Loading...
HomeMy WebLinkAboutSW7110902_COMPLIANCE_20121218STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW -711OZ4 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATEl` YYYYMMDD December 18, 2012 Amy Adams, Regional Supervisor Surface Water Protection Section Washington Regional Office North Carolina Division of Water Quality 943 Washington Square Mall Washington, NC 27889 RE: Notice of Violation NOV-2012-PC-0379 Dear Ms. Adams: I received your letter dated December 6, 2012 to Mr. Arthur Ravenel, III, Managing Partner, ARTTCOTWO, LLC regarding the site conditions at the Tractor Supply Store in New Bern, NC. Please be assured we have taken immediate actions to remedy this matter. Trident Construction is the general contractor for this project. Prior to your Notice, on October 10, 2012, we had Kevin Avolis, Avolis Engineering, the civil engineer for this project inspect the site conditions, as we also were not satisfied'with the maturity and stabilization of the grassing. On November 8, 2012, Kevin Avolis provided a remediation plan for the stabilization and grassing of the deficient areas. The plan is attached for your review. Brian Elks, Elks Landscapinkq, was provided the November 8"remediation drawing and issued a Notice to Proceed. On December 10' , we were notified by Mr. Elks that the winter seeding is completed and should germinate immediately. He will also provide spring seeding and fertilizing. Mr. Elks will be providing pictures, which will be forwarded to you. We have also directed Mr. Brad Carpenter of GHC Construction to investigate the rip -rap and correct/improve the banks to assure that the erosion basin is correct. Upon receiving photographs from Mr. Carpenter of the completed work, they will be forwarded to you. We trust that these corrective actions are satisfactory, and hope you understand that we were taking proactive steps to correct this matter prior to receiving you letter. Please let me know if you have any questions. Sincerely, Ttldent onstruction H. Chapman M Kay W Vice President CC: Arthur Ravenel, III, ARTTSCOTWO, LLC Kristin Jarman, NCDENR Attachment Avolis Reseeding Plan Tddera Cot>crn:rtinu, Ll.0 2245 Technical Parkway • North Charleston, SC 29406 1 P.O. Box 60939 • North Charleston, SC 29419-0939 of (U!;2 843.572.7600 :=ri. 843.764.1704 [hLn,i, tcc'@tridentconstruction.com F1 [09DELY hSLlYY1'BOWttH25L�1M tB59t JN M!®AO'd ON3S110 'd - 'Yd'OMN3jNIDN3 SIl0AV NV7d 9oVNn15 UNV 3 3.L]S N HAR mY1 YaAlB WNON 'TA YAN 'M7H NI 's,WM TA 1?B6 A'Ly1ns Hnt�nit —mtureTR"zn I I I I 1 I I � I I Ii Ij 1 1 I 1 II i ill ��, II s I I, I I I I 1 nfi G$ 1 III � I I I I 'I I 1 I 1 11 II II i III 1 I I , I I i 1 i 1 I i 11 I i I 11 I I 4 II I Ili e l , II 11 �. I' I II I I iI NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Governor ' Director December 6, 2012 CERTIFIED MAIL #70111150000042065117 RETURN RECEIPT REQUESTED Mr. Arthur Ravenel, Ill, Managing Partner ARTTSCOTWO,LLC 105 Wappoo Creek Drive, Suite 4-A Charleston, SC 29412 Dear Mr. Ravenel: Natural Resources Subject: NOTICE OF VIOLATION NOV-2012-PC-0379 Permit Condition Violations Stormwater Permit No.SW71 10902 Tractor Supply Craven County Dee Freeman This letter is to notify you that you are in violation of Title 15A North Carolina Administrative Code (hereby known as NCAC) 21-1 .1003 for failing to comply with terms, conditions and limitations of a Stormwater Management Permit, 15A NCAC 21-1 .1003 is a rule of the Environmental Management Commission implementing Part I of Article 21 of the North Carolina General Statutes. On November 28, 2009, Mrs. Kristin Jarman of the Washington Regional Office performed an Inspection to determine the status of compliance with Stormwater Permit Number S W71 10902 issued to you on October 6, 2011 for the subject project located at 3821 ML King, Jr. Boulevard in New Bern, NC, and lying within Craven County, North Carolina. As a result of the site inspection and file review, the following violations are noted: l . Unpermitted drainage has been entering the basin. 2. There is severe erosion in the basin where the unpermitted drainage has been occurring and in other areas around the basin. North Carolina Division or Water Quality Internet: www.ncwaterauality.org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27899 17AX 252-946-9215 An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper NorthCarohna naturally f Page 2 of 2 Requested Response This Office requests that you respond to this letter in writing to the address listed on the letterhead within 30 calendar days of receipt of this Notice and should address the following items: Provide a written "Plan of Action" which outlines the actions you will take to correct the violation(s) and a time frame for completion of those actions. As part of the plan please return the riprap at the northeast inlet outfall to its proper place. Failure to provide the "Plan of Action" within 30 calendar days, or failure to correct the violations by the date designated in the 'Plan of Action", are considered violations of 15A NCAC 21-1.1000, and may result in the initiation of enforcement action which may include recommendations for the assessment of civil penalties, pursuant to NCGS 143-215.6A. Thank you for your attention to this matter. Please be advised, these violations and any future violations are subject to a civil penalty assessment of up to $25,000.00 per day for each violation pursuant to North Carolina General Statute 143-215.6A.. Should you have any questions regarding these matters, please contact either Kristin Jarman at (252) 948-3918. Sincerely, Amy Adams, Regional Supervisor Surface Water Protection Section Washington Regional Office Enclosures: Inspection Report cc: Shelton Sullivan — WBCSP WaRO Coastal Stormwater files i J General State Stormwater Inspection Report Project Name: Tractor Supply Permit No: SW7110902 Expiration Dale: 10-6-2021 Contact Person: Arthur Ravenel, III Phone Number: 843-723-7840 Inspection Type: Compliance Inspection Date: 1 1/28/2012 Time In: 09:00am Time Out: 09:30 am Current Weather: Clear Recent Rain (Date)? - Rain— in Location Facility Address / Location: 3821 ML King Jr. Blvd City: New Bern Zip: 28562 County: Craven LaC 35 05'41"N Long: 77 06'43"W Permit Information Rule Subject to (circle one): 1988 Coastal Rule 1995 Coastal Rule 2008 Coastal Rule Session Law 2006-246 Goose Creek High Quality Waters Outstanding Resource Waters Density (circle one): High h HD Low (LD) Stormwater Best Management Practices (BMPs) (insert numher of each): _Wet Ponds _x_Infiltration Basins . Infiltration Trenches _x_LD Swales_Stormwater Wetlands _Dry Ponds Bioretention x_Permeable Pavement _Sand filters (circle one) Open Closed _Cistern _Level Spreader/Filter Strip Other (specify): File Raviaw I. Is the.permit active? I ca IVU N/A Nir X 21 Signed Engineer's Certification on file? X 3. Signed Operation and Maintenance a reement on file? X 4. Recorded Deed Restrictions on file? X Site Vicit. Fluitt Ilnnn Arm ini I A I - -- — -- - 5. BUA is constructed and consistent with the permit requirements? I cs NO N/A Nit X 6. BUA aspermitted) is graded such that the runoff drains to the system? (high densi[ only)X 7., Drainage area is consistent withpermit? i.e. no un ermitted drainage to the SW BMPs X 8. Drainage area is stabilized? to reduce risk of sedimemation to the SW BMPs X Aita Vicit• Sinrmw�far RMDc 9. Stormwater BMPs are located per the approvedplans? r oa X No N/A Nit 0. Stormwater BMPs have dimensions e . len th, width, area matchin the a roved lans? X I I. Stormwater BMPs are constructed per the approvedplans? I X Site Visit- Onarntinn nnrl 12. Access points to the site are clear and well maintained? Ies X NO N/A WE 13. Trash has been removed as needed? X 14. Excessive landscape debris(grass c lip2ings, leaves, etc is controlled? X 15. Stormwater BMPs being operated and maintained as per the 2ennit requirements? X 16. Inspection and Maintenance records are available for inspection? (high density only, 1995 — present only) X Site Visit: Other Permit Conditions Yes No N/A N/E 17. Is the site compliant with other conditions of the permit? ,. . &L L. VUlwl .ra(CI wudluvIssues Yes No N/A N/E _ 18. Is the site compliant with other water emality issues as noted durino the inenartinn9 Slate Stormwater Inspection Report, Version 3.0 Page 1 o1 2 State Stormwater Inspection Report Unpermitted offsite drainage has been entering the North East corner of the basin and has eroded the corner of the basin. A lot of erosion and loss of vegetative cover is present in various parts of the basin. A vehicle has been driven in the basin. That is alright if it was used for maintenance but maintenance vehicles should be in the basin as little as possible to avoid soil compaction. Some of the rip rap at the North East outlet has moved out into the basin and needs to be put back in the correct area. Insoection Picture a�l.. j i.T '� r.• T ti:. �t r PSI �M v �f ���>�� � '+.er.`r�, �a yVi,^ • t . rye..rf 1.. !+• ti tl el "7?i !ia ya.yamr 'r S Y T t �ryrr� + �,.r :.. ti ^.. ♦ 4 �: i, I; ty j r r...4i VA ,, 1��•�.yt; ; j a f a �;?'+�J°`Y!}'� Y & ..A c �'`� ,lf.`yyJlt t ,y� 1 ♦ ��. CSt $ + i i ,+y.4„y'Tr"�., �� _.:y �?i tI 1' '.+ '. 1 JT` TT ' --ee' .t'r 1 y' ' 1 rx , I{r +ni t 4 Y••f e x t _ 1 t ..fit �.. �. . r ;;� " y r5 �' �ry.��"J�`�,,,,�. �;� �+ "-��A��r�„ "1 � s )y t }''r � J� L .r� t p' ♦ � Y � ' 'r ,, ' �� V_ i. .F v� i a.r:•v rt;"..}f1 r i � r r i` , ' „Y•dvni 4.aii• fLrtrti'?rsi AI! l ;n Jt r.t°t'Y, r`t �'•n�.. • .I PL rA� 1� 1 ��}.^tt 1 PH /.1•f i Y� �. f F 1 �\� � j� ��. .r4.N • Compliance Status ❑ Compliant x Non -Compliant Letter Sent (circle one): Yes No Letter type: CEI NOV NOVRE Other Date Sent: 12- Z Reference Number:_NOV-2012-PC-0379 1 Inspector Name and Signature: // S J 1 Date: State Stormwater Inspection Report, Version 3.0 Page 2 of 2