Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW7110114_HISTORICAL FILE_20200826
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW C ez�`� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑. COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD d ROY COOPER Govarnor WCHAEL S. REGAN Secretary BRIAN WRENN Mwtor NORTH,CAROLINA Environmental Quality. August 26, 2020 Dr. Michael Sue 1537 Clubhouse Drive Elizabeth City, NC 27809 Subject: Stormwater Permit Renewal,' Stormwater, Management Permit SW7110114 Dr. Michael Sue Office 'Elizabeth City,,NC; Pasquotank'County ' Dear Dr. Sue: A Division of Energy, Mineral; and Land Resources file' review has'determined that Stormwater Permit SW71.10114 for a stormwater treatment system consisting of a wet detention pond serving an office located at 102 Northside Park Drive, Elizabeth City,. NC expires on February 8, ?021. This is a reminder that permit renewal applications are due 180 days prior to expiration. We•do:not have a record,of receiving a renewal application. Please submit a completed permit renewal application along -with a $505:00 fee for permit renewal. Permit application forms for renewal can be found on our website at: . h=s /,//degnrgQy/ bout/divisions/en rgy-mineral-land-resources/energy-mineral-land- rules/stormwater_nrogram/pyr•ronstructlon. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under,a Stormwater . permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can a -mail you a copy of the application form. You can request a copy by e-mailing me at'rooer thorpe(a)ncdenr.4ov. Sincerely, Roger K. Thorpe Environmental Engineer. P9. --L�Nw2h Carolina Departmentof EnvhonmentalQyalhy I DMslondfEnergy:Mineraland Land Rnourms J� wesHngton Regional Office 1943 Washing ton Square Mell Wehington�North CaroNne 27889 ..n.d252.946.6481 NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Dr. Michael Sue 102 Northside Park Dr. Elizabeth City, NC 27909 Dear Dr. Sue: John E. Skvarla, III Secretary May 21, 2014 Subject: NOTICE OF INSPECTION Permit No. SW7110114 Dr. Michael Sue, MD at 102 Northside Park Drive Pasquotank County This office received a designer's certification from your consultant for the subject project. On March 12, 2014, Roger Thorpe of the Washington Regional Office of the Division of Energy, Mineral, and Land Resources inspected the wet detention pond serving your office located at 102 Northside Park Drive in Elizabeth City, NC to determine compliance with Stormwater Management Permit Number SW7110114, which was issued on February 8, 2011. The site inspection revealed that the wet detention pond is well operated and maintained and is in compliance with stormwater permit SW7110114. If you have any questions please contact me at the Washington Regional Office, telephone number (252) 948- 3923. Sincerely, Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources . Land Quality Section Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 • Phone: 252-946-64811 FAX: 252-975-3716 Internet: http://I)ortal.ncdenr.org/web/ir/land-guality An Equal Opportunity 1 Affirmative Action Employer— 50% Recycled 110% Post Consumer Paper NFA WC®EW North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Land Quality Section Tracy E. Davis, PE, CPM Director Dr. Michael Sue 1�2-%6 Elizabeth City, NC 27909 Dear Dr. Sue: Pat McCrory, Governor John E. Skvada, III, Secretary October 28, 2013 Nor7Lk Jaca-r k D r. Subject: Failure to Provide Certification Stormwater Management Permit SW7110114 Dr. Michael Sue, MD at 270 Northside Park Drive Pasquotank County This letter is to inform you of certain conditions of your stormwater permit that have not been met. [&Kn A Division of Energy, Mineral, and Land Resources file review confirms that a certification of completion has not been submitted. Permit condition number II. 8 states "Upon Completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed In accordance with this permit, the approved plans and specifications and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations." Please provide a copy of the certification to this Office at the letterhead address within 30 days of receipt of this letter. If you have questions, please feel free to contact me at (252) 948-3923. Sincerely, Roger K. Thorpe — Environmental Engineer Washington Regional Office Cc Albemarle & Associates Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 • Phone: 252-946.6481 / FAX: 252-9753716 Internet: http:]Avww.portal.nodenr.org/webArAand-quality An Equal Opportunity / Affirmative Action Employer - 50%Recycled/1056 Post Consumer Paper p� 1 : NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary February 8, 2011 Dr. Michael Sue, Owner 1134 North Road St., Suite 8 Elizabeth City, NC 27909 Subject: Stormwater Permit No. SW7110114 Dr. Michael Sue, MD High Density Commercial Wet Pond Project Pasquotank County Dear Dr. Sue: The Washington Regional Office received a complete Stormwater Management Permit Application for Dr. Michael Sue, MD office building on January 31, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 21-1.1000. We are forwarding Permit No. SW7110114 dated February 8, 2011, for the construction of the subject project. This permit shall be effective from the date of issuance until February 8, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable; you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Scott Vinson, or me at (252) 946-6481. S�cerely, . � 1 Al H'1odge Regional Supervisor Surface Water Protection Section AH/ sv: K:\WQS\STORMWATER\PERMIT\SW7110114 cc: Mike Morway, PE — Albemarle & Associates Pasquotank County Planning/Building Inspections ',Aashington Regional Office North Carolina Division of Water Quality Internet: www,ncwaterquallty.org One 943 Washington Square Mall Phone: 252-946-6481 1 FAX: 252-946-9215 }�] O rt}� CaPO} I n R Washington, NC 27889 FAX: 252-946-9215 An Equal Opportunity 1 AManative Action Employer Xaturally State Stormwater Management Systems Permit No. SW7110114 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Dr. Michael Sue Dr. Michael Sue, MD Lot 10, Northside Park Drive in Elizabeth City, Pasquotank County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 8, 2011, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 34,784 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section I. of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent surface waters. Page 2 of 7 State Stormwater Management Systems Permit No. SW7110114 7 The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. b. C. d. e. f. 9. k. I. m Drainage Area, acres: Total Impervious Surfaces, ftZ: Design Storm, inches: Pond Depth, feet: TSS removal efficiency: Permanent Pool Elevation, FMS�: Permanent Pool Surface Areq, ft Permitted Storage Volume, ft : Temporary Storage Elevation, FMSL: Predevelopment 1 year 24 hour: Post development 1 year 24 hour: Controlling Orifice: Permitted Forebay Volume, ft3: Fountain Horsepower, HP Receiving Stream/River Basin: Stream Index Number: Classification of Water Body: II. SCHEDULE OF COMPLIANCE 2 C! 5. 91 1.65 34,784 1.50 5.10 (3.10 average) 90% 8.10 6,706 13,189 at temporary pool el 9.60 0.07cfs 0.02cfs 1.00"0 pipe 3,376 0 (fountain not allowed, pond too small) Knobbs Creek/ Pasquotank 30-3-8 C; Sw" The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all time provide the operation and maintenance necessary. to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. a. Access to the outlet structure must be available at all times. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. Access to the stormwater facilities shall be maintained via appropriate easements at all times. Decorative spray fountains shall not be allowed in the wet detention basin stormwater treatment system due to the ponds small size. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 3 of 7 State Stormwater Management Systems Permit No. SW7110114 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. Page 4 of 7 State Stormwater Management Systems Permit No. SW7110114 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from the date of issuance until February 8, 2021. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 8th day of February, 2011. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for goleeh H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Stormwater Permit No. SW7110114 Page 5 of 7 State Stormwater Management Systems Permit No. SW7110114 Dr. Michael Sue, MD Stormwater Permit No. SW7110114 Pasquotank County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW7110114 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Pasquotank County Planning / Building Inspections Page 7 of 7 t DWQ USE ONLY _ -E a e ft cei SS Fee Paid C.te.l� 1"1 Permit Number 3500 S�nl "1 O lk4 Applicable est 1 :N coastal SW -1995 Coa 1 SW - 2008 ❑ Ph II - Post Construction (select all thatell l��Von-Coastal SW- HQW/ORW Waters El Universal Stormwater Management Plan igtherWQM ��jj tPlan: State of North Carolina O Department of Environment and Natural Resources Division of Water Quality WW STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Dr. Michael Sue MD 2. Location of Project (street address): 270 Northside Park Drive City:Elizabeth City County:Pasquotank Zip:27909 3. Directions to project (from nearest major intersection): 4.5 miles south on N. Road Street (US 17 Bus) from its intersection with US 17 Bypass Turn left onto Northside Park Drive (adjacent to State Employees Credit Union) and follow loop road 0.25 miles. Site is on 4. Latitude:360 20 41" N Longitude:76° 15' 15" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* []Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density []Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®SedimentaLion/ Erosion Control:1.77 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/ Organization:M ichael Sue Signing Official & Title:Owner b.Contact information for person listed in item 1a above: Street Address:] 134 North Road St., Suite 8 City:Elizabeth City State:NC Zip:27909 Mailing Address (if applicable): Phone: (252 ) 3354619 Fax: Emad:dms4619@embargmail.com c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owners name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Albemarle & Associates. Ltd. Signing Official & Title:Michael 1. Morway, PE b.Contact information for person listed in item 3a above: Mailing Address:P.O. Box 3989 City:Kill Devil Hills State:NC Zip:27948 Phone: (252 ) 441-2113 Fax: (252 ) 441-0965 Email:mikem@albemarleassociates.com 4. Local jurisdiction for building permits: City of Elizabeth City Point of Contact:Stanley Ward IV. PROJECT INFORMATION Phone #: (252 ) 337-6868 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Runoff from impervious surfaces for this facility will be directed into swales around the perimeter of the building & parking areas, which will convey the runoff to a stormwater wet detention pond Both the orifice & riser discharge trough a 12" pipe that in turn will discharge into the front swale along Nprthside Park Dr. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Pasguotank River basin. 4. Total Property Area: 1.65 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) -Total Coastal Wetlands Area (5) -Total Surface Water Area (6) = Total Project Area+:1.65 acres Total project area shall be calculated to exclude the following: the normal y001 of imyyounded strictures, the area between the banks of streams and rivers, the area below the Normal High Water (NM line or Mean High Water (MHP1) line, and coastal wetlands landward from the NHW (or MHM line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 48.3 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area Drainage Area _ Drainage Area _ Receiving Stream Name Knobbs Creek Stream Class * C, SW Stream Index Number * 30-3-8 Total Drainage Area (so 72,045 On -site Drainage Area (sf) 72,045 Off -site Drainage Area (so 0 Proposed Impervious Area** (so 34,794 Impervious Area** total 48.3 Impervious" Surface Area Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/Lots (sf) 9,000 On -site Streets (so 0 On -site Parking (so 21,789 On -site Sidewalks (so 3,995 Other on -site (so 0 Future (so 0 Off -site (so 0 Existing BUA*** (so 0 Total (so: 34,784 V * Stream Class and Index Number can be determined at: http://nortal.ncdenr.org/web/wq/ns/csu/classifications Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. ***Report only that arnount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Autocad Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from htW://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://12ortal.ncdenr.org/web/wg/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://12ortal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms dots. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. AMJM 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants 'J/A Form. (if required as per Part V11 below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M AAJ,v\ agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to /vl W'1 http:/ /www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor M-IM the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the 11A.1M receiving stream drains to class SA waters within 1h mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. MJM 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: M 3 M a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify IK-1 rA elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 1091 Page No: 469 M eA 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC �J %A Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application wit] be returned. h!W://www.secretaiy.state.nc.us/Corporations/CSearch.asp VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from hqp://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer.Michael I. Morway, PE Consulting Firm: Albemarle & Associates, Ltd. Mailing Address:P.O. Box 3989 City:Kill Devil Hills State:NC Zip:27948 Phone: (252 ) 441-2113 Fax: (252 ) 441-0965 Email:mikem@albemarleassociates.com IX, PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of do hereby certify that before me this _ day of County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Co; certify that the information included on that the project will be constructed in cc and protective covenants will be record4 applicable stormwater rules under 15AJ ation, item la) Michael Sue r it application form is, to the best of my knowledge, correct and Lnce with the approved plans, that the required deed restrictions that the propo project complies with the requirements of the 2H .1000,, SL 2 6 246 (Ph.11- Post Construction) or SL 2008-211. - l ._._9 Date: 141 i 1'y I, I --Z�E . a Notary Public for the State of tJ 6(t-rH-(AI-" L 1. fA. County of PAr� Q u trTfW L- do hereby certify that N1 ` U I A — 5 U C personally appeared before me this ) rl day of 36- V 2 O I I , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, (�— UASO►d A. PAIZELLE NOTARY PUBLIC pASQUOTANK COUNTY, N.C. SEAL My commission expires G { 5 Zp 13 Volumetric Runoff Calculations Simple Method Project Name: Dr. Michael Sue MD - 270 Northside Park Drive Project Area Description - DRAINAGE AREA # Bashi Information existing 0 0 0 0 0 0 0 0 existing (to remain) 0 0 0 0 0 0 0 0 proposed (additional) 9,000 0 21,.769 3,995 0 0 0 34,784 Receiving Stream Name Knobbs Creek Receiving Stream Class 8 Index Number C. SW (30-3-8) Drainage Area 72.045 SF Existing Impervious Area 0 SF Proposed Impervious Area 34.784 SF % Impervious Area (total) 48.3% Impervious Surface Area On -sire Buildings or Lot BUA 9.000 SF On site streets 0 SF On -site Parking 21.789 SF On-sfte Sidewalks 3.995 SF Other on -she 0 SF Future 0 SF Off -site 0 SF Total: 3a,784 SF Runoff Calculations (Simple Method) NCDENR 1yr/24hr(pre) 1yr/24hr(post) Design Runoff (in) 1.5 0 0 Total Area (so 72,045 72,045 72,045 Coverage 48.3% 0.00/0 48.3% R(v) 0.485 0.050 0.485 Rainfall Volume 4,363 0 0 u.uu (cts) u.uu icrs/ NCDENR 1.5: 4,363 NCDENR Pre/Post 0 :J STORMWATER MANAGEMENT CALCULATIONS -WET DETENTION POND DESIGN Project Drainage Area Receiving Wet Pond Dr. Michael Sue MD - 270 Northside Park Driv, 1 Wet Detention Pond Volume Calculations By: mjm Date : 01/17/11 EXPR S JAN 31 2011 Description Forebay B,gsin Description elev (ft) area volume (sf) (cf) elev (ft) area (sf) volume (cf) Excavated Bottom 2.0 9 2.0 310 Bottom (sediment clean -out elev.) 3.0 83 3.0 797 4.0 228 156 4.0 1,330 1,064 6.5 846 1,343 6.5 2,957 5,359 Bottom of Bench 7.6 1,223 1,138 7.6 3,778 3,704 Permanent Pool Elevation : 8.1 1,738 740 8.1 4,968 2,187 Permanent Pool Volume: 3,376 12,313 Top of Bench 8.6 2,333 1,018 8.6 6,236 2,801 Storage Elevation 9.6 2,865 2,599 9.6 7,306 6,771 Storage (Temp. Pool) Volume : 3,617 9,572 Total Permanent Pool Volume:Volume : 15,689 Forebay Percentage of Total Volume : 21.5% Total Storage Volume: 13,189 Total Excavated Volume Below Storage Elevation : 29,477 Pond Design Parameters Pond Drawdown Calculations Storage Elevation : 9.6 (ft.) Area at Storage Elev.: 10,171 (s.f.) Permanent Pool Elev.: 8.1 (ft.) Area at Perm. Elev.: 6,706 (s.f.) Storage Volume: 13,189 (c.f.) Design Volume: 4,363 (c.f.) Orifice: 1.00 (in) Discharge coefficient: 0.6 Design Volume = 4,363 cf Design Storage Height = 1.50 ft Average Head = 0.49 ft. Discharge Coefficient = 0.60 Area of Orifice = 0.005 sf. Discharge Rate = 0.018 cfs. Drawdown Calculations NCDENR Design Volume = 66 hrs Average Depth,(opt#2): 3.1 Percent Coverage: 48% Required SA/DA ratio: 5.4 (coastal county, 90% tss removal, depth = 3.0 ft.) Req'd Surface Area : 0.09 (ac) ( 0.15 provided) Prepared by Albemarle and Associates, Ltd. lbemarle & ASSOCIATES, LTD. EXPRESS 270 Northside Park Drive JAN 31 2011 Stormwater Management Narrative prepared for NC ®ENR Dr. Michael Sue MD January 17, 2011 Existing Conditions: The 1.65 acre parcel is located at 270 Northside Park Drive (off US-17) in Elizabeth City (Pasquotank County), NC. The lot was previously cultivated but has since been converted into a commercial subdivision. Elevations on the site range from 8 (within drainage inverts) to 11 feet above msl. The property is currently drained by a system of perimeter swales installed during the construction of the development. The majority of the lot drains to the front swale (along Parkside Drive), with the remainder draining offsite via the rear swale. Ultimately, both drain to the US-17 collection system and eventually into Knobbs Creek. The Soil Survey for Pasquotank County has mapped the soils to consist of Tomotley fine sandy loam (ToA) and Gertie silt loam (GrA). The project is not within 575' feet of ORW classified waters, or within 'Y2 mile of those classified as SA. A Stormwater Management Permit (SW7050215) was issued for the commercial subdivision (Northside Park) as a low density project on February 17, 2005. Proposed Development: Dr. Michael Sue, MD intends to construct a 9,000 sf medical facility with parking. The project will include two new driveway entrances, sanitary sewer connection (to a proposed sanitary sewer collection system along Northside Park Drive) and waterline system connection. Existing permit SW7050215 allows 20,893 sf of built upon area to be constructed on this parcel (lot 10) in order for the parcel to remain in compliance with the permit. Since a greater amount of coverage is necessary for this project (34,784 sf), a new stormwater management wet pond will be constructed in order to comply with NCDENR as well as Elizabeth City regulations. NCDENR Permitting Compliance: The combined impervious coverage for this project is approximately 48%, thereby classifying the project as a "high density" development within the 20 coastal counties. Runoff from impervious surfaces for this facility with be directed into swales around the perimeter of the building and parking areas, which will convey the runoff to a stormwater wet detention pond. The wet pond has been selected for this site due to the nature of the soils (fairly heavy with clay) and relatively high water table (24" — 48" below existing grade). The swales will be grassed, providing pretreatment by allowing the opportunity for filtration and infiltration of stormwater, and will direct stormwater into the forebay of the pond. The pond has been sized to conform to the North Carolina Division of Environment and Natural Resources Division of Water Quality "Best Management Practices Manual". In order to meet Pasquotank County standards (25 year, 24 hour pre vs. post development runoff rates), storage for runoff resulting from more than 1'/z" of rainfall is provided below the riser. The ponding level for the 1 'W event is approximately Land Planning - Engineering - Surveying - Ernim mental - Constnxtion Management 117C North Water Street, Elizabeth Gry. North Cerana 27909 Phone: 252-338-5771 ~v.AlbemarleAssoolates.00m Fax: 252-338-5719 270 Northside Park Drive Stormwater Management Narrative January 17, 2011 Page 2 of 2 8.7. This runoff drains through a 1" orifice (invert elevation = 8.1), which will release the runoff from I in 66 hours based upon the average head provided from the top of riser elevation of 9.6. Both the orifice and the riser discharge trough a 12" pipe that in turn will discharge into the front swale along Northside Park Drive. The Estimated Season High Water Table (ESHWT) for the site is at or around 8.1 feet above mean sea level, which is nearly the same elevation as the majority of the adjacent ditches. The soil composition, which includes significant amounts of clay, should allow for the permanent pool elevation to be fairly consistent even during times when the water table is low. I em rle ba & ASSOCIATES, LTD. EXPRESS 270 Northside Park Drive Soils Narrative prepared for JAN 31 2011 Dr. Michael Sue, MD NC DENR December 17, 2010 Dr. Michael Sue, MD intends to construct a 9,000 square foot medical office with parking at 270 Northside Park Drive, located off US 17 in Elizabeth City, North Carolina. A wet pond is proposed on the north edge of the property to facilitate stormwater management requirements. The Soil Survey for Pasquotank County has mapped the soils to consist of Tomately fine sand (ToA), with Gertie silt loam (GrA) along the north and south edge of the property. The project is located within a commercial subdivision with mostly vacant lots. The existing improvements within the subdivision itself consist of a roadway with swales on either side. Lots are well graded with swales along the side and rear. Elevations on 270 Northside Park Drive range from 8 feet above msl at adjacent ditch inverts to 11 feet above msl at the crown of the property. The region was previously .cultivated prior to being subdivided. Albemarle & Associates performed soils investigations on November 191h, 2010. The results of this investigation are summarized as follows: Stormwater Management Pond: At the time, it was uncertain whether the proposed pond would be located on the north or south side of the property. Soils borings were performed in both locations, each yielding very similar findings. Each location appeared to be fairly consistent with Gertie, as clay was consistently found within the boring through it's termination five feet below the surface. Mottling was observed between the 24 to 30 inches below the surface, indicating season high water table between 8.0 and 8.5 feet above msl. However, the current ground water table appeared to be approximately 48" below the surface. Existing ditches with inverts near 8.0 were dry. Based upon the condition of the vegetation within the swales, they appear•to remain mostly dry throughout the year. For these reasons, the permanent pool was set at 8.1, allowing the pond to drain above the permanent pool, while maintaining maximum temporary storage capabilities. A nearby constructed stormwater pond in Gertie mapped soils maintain a permanent pool at it's orifice, although the surface water in the adjacent ditch was at least 18" below the pool. This confirms that the soils have the ability to retain water without excess infiltration, thus allowing the desired permanent pool to be maintained more consistently. A copy of the USDA Web Soil Survey for the site and soils boring report are attached. Land Planning — Engineering — Surveying — Emdronmental — Construction Management 117C North Water Street, Elizabeth City, North Carolina 27909 Phone: 252,338-5771 mmvAlbemaA6Assoctates.com Fax: 252-336.5719 07808C - Coastal Studies Institute Soil Boring Log Soil Boring Depth B-1 B-2 0" to 6" brown topsoil brown topsoil 6" to 12" brown topsoil brown topsoil 12" to 18" grey sandy clay grey sandy clay 18" to 24" grey sandy clay grey sandy clay 24" to 30" grey sandy clay w/ some grey sandy clay wl some mottling mottling 30" to 36" grey sandy clay w/ some grey sandy clay wl some mottling (wet) mottling 36" to 42" grey sandy clay w/ some grey sandy clay wl some mottling (wet) mottling 42" to 48" grey sandy clay w/ some tan sandy clay w/ some mottling (wet) mottling (wet) 48" to 54" light grey sandy clay tan sandy clay w/ some (saturated) mottling (saturated) 54" to 60" light grey sandy clay tan sandy clay wl heavy (saturated) mottling (saturated) Soil Type Gertie Silt Loam Gertie Silt Loam Date of Boring 11/19/10 11/19/10 Ex. Ground Elevation (ft 10.5 10.5 above MSL) Depth to ESHWT (in) 30 30 ESHWT Elevation 8 0 8.0 Depth to Water table (in) 48 48 Estimated Water table Elevation 6.5 6.5 (ft Prepared by Albemarle and Associates, Ltd. - AenmS IIoS angeLadooO leuogeN aolmas uopemasuoO _ FanmS iloS q9M sawnosa eLn e 211 1 N y(]$(1 .EY AZ .K M om os sz o loaf of oz o s o veyyy MEMORN MOl.dlx,eal ezrs V uo Pluud 119LLI almS deyy _� .BE AZ.% .EV AZ,K (anuO )Pad OPISWON OLZ - OW anS l9e40% LO) euilaeo WON '/qunoO AueMbsed—deW IpS Soil Map—Pasquotank County, North Carolina (Dr Michael Sue MD - 270 Northside Park Drive) MAPLEGEND Arse of Interest (AOI) Q Area of Interest(AOI) Soft Soil Map Units Special Point Features V) Blowout ® Borrow Pit X Clay Spot e Closed Depression X Gravel Pit .. Gravelly Spot ® Landfill A Lava Flow ,,l,, Marsh or swamp R Mine or Quarry po Miscellaneous Water p Perennial Water �. Rock Outcrop } Saline Spot Sandy Spot Severely Eroded Spot 0 Sinkhole Slide or Slip 0 Sothic Spot dd Spoil Area Q Stony Spot Natural Resources Conservation Service �r1 Very Stony Spot 1 Wet Spot Other Special Line Features Gully Short Steep Slope Other Political Features 0 Cities Water Features Oceans Streams and Canals Transportation +++ Rails N Interstate Highways US Routes Major Roads Local Roads MAP INFORI Map Scale: 1:776 if printed on A size The soil surveys that comprise your/ Please rely on the bar scale on each measurements. Source of Map: Natural Resources Web Soil Survey URL: http:l/webs Coordinate System: UTM Zone 18 This product is generated from the U1 the version date(s) listed below. Soil Survey Area: Pasquotank Coi Survey Area Data: Version 11, Oc Date(s) aerial images were phologra The orthophoto or other base map of compiled and digitized probably diffe imagery displayed on these maps. A of map unit boundaries may be evid( Web Soil Survey National Cooperative Soil Survey Soil Map-Pasquotank County, North Carolina Dr Michael Sue MD - 270 Northside Park Drive Map Unit Legend Pasquotank County, North Carolina (NC139) Map Unit Symbol Map Unit Name Acres in AOI Percent of AD] GrA Gertie sill loam, 0 to 2 percent slopes 0.6 38.8% ToA Tomotley fine sandy loam, 0 to 2 percent slopes 1.0 61.2% Totals for Area of Interest 1.6 100.0% Natural Resources Web Soil Survey 12/112010 Conservation Service National Cooperative Soil Survey Page 3 of 3 I • �, - >r , eta '. �• ; �_ R3d10' J BOOK 1091 PAGE 469(2) 4obt3 IIIIIII�IBII�B�I�II� This document presented and filed: 08252010 12:20:36 PM JOYCE W. PRITCHARD, Pasquotank County, NC Excise Talc: $264.00 NORTH CAROLINA GENERAL WARRANTY DEED Gxrcisc Iav s � JAuN 1 ] e c DC Parts ldemilier No. 8905856640 Verified he Cnunq on the_ dac of ,20_ B,: WWII.,w G. Wendell Sni,ec P.O. In,, 581 fliiabeth C. NC 27907-0581 This instrument ,. prepared 61 Brief des:ripcion ter the Indes:_ THIS DEED made this 19" day of August .20 10 , by and between GRAN FOR I GRANTEE J.O. G. Development, L.L.C. Michael Sue & or Assigns a North Carolina Limited Liability Company 1537 Clubhouse Road Post Office Box 448 Elizabeth City, NC 27909 Elizabeth City, NC 27907 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular. plural, masculine. feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain. sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situate in Providence Township. Pasquotank County, Noah Carolina and more particularly described as follows: Being all of Lot 10 (containing 1.65 acres), as described and delineated on that plat entitled in part "Final Plat of Northside Park, dated February 14, 2006, prepared by Scan L. Temple, Professional Land Surveyor, which plat is recorded in Map Book 41, Pug" 12 and 13. in The Pasq uotank County Public Registry and which plat is incorporated herein by reference. The property herein above described was acquired by Grantor by instrument recorded in Deed Book 794 ,Page 866 A map showing the above described property is recorded in Map Book 41, Pages 12 and 13. PA8000TANK P,piOM Dead number / Trwrorhx$ 1a . y N squognk taady rseseae OOke 14) BK 1091 PG 470 DOC#402313 r TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenant with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Gmntor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exception hereinafter stated. IN TESTIMONY WHEREOF. said Grantors have hereunto set their hands and seals the day and year first above written. J.O.C. Develoilment, L.L.C., a North Carolina Stephen L. James T C.Mory, Manager IL William C. (livens, Jr, Manager STATE OF NORTH CAROLINA COUNTY OF PASOUOTANK I, the undersigned Notary Public of the County and State aforesaid, certify that Stephen L. Jones personally came before me this day and acknowledged that he is Managing Member of J.O.G. Development. L.L.C.. a North Carolina limited liability company and that he as Managing Member being authorized to doh , executed the foregoing on behalf of the company. Witness m% hand and My Commission Expires: Wm Wrolm•P TERESA1.h NOTARY kN Cammmnfin Notary Public STATE OF NORTH CAROLINA COUNTY OF PASOUOTANK 1, the undersigned Notary Public of the County and State aforesaid. certify that James T. Gregory personally came before me This day and acknowledged that he is Managing Member of J elopment, L.L.C., a North Carolina limited liabilih company and that he as Managing Member being authorized o do so, a ecuted the foregoing on behalf of the company. Witness my hand and Notarial stamp or seal this � d>lyvT s1..2010, I ' r /� A /1 My Commission Expires D-Ib`o901 r Canir.. Pmpntadi cM?M TERESA 1. HECKSTALL 40 NOTARYPOBLIC STATE OF —NOR IH CAROLINA Notary Public COUNTY OF PASOUO"TANK I, the undersigned Notary Public of the County and State aforesaid, unify that William C. Owens, Jr. personally came before me this day and acknowledged that he is Managing Member of1.O.G. Development, L.L.C., a North Carolina limited liability company and that he as Managing Member being authorized to &�:so�xfcuted the foregoing on behalf of the company. Witness my hand and Notarial stamp or seal My Commission Expires: ERESA I. HEC�KSTAAL .. _ NOTARYMBLIC For DENR Use ONLY Reviewer: ©, 0 North Carolina Department of Environment and ANatural Resources Submit: A _ NCDENR Request for Express Permit Review Time. — Confirm: FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296.4698;alison.davidson(a,ncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791.4203; david.lee(g ncdenr.gov • Mooresville & -Patrick Grogan 704-663-3772 or patrick.gropan(a)ncdenr.pov • Washington Region -Lyn Hardison 252-946.9215 or lyn.hardison(a)ncdenr.gov • Wilmington Region -Janet Russell 910-350.2004 or janet.rusself(a.ncdenr.gov NOTE: Project application received after 12 noon will be stamped in the following work day Project Name: DR MICHAEL SUE, MD OFFICE County: PASOUOTANK Applicant: DR. MICHAEL SUE Company: Permits of request SW SW SW SW SW Address: 1134 NORTH ROAD ST., SUITE 8 City: ELIZABETH CITY, State: NC Zip: 27909-_ C '1 " (� LI Phone: 252-335-4619. Fax: _ _ y Email: dms4619@embargmail.com v T Physical Location:270 NORTHSIDE PARK DRIVE, ELIZABETH CITY - ADJACENT TO NCSECU Project Drains into KNOBBS CREEK waters — Water classification C SW (for classification see-http://h2o.enr.state,nc.us/bims/reports/reportsWB.html) Project Located in PASOUOTANK River Basin. Is project draining to class ORW waters? YIN , within '/: mile and draining to class SA waters YIN or within 1 mile and draining to class HOW waters? Y/N EXPRESS �a Engineer/Consultant: MICHAEL MORWAY Company: ALBEMARLE & ASSOCIATES !EXPRESS Address: PO BOX 3989 City: KIL DEVIL HILLS, State: NC Zip: 27948-_ Phone: 252-441-2113, Fax: 252-441-0965, Email: mikem@albemarleassociates.com JAN 21 2011 SECTION ONE: REQUESTING A SCOPING MEETING ONLY EEC DENR ❑ Scoping Meeting ONLY ❑ DWO, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Weiland ( linear ft o r acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ It Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)j ® High Density -Detention Pond 1 # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands — # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 1_8 acres to be disturbed.(CK # n—� (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes ❑ No Buffer Impacts: ❑ No ❑ YES: ac re(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Isolated wetland on Property ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No For DENR use mdv Fee Split for multiple permits: (Check# %G,SG ) Total Fee Amount S 4000 SUBMITTAL DATES Fee I I SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ Sw (® HD, ❑ LID, ❑ Gen) $ 0Z) 401, $ LQS $ CZ) Stream Deter— $ NCDENR EXPRESS March 2009