Loading...
HomeMy WebLinkAboutSW7110601_CURRENT PERMIT_20110613STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW_ DOGTYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYM M DD North Carolina Beverly Eaves Perdue Governor Mr. Wayne Black Perdue Agribusiness, Inc. PO Box 10 Pantego, NC 27860 Dear Mr. Black: NCDENR Department of Environment and Division of Water Quality Coleen H. Sullins Director une WaRo Natural Resources Dee Freeman Subject: Stormwater Permit No. SW7110601 Perdue — Pantego Grain Storage Pad High Density Commercial Wet Pond Project Beaufort County The Washington Regional Office received a complete Stormwater Management Permit Application for Perdue — Pantego Grain Storage Pad on June 6, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 21-1:1000. We are forwarding Permit No. SW7110601 dated June 13, 2011, for the construction of the subject project. This permit shall be effective from the date of issuance until June 13, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Samir Dumpor, or me at (252) 946-6481. ncerely Al Hodge p'Y� Regional Supervisor Surface Water Protection Section AH/ so: K:\WQS\STORMWATER\SD\SW7110601 cc: Marie Peedin, PE, Pamlico Engineering Services, PLLC Beaufort County Building Inspections v- C ashington Regional Office North Carolina Division of Water Quality Internet: www.newmorqualitv.ore 943 Washington Square Mall Phone: 252-946-6491 Washington, NC 27889 FAX 252-946-9215 NorthCarolina Natural& An Equal OpportunitylAffrmative Action Employer — 50% Recycled110% Post Consumer Paper State Stormwater Management Systems Permit No. SW7110601 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Perdue Agribusiness, Inc. Perdue — Pantego Grain Storage Pad Beaufort County FOR THE construction, operation and maintenance of one wet detention pond in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 13, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 43,473 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section I. of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this prol'ect shall be located at least 50 feet landward of all perennial and intermittent surface waters. 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: Page 2 of 7 State Stormwater Management Systems , Permit No. SW7110601 a. Drainage Area, ft2: 72,408 b. Total Impervious Surfaces, ft2: Design 43,473 C. Storm, inches: 1.5 d. Pond Depth - average, feet: 4.0 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 6.50 g. Permanent Pool Surface Area required, ft2: 4,344 h. Permanent Pool SurfacS Area, ft : 4,520 i. Min. Volume required, ft : 5,345 j. Permitted Storage Volume, ft3: 5,384 k. Temporary Storage Elevation, FMSL: 7.25 I. Controlling Orifice: 1.50" O pipe M. Permitted Forebay Volume, ft3: 2,800 n. Receiving Stream/River Basin: Pantego Creek o. Stream Index Number: 29-34-34-(1) P. Classification of Water Body: "C;Sw;NSW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 3 of 7 State Stormwater Management Systems Permit No. SW7110601 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. Page 4 of 7 State Stormwater Management Systems Permit No. SW7110601 ' 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from the date of issuance until June 13, 2021. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 13th day of June, 2011. N61RTHCAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Division of Water Quality By Authority of the Environmental Management Commission Stormwater Permit No. SW7110601 Page 5 of 7 State Stormwater Management Systems Permit No. SW7110601 Perdue — Pantego Grain Storage Pad Stormwater Permit No. SW7110601 Beaufort County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW7110601 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Beaufort County Building Inspections Page 7 of 7 DWQ USE ONLY e Fee Paid Permit Number 2"I5o &-"- Y 9FWYY3 W-I I (O O u es: Applicable oastal SW -1995 ❑ Coastal S - 2008 ❑ Ph II - Post Construction (select all tWcpulul— on -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan Uil6s N � Other WQ M mt Plan: State of North Carolina PLO Department of Environment and Natural Resources orl`�o Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Perdue - Pantego Grain Storage Pad 2. Location of Project (street address): City:Pantego County:Beaufort Zip:27860 3. Directions to project (from nearest major intersection): take us 264 east of Washington to NC 99 and follow NC 99 toward Swindell Road. Continue on Swindell road and farm is on the east side of the road 4. Latitude:36° 36' 30" N Longitude:76* 40' 35" W of the main entrance to the project. lI. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System []Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/ Erosion Control: 4.78 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Fonn SWU-101 Version 07Jun2010 Page 1 of I; Ii fill, f*' I; !, I - _, t, 14, -- 4;,j ti 09. In JA PG104% IN, ILIX;Y� too"), Jail .�;2Of1«Ght 'It, IN q,j. Ill Of III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Perdue Agribusiness Inc Signing Official & Title:Wayne Black b.Contact information for person listed in item la above: Street Address:1461 Swindell Road City:Pantego State:NC Zip:27860 Mailing Address (if applicable):P O Box 10 City:Pantego State:NC Zip:27860 Phone: (252 ) 943-3061 Fax: ( 1 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) �• r ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) Gi - k., 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:Perdue Agribusiness Inc Signing Official & Title:Wayne Black - b.Contact information for person listed in item 2a above: Street Address:same as above City: Mailing Address (if City: Phone: ( ) State:- State: - Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & b. Contact information for person listed in item 3a above: Mailing Address: Zip: Phone: ( ) Fax: 4. Local jurisdiction for building permits: Beaufort County Point of Contact: Brandon Hayes Phone #: (252 1 946-7182 Form SWU-101 Version 07Jun2010 Page 2 of 6 I I d:. 11 ,'1.11 i\.•' I I''' I•. I'r., :. Ili. j,t,i4' .(^II"` r. i1. I f, •!'.. .__..__ __..__ - 1.1...a. 7�i --. -'f,_ _, - - _. I. }'j q!1 Id. .Pti .. ..! r .'. -I. I .. j,f. an r, ,IfI ,J: ;III �yl, ••r: , ',' --- _.. _.._.__ _ ."- - -- - - - - - -- - - ! r';.. 4. y....... 7 I,r,7,: I.•' , t..l •,12 L�.. - _—_ — -' _ _ _ . . ..,:f I l:.71 �v - f,.., r, I{�'. r•n a /', (�1. I :. :- . ' I,. . Ii9:61. frt r• �I'q" , o 11•., A'f,{'.... (( rh7 i �• (.: 1 i. ."- {I'p .Id Itfl,n,' :�, 1 �•' i!!r J' _� 1 1'I' I I 'nJ. r . i' .. - •.!( .. (., It L]'1 I . ;..w J. r.1•. . .. .;� : I �l Jl,l. • , u,r :.f it f, r u u ., . • 4f � ,. "- i4 a ' SP pelorn rtl•iq I 1, ' j - 17 _ .fityl. li IV. PROJECT INFORMATION 1. In the space provided below, brieFly summarize how the stormwater runoff will be treated. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. if claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Pamlico Tar River basin. 4. Total Property Area: 15.96 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:15.96 acres Total project area shall be calculated to exclude the followingg: the normal pool of impounded structures, the'area between the banks of streams and rivers, the area below the Nornnal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHIM line nnmy be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 28 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stonmwater BMP. For low density and otlner projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area Drovided in the same format as below. Basin Information Draina a Area 1 Draina a Area _ Draina a Area _ Draina a Area _ Receiving Stream Name Stream Class * Pantego Crk c, sw, nsw Stream Index Number * 29-34-34 +1 Total Drainage Area (so 72408 On -site Drainage Area (so Off -site Drainage Area (so 0 Proposed Im rvious Area** (so 43473 % Impervious Area** total 60 ous" Surface Area Draina a Area 1 Draina a Area _ Draina a Area _ Draina a ABuildings/Lots (soStreets (soParking (soSidewalks I (so 43473 n-site (so Future (so 0 Off -site (so 0 Existing BUA*** (so 0 Total (so: 43473 Stream Class and Index Number can be determined at: tu�://yortat ncaenr oryweola,rl/psicsniuue�gIun,o..> * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 07Jun2010 Page 3 of 6 -r I;. •..r, r. I. ! �, '. r -I, r'.. 'ri; iUl J�JI'�I '• fa:'!'I r ,r •.. _,�i '4Y � - �Y .. 1... 'l'.. .'ISr, . slll.l % r.l • i. ,. 1. '1 •1 � ... .! � 'rrr. .�, 'ir! .1 � r 1� 3'. 1:•tr. IIJ'r'n. �n! 'r1 r•sl 1 _ �.:q.�._••..t'�fl 1 _.. ___ .�.___ 1 'i 11 ftf tl /1 � 1'1 1�. '. 1. f � I'.'� •. P. fly. ..� .. �'d� ;, ff f. i I il' 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Protects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from httD://Dortal.ncdenr.ore/web/wo/ws/su/bmD-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available fromhgp://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Thecomplete application package should be submitted to the appropriate DWQ Office. (The appropriate office. may. be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hqp://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part Vll below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexoress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator fo additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the'h mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MI-IW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. I. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. Form SWU-101 Version 07Jun2010 Page 4 of 6 'iJ%.. .It,• „ (r n!! '.lr.l' :�i I'! .. l: e u r, r. .,, .r, ..� ., I 1�•:'I!f':, '.I (I 1 ! ..r 1..., .r,. � l�.f. ii 'J! .II � �r' Irgr - 1.,' q,l,Cl•Ir �ILV.'.'.l �r.. .1, (!.! �., '1' •.) '.11.i.'1•.f ,_.. !.1.. 11`I,r.'1 !i I �.( .'I U. .I:I r!i. •r J'j !. t!:6 91.1. JL'. .•!• r1 'r' r it n ,u..'r•. r!rN ,,( {i•✓.i. IL .� !.1 ( I. if' .L(. Y• .,i('.'( , ..I ...... . •...1 .r N.'.r (ln, l... r(.>.II :f1.�'r) r "�1�•_ 'r l`'. J'li' ''(1'r ', ' , •.tl...(. !',' . .7('•rl' ;Ir •'r i.r ,'If '. ,il'r I•..r t•a, (' �l; l�r. '!'. r,r l!/ '!:'. �. -� y '.9_Ir. !'- `(rf ,I'' 14 r. .I �!' •r .l .r fl•r '1 r !' .. f �. �� 1,.!%r !r'Al " a .(r. 'it W!, t' try.,.. ,•, '1 :' 4'I {: 11. }.. IiJ I • (!. r.l, 1, .... ) r.� .' � . . 1 r• :) -. 't .l''. , ..l,.l .'il !'!:fin .._._ _ ' JI9:. lr'J (, :iI:J -.f'. N' Ulr' I' rll' r- r ;J;. •'1 l/' d-A., . :1 I. - ._ ._ I III'.•... '1.'1' ,u y. ( •.'!''r'I •I'. ...... (,I' h• 'IL' .b 1� ,�.).••„ i .__. •".4r(,1'G., 4 (it.'. IJFI• �.r I ri ( I -# -.r` I.—.i .. Lt:i !JI I-', '1' 4 -1'I •1 r t!i„ . .r .rl..(f i(,. r ., ro• f':' 'rlr .. n. :n.1y, rf; r, rvlt, rlr, .'j •(J' •71..:.'I,r.. '.(y :bi .:l.r ���'�- �I 1F1•:Cil j'i!r .i 6 49•, p' .ti r. A �'..' Ill, f, .."f..' ,!'.fif. ,),. ~ ('' � J ' .'..(''rill•`'lb. (.... jJ(.f. I; rr%� _ rr:r.' .✓.1 I I '.1•' ' 'J 4t'liiAGV°. `,'1':. �r2'. r '.WGN y,. 1( I'• � I Il;i� .. J (f .II- , ♦ .I „il.. _ ,I '/ Ir..- '.far '. "rL (: rra f'•. -_! s rr' -f.. rt 7r.f.'�r -IC jl It 1 ,�_ri r'r lI!f i•in_-�Irf.•'! .,r rl(, I'. `. , ,y. ,1.r �.. r ! ': 't',. 4'�,. , �. 1., , U9r. "'1 '.� t. "I.;, ( I ) Ir!., rI r r. rll 11 ,.I !'''rl • .� 'ir' 'i.r -�i It.� r•t o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWF prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 1655 Page No: 874 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http7//www.secretaiy.sta nc.us/Corporations/CSearch.aspx V II. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. if lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from ht�t [portal ncdenr org/web/wo/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant. Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer.Marie Peedin PE Consulting Firm: Pamlico Engineering Services PLLC Mailing Address:128 Abbey Lane City: W ashington Phone: (252 1 945-2983 Email:pespllc@embargmail.com State:NC Zip:27889 Fax: (252 1 974-7678 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Inforrratimr, item 2n) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07Jun2010 Page 5 of 6 -M) lit if r, e.1 .A it 'j, I fit 7t, ',.t ",,fl It It t'l 1% Ili 1, if vi p it 1! fit -qj!; 14" if In IC'Mi 1:i" !".-,, ; In, it; 3l.r"11I ir. tj S I r, , - Ir I I t \ 1 :1 i a j'j " , ( /, P /q .1 r . [ - , , : - , / k : ) .* it "iff, du. I., fur MIA,, If If, 19 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and maresul to apprNCGopriate enforcement f �� action including the assessment of civil penalties of up to $25,000 per day, pursuant Signature: Date: I a Notary Public for the State of County of do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANTS CERTIFICATION 1, (print or type name of person listed in Contact Information, item la) W^ we Black certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 21-1.1000, SL 2006-246 (Ph,11— Post Construction) or SL 2008-211. Date: - 3 a o I ( a No ry Public for the State of /y C County of do hereby certify thatpersonally appeared before me this day ofJ-U4 .0 and a owledge ue execution of the application for a stormwater permit. Witness my hand and official seal, p!lB1.�G Ci SEAL My commission My Commission Expires October 11, 2015 Form SWU-101 Version 07Jun2010 Page 6 of 6 � l r_ v Q1., e.. 'i., Lam''{ •'_ 4i1` Lci�`'.•*"� ' � Jb�oii33N ' It'1a�� I r .C. .. J. rC. .r> .r ,^e ," r r:•J y'r'.1. . ,. .Q > 1 + r. _ r,r a' r 1r. -J r ` Jt � "'C• _. i ,J .r[r IJ..JJ • ..1 F _ .L. :-. .. "> r r lap tf �i• :r .a ,. . , . _ 1 � 1 -11 .r r ' � i 1 a : ,' 1• E` FIX UENH USe ONLY Reviewerc i �" ©rX A North Carolina Department of Environment and; 'Natural Resources NCDENR Request for Express Permit Review Time Confirm: FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed forth to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-2964698;alison.davidson(d,)ncdenrgov • Fayetteville or Raleigh Region -David Lee 919.7914203; davidJee(ilncdenr.gov • Mooresville & -Patrick Grogan 704-663-3772 or patrfck.grogan(lgnccienngov • Washington Region -Lyn Hardison 252-946.9215 or lvn.hardison(&,ncdenrgov • Wilmington Region -Janet Russell 910-350-1004 or janet.russell(Uncdenr.gov NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name: PERDUE GRAIN STORAGE PAD County: BEAUFORT CO Applicant: WAYNE BLACK Company: Perdue A01husiness, Inc Address: 1461 SWINDELL ROAD City: PANTEGO State: NC Zip: -2786 Phone: 252-943-306, Fax: _ _ _, Email: -@ SW SW SW SW SW Physical Location: 1 (oO' Project Drains into PANTEGO CREEK waters — Water classification C SW NSW: (for classification see- http://h2o.enr.state.nc.us/bims/report freportsWB. html) Project Located in TAR PAM River Basin. Is project draining to class ORIN waters? N , within Y2 mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N Engineer/Consultant: PAMLICO ENGINEERING SERVICES, Company: MARIE PEEDIN ������� Address: 128 ABBEY LANE City: WASHINGTON State: NC Zip: 27889-_ Phone: 252-945-2983, Fax: 252-974-7618, Email: PESPLLC@EMBARQMAIL.COM JUN 06 2011 SECTION ONE: REQUESTING A SCOPING MEETING ONLY I�p ❑ Scoping Meeting ONLY ® DWQ, ❑ DCM, ® DLR, ❑ OTHER: _ NC DENR SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ IntermittenYPerennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ® Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _#Treatment Systems ❑ High Density -Bio-Retention # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems /❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Manna Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 5_0 acres to be disturbed.(CK #" r • p l got DENR use)) 1 3,�5 SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes ® No Buffer Impacts: ® No ❑ YES: _acre(s) Wetlands Delineation has been completed: ❑ Yes ® No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit Received from US ACOE ❑ Yes ® No For DENR use only Fee SPIN for multiple permits: (Check # 1 Total Fee Amount $ SUBMrTTAL DATES Fee SUBMITTAL DATES Fee $ Variance (I] Maj; ❑ Min) $ SW (El HD, ElLD, ❑ Gen) I Jy. $ ` 401: $ LDS C 3 i 21r3SG8 1 $ 1 >6p Stream Deter,_ $ NCDENR EXPRESS March 2009 Permit No. (to be wooded by DIND) EXPRESS JUN 06 2011 M NC DENR NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be lifted out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submMed along wdh all o/the requued inlonmadon. Project name Contact person Phone number Date Drainage area number Made U Peedin, PE 252-945-29M Area to Ford only II. DESIGN INFORMATION Site Characteristics Dminage area "I800 ✓ ✓ Impervious area, post -development % impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pm -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: l-yr, 24-hrstorm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr. 24-hr peak flow Pre/Posl 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the pen. pool elevation) Top of 10fl vegetated shelf elevation Bonom of loft vegetated shelf elevation Sediment clmnout, bop elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pout? Elevation of the top or the additional volume 60.16 % 1.5 in / 5,345 fls ✓ OK 5,384 fP V OK, volume provided is equal to or in excess of volume required. to ft to ft3 to Y (Y or N) 3.5 in 0,60 (finless) 0.85 (unifless) 0.15 in/hr OK 0.06 fits/sec 0.09 fl3/sec 0.03 go/sec 7.25 host 6.50 hmsl 6.50 hmsl 7.00 fmsl 6.00 Imsl 1.00 Intel 0.00 Imsl 1.00 9 Y (Y or N) 7.3 hosl OK Forth SW401-Wet Detention Basin-Rev.8-9117N9 Parts I. a n. Design Summary (2), Page 1 or 2 Permit No. no be provided by DWQI 11. DESIGN INFORMATION Surface Areas Area, temporary pool 6,249 ft?V Area REQUIRED, permanent pool � 4,344 ft y / SA/DA ratio 6.00 (unitless) Area PROVIDED, permanent pool, Ate,,, -yam, 4,520 ft✓ OK Area, bottom of 1011 vegetated shelf, Ab,_" 3,215 ft` ✓ Area, sediment deanoul, top elevation (bottom of pond), Ab .y 1,174 fl` Volumes / Volume, temporary pod 5,384 fl' OK ✓ Volume, pernanem pod, Vp _md 14,036 ft Volume, frebay (sum of forebays fl more than one frebay) 2,800 ft' Forebay %of permanent pod volume 19.9% % OK 11/ SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) ✓ Mountain/Piedmont SAIDA Table Used? N (Y or N) ✓✓ SAIDA ratio 6.00 (unidess) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-21g) N (Y or N) Volume, permanent pool, V. -PW 14,036 ft' Area provided, permanent pool, A. _,d 4,520 ft Average depth calculated it OK Average depth used in SAIDA, d„, (Round to nearest 0.511) it Calculation option 2 used? (See Figure 10-21b) y (Y or N) Area provided, permanent pool, Ate,,,. 4,520 W Area, bottom of 10ft vegetated shelf, Aba #e 3,215 ft Area, sediment deanout, top elevation (bottom of pond), A,., 1,174 ft 'Depth' (distance b/w bottom of 10ft shelf and top of sediment) 5.00 ft Average depth calculated 3.844 OK Average depth used in SAIDA, d„, (Round to dearest O.Sft) 4.0 it OK Drewdown Calculations Drawdown through orifice? Diameter of odfice (if circular) Area of orifice (ifrron-circular) . Coefficient of discharge (Co) Driving head(H,) Dmwdown through weir? Weir type Coefficient of discharge (Ce) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of fiowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: Y (Y or N) 1.50 in In? 0.60 (unifless) 0.50 it N (Y or N) (unidess) (unitless) ft It 0.06 ft'/sec 0.09 fi /sec 0.01 ft'/sec 2.00 days 3 :1 10 :1 10.0 It 3 :1 2.0 :1 Y (Y or N) Yft OK, draws down in 2-5 days. OK OK OK OK OK OK OK n (Y or N) OK n (Y or N) Insufficient. Recorded drainage easement required. Y (Y or N) OK Form SW401-Wet Detention Basin-Rev.8-9/17/09 Pads I. & II. Design Summary (2), Page 2 of 2 1' f cv _ Permit No. (to be provided by DWQ) Ill. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initialo Sheet No. Qo ° 7✓ 1. Plans (1' - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROM, - Overflow device, and - Boundaries of drainage easement. CovZ 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. /J n L! Cam- 3. Section view of the wet detention basin (1' = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 4 rn, 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 'Z go 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the n � entire drainage area is stabilized. 7. The supporting calculations. B. A copy of the signed and notarized operation and maintenance (O&M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part 111. Required Items Checklist, Page 1 of 1 LC. '1'i•VJ ... 'unill.• -- •IiV. .r 1:: .. rll 1 ..: 1�.)-r : �I. � ') .f�.�li.r -'i.l' 1"'l :fl: ..F� U'.. r. ^,74'i r '1 'e. 1 ,' Ir �!1Rrr �:1' •f1:r4 1 , 1'.,I Y ;I .�4 �,P>.•"'VR;. is m $1. r_.. ' .. .. ... •'fly 'l.. Ji "•., v''ry •. lu.'cv:L. . _ C EXPRESSPermit Number: (to be provided by DWQ) JUN 06 2011 Drainage Area Number: NC ®Et Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMW. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ® does ❑ does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of I long. approximately six inches. Pomt S W401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 f , r, '.I„_.:1.1, u„ ,� i,{ .. .j•.'11.7•.. ._iy 1'If' UfI .j ll .. ( 1 ..1 L,.'1• i f, L., +191 ! 'u . : i.r� .'1 .:) f� l'r J ..r'i. t. "'J!i r }i`�;Ir_ 1' .. )�,iJi L'Ir Y. •.(...',.;r -. __ _ .. .. .LI ,, f,� n .. "d.. - - _ IJ ...f , .(lt'.l:•. - _ " . _ a,'t' -" fL 111 .i' . � �J.1 J" .� 1.!7 ,�-J•.O .f r:71 '� �'' 1., 1;./1J'rl r 1-".�J�t...'.'i1Lt:.1 ::'ll ,;: )< `J :J'.G.t•nr,ll L;.:'.IU{�'1 .. . •!f, fl'J i i•'(i Ir.: J.• • r✓J f r�rfj �'l','Ji- (l: .)/ ;'rl rL'. (. .pt.l-r i:."r . , ', I r'^(t.L`. .'.f�l:u .� ' `F' 1f).+ .... .r r , i ' �.,f .a•., J. r' '... 7.III"' t. rll ,'• f r4'. (r�• •..'..:(1•,:'iFr �.. r.., i1,-... . I,O r 'I, ,7 ,l„J. ,r .).J _I �.r( l tJ�. • try., r. u r , 1 ,'r.('_tf, .(� f . 1 e i',I.J r, f l ,'tr j''Jf jt,)•,'1. ' lL)(. ill ',r 11'. J•r:)J !. ... n_1.• 1•, ,-.J 1.: )' ,. �� i ',,, 'f 1 .'1= I F' ).1 .:: ,{ .J( �Yr... -!1; �1 . , ., 'Ir rr r ,.P Ir, /• I, !.I , '(' {, � • j, .'.r:, a .( ll' J F. Ir,'l 1' „ „ f'' ,;J„' ;11{' f'J rl' 1- .Or-•. - 1.t j. It�F :SJ•'L.!`ii"t r., *1..qF:. i";'Oi; (�: f: jJ:1 g}"..t c7 ('1 rs, j.y'; llc fr v• p 1. r { . .. ,r! � : aF. �• ,1 �11J � F, - ,1 'r ',� 1 .J ' •t. .� ,U ."✓�' .h'J 17'r , � .. ..".�� •_I r'J'_C. 'i. '1S- 'I r( t _ r.. 1 .��', rr f, t,f '. 7drj, Y--.. (, '+ i., !� .`S.• ,. .. .. eu.' �.1)! t}'' ii. Ill. ,,^')JI 1 j .ttll: A•. _}J7 f f�.. ij 't iF.r f.J e�i'L!1�'i1/( - ,� ��,-'�.(x(; •Y, J's L•i "�'L: !—'..1'Oft 1 • ' Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay • Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 .•1 .fit 'fl II ^I .'1!�) 1'{,{7 1I: •111I i :,.j!rf .{fig , • )".11 I.r�: ,.i .. I� �f '.1) � 1' .., .'l., � .. , ••) r,f" 1 l• , ,. a .., Ilr >. "!'1:1"„ l� ifph... , .ft..:l!: _. ,.,9 ,7 1f.nrnfll.I / {rl 1 ,.,.I ,r✓: { Ij 1:.t. j,.riy?r.I,rr_IIr.•, ,>'I, ,/ ., -''In', i 1, .•. •�,9',}: � .'ll,' .tt,• , , J 1' I♦ . rr d. � u I' Ii - _ ), y.�., y � , 1, ,�l•',r r ''I .rRtL li' i` �i•9 , �,Y. .. n i',. r Win' ,. • ., , , r .. + ,, ,i 1, ., 1. p .•1 � ..� qJ+P, ..II. Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 55:5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 44:5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Sediment Removal . 2 Pe aned` ------------ -- Volume Bottom Elevatio 3 -ft Min. Sediment Storage FOREBAY Form SW401-Wet Detention Basin O&M-Rev.4 Permanent Pool Elevation 6.5 Sediment Removal Elevation 1 Voluml ---- ------ Bottom Elevation _0 1 1-11 MAIN POND Page 3 of 4 Storage (.J1. ♦I it • rr-.. .1 L.J+fl1.')(♦')�I ).1' .r V.. •i 't,.. , 1'- 1'. r.r , . '! , +- rr 'O r �/r..l �r .') �i '. ;'ni+. r''.♦i rl r "J JI IJ .�Irl, .. + '!. sr 1 ♦r1♦ ,.r i - Ir .. ,il r. „ 1 rtJ'r: y :L �i,.lf, u... r. ..r, ♦ r.('OI ,� j � 1�f 1•11 'rli rll ryJ .l+i• ;L'., •)ill ,"/. i,''+• .. 1 ''f,l _ :�.. '.1)� ri ., �f. r � r 7 :JI-. 111 I.. 1; rIn..r.' 1 i•V ! r Ir ri 1. +l � n,.•'i'_ ______.__. - r.l r..'1 • rt.r it r rl. �. � -Ir r f . r., Permit N (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Perdue Agribusiness Grain storage pad BMP drainage area number: Print name:C. Wayne Black Title:Director Agribusiness Enviromental Address: PO Box 10 Pante o NC 27860 Phone: 943-3061 Signature 3 ^ id1, Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. i?� l , a Notary Public for the State of County of �f do hereby certify that A personally appeared before me this —_ day of :] t A j o [ / , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, '021 C OOA N "0 pV81.�G ��hgC0�1 aN•C(���,• SEAL My Commission Expires My commission expires October 11, 2015 Form SW40I-Wet Detention Basin O&M-Rev.4 Page 4 of 4 _ I Q 1 �� C/• _ • _ eCJ rAy 17 • � 9acyPa0iad04 C0444�'•V _ r` _ �, - � __. " 1 EXPRESS JUN, 0 6 2011 Permit Name: (io be provided by DWQ) HC®Epp R Drainage Area Number: �V Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed Swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element Potentialproblem: How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733 1786. Form SW40 I -Grassed Swale O&M-Rev.3 Page 1 of 2 f J 7IjA .'I• ,'1�'b: .. )�. r r•',1!f'.',) iY71r," + J .r t _.. •r.,,l ", 1.' y". ._ r'r ••T 1'r.r,rS�,. '' fl: )Y^r rl . ,'' ,','�5,.. ,. r,�ir, � r vi�,r r� Lt' JI"'' •:r;� _+� .., , . _ '-G ' ' •III ..' 1 .'. 1, ..,, •. , r{ ,., �.,. ., ' Permit Number: (to be provided by DWQ) 1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Perdue Agribusiness Grain storage pad BA4P drainage area number: I Print name:C. Wayne Black Title:Director Agribusiness Enviromental Address:P O Box 10 Pantego, NC 27860 Phone:252-943-3061 Signature: K, _ '--- Date: G- 3- 141, Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, t V 0 4 W 000 I I, a Notary Public for the State of '(_ County of72, i� , do hereby certify that _cl personally appeared before me this day of � J4 -(_ o t , and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my handpId official seal, �t%GY coo,**,; OOTA%. �9 '0�e sec o• SEAL nay Commission Expires My commission expires October 11, 2015 Form SW401-Grassed Swale O&M-Rev3 Page 2 of 2 L " I rl. r .r . r a \ b • � r� .Fa+`' �99dt6tj p9�4a4 .✓ � .I nrr: �. r11 I, •� efr,'�' !.' rr - rv�� � � fliii Il�,.(1 'r.. .r .. ^I.Y Permit Number fro be provided by DWQ) >�0� W A7FyO V E EXPRESS o` NCDENR JUN 0 6 ZfT)ORMWATER MANAGEMENT PERMIT APPLICATION FORM MA CERTIFICATION APPLICATION FORM SIC DENR GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must also be filled out, printed and submitted along with all of the required information. Project name Contact name Phone number Date Drainage area number Site Characteristics Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 10-yr storm runoff depth 10-yr storm intensity Post -development 10-yr storm peak flow Velocity Maximum non -erosive velocity (peak 10-year storm) Soil characteristics (enter Y below) Sandlsift (easily erodible) Clay mix (erosion resistant) Grass Type (enter Y below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: Maximum velocity Perdue Grain Storage Pad Made Peedin, PE 252-945-2983 May 27, 2011 695,217.00 ff2 V 196,020.00 fl2 ✓ 28.2% % i 1.50 inch y / 0.62 in 7.45 in/hr 5.21 ft3/sec 3.50 ft/sec x x (Y or N) Side slopes 1 Swale length ft Option 2' Conveyance Swale Seeking Pollutant Credit: y (Y or N) Maximum velocity for 10-yr stone 1.00 ft/sec OK Side slopes 5.00 :1 OK Swale length 300.00 fit OK Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 1 of 2 Permit (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an Y in the appropriate cell below: Trapezoidal Parabolic V-shaped Width of the bottom of the Swale Width of the top of the swale Additional Information Is the Swale sized for all runoff from ultimate build -out? Is the BMP located in a proposed drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? What is the ground level elevation? What is the elevation of the bottom of the Swale? What is the SHWT elevation? What is the longitudinal slope of the swale? What is the depth of freeboard? x 2.00 ft 15.00 ft y (Y or N) OK y (Y or N) OK 2.50 it OK 8.00 fmsl 6.50 fmsl 4.00 fmsl 0.50 % OK 0.50 it OK Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 2 of 2 Permit No: (to be assigned by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. Goo\ Plans 0" = 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), Swale dimensions (width, length, depth), Maintenance access, Proposed drainage easement and public right of way (ROW), Grass species, and Boundaries of drainage easement. W� 2. Plan details (1" = 50' or larger) for the grassed swale showing: - Swale dimensions (width, length, depth), - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Grass species, - Off -site drainage (if applicable),and - Boundaries of drainage easement. 00 3. Section view of the grassed swale (1" = 20' or larger) showing: "ON - Side slopes, - Longitudinal slope, - Freeboard - Swale dimensions, and - SHWT level(s) 4. Supporting calculations (including maximum velocity calculations for applicable storms) 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1