Loading...
HomeMy WebLinkAboutSW7110105_CURRENT PERMIT_20201103 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE �QJanO YYYYM M D D WAf,'o ROY COOPER co„ernor MICHAEL S. REGAN Sectetary BRIAN WRENN Director Croatan Church of Christ Attention: Mr. Peter Povich 3446 Old Airport Road New Bern, NC 28562 NORTH CAROLINA Environmental Quality November 3, 2020 Treasurer Subject: Stormwater Permit No. SW7110105 Renewal Croatan Church of Christ High Density Project Craven County Dear Mr. Povich: The Washington Regional Office received a Stormwater Management Permit Application for renewal of the subject permit on October 7, 2020. Staff review of the application has determined that the permit can be reissued. We are forwarding Permit No. SW7110105 dated November 3, 2020, for the continued operation of the subject project. This permit, upon its effective date, will replace all previous State Stormwater permits for this project. This permit shall be effective from February 22, 2021 until February 21, 2029 and shall be subject to the conditions and limitations as specified therein, and does not supercede any other agency permit that may be required. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact me at (252) 948-3923. Sincerely, Roger K. Thorpe Environmental Engineer IrTih �Mm QVF;*�HorthCa,ollna Deparnnen[of [nvinannental Quality I Division of Encryy. Miner al and Lind C esourres _ Washington Regional Office, 42Washington5quore Niall_`Na fiington.Va;th Carollni-r85U ow�au ww� 2529-16.o-I8I STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Croatan Church of Christ Located at 4115 Old Cherry Point Road, New Bern, NC Craven County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A,NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources (Division) and considered a part of this permit. This permit shall be effective from February 22, 2021 until February 22, 2029, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit) is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 42,000 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section 1.7 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. The built -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent surface waters. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, ft2: 75,326 b. Total Impervious Surfaces, ft2: Design 42,000 C. Storm, inches: 1.5 d. Pond Depth - average, feet: 3.5 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 24.50 g. Permanent Pool Surface Area required, ft2: 4,218 h. Permanent Pool Surface Area, ft2: 4,234 i. Min. Volume required, ft3: 5,179 j. Permitted Storage Volume, ft3: 5,567 k. Temporary Storage Elevation, FMSL: 25.50 I. Controlling Orifice: 1.25"0 pipe M. Permitted Forebay Volume, ft3: 1,962 n. Receiving Stream/River Basin: UT to Neuse River o. Stream Index Number: 27-(104) P. Classification of Water Body: "SB;Sw;NSW' II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted SCM. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division an annual summary report of the maintenance inspection records for each SCM. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Title 15A NCAC 21-1.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from February 22, 2021 until February 21, 2029. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 3rd day of November 2020. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION For Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW7110105 r DEMLR USE ONLY Date Received Fee Paid Permit Number NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW7110105 2. Project name: Croatan Church of Christ RECEIVED XT D 7 219P6 3. Project street address: 4115 Old Chem Point Rd City: New Bern NC County: Craven —ZIP: 28562 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at., https://deg.nc.aov/about/divisions/enerav- mineral-land-resources/energy-mineral-land-rules/stormwater-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https'///`deq.nc.aov/about/divisions/energy-mineral-land-resources/ energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: Croatan Church of Christ 2. Signing Official's Name: Peter Povich 3. Signing Official's Title: Treasurer 4. Mailing Address: 3446 Old Airport Rd City: 5. Street Address: NCZIP: 28562 City: State: —ZIP: 6. Phone: (252) 671-9326 Email: povich suddenlink.net Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 Cl ... ;. '`1 - ,t'I r C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include g(( required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: Pe 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/ planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and //��jj protective covenants will be submitted at a later date. (EF-4. O&M Agreements, Please select one: I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. /? 5. Designer Certifications, Please select one: A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or The project has not yet been built. _ 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. W-b 7. (IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). hops://www.sosnc.gov/online services/search/by title/ Business Registration Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 ' � 1 w D. PERMITTEE'S CERTIFICATION E T c %Z (bU ( C N , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, corre d complete. Signature: Date: 2D2'D NOTARIZATION: that _ this the of a Notary Public for the State of do hereby certify personally appeared before me day of QGT , 20-2CL and acknowledge the due forgoing instrument. Witness my hand and official seal, Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 a `1 State Stormwater Management Systems Permit No, SW7110105 Croatan Church of Christ Stormwater Permit No. SW7110105 Craven County Designer's Certification as a duly registered ro 2 h.@orin the State of North Carolina, having been authorized to obsery eno Ica weekly/ full time) the construction of the project, for ( AP-C" (fn'L-Y,4&) C_ 1s�Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Page 6 of 7 ocj fl 110 ockVIED C-438 1983 All Permit No. SW7110105 Certification Requirements: ✓ 1. The drainage area to the system contains approximately the permitted acreage. _ L. The drainage area to the system contains no more than the permitted amount of built -upon area. ✓ 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. ✓�4. All roof drains are located such that the runoff is directed into the system. ✓ 5. The outlet/bypass structure elevations are per the approved plan_ moo• The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. ✓ti. All slopes are grassed with permanent vegetation. �9. Vegetated slopes are no steeper than 3:1. ,, f0. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. ✓ 122.. Required drawdown devices are correctly sized per the approved plans. ✓133 All required design depths are provided. ✓44. II required parts of the system are provided, such as a vegetated shelf, / and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Craven County Building Inspections Page 7 of 7 }+ I r. .� -.. ♦ �. 1. _ i .. i, � ... .. .. "r 1 •Irr ...� .. J. ♦.. .Y .. 1 State Stormwater Management Systems Permit No. SW7110105 Croatan Church of Christ Stormwater Permit No. SW7110105 Craven County Designer's Certification I, Jv .� �,�s , as a duly registered �M�osy the State of North Carolina, having been authorized to obsery!no wa weekly/ full time) the construction of the project, (Project) for C 1ba " CLo)i�11 (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: RECEIVED SEP 3 0 2&V \\fit ARO O :o �SSIQy. 9% SEAL: M 10147 (Z_ i'p'FtG114 \A . C-438 1983 J Page 6 of 7 Permit No. SW7110105 Certification Requirements: ✓ 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. ✓ 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. ✓4. All roof drains are located such that the runoff is directed into the system. ✓ 4.55 The outlet/bypass structure elevations are per the approved plan. :/6. The outlet structure is located per the approved plans. VIA--7. Trash rack is provided on the outletibypass structure. ✓6. All slopes are grassed with permanent vegetation. - . Vegetated slopes are no steeper than 3:1. ,/f0. The inlets are located per the approved plans and do not cause short- circuiting of the system. 1✓ 1. The permitted amounts of surface area and/or volume have been provided. ✓ 122 Required drawdown devices are correctly sized per the approved plans. -�13. All required design depths are provided. 4. II required parts of the system are provided, such as a vegetated shelf, and a forebay. ✓✓✓ 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Craven County Building Inspections Page 7 of 7 Permit No. (fo be provided by DWQ) LTMWA TA O2pF WA7- NCDENR C o STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I: PROJECT INFORMATION Project name Croatan Church of Christ Contact person Bobby Billingsley, PE Phone number 252.637,2727 Date 1.6.2011 Drainage area number 1 II. DESIGN INFORMATION , • i¢�i .r . .. e. . __ _.: ..-_ •. � -, ,-- __s L: • ' _... .:...' __ � 'i_1'.,_ Site Characteristics Drainage area 75,326 ft' Impervious area, post -development 42,000 ft' (/ %impervious 55.76 %I/ Design rainfall depth 1.5 in t/ Storage Volume: Non -SA Waters Minimum volume required 5,179 ft3 Insufficient required volume. Volume provided Storage Volume: SAWaters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the preipost control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: l-yr, 24-hr stonn Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow PrelPost 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHVIT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 5,567 fts OK, volume provided is equal to or in excess of volume required. ft3 fts ft3 fta ft3 JAN 14 2011 Y (Y or N) 3.7 in 0.20 (unitless) 0.55 (unitless) 7.00 in/hr OK 2.42 ft'Isec 7.50 ftslsec 5.08 ft'Isec 25.50 fmsl 24.50 fmsl 23.5 a1- first 25.00 fmsl 24.00 fmsl 19.50 fmsl 18.50 fmsl 1.00 it N (Y or N) fmsl Form SW401-Wet Detention Basin-Rev.8-9117109 Parts I. & II. Design Summary, Page 1 of 2 Permit No. no be Provided by DwQ) Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, Ap,... Area, bottom of 10ft vegetated shelf, A... Area, sediment cleanout, top elevation (bottom of pond), A.... Volumes Volume, temporary pool Volume, permanent pool, Vp,,,,, . Volume, forebay (sum of forebays if more than one forebay) Forebay %of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vp,, -. Area provided, permanent pool, A._,, Average depth calculated Average depth used in SAIDA, d., (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ap,,,,. Area, bottom of 10ft vegetated shelf, A.,i,mf Area, sediment cleanout, top elevation (bottom of pond), Ab, 'Depth' (distance blw bottom of 10ft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d,,, (Round to nearest 0.511) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C„) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all mnoff at ultimate buildcut? Drain mechanism for maintenance or emergencies is: 6,357 ft 4,218 ft 5.60 (unitless) 4,234 it` OK 2,792 ft' 992 ft` 5,567 ft' OK 9,715 fi' 1,962 ft' 20.2% % OK 90 % Y (Y or N) N (Y or N) 5.60 (unitless) (Y or N) 9,715 ft' 4,234 e It ft Y (Y or N) 4,234 fit` 2,792 ft' Need 3 ft min. 992 fe 4.50 ft 3.40 It OK 3.5 It OK Y (Y or N) 1.25 in in' 0.60 (unitless) 1.00 ft N (Y or N) (unitless) (unitless) ft it 2.42 ft'/sec 7.50 ft'/sec 0.03 ft'Isec 2.00 days OK, draws down in 2-5 days. 3:1 OK 10 :1 OK 10.0 ft OK 3:1 OK 3.0 :1 OK Y (Y or N) OK 1.5 It OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Mechanical Pumps Farm SW401-Wet Detention Basin-Rev.8-9117/09 Parts I. & II. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials /Z t' Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High Flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. 7 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 7Z�rS 7 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. N 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual Feld investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 SCS Type III Storage Routing Croatan Church of Christ - Wet Detention Pond Design Storm = SCS Type III Hydrograph 1 yr Storm 7.00 cfs flow 1 yr Storm 3.52 in/24 yr precipitation C pre 0.2 C post 0.55 Imp. Area 42000 sf post development Total Area 75326 sf Qpre 2.42 cfs rational method Pond Storage for I yr/24 hour precipitation Rv 0.55 V 12193 cf <=1yr/24 hr Storm Volume Pond Storage 5567 cf <=Design Time Prec. Ratio I yr storm (in) Inflow (ft3) Storage (ft) Outflow (ft) Outflow (cfs) 0.0 0.00000 0.00000 > • • -.' 0.2 0.00200 0.00704 24.39 24.39 0.00 0.00 0.4 0.00400 0.01408 24.39 48.77 0.00 0.00 0.6 0.00600 0.02112 24.39 73.16 0.00 0.00 0.8 0.00800 0.02816 24.39 97.54 0.00 0.00 1.0 0.01000 0.03520 24.39 121.93 0.00 0.00 1.2 0.01200 0.04224 24.39 146.31 0.00 0.00 1.4 0.01400 0.04928 24.39 170.70 0.00 0.00 1.6 0.01600 0.05632 24.39 195.08 0.00 0.00 1.8 0.01800 0.06336 24.39 219.47 0.00 0.00 2.0 0.02000 0.07040 24.39 243.86 0.00 0.00 2.2 0.02203 0.07755 24.75 268.61 0.00 0.00 2.4 0.02412 0.08490 25.48 294.09 0.00 0.00 2.6 0.02627 0.09247 26.21 320.30 0.00 0.00 2.8 0.02848 0.10025 26.95 347.25 0.00 0.00 3.0 0.03080 0.10842 28.29 375.54 0.00 0.00 3.2 0.03308 0.11644 27.80 403.34 0.00 0.00 3.4 0.03547 0.12485 29.14 432.48 0.00 0.00 3.6 0.03792 0.13348 29.87 462.35 0.00 0.00 3.8 0.04043 0.14231 30.60 492.95 0.00 0.00 4.0 0.04300 0.15136 31.34 524.29 0.00 0.00 4.2 0.04563 0.16062 32.07 556.36 0.00 0.00 4.4 0.04832 0.17009 32.80 589.16 0.00 0.00 4.6 0.05107 0.17977 33.53 622.69 0.00 0.00 4.8 0.05388 0.18966 34.26 656.95 0.00 0.00 5.0 0.05670 0.19958 34.38 691.33 0.00 0.00 5.2 0.05968 0.21007 36.33 727.67 0.00 0.00 5.4 0.06267 0.22060 36.46 764.12 0.00 0.00 5.6 0.06572 0.23133 37.19 801.31 0.00 0.00 5.8 0.06883 0.24228 37.92 839.23 0.00 0.00 6.0 0.07200 0.25344 38.65 877.88 0.00 0.00 6.2 0.07530 0.26506 40.24 918.12 0.00 0.00 6.4 0.07880 0.27738 42.67 960.79 0.00 0.00 6.6 0.08250 0.29040 45.11 1005.90 0.00 0.00 6.8 0.08640 0.30413 47.55 1053.46 0.00 0.00 7.0 0.09050 0.31856 49.99 1103.45 0.00 0.00 7.2 0.09480 0.33370 52.43 1155.88 0.00 0.00 7.4 0.09930 0.34954 54.87 1210.74 0.00 0.00 7.6 0.10400 0.36608 57.31 1268.05 0.00 0.00 7.8 0.10890 0.38333 59.74 1327.79 0.00 0.00 8.0 0.11400 0.40128 62.18 1389.98 0.00 0.00 8.2 0.11943 0.42039 66.21 1456.18 0.00 0.00 8.4 0.12532 0.44113 71.82 1528.00 0.00 0.00 8.6 0.13167 0.46348 77.42 1605.42 0.00 0.00 8.8 0.13848 0.48745 83.03 1688.46 0.00 0.00 9.0 0.14580 0.51322 89.25 1777.71 0.00 0.00 9.2 0.15348 0.54025 93.64 1871.35 0.00 0.00 9.4 0.16167 0.56908 99.86 1971.21 0.00 0.00 9.6 0.17032 0.59953 105.47 2076.67 0.00 0.00 9.8 0.17943 0.63159 111.08 2187.75 0.00 0.00 10.0 0.18900 0.66528 116.68 2304.44 0.00 0.00 10.2 0.19928 0.70147 125.34 2429.78 0.00 0.00 10.4 0.21052 0.74103 137.05 2566.82 0.00 0.00 10.6 0.22272 0.78397 148.75 2715.58 0.00 0.00 10.8 0.23588 0.83030 160.46 2876.03 0.00 0.00 11.0 0.25000 0.88000 172.16 3048.20 0.00 0.00 11.2 0.26644 0.93787 200.45 3248.64 0.00 0.00 11.4 0.28656 1.00869 245.32 3493.96 0.00 0.00 11.6 0.31430 1.10634 338.23 3832.19 0.00 0.00 11.8 0.37330 1.31402 719.37 4551.57 0.00 0.00 12.0 0.50000 1.76000 1544.83 6096.39 1544.83 2.06 12.2 0.62670 2.20598 1544.83 7641.22 1544.83 2.06 12.4 0.68570 2.41366 719.37 8360.59 719.37 0.96 12.6 0.71344 2.51131 338.23 8698.82 338.23 0.45 12.8 0.73336 2.58141 242.83 8941.65 242.83 0.32 13.0 0.75000 2.64000 202.94 9144.59 202.94 0.27 13.2 0.76412 2.68970 172.16 9316.75 172.16 0.23 13.4 0.77728 2.73603 160.46 9477.21 160.46 0.21 13.6 0.78948 2.77897 148.75 9625.96 148.75 0.20 13.8 0.80072 2.81853 137.05 9763.00 137.05 0.18 14.0 0.81100 2.85472 125.34 9888.35 125.34 0.17 14.2 0.82057 2.88841 116.68 10005.03 116.68 0.16 14.4 0.8296 22.92047 111.08 10116.11 111.08 0.15 14.6 0.83833 2.95092 105.47 10221.57 105.47 0.14 14.8 0.84652 2.97975 99.86 10321.43 99.86 0.13 15.0 0.85430 3.00714 94.86 10416.29 94.86 0.13 15.2 0.86152 3.03255 88.03 10504.32 88.03 0.12 15.4 0.86833 3.05652 83.03 10587.36 83.03 0.11 15.6 0.87468 3.07887 77.42 10664.78 77.42 0.10 15.8 0.89057 3.09961 71.82 10736.60 71.82 0.10 16.0 0.88600 3.11872 66.21 10802.80 66.21 0.09 16.2 0.89110 3.13667 62.18 10864.99 62.18 0.08 16.4 0.89600 3.15392 59.74 10924.73 59.74 0.08 16.6 0.90070 3.17046 57.31 10982.04 57.31 0.08 16.8 0.90520 118630 54.87 11036.91 54.87 0.07 17.0 0.90950 3.20144 52.43 11089.33 52.43 0.07 17.2 0.91360 3.21587 49.99 11139.33 49.99 0.07 17.4 0.91750 3.22960 47.55 11186.88 47.55 0.06 17.6 0.92120 3.24262 45.11 11231.99 45.11 0.06 17.8 0.92470 3.25494 42.67 11274.66 42.67 0.06 18.0 0.92800 3.26656 40.24 11314.90 40.24 0.05 18.2 0.93117 3.27772 38.65 11353.55 38.65 0.05 18.4 0.93428 3.28867 37.92 11391.47 37.92 0.05 18.6 0.93733 3.29940 37.19 11428.66 37.19 0.05 18.8 0.94032 3.30993 36.46 11465.12 36.46 0.05 19.0 0.94330 3.32042 36.33 11501.45 36.33 0.05 19.2 0.94612 3.33034 34.38 11535.83 34.38 0.05 19.4 0.94891 3.34023 34.26 11570.10 34.26 0.05 19.6 0.95168 3.34991 33.53 11603.63 33.53 0.04 19.8 0.95437 3.35938 32.80 11636.42 32.80 0.04 20.0 0.95700 3.36864 32.07 11668.49 32.07 0.04 20.2 0.95958 3.37772 31.46 11699.95 31.46 0.04 20.4 0.96211 3.38663 30.85 11730.80 30.85 0.04 20.6 0.96460 339539 30.36 11761.16 30.36 0.04 20.8 0.96704 3.40398 29.75 11790.91 29.75 0.04 21.0 0.96940 3.41229 28.77 11819.68 28.77 0.04 21.2 0.97179 3.42070 29.14 11848.82 29.14 0.04 21.4 0.97410 3.42883 28.17 11876.99 28.17 0.04 21.6 0.97636 3.43679 27.56 11904.54 27.56 0.04 21.8 0.97858 3.44460 27.07 11931.61 27.07 0.04 22.0 0.98080 3.45242 27.07 11958.68 27.07 0.04 22.2 0.98288 3.45974 25.36 11984.04 25.36 0.03 22.4 0.98496 3.46706 25.36 12009.40 25.36 0.03 22.6 0.98700 3.47424 24.87 12034.28 24.87 0.03 22.8 0.98899 3.48124 24.26 12058.54 24.26 0.03 23.0 0.99090 3.48797 23.29 12081.83 23.29 0.03 23.2 0.99284 3.49480 23.65 12105.48 23.65 0.03 23.4 0.99470 1 3.50134 22.68 12128.16 22.68 0.03 23.6 0.99651 3.50772 22.07 12150.21 22.07 0. 33 23.8 0.99828 3.51395 21.58 12171.81 21.58 0.03 24.0 1.00000 3.52000 20.97 12192.78 20.97 0.03 Outflow (cfs) O N O lA F+ lli N lA 0.0 0.6 1.2 1.8 2.4 3.0 3.6 4.2 4.8 5.4 6.0 6.6 i 7.2 7.8 n S 8.4 O O 9.0 9.6 �Nr 10.2 (� O S 10.8 '1 11.4 N 3 A 12.0 S rt 12.6 13.2 13.8 M 14.4 Q- 15.0 C 15.6 rt h 16.2 C 16.8 17.4 18.0 18.6 19.2 19.8 20.4 21.0 21.6 22.2 22.8 23.4 24.0 Permit Number: �W 00 IU5 (7o be provided br UII'Q) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this ItMP. This maintenance record will be kept in a log in a known set location. Any deficient RMP elements noted in the inspection will be corrected, repaired or replaced immediately. 'these deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the IM1. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filler if one is provide(]. This system (check one): ❑ does ® does not This system (check one): ❑ does © does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should lie watered twice weekly if needed, until the plants become established (amunonly six weeks). — Plo portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, [lie flushing of sediment thrOUllh the emergency drain should be minimized to the maximum extent practical. — Once it year, a dam safety expert should inspect the embankment. JAN 14 2011 After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately, BMP element: Potentialproblem: Ilow I will remediate theproblem: The entire BMP Trash/debris is resent- Remove the trash/dehris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have funned. remove the gully, and then plant it ground cover mid water until it is established. Provide lime and a one -lime fertilizer a pplication. Vegetation is text short or too Maintain vegetation at a height of long,. a i roximateh, sic inches. Form SW401-Wel Detention Basin Page 1 0I'4 Permit Number: (Io Ih• prurideal by DII'OI Urinate Area Number: DMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swan' sedllnllit off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to sovale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap In avoid future problems will, erosion. The forebay Sediment has accrunulated to Search for the source of the a depth greater than the sediment and renmedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the IMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf malting or riprap if needed to prevent future erosion problems. Weeds are present Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s prayin . The vegetated shelf Best professional practices Prune according to lest professional show [hat pruning is needed practices to maintain optinmal plant health. Plants are dead, diseased or Determine the source of the (filing. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessarv. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wile it on the plants rather than s ravin , The main treatment area Sediment has accumulated to Search for [he source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the se liment and storage depth. dispow of it in a location where it will not cause impacts to streams or the RpIP. Algal growth covers over Consull a professional to remove 50". of the area. and control the algal growth. Cattails, phragmites or other invasive pirates cover 50% of Remove the plants by wiping them with pesticide (do not spray). the basin surfam. Form S%V-pl I -Wet Detention Basin O&M-Rc%-A face 2 of-d Permit Number: (to be provi(fcrl by DIPQ) Drainage Area BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immedialely. on the embankment. Gvidence of muskrat or Use traps to remove muskrats and beaver activily is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if a Iicablc The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water L'rosion or other signs of Contact the local NC Division of damage have occurred at the Water Qualih, Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5;0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5.0 feet in the forebav, the sediment shall be removed. BASIN DIAGRAM UI( is the h@tnkq Sediment Removal I:. 19.5 I'e n:mell ______________ Volume Rotlom IIcvatim IR,S R Min. SLdimcnt Storage Penman ml Pool Elevation 24.5 __-_Sediment Removal Elevation 19.5-_-_ Volume Bnitmn I:Icvatinn 18S storage LOREB,\V MAIN POND Pnmi S\VJ01-\Vet Detention Basin O&M-Rcv.d Page 3 of 4 Pennit Numher: Oo he provided ter I acknowledge and agree by my signature below that I ante responsible for the performance ol'the maintenance procedures listed above. I agree to notily DWQ of an} problems tvilh the system or prior to ;my changes to the system or responsible party. Project name:Cro:uan Church of Christ Bit9P drainage urea number: l Print nanhc:Cnaie Hearne Title["rnasice - Croatan Church ol'Chrisl Address:3445 Old Airport Road. New Bern. NC 28562 Date: Note: The legally responsible party should not be a Iwmemmers assmiation unless more than 5051. of the lots have been sold and a resident ul'the sutxlivisiun has been n:uncd the president. I. G � iQ r 1 o —f�) l O Uk )-I . a Notary Public liter the State of (� O r ect t''Dt 1i r-\Xomuv of _�Q t4Q do hereby certify that - personal[\, appeared before me this 5 ", clay of 70k a�d r v _. _;)O Ll_ and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal. /J.�IS�L<.,a� 4&uq,t� SEAT. vlv commission expires (-1 vie V� harm SW401.O'et I )emotion Basin U C\I-Re%'.J PaLe4 of'4 STORMWATER SUBMITTAL REQUIREMENTS WET DETENTION POND Objective A. Collect all runoff from all BUA (proposed and/or existing and/or offsite) as the case may be, by any means including piping or swales, and direct it to the pond. B. Check the proposed pond design to make sure it meets or exceeds the minimum design criteria for surface area, volume and drawdown. II. What makes up a complete wet detention pond application package? A. Two sets of sealed, signed & dated layout & grading plans with appropriate details. (Additional sets of plans may be requested for projects in certain counties) B. Completed application with supplement(s), SWU-101, SW401-Wet Pond, and inspection and maintenance agreements. C. Deed restriction document, if applicable (for subdivisions & projects with out parcels) D. Sealed, signed & dated calculations. E. Estimated seasonal high water table elevation at all pond locations. F. Chlorides test results must be provided if the project is within ''/z mile of SR waters (Phase II). (This is only required to test out of SR water treatment requirements) III. BIMS entry (for DWQ use only) Enter & track application acknowledged date, review date, add info requested/received dates, permit issue dates, and drainage area info. Best done after the add info letter is written and before sending permit up for signature. IV. Shell documents (for DWQ use only) Permit shells: s:\wqs\stormwater\shells\highcompond s:\wqs\stormwater\shells\highsubpond s:\wqs\stormwater\shells\HDhybrid Spreadsheet: s:\wqs\stormwater\excel spreadsheets\pond VI. Review Procedure A. APPLICATION 1. V�An original signature is required. Photocopied signatures cannot be accepted. 2. ✓A completed wet detention pond supplement and a signed, dated and notarized wet 3. ✓detention pond Inspection and Maintenance Agreement with an original signature. The numbers on the supplement match up to the numbers used in the calculations and shown on the plan details. 4. �/Built-upon areas are reported in square feet in Section 111.6. 5. Receiving stream name and classification. This is important because in the non -Phase I I,counties, a wet pond cannot be used on a project that is within Y2 mile of and draining to SA waters. For Phase 11, a wet pond is allowed within '/2 mile of SA waters. 6. ✓Section 111.6 is filled in -cannot be left blank. One column must be filled in for each 7. t/proposed wet pond. If the applicant is a corporation, partnership or LLC, look it up on the Secretary of State Corporations Database. Make sure corporation is spelled correctly (capitalization and punctuation matter) and that the person signing the application is at least a vice- president in the corporation, a General Partner in the partnership, a member in a member -managed LLC, or the manager of a manager -managed LLC. Need documentation to support if the Articles of Incorporation do not list the members or managers of the LLC. If an agent signs, then a letter of authorization is needed from the sident, vice president, general partner, member or manager. 81 For subdivided projects, a signed and notarized deed restriction statement must be provided. Wet Detention Pond, cont. B. CALCULATIONS 1. The orifice is sized based on drawing down the calculated minimum volume in 2-5 days. The average head to use in the orifice equation is approximately one-third of the distance between the permanent pool elevation (PPE) and the elevation of the next available outlet above the permanent pool. The elevation of the next available outlet must be either the elevation where the minimum volume is provided, or it can be higher. The temporary pool elevation (TPE) to report on the supplement will be the elevation of the next available outlet above the PPE. The temporary pool volume (TPV) to report on the supplement is the volume between the specified PPE and the TPE. 2. For Phase II projects that are within '/2 mile of and draining to SR waters, the difference in runoff from the predevelopment and post -development conditions for the 1 year 24 hour storm must be controlled and treated. 3. For Phase II projects, the discharge rate leaving the pond can be no more than the pre -development discharge rate for the 1 year 24 hour storm. 4. For Phase II projects draining to SA water, no discharge to surface waters may occur from wet ponds. The discharge leaving the orifice must be effectively infiltrated prior to reaching surface waters. 5. The average pond depth is the permanent pool volume divided by the permanent pool surface area. The result must be between 3 ft. and 7.5 ft. Parts of the pond can be deeper than 7.5 ft., but in no case can any part of the pond be less than 3 ft deep. 6. If the 85% TSS chart is used a 30' vegetated filter must be provided at the outlet of the pond. If the 90% TSS chart is used, no filter is required. 7. Use the correct SA/DA TSS chart from the BMP Manual noting that there are different charts for different areas of the State. 8. Required surface area at permanent pool. 9. Provided surface area at permanent pool (Based on pond dimensions) 10. Required volume calculation based on 1.5" storm for Phase II projects* and 1" storm for all others projects. *unless the project is Phase 11 and within '/2 mile of and draining to SR waters then the volume calculation must be based on difference between the pre and post development conditions for the 1-yr 24-hr storm. 11. Table of elevations, areas, incremental volumes and accumulated volumes for overall pond and for forebay, to verify volumes provided. 12. Forebay designed to hold 20% of the permanent pool volume. (Range of 18%-22% OK.) 13. Non -erosive flow for 10 yr. storm in the vegetated filter, if using 85% TSS. 14. The seasonal high water table must be at or below the proposed permanent pool elevation to assure that the necessary volume will be available above the permanent pool. 15. Rounding numbers off during the calculation process can result in deficiencies. Do not round the numbers until you get to the final result. 16. An additional one foot must be excavated below the bottom elevation of the pond. The 1 foot sediment accumulation depth is not included in the average depth calculation. I-ov = O'C� fi G,S n T"' =U,hS v 3E Wet Detention Pond, cont. C. PLANS- Due to storage space constraints, plan sheets should be kept to a minimum. For small commercial single wet pond projects, the plan set could consist of only 2 or 3 sheets, layout, grading and details. For larger projects, show as much information as possible on as few sheets as possible, without cluttering them up. 1. ��Oevelopment/Project Name 2. Engineer name and firm. 3. � Legend 4. North Arrow 5. V'Location Map with nearest intersection of two major roads shown. Major road is any 1, 2, or 3 digit NC, US or interstate highway. 6. 'Location standard engineering scale, no off-the-wall stuff. 7.✓ Date 8. ✓Revision number and date, if applicable. 9. ✓Original contours, proposed contours, spot elevations, finished floor elevations, pipe 10✓I Swale inverts, etc. Existing drainage (piping, swales, ditches, ponds, etc.), including off -site. Include a map delineating the offsite drainage areas. 11.VP,roperty/Project boundary lines, bearing & distances. 12.� Mean High Water Line or Normal High Water Line, if applicable. 13. The permanent pool elevation must be above the SHWT and above the lowest elevation of adjacent wetlands. Evaluate the need for a liner and/or berm/slurry wall to prevent dewatering the wetland. 14 ✓Drainage easement widths, pipe sizes and swale inverts are provided. 15.✓Wetlands delineated, or a note on the plans that none exist. Get a copy of the wetlands delineation map signed by the Corps of Engineers, or have the applicant include a copy of the unsigned delineation map submitted to the Corps. Wet ponds may not be located in wetlands unless a permit to fill those wetlands has been obtained. 16. Details for the roads, parking, cul-de-sacs, including sidewalk width, radii, dimensions & f slopes. 1ll!(/IApartment / Condo development- Provide a typical building footprint with dimensions and note all concrete and wood deck areas. 18. The drainage area for each wet pond is clearly delineated and numbered to match up to the calculations and supplement. Drainage area delineation is best done as a separate /plan sheet. 19. A pond section detail to include the forebay, a 10 foot wide vegetated shelf, pertinent elevations for the bottom, permanent pool, temporary pool, and SHWT, 3:1 slopes above the permanent pool, and the weir elevation between the main pond and the ✓forebay. 20. The 10 vegetated shelf extends 6" below and 6" above the permanent pool elevation. 21. ✓An outlet structure detail showing a trash rack with <_6" square openings, the necessary orifice invert elevation (i.e., the permanent pool), orifice size and temporary pool elevation. 22.✓ Dimensions for each line and arc formed by the permanent pool contour. 23. Where the 85% TSS chart was used, a 30 ft. vegetated filter strip is required to be /shown on the plans & detailed (elevations, inverts, slopes, and flow spreader V mechanism). Please note that the filter strip is not a ditch. 24., /A forebay is provided for each inlet and located so as to prevent short-circuiting. 25. The pond must have a minimum 1.5:1 length to width ratio and a minimum 3:1 flow path length. Artificial "baffles" of timber, vinyl, or earth can be used to create a longer flow path. The top elevation of the baffle should be set at the temporary pool elevation or higher. 26 A Vegetation plan is specified for the pond, including slopes. Wetlands species are listed for planting on the 10:1 shelf. Weeping Love Grass is not suitable as a permanent vegetated cover for pond slopes. 27. All roof drainage must be directed to the pond. Show the roof drain collection lines on the plan. This is necessary for projects where the buildings back up the property lines where roof drainage may leave the site prior to going through the pond. WET DETENTION POND ANALYSIS -ALL RULES FILE NAME: S:IWQS\STORMWATERIEXCELSPREADSHEETSIPONDI110105 PROJECT*SW7 110105 REVIEWER: Sdumpor Initial Run Date ???? PROJECT NAME: Croatan Church of Christ Last modified 21-Feb-11 Receiving Stream: Neuse River Class: SB, Sw NSW Drainage Basin: Neuse Within 112 mile S N�Y or N Index No. 27-104 @Drainage Area feet DA Area 1.73 acres Buildings 5025.00 square feet 1 user input rec Street 21254.00 square feet 0.98 formula SW square feet Future 14860.00 square feet 0.98 Offsite square feet Other 861.00 square feet 0.98 _ BUr A at dill. DO) (square feet TOTAL 42000.00 square feet SURFACE AREA CALCULATION (with added DA and BUA at different design storm) Overall % Impervious 1 55.76% SA/DA Ratio 5.58% Average Design Depth 1 3.5 feet Req. SA 4200 sf TSS, 85 or 90: 90 °h Prov. SA 4234 sf TEMPORARY POOL AND FOREBAY VOLUME CALCULATIONS New BUA Old BUA DrainageAream 75326.00 sf BUA 42000.00 0.00 sf Post development Rv= 0.552 #DIV/01 unitless Old BUA Design Storm inches Old BUA Design Volume 0 1.5" New BUA Design Storm Volume 5196 1 yr. 24 hour precipitation depth (inches) from NOAA Chart Predevelopment Rv value I lUse 0.05 it no existing BUA 1 yr. 24 hr. Pre -development volume 0 cubic feet 1 yr. 24 hr. Post -development volume 0 cubic feet 2008 Design Volume 5196 1 cubic feet Phase 2 Design Volume 5196 cubic feet Average Head Flow 02, cfs Flow 05, cfs No. of Orifices Diameter, inches Drawdown = 1 yr 24 hr intensity, inthr Runoff Coefficient 1 yr 24 hr peak Q Orifice flow<lyr24hr T 0.32 feet Q2 Area 4_ 1.60 ds Q5 Area 0.64 cfs Orifice Area 1.23 Av . Flow Q=I 0.023 or weir H x W in x days '# of end contractions, N = NOAA chart @ discharge coefficient, C = unitless Effective weir length, L = cfs sq. inches sq. inches sq. inches cfs 0.030 0.012 1 1.25 2.6 3.70 3.31 0.66 0.00 4.21 YES -OK