 1.0 A Vegetated filler provided? N (Y or N) Recorded drainage easement provided? N (Y or N) Captures all runoff at ultimate build -out? Y (Y or N) Drain mechanism for maintenance a emergencies Is: PUMP OUT OK, dram down in 2.5 days. OK OK OK OK OK OK OK OK InsuHiclent. Recorded drainage easement required. OK Fort, SW4et.Wet Delenuon Baslo-Rwrr-N11112 Pans I, a II. Oea:gn Summary, Page 2 or 2 LANDSCAPE NOTES �. .....s .va... -..- ,..... ,. MAI .1 A. x tl,f. ,xE OwxI IISs<c. Ox .s nax, 1. .w o ENEN "FEN w,oLLgNG. i..mzc x . . „E.&L.ix'Y ANDGROANS EE �aa NSEx:,.x�S. INS . V„E•Ea. xn ., .P, us+.0 wE w'A. nmm E EAS ,w c SE ax.c E NE.1 ow., , NE -I N. xx a EAEI. TEAIS MTSE yy ME SOD SNALL E MASIAEUS m wE TEI IN SMSE SEASATS, SEEMED, eE Aos &8 LOµl FIEECs Gi sM..xo /.ESE✓, ITT LOAMY ,a mN " MES O - ,a u M,, E M ETAMPNS" PACE IN RE. sru_ xA .wwEa a,O w.iEuco AS .E�Ess.eva'. v NOTE: ENTIRE SITE IS TO BE FULLY IRRIGATED. NOTE: SOD ALL DISTURBED AREAS E%CEPT THOSE AREAS NOTED AS FIANT BED AREAS. (1 SHOVEL_-- EDGE rlz . APPIAMA �_ i� w'�iK wwuewa.voAP AT NPDJ— _.� ' z ti }TeMAP J U s ...e,. EVnERGREEN TREE PLANTING A Av .r. a ., 9..,. W s c y 1 oRa F„a,nEENNM .n,. ME --.--AT QI A; NAA— MIT II II a og zwz�,aRicrad I 3 s E, A. n~/Bavm„ Kw • n TRE(Z E PLANTING a .,. PA— �.. .. _\,.. I rr- - ,..DPP... AAAAANAAAAAA . ,A...m. W. m,..n....... m... ..... �w �. a nSHRUB PLANTING iy5a5 1�1((6,g /1GROUND COVER PLANTING ^ -.•- C ` LANDSCAPE DETAILS c 4 D 4 M A »�f .. ,....� ,.� ...,, �!.|. ,�! |.!|:•; , 081z, \ 7z / / ( 11 ® NEW RETAIL STORE No6339 PREPARED FOR THE BROADWAY GROUP LLC NORTH BROAD STREET �------- � \ ;\ n§ \ ( ( . P )j \ 7;j NEW RETAIL STORE NO. 6339 L2,J. b._PRE-PARED FOR THE NORTH O//�. ) / 912 M. ..)}/ X g ]§ )\ (}\ E \ ■ r [ 1� ;: