Loading...
HomeMy WebLinkAboutSW7130408_APPROVED PLANS_20140606STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE��p(�� YYYYMMDD 'T) �I PROP. STORMWATER MAINTENANCE AND ACCESS EASEMENT Lo TERMINATE FENCE ON EAC�' ' SIDE OF CONCRETE SPILLWAY SITE DATA. I I SITE AREA: 1.30± Ac. (56,955± SF) x x x x' x x' x x x NIR w F ADDRESS: US HIGHWAY 17 BUSINESS ��� �+ / /+ PARCEL: PORTION OF LOT 2 (DB 760-212 & 1004-846) \ I TAX PARCEL #: 15008189 (PART) I r CURRENT OWNER: SIMMONS I. PATRICK y11 F ZONING DISTRICT: B-1 (GENERAL COMMERCIAL) x I La PROPOSED USE: GROCERVRETAIL USE I 1 I GRAVEL / k\LP BUILDING SQUARE FOOTAGE: GROSS BUILDING SQUARE FOOTAGE - 8320± SF I MAX. BUILDING HEIGHT: 35 FT. 2-6' DIA. PIPE BOLLARDS x SETBACKS: FRONT - 10 FT @ EACH DUMPSTER FILLED I I SIDE - 8 FT WITH CONCRETE, PAINTED / I REAR - 0 FT RED I x PARKING REQUIRED: 16 SPACES (1 SPACE PER 500 SF BASED ON GROCERY USE) I0 DUMPSTER ENCLOSURE ( 6' WOOD FENCE 1 PARKING PROVIDED: 33 SPACES INCLUDES 2 HANDICAP SPACES, 1 VAN I WITH DOUBLE LEAF I I ACCESSIBLE) GATES 4' CONDENSING UNIT PAD I x x (T-6"x16'-B') ' HIG� CHAIN± I x O (LINKIT H CHAIAlfL ENCE Li I x TERMINATE CHAINLINK FENCE N EACH SIDE OF RIPRAP APRON xI I ::.. I 4 M T' 3' WIDE JURB UTkD6' CONCRETE x p x UMPST PAD'-; F Y y x GRAVEL O `'x v x I O R A o r15.0c ODM `il � O "4" 'x� .{X I M y x '.> F I x� I o I 00 ' k¢ Q� 0 I 1'-6' STANDARD CURB LU & GUTTER 0 I GRAVEL I I I 20' TAPER FROM 30' TO 18' C&G I I RING D.B. 1004-846) '"W 759.91'(T)' I LP RIA gyp I �1 0 0 ---------------------- x x x ' ['QN('RFTFx PAT: (10'x22x22')- INK F NCE , � ! 12' WIDE, DOUBLE LEA._ MATE A U ENCU`n` CHANK s _X LOADING AREA (20'x30') P° LJ W V I 6' DIA. PIPE BOLLARDSLa o I x FILLED WITH CONCRETE, N • PAINTED RED / I w CONCRETE WHEEL STOPS (TYP,) l�l WI / 4' MONOLITHIC CONCRETE SIDEWALK (TYP) I PROPOSED FAMILY y DOLLAR r4i r 7 �± 8,000 SF� A ' FFE`-f31,00 o X I ' 6' DIA. PIPE BOLLARDS GRAVEL S.0' @ 6' O.C. FILLED WITH j CONCRETE, PAINTED RED I I ' CONCRETE WHEEL I STOPS (TYP.) O 18 7' LP E _ DPP -- E --�' -s..j'1 e �s-;� 3 I M X ".-�• ice,: �: c:.. '- o 0 0 0 o I X i*t 8.0 8.0 /Qt roLd 'Ra " 10.0' SIGN yr $fix-6' REVERSE SLOPE CURB AND GUTTER n I � yx'xx'4�� .J�1llLWAL _ x� S Gr 4G ES X >W 10.0' (Typ) 10 IN 1U' Y KUN I JL 1 ant. 1'-6' REVERSE SLOPE POTENTIAL FUTURE ACCESS POINT L I I 25'x25' TRIANGLE I NCDOT EASEMENT —AL 19.91' 10'x7GHT—! A r X*`BHT—NGLES �� �� X ��pp CURB AND GUTTER ECM N49 25'S3_'E ICJ pIN�R ---�-- -- — �, 0.00 -- — -- -1 — ��� \\ C o; jo TB3 449.80'(TIE) V tlFi O- c, °TB y x Q� F0M�3MH oFOM E E E 1� E pSIGN GW S6_V TB E E— RIM 28.45' /8% 3� ' I IOUT:25.85' AO' -� I4' Ilk 00 I I " v� P.O.0 w /^ a III NGS MONUMENT "F 213" NAD 83(1986) N: 649,245.41 FT E: 2,567,585.30 FT EL: 28.82 FT (NAVD 88) w �\ II 30 &G 11 11> FULL OF8DE8 IS AW _---_—__--U S._ HIGHWAY 1 (BUSINESSPPS- 100 PUBLIC RIGHT—OF—WAY \ `\ • \\ aw CB -41' GENERAL SITE NOTES: 1. DIMENSI❑NS SHOWN ON PLAN ARE TO FACE OF CURB, UNLESS NOTED ❑THERWISE. CONTRACTOR SHALL N❑TIFY ENGINEER OF ANY DISCREPANCIES WITH THE DIMENSI❑NS SHOWN ON THE PLAN, 2. ALL PARKING LOT STRIPING SHALL BE 4' WIDE. PAINT COLOR SHALL BE WHITE. 3, CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR BUILDING DIMENSI❑NS, 4, CONTRACTOR RESP❑NSIBLE FOR PROVIDING ALL MATERIALS TESTING DURING C❑NSTRUCTI❑N. HEAVY DUTY ASPHALT: 8' ABC STONE + 2' S 9.5B + 1' S 9,5A NOTE: REMAINDER OF PARKING LOT WILL BE LIGHT DUTY WITH A SECTI❑N OF 6' ABC STONE + 2' S 9,513 + 1' S 9,5A SIGN LEGEND: T A - STOP SIGN (R1-1: 30'x30') �— B - _ HANDICAP PARKING SIGN Know what's below. Call before you dig. z CeD a 7" En O C\2 C N N z coLO x N z 0 `� — `° z O � L U co i O CD co m a a �z Quo o U ^ 1—i M 1-4 U m O a m W � � Ld ~ U1 O to W O E--4 JUN - 6 2014 .�i4,.yd•..b11 ks , SITE PLAN _ = AL .•. 2009�J1. m ••. JJII �IEiln`\\\\\ NORTH Scale: 1 "=20' Date: 03/28/2013 Project No.: Revisions: -1. 05/21/13 NCDOT COMMENTS 1 06/13/13 REVISED BUILDING SIZE 4, 03/20/14 REMOVED LEFT TURN LANE ,'d 03/20/14 ADDED CHAINUNK FENCE ' 03/20/14 ADDED SIDEWALK TO R/W Sheet C3 . ..' f _ � _ _ • _ - • �.L � �J�� .� . _. •mil .. _� _ _ _ _ � ' TEMPOR ILT \FENCE I S i�L\�.E ALONG Cp - f D STURBED\ 1\S I \ 28 - - - XX= o r � - LP SEDIMENT I I I FOREBAY \ CU I I J \ TOP OF DI I El EV - 283 I 4' HIGH CHAIN LINK FENCE at I' CLASS 1 RIP RAP APF-" Y0X1Nh'FL8'CFWINK I RIP RAP APRON I rw 1 RIP RAP APRON `CLASS L=12', W=5', D=12' / U Qm w p W 0 m TEMPORARY SILT FENCE INSTALLED ALONG DISTURBED LIMITS HARDWARE CLOTH INLET PROTECTION (TYP) I \ TEMPORARY STABILIZED CONSTRUCTION ENTRANCE / I 2 01, I / x 29. I I _ A 30.20 -- \ L. ',� .t •e• ''rY \ co J CHAIN-UNK 'X 30.67 30.67 30.33 FENC ^ X 29.00 / X / 30.33 30.33 ro 9 >eo 9 PROPOSED FAMILY d W - FFE^31.00 PP ' II -11 w\ I 10, CONCRET� 1 / EMERGENCY SPILLWAY TERMINATE FENCE ON EA EL. - 27.0 I SIDE OF CONCRETE SPILL A\ SEE DETAIL SHEET C6 Z 1 //�� I 23'/15' RCP ry @ 0.43% / l TOP ELEV F DA 28.3 ), I ' I CL I RIP RAP APR N -- k i L= W=G', D=12' 27 ri +� 10' TEMPORARY RI RAP 28 \ EMERGENCY SPILLW o ° FOR SKIMMER BASIN EL - 27.5 26 o w OUTLET STRUCTURE \ - (SEE DETAIL SHEET k I C6) I 1 PERMANENT POOL -� �' I �� L. 20,5 \\ S LF SKIMMER OUTLET D IC� I (SEE DETAIL SHEET C7 TOP OF DAM .5 -� ' q I ELEV - 28.3 26 I I fix/ HIGH CHAIN 28 I I WINK FENCE 9 LLF) E E - 28.5 / 38 E��� 30 L • a 31.00 :. • •.. � .M•. �- 30.90 3p 31.00 30.79 m:!mI///�:.�'' 6 .; TC 30 BC 30 i� f• 30.79 30.19 30.00 31.00 31.00 T"__30. 0� o BC 30 0 30.3 30.30 \ TEMPORARY SILT FENCE INSTALLED A ONG DISTURBED LIMITS � / J 30.10 6 29.96 HP 48 29 1 HARDWARE 3� INLET PROTE( (I YP) A 30.50 I LJ J \ _ LP A - _ PF __ 1 w II II PLANTER A- - ECM II�II W � � wv W � n'- q UT UT UT ��-jjj i o �TMH oFOM w FT -_CFO \ - FO FO FO FO FO GBiv E E E E- ----- - - - =� IL I CB LMPORARY SILT IIRIM:28.45' FENCE INSTALLED ALONG 11OUT:25.85 -24- - - - - DISTURBED LIMITS29 11> / I I w a III NGS MONUY - ii'2 "F 213' NAD 8 N: 649,245.1 11> I I E: 2,567,585. CJ I ( EL 28.82 FT (A w W W W � W � /' `7. - W - = W - _ =W SS SS SS '',SS SS SS-SS-SS---------S FCB FURI DEBRIS _ TARY SEWER LINE S \ INITY SEWER MAP _- P----------U.S. HIGHWAY 17(BUSINESS)----SS, 1SS- � \S -,SS- 100' PUBLIC RIGHT-OF-WAY // 29.96 w I !LP 29.66 I � I I w I ASPHALT 3o.so � I J a - - 1tu 1�1 1RI 111 Fx pp1` l4 J Figure 6.65a Pomus baffles in a sediment basin. The fbw is d<sbilb led eveNy acmes the basin b md" flow labs and hobuWme, resulrg m 9reabr sediment reterltam Bdlbt aW m be lagllW et> ..* in t11dir My pwide Web' WbdhL Rd rtuPipn 6A%and the PollawkI Yri PDim • The bd % nurrYl eaWt to be awted a the botmm and ddr wft BWN W by trmohlny a tat dr tine.. • Mm of do eedltnra will mxmllar to the Mr bW m 9N ahodd be mdily wmitible Pox mfift erne. Ouooert mpg 6Lpperf post. to wars to pfw la9Me berte 6 6Wdts vmtmm fre ward. . w POML6m dew4mW0ndapemuebdflebfeaetim i bndn Nnrthet6lrtibmwelrbealm0awdlr gone ih*Ah dle bepM mmmiel. f,6a t ww POROUS BAFFLE DETAIL � A SITE DATA: SITE AREA - 1.30t Ac. �56,955t SF DISTURBED AREA - ;t 50t Aa (65,126t SF) A SOIL TYPE - CRAVEN CrA� AND LEN )IRje CONSTRUCTION SEQUENCE: 1 G 1. INSTALL CONSTRUCTION ENTRANCE AND TEMPORARY SILT FENCE. CONTRACTOR SHALL ONLY REMOVE ENOUGH OF THE EXISTING CURB AND GUTTER TO INSTALL CONSTRUCTION ENTRANCE. 2. BEGIN STRIPPING OPERATIONS. 3. BEGIN GRADING OF BUILDING PAD. 4. BEGIN INSTALLATION OF FOOTINGS AND BELOW SLAB UTILITIES. POUR BUILDING SLAB AND START BUILDING CONSTRUCTION. r6. INSTALL SKIMMER DEVICE AND TEMPORARY EMERGENCY SPILLWAY. GRADE SEDIMENT BASIN TO BOTTOM ELEV. 25.0. 7. INSTALL STORM DRAINAGE AND UTILITIES. 8. INSTALL EXTERIOR CONCRETE ALONG WITH THE CURB AND GUTTER. COMPLETE DRIVEWAY ENTRANCE ONTO HIGHWAY 17. 9. INSTALL ABC STONE ON PARKING LOT. Ito REMOVE SKIMMER DEVICE, POROUS BAFFLES AND TEMPORARY EMERGENCY SPILLWAY. 11.INSTALL OUTLET STRUCTURE AND 15" RCP ALONG WITH PERMANENT CONCRETE EMERGENCY SPILLWAY. 121COMPLETE EXCAVATION OF SEDIMENT FOREBAY AND PERMANENT POOL 13. COMPLETE PAVING AND LANDSCAPING. 14. REMOVE PERIMETER SILT FENCE ONCE SITE IS STABILIZED. GENERAL NOTES: 1. GROUND STABILIZATION IN 7 DAYS ON PERIMETER AREAS AND SLOPES GREATER THAN 3:1. 2. PERMANENT GROUND STABILIZATION IN 14 DAYS AFTER CONSTRUCTION IS COMPLETE. 3. SEE TABLE BELOW FOR GROUND STABILIZATION CRITERIA. 4. EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE. ( SECT. ILB (2)(b)) SITE AREA STABILIZATION TIME STABILIZATION TIME DESCRIPTION FRAME FRAME EXCEPTIONS PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES, AND �51_UVLb HIGH QUALITY WATER 7 DAYS NONE HQW ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND THAN 3:1 ARE NOT STEEPER THAN 2:1. 14 DAYS ARE ALLOWED. 7-DAYS FOR SLOPES SLOPES 3:1 OR 14 DAYS GREATER THAN 50 FEET FLATTER IN LENGTH. NONE ( EXCEPT FOR ALL OTHER AREAS 14 DAYS PERIMETERS AND HQW WITH SLOPES FLATTER T14AN 4-1 ZONES) GRADING NOTES: 1. SPOT ELEVATIONS SHOWN ARE BOTTOM OF CURB, UNLESS OTHERWISE NOTED. 2. CONTRACTOR SHALL REFER TO GEOTECHNICAL EVALUATION, DATED SEPTEMBER 13, 2012 BY SHIELD ENGINEERING ALONG WITH RECOMMENDATION LETTER DATED X. 3. FOR BUILDING PAD PREPARATION, CONTRACTOR SHALL REMOVE TOPSOIL. CONTRACTOR SHALL COMPACT EXISTING SOIL WITH A NON -VIBRATORY ROLLER. CONTRACTOR SHALL PLACE GEOCOMPOSITE (TENCATE PEC 35/35 OR EQUAL) ON SUBGRADE. 4. THE UPPER 12-INCHES OF FILL BENEATH BUILDING PADS AND ROADWAYS SHALL BE COMPACTED TO 100% STANDARD PROCTOR. THE REMAINING SHALL BE COMPACTED TO 95 PERCENT STANDARD PROCTOR. 5. THE DAM FOR THE STORM WATER POND SHALL BE COMPACTED TO 98% STANDARD PROCTOR. 6. LANDSCAPE AREAS SHALL BE COMPACTED TO 90% STANDARD PROCTOR. PERMANENT SEEDING SPECIFICATI❑NS: SEEDING DATES: MARCH -JUNE MIXTURE RATE FERTILIZER (10-113-10) 20 lb/1000 sf AGRICULTURAL LIME (GROUND OR PULVERIZED) 0 lb/1000 sf CENTIPEDEGRASS 20 lb/Acre MULCH 4000 lb/Acre I LI"II-UKHK T 3Ltin,4u Jr'_ui_r il..H I iuiw!>: SEEDING DATES: COASTAL PLAIN - AUG. 15- DEC. 30 MIXTURE RATE AGRICULTURAL LIME (GROUND OR PULVERIZED) 2,000 lb/Acre RYE 120 lb/Acre MULCH 4000 lb/Acre Know what's below. Call before you dig. co r^ v 1 Q'i C\J w z O Z x E-+ O O H t•••t Q x z 1•-1 FTI M W GRADING AND EROSION CONTROL PLAN N 0 04 00 N o U Z 0 -- L ro a L U � ch o ti to Iv co ci v Q- _ o 0 cu � N L m 0 0 2 LLI CD to 'ESS 0 20 -L ��'.• �. Z :....... - .� 7�, NORTH 1 "=20' Scale: Date: Project No. Revisions: 3/28/2013 LT04/17/13 REVISED SPOT ELEVATIONS 04/18/13 NCDENR COMMENTS • 05/21/13 NCDOT COMMENTS a• 06/13/13 REVISED BLDG FOOTPRINT Sheet C4