Date 6/7/13 Job No. 13009
NCDENR - DWQ
Attention
Scott Vinson
Family Dollar Bath
WE ARE SENDING YOU ® Attached ❑ Under separate cover via
the following items:
❑ Shop drawings ❑ Prints ® Plans ❑ Samples
❑ Copy of letter ❑ Change order ❑ p ❑Specifications
No
2
2
THESE ARE TRANSMITTED as checked below:
® For approval ❑ Approved as submitted ❑ Resubmit _ copies for approval
❑ For your use ❑ Approved as noted ❑ Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corrected prints
❑ For review and comment ❑
❑ FOR BIDS DUE 20_ ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS:
Please call if you have any questions.
Marie U. Peedin, PE.
RECEIVED
JUN - 7 2013
D V Q Y Yf RO
..i
iV. -PROJECT INFORMATION
1. In the space provided below, briefly summarize how the stormwater runoff will be treated.
Stormwater runoff from the development shall be treated with onsite stormwater wetland. The 1 yr - 24 hr
event shall be detained onsite and then outlets stem.
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
Approval of a Site Specific Development Plan or PUD Approval Date:
❑ Valid Building Permit Issued Date:
Other:
Date:
b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW -1995 ❑ Ph It - Post Construction
3. Stormwater runoff from this project drains to the Tar Pam River basin.
4. Total Property Area: 1.7 acres 5. Total Coastal Wetlands Area: 0 acres
6. Total Surface Water Area: 0 acres
7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project
Area':I.7 acres
Total project area shall be calculated to exclude the followin the normal pool of imppo�u��nded structures, the area
between the batiks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water
(MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to
calculate overall percent built upon area (B LIA). Non -coastal wetlands landward of the NHW e
be included in the total project area.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 46.51 %
9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered
stormwater BMP. For low densihj and other projects, use 1 for the whole properht area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
.,rnvidpd in the same format as below.
Basin Information
Draina a Area 1
Drainage Area _
Draina a Area _
Draina a Area _
Receiving Stream Name
Stream Class *
Trib of Back Crk
SB NSW
7 2a
Stream Index Number *
29-19-9 2)
Total Draina a Area (sf)
50,965
793S7
On -site Draina a Area (sf)
50,965
N 5
Off -site Drainage Area (sf)
0
Proposed Impervious Area** s
34582
% Impervious Area** total
46.51
Im rvious" Surface Area
Draina a Area 1
Draina a Area _
Draina a Area _
Draina a Area _
On -site Buildin s/Lots (sf)
8320
On -site Streets (so
0
On -site Parkin (so
25222
On -site Sidewalks (sf)
1040
Other on -site (sf)
0
Future (so
Off -site (sf)
Existing BUA*** (so
Total (sf):
0
0
0
34582
* Stream Class and Index Number can be aetermmea at: nrmiiporuu ncuenr. „yu.r..r...yga...............
** Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
Form SWU-101 Version 06Aug2012 Page 3 of 6
- ,1
,.Ir f.� 1 •:, • •f. ,�
it'1 .11 .lj� �•i L.� I it 1. 4i.!!�
__. _.. __ .___ -"F"
_ _
_._ ___. _ .. __ r
_
- _
�. V' ,'ice i .._��, •-t
f 1�
1 r•
-
4
I
Aill
E
IH
I'.
r
•
V •
ilkig
1741
• �`
I • '••� ' � 12-0e72 a
•. • I
N 36 28.509'
W7648.365'
�\ - •� • 12-0872 B • i
D• •lI•7MM \� • W7648..3696' _ •.
. M • ••
..� 124872 C • '
N J5 28.484' _
6 " -.. .. W 76 48.384'
Bonnets
Pt
r
�-
+�
•
Piling
Han
Nui
��+ Pill
V
r/
ru
t ware _ N'\N&' p���•1,��--�
Location: 035' 28' 27.30" N 076' 48' 21.74" W
2 Caption: Stream Determination, Chesson Property, Tax PIN# 15006330
m Jl
A, A