Loading...
HomeMy WebLinkAboutSW7130504_COMPLIANCE_20200611PERMIT I STORMWATER DIVISION CODING SHEET ���ro.oEw..— POST -CONSTRUCTION PERMITS NO. SW 1 DOC TYPE ❑ CURRENT PERMIT �.»aa..oP�„ ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Y' i . �k ,, 5 Compliance Inspection Report Permit: SV 7130504 Effective:06128/13 Expiration: 06/28/21 Project: Family Dollar Store - Elizabeth City - relocation Owner: Eastern Pride Inc County: Pasquotank Adress: 709 W Ehringhaus St Region: Washington City/State/Zip: Elizabeth Cty NC 27909 Contact Person: Barnes Boykin Title: Phone: 252-230-0632 Directions to Project: I From the intersect of INC 344 & US 17 Bus, travel east on US 17 Bus (Ehringhaus St) for approx 0.9 miles. Project is on the southwI est corner of Ehringhaus St & Westover St. Type oI If Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Pasquotank River) (03-01-50) ( SC) I On -Site Representative(s): I Related Permits: Inspection Date: 06/11/2020 Entry Time 01:OOPM Primary Inspector: William J Moore I Second ary Inspector(s): Reason for Inspection: Routine Permit Ii nspection Type: State Stormwater Facility Status: Compliant ❑ Not Compliant Question Areas: State Stormwater (See attachment summary) Exit Time: 01:20PM Phone: 252-946-6481 Ext.264 Inspection Type: Compliance Evaluation page 1 Permit: SVV7130504 Owner- Project: Eastern Pride Inc Inspection Date: 06/11/2020 Inspection Type Compliance Evaluation Reason for Visit: Routine Inspection Summary: BUA & wet pond system appear to be constructed according to plans, 0&M good. PE Cert & signed O&M in file. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? 0 ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? 0 110 ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? M ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? 0 ❑ ❑ ❑ Are the inlets located per the approved plans? 0 ❑ ❑ ❑ Are the outlet structures located per the approved plans? 0 ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ DWQ upon request? Comment: page 2