HomeMy WebLinkAboutSW7101206_CURRENT PERMIT_20201006STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
DOC TYPE
ZPCURRENT PERMIT
APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
ROY COOPER
Governor'
MICHAEL S. REGAN
So, crerory
BRIAN WRENN
Acting Vita tor
NORTH CAROLINA
Environmental Quality
October 6, 2020
Commerce Pond Owners Association, Inc.
Attention: Mr. John W. Taylor, Vice President
P.O. Box12006
New Bern, NC 28561
Subject: Stormwater Permit No. SW7101206 Renewal
Commerce Park II
High Density Project
Craven County
Dear Mr. Taylor:
The Washington Regional Office received a Stormwater Management Permit
Application for renewal of the subject permit on September 14, 2020. Staff review of the
applications have determined that the permit can be reissued. We are forwarding Permit
No. SW7101206 dated October 6, 2020, for the continued operation of the subject
project.
This permit, upon its effective date, will replace all previous State Stormwater permits for
this project. This permit shall be effective from January 12, 2021 until January 11, 2029
and shall be subject to the conditions and limitations as specified therein, and does not
supercede any other agency permit that may be required. Please pay special attention to
the Operation and Maintenance requirements in this permit. Failure to establish an
adequate system for operation and maintenance of the stormwater management system
will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you
have the right to request an adjudicatory hearing upon written request within thirty (30)
days following receipt of this permit. This request must be in the form of a written petition,
conforming to Chapter 150B of the North Carolina General Statutes, and filed with the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714.
Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
contact me at (252) 948-3923.
Sincerely,
;';�•�� is �'�-,7�
Roger K. Thorpe
Environmental Engineer
North Carolina Department of Environinental Quality . Division of Energv. Mineral and Land Resom'ces
J/ Washlnyton Regional Office 043 Washington Square Mall I Washington. North Carolina 3788o
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended; and other applicable Laws, Rules and Regulations
PERMISSION IS HEREBY GRANTED TO
Commerce Pond Owners Association, Inc.
Commerce Park 11
Located at 1315 Commerce Drive, New Bern, NC, Craven County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and
the approved stormwater management plans and specifications and other supporting
data as attached and on file with and approved by the Division of Energy, Mineral, and
Land Resources (Division) and considered a part of this permit.
This permit shall be effective from January 12, 2021 until January 11, 2029, and shall
be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 of this permit. The subdivision is permitted for
lots, each allowed a maximum of (see attached table) square feet of built -upon
area and 15,500 square feet of existing off -site built -upon area.
The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
4. Each new lot owner within the subdivision must submit two (2) copies of the final
proposed development plans to the Division of Energy, Mineral, and Land
Resources and receive written plan approval prior to any construction on the lot
to ensure compliance with this State Stormwater Management Permit.
The built -upon areas associated with this project shall be located at least 50 feet
landward of all perennial and intermittent surface waters.
The following design elements have been permitted for this wet detention pond
stormwater facility, and must be provided in the system at all times.
a. Drainage Area, acres:
b. Total Impervious Surfaces, ft2
Average Pond Design Depth, feet
TSS removal efficiency:
Design Storm:
Permanent Pool Elevation, FMSL:
Permitted Surface Area @PP, ft2:
Permitted Storage Volume, ft3:
Storage Elevation, FMSL:
Predevelopment 1 year 24 hour:
Post development 1 year 24 hour:
Controlling Orifice:
Permanent Pool Volume, ft3:
Forebay Volume, ft3:
Maximum Fountain Horsepower:
Receiving Stream / River Basin:
Stream Index Number:
Classification of Water Body:
II. SCHEDULE OF COMPLIANCE
4.46 (including 21,800sf of off -site area)
128,275 new + (5,434sf vested + 15,500sf
off -site)
5.00
90%
1.50
17.00
8,850
23,225 at temporary pool
19.00
4.15 cfs
2.89 cfs
1.25" O pipe
34,486
6,478
1/8hp / 0.125hp
Wilson Creek / Neuse River
27-101-37
"C; Sw, NSW"
No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature
(such as swales) shown on the approved plans as part of the stormwater
management system without submitting a revision to the permit and receiving
approval from the Division.
The permittee is responsible for verifying that the proposed built -upon area for
the entire lot does not exceed the maximum allowed by this permit. Once the lot
transfer is complete, the built -upon area may not be revised without approval
from the Division, and responsibility for meeting the built -upon area limit is
transferred to the individual property owner.
If an Architectural Review Board or Committee is set up by the permittee to
review plans for compliance with the BUA limit, the plans reviewed must include
all proposed built -upon area. Any approvals given by the Board do not relieve the
homeowner of the responsibility to maintain compliance with the permitted BUA
limit.
The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
5. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
6. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
e. Further subdivision, acquisition, or sale of all or part of the project area.
The project area is defined as all property owned by the permittee, for
which Sedimentation and Erosion Control Plan approval or a CAMA Major
permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
7. The permittee shall submit for approval, final site layout and grading plans for
any permitted future development areas shown on the approved plans, prior to
construction.
3. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
3. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
10. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for these deviations.
11. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
12. The permittee shall at all times provide the operation and maintenance
necessary to assure that all components of the permitted stormwater system
function at optimum efficiency. The approved Operation and Maintenance Plan
must be followed in its entirety and maintenance must occur at the scheduled
intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans.
f. Debris removal and unclogging of structures, orifice, catch basins and
piping.
g. Access to all components of the system must be available at all times.
13. Records of maintenance activities must be kept by the permittee. The records will
indicate the date, activity, name of person performing the work and what actions
were taken.
14. This permit shall become void unless the facilities are constructed in accordance
with the conditions of this permit, the approved plans and specifications, and
other supporting data.
15. Prior to the sale of any lot, the following deed restrictions must be recorded:
a. The following covenants are intended to ensure ongoing compliance with
State Stormwater Management Permit Number SW7101206, as issued by
the Division under NCAC 2H.1000.
b. The State of North Carolina is made a beneficiary of these covenants to
the extent necessary to maintain compliance with the Stormwater
Management Permit.
C. These covenants are to run with the land and be binding on all persons
and parties claiming under them.
d. The covenants pertaining to stormwater may not be altered or rescinded
without the express written consent of the State of North Carolina, Division
of Energy, Mineral, and Land Resources.
e. Alteration of the drainage as shown on the approved plans may not take
place without the concurrence of the Division.
The maximum built -upon area per lot is as listed below
Lot #
Lot Area (sf)
Maximum BUA (sf)
BUA (%)
1
24,577
0
0
2
20,108
18,097
90
3
20,134
18,121
90
4
20,160
18,144
90
5
20,185
18,167
90
6
20,211
16,775
83
7
20,237
16,797
83
8
26,717
22,175
83
This allotted amount includes any built -upon area constructed within the
lot property boundaries, and that portion of the right-of-way between the
front lot line and the edge of the pavement. Built upon area includes, but is
not limited to, structures, asphalt, concrete, gravel, brick, stone, slate,
coquina and parking areas, but does not include raised, open wood
decking, or the water surface of swimming pools.
3. All runoff on the lot must drain into the permitted system. This may be
accomplished through providing roof drain gutters, which drain to the
street, grading the lot to drain toward the street, or grading perimeter
swales and directing them into the pond or street. Lots that will naturally
drain into the system are not required to provide these measures.
h. Built -upon area in excess of the permitted amount will require a permit
modification.
i. The owners of lots 2-8 must submit two (2) copies of final proposed
development plans to the Division and receive written plan approval to
ensure compliance with State Stormwater Management
Permit Number SW7101206 prior to any construction on the lot.
j. The project and each lot will maintain a 50 foot wide vegetated buffer
between all impervious areas and surface waters.
k. Each lot owner within Commerce Park II is by ownership a member of the
Commerce Pond Owner's Association, Inc. and subject to the conditions
and requirements of the Stormwater Management Permit SW7101206.
16. A copy of the recorded deed restrictions must be submitted to the Division within
30 days of the date of recording the plat, and prior to selling lots. The recorded
copy must contain all of the statements above, the signature of the Permittee, the
deed book number and page, and the stamp/signature of the Register of Deeds.
17. Prior to transfer of the permit, the stormwater facilities will be inspected by the
Division personnel. The facility must be in compliance with all permit conditions.
Any items not in compliance must be repaired or replaced to design condition
prior to the transfer. Records of maintenance activities performed to date will be
required.
18. Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria:
a. The fountain must draw its water from less than 2' below the permanent
pool surface.
b. Separated units, where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the deepest
part of the pond.
C. The falling water from the fountain must be centered in the pond, away from
the shoreline.
d. The maximum horsepower for the fountain's pump is based on the
permanent pool volume. The maximum pump power for a fountain in this
pond is 1/8hp (0.125hp).
19. If permeable pavement credit is desired, the permittee must submit a request to
modify the permit to incorporate such language as required by the Division. The
request to modify must include a soils report identifying the type of soil, the
Seasonal High Water Table elevation and the infiltration rate. Upon the
successful completion of a permit modification, the individual lot owners that
request to utilize permeable pavements must submit the necessary forms and
documentation to the permittee and receive approval prior to construction of the
permeable pavement.
20. A copy of the approved plans and specifications shall be maintained on file by
the Permittee at all times.
III. GENERAL CONDITIONS
1. This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a completed Name/Ownership Change form signed by both parties, to the
Division, accompanied by the supporting documentation as listed on page 2 of
the form. The approval of this request will be considered on its merits and may or
may not be approved.
2. The permittee is responsible for compliance with all permit conditions until such
time as the Division approves a request to transfer the permit.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division, in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
6. The permittee grants DEQ Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
7. The permit issued shall continue in force and effect until revoked or terminated.
The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and re -issuance or
termination does not stay any permit condition.
Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
10. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit
as allowed by the laws, rules and regulations contained in Title 15A NCAC
2H.1000, and NCGS 143-215.1 et.al.
11. The permittee shall notify the Division in writing of any name, ownership or
mailing address changes at least 30 days prior to making such changes.
12. This permit shall be effective from the date of issuance until January 11, 2029.
Application for permit renewal shall be submitted 180 days prior to the expiration
date of this permit and must be accompanied by the processing fee.
Permit issued this the 6th day of October 2020.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
For
Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW7101206
`... a.. �, �,.. ,r .. ., nr'"_^^�'„ y:-UEM` :Ub `.UNL'Y ..a+�' `yw U 1 , i, 7 , ,.u......., . ,..,... ._ V
Date Received Fee Paid Permit Number
14/)-c S 5 iC4
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A__NCAC_2H_1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60. (c). This application form is for permit renewals only.
A. PROJECT INFORMATION
f,
1. State Stormwater Permit Number: S vvq i b j a01,
2. Project name: _
3. Project street address: 13.15
`\:Oyw rnPY C� llr .
City: "LyLm County: (\)C ZIP. to
4. What, if any, changes have been made to the project as permitted? NCIV C-
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: https//deq,nc_gov/about/divisions/energy_.
..............
mineral-land_resources/energy_minere l-land-rules/stormwater-program/post-construction.
PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property. n
1. Current Permit Holder's Company Name/Organization: `—MmW"L2 VDnk NoAets K%-oG uJ im ,)�r
2. Signing Official's Name:
3. Signing Official's Title: V I C,e� Vr¢SidZ jX
4. Mailing Address: � r)
,,
City: 1� 6RM State: iJC ZIP : 'Ma I
5. Street Address: 13, .A
City: NQto �enti State: ZIP
f
6. Phone: (ZML) b�-J!ZAUO Email: r-N%
RECEIVED StN 14 2M
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
1. A permit application processing fee of $505.00 payable to NCDEQ.
2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president,
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee,
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
'vi n 3. One hard copy and one electronic copy of recorded documents required by the original permit that have
not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
4. O&M Agreements, Please select one:
LvU I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit, or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
5. Desigger Certifications, Please select one:
12 A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division, or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
01A 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
N� 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide
one hard copy and one electronic copy of documentation from the NC Secretary of State, or other
official documentation, which supports the titles and positions held by the persons listed in Section
C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online_services/search/by_title/ Business_ Registration_
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEE'S CERTIFICATION
lot- the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs or ownership. All information provided on this permit renewal application is, to the best of my
knowledge, Arr ct and conyglete. n
Signature: U / V V 111_L. _ Date: clJ I �JI U" U
NOTARIZATION : �( (?
I Y. O^`1 (1S t� a Notary Public for the State of
UV\�C County of \ �av�-►.i do hereby certify
that c O personally appeared before me
this the 1 Olh da 20 a 0 , and acknowledge the due
execution of the forgoing instrument. Witness my hand and official seal,
(Notary Seal)
Notary Signature:
a+,CiTAF?b,..
My commission expires-'�-'a�
kG �. z
;r
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
Commerce Pond Owners Association, Inc.
P 0 Box 12006
New Bern, NC 28561
252-633-5106
September 10, 2020
Roger Thorpe
NCDEQ
943 Washington Square Mall
Washington, NC 27889
Re: Stormwater Permit #SW7101206
Roger,
usczVv)
SEP 14 D9
We spoke on Tuesday, Sept. 8 about our stormwater permit renewal. 1 have attached a signed Permit
Renewal Application Form and the check for $505 made out to NCDEQ, and have emailed a copy of the Permit
Renewal Application Form also to you at roger.thorpe@ncdenc.gov.
When we spoke you said that you were confident that you already had all of the initial documents that were
necessary, and that all you would need is the signed Renewal Application and the payment. If you find out
that you need further documentation, please call me.
Thank you.
Sincerely,
Cindy Gaski�Ts'
Office Manager
State Stormwater Management Systems
Permit No. SW7101206
Stormwater Improvements to Commerce Park II
Stormwater Permit No. SW7101206
Craven County
Designer's Certification
Page 1 of 2
67. ocK as a duly registered P^v oss o �fi ;aod'in
the State of North Carolina, having been authorized to observe eriodicall eekly/full
time) the construction of the project,
for — AU ��2 (Project Owner) hereby state that, to the
best of my abiliti s, due dare and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is a part of this Certification.
Noted deviations from approved plans and specispecifications:r1 * 8
sr 6 �irry � ,a' /Yl T 9,; li o 4-. c ^i l`( 10� .
111111/,
GAR i,
Signature
—"e �QgEp� -7 _
Registration Nu ber
Q 'h
Date j .FN �cF •' �:
SEAL
RECEIVE®
DEC 1 3 2011
®WQ-WAR®
Page 8 of 9
to
- /fit'
[•' -
_
II,
i
State Stormwater Management Systems
Permit No. SW7101206
Certification Requirements: Page 2 of 2
✓ 1. The drainage area to the system contains approximately the permitted
acreage.
✓ 2. The drainage area to the system contains no more than the penpitted
amount of built -upon area. b o I+- o,, I-.
✓ 3. All the built -upon area associated with the project is graded suc i that the
runoff drains to the system. S" h d �; s?dti .v.f I.", I� ow-F
✓ 4. All roof d ains are locate9gG[uch that thp}runoff is directed into the system.
i s»�6514 :S9f VJ /mod �41 I rC7 L 1
✓ 5. The outlet/bypass structure elevations are per the approved plan.
✓6. The outlet structure is located per the approved plans.
✓7. Trash rack is provided on the outlet/bypass structure.
✓�S.�All slopes are grassed with permanent vegetation.
99 Vegetated slopes are no steeper than 3:1.
✓ 10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
✓ 11. The permitted amounts of surface area and/or volume have been
provided.
✓ 12. Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf, a
forebay, and the vegetated filter.
15. The required dimensions of the system are provided, per the approved
plan.
cc: NCDENR-DWQ Regional Office
New Bern City Planning / Building Inspections
Page 9 of 9
EXPRESS
DEC 28 2010 permit Number:
^ ®C�(to be provided by DIVQ)
NC 66 R Drainage Area Number: I
Wet Detention Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
❑ does ® does not incorporate a vegetated filter at the outlet.
This system (check one):
❑ does ® does not incorporate pretreatment other than a forebay.
Important maintenance procedures:
— Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks).
— No portion of the wet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated shelf.
— Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
— If the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum extent practical.
— Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a
Coastal County). Records of operation and maintenance should be kept in a known set
location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash debris is present.
Remove the trash debris.
The perimeter of the wet
Areas of bare soil and/or
Regrade the soil if necessary to
detention basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Vegetation is too short or too
Maintain vegetation at a height of
long.
approximatelysixinches.
Form SW401-Wet Detention Basin O&M-Rev.4
Page I of
,0
Permit Number:
(m be provided by DWQ)
Drainage Area Number:
BMP element:
Potentialproblem:
How I will remediate theproblem:
The inlet device: pipe or
The pipe is clogged.
Unclog the pipe. Dispose of the
swale
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged.
Erosion is occurring in the
Regrade the swale if necessary to
Swale.
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
The forebay
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design depth for
possible. Remove the sediment and
sediment storage.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The vegetated shelf
Best professional practices
Prune according to best professional
show that pruning is needed
practices
to maintain optimal plant
health.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The main treatment area
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design sediment
possible. Remove the sediment and
storage depth.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Algal growth covers over
Consult a professional to remove
50 % of the area.
and control the algal growth.
Cattails, phragmites or other
Remove the plants by wiping them
invasive plants cover 507. of
with pesticide (do not spray).
the basin surface.
Farm SW401-Wet Detention Basin O&M-Rev.4
Page 2 of 4
of
Permit Number:
(to be provided by D111Q)
Drainage Area Number:
BMP element:
Potentialproblem:
How I will remediate theproblem:
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankment.
remove the tree.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair. if applicable)
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
1 Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
outlet.
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads 66:5 feet in the main pond, the sediment
shall be removed.
When the permanent pool depth reads 6.5 feet in the forebay, the sediment
shall be removed.
BASIN DIAGRAM
(fill in the blanks)
Permanent Pool Elevation 17.0
Sediment Removal E . 10.5 Pe manes Pool
---------------- -ftVolume Sediment Removal Elevation 10.5 Volume
Bottom Elevatio 9.5 Min.
----------------------------- ----------- ------
Sediment Bottom Elevation 9.5 1-ft n
Storage Sedimer
Storage
FOREBAY MAIN POND
Form SW401-Wet Detention Basin O&M-Rev.4
Page 3 of 4
2,f
Permit Number:
(to be provider/ by DWQ)
I acknowledge and agree by my signature below that 1 am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:Stormwater Improvements for Commerce Park 11
BMP drainage area number:
Print name:
Address:PO Box 12006, New Bern, NC 28561
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
lT4.�n S , a Notary Public for the State of
1L vj pp County of f hys'.t1 do hereby certify that
zalhl r Q ,' r personally appeared before me this
day of 01 , and acknowledge the due execution of the
forgoing wve�t�deQt-e�nt�ion basil maintenance requirements. Witness my hand and official
seal,
CAs�i�^^
itkOTA,R5-
toUBLXC ,
•,.,,00 U NS
SEAL 1'
My commission expires
Form SW401-Wet Detention Basin O&M-Rev.4
Page 4 of 4
Permit No. S'w'7lolaob
no be provided by D WO)
EXPRESS
DEC 28 2010
® � l WATf9O
Nil
DENR
r
o
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Pad III) must be printed, filled out and submitted along with all of the required information.
1..P-ROJECTi INFORMATION
Project name Site Improvement for Commerce Park II
Contact person Bobby Billingsley, PE
Phone number 252.637.2727
Dale 11.23.2010
Drainage area number 1
Drainage area
Impervious area, post -development
% impervious
Design rainfall depth
Storage Volume: Non-SAWaters
Minimum volume required
Volume provided
Storage Volume: SA Waters
1,5' runoff volume
Pre -development 1-yr, 24-hr runoff
Post -development 1-yr, 24-hr runoff
Minimum volume required
Volume provided
Peak Flow Calculations
Is the prelpost control of the lyr 24hr stone peak flow required?
1-yr, 24-hr rainfall depth
Rational C, pre -development
Rational C, post -development
Rainfall intensity: 1-yr, 24-hr stone
Pre -development 1-yr, 24-hr peak flow
Post -development 1-yr, 24-hr peak flow
Pre/Post 1-yr, 24-hr peak flow control
Elevations
Temporary pool elevation
Permanent pool elevation
SHWT elevation (approx. at the permpool elevation)
Top of 10ft vegetated shelf elevation
Bottom of 1Oft vegetated shelf elevation
Sediment cleanout, top elevation (bottom of pond)
Sediment cleanout, bottom elevation
Sediment storage provided
Is there additional volume stored above the state -required temp. pool?
Elevation of the top of the additional volume
122.841 ft7
71.28 %
1.5 in
14,863 ft3 Insufficient required volume.
23,225 ft3
OK, volume provided is equal to or in excess of volume required.
rya
ry3
ft3
If
0
Y (Y or N)
3.7 in
0.15 (unitless)
0.78 (uni8ess)
7.00 iNhr OK
4.15 ft3lsec
2.89 ft3/sec
-1.26 ft3/sec
19.00 fmsl
17.00 fmsl
to determine fmsl
17.50 fmsl
16.50 fmsl
10.50 first
9,50 fmsl
1,00 ft
ti 1&. S_T-3 Inr17
N (Y or N)
fmsl
Form SW401-Wet Detention Basin-Rev.8-9I17I09 Pans I. & 11. Design Summary, Page 1 of 2
Permit No.
(to be prcv,dsd by DWO)
Surface Areas
Area, temporary pool
Area REQUIRED, permanent pool
SAIDA ratio
Area PROVIDED, permanent pool, A..
Area, bottom of 10H vegetated shelf, A. ,rel
Area, sediment cleanout, top elevation (bottom of pond), A._p.
Volumes
Volume, temporary pool
Volume, permanent pool, Vperm�od
Volume, forebay (sum of forebays if more than one forebay)
Forebay % of permanent pool volume
SAIDA Table Data
Design TSS removal
Coastal SAIDA Table Used?
Mountain/Piedmont SAIDA Table Used?
SAIDA ratio
Average depth (used in SA/DA table):
Calculation option 1 used? (See Figure 10-2b)
Volume, permanent pool, V.-.
Area provided, permanent pool, Apra,,,,
Average depth calculated
Average depth used in SAIDA, J., (Round to nearest 0.5ft)
Calculation option 2 used? (See Figure 10-2b)
Area provided, permanent pool, A..
Area, bottom of 1Oft vegetated shelf, Abd rasa
Area, sediment cleanout, top elevation (bottom of pond), Ab.
'Depth' (distance b/w bottom of 1 Oft shelf and top of sediment)
Average depth calculated
Average depth used in SAIDA, dm„ (Round to nearest 0.5ft)
Drawdown Calculations
Drawdown through orifice?
Diameter of orifice (it circular)
Area of orifice (if-noncircular)
Coefficient of discharge (Co)
Driving head (Ho)
Drawdown through weir?
Weir type
Coefficient of discharge (C.„)
Length of weir (L)
Driving head (H)
Pre -development l-yr, 24-hr peak flow
Post -development 1-yr, 24-hr peak flow
Storage volume discharge rate (through discharge orifice or weir)
Storage volume drawdown time
Additional Information
Vegetated side slopes
Vegetated shelf slope
Vegetated shelf width
Length of flowpath to width ratio
Length to width ratio
Trash rack for overflow & onfice?
Freeboard provided
Vegetated filter provided?
Recorded drainage easement provided?
Capures all runoff at ultimate build -out?
Drain mechanism for maintenance or emergencies is:
Form SW401-Wet Detention Basin-Rev.8-9I17I09
613,4165�pr.n0
8,789 ft'
5.10 (unitless)
8,850 ft3 OK
6,788 ft'
3,404 ft'
23,225 ft3 OK
34,486 ft3
6,478 k3
18.8% % OK
90 %
Y (Y or N)
N (Y or N)
5.10 (unitless)
N (Y or N)
34,486 ft3
8,850 ft'
ft Need 3 ft min.
ft
Y (Y or N)
8,850 ft, (`
6,788 ft3 Lo ,`14j -l�
3,404 ft2 ,%
6.00 ft
4.94 k OK
5.0 ft- OK
Y (Y or N)
1.25 in
in
0.60 (unitless)
1.50 ft
(Y or N)
(unitless)
(unitless)
ft
ft
4.15 ft3/sec
2.89 ft3/sec
0.04 ft3/sec
2.00 days
3 :1
10 :1
OK, draws down in 2-5 days.
OK
OK
10.0 It OK
3 :1 Insufficient flow path to width ratio. Must not short-circuit pond.
2.6 :1 OK
Y (Y or N) OK
1.5It OK
N (Y or N) OK
Y (Y or N) OK
Y (Y or N) OK
Mechanical Pumps
Parts I. & II. Design Summary, Page 2 of 2
Permit
III. REQUIRED ITEMS CHECKLIST
(to be provided by DWO)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
/L r,
1. Plans (1" - 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Basin dimensions,
- Pretreatment system,
- High flow bypass system,
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Overflow device, and
- Boundaries of drainage easement.
4 Lld
2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing:
- Outlet structure with trash rack or similar,
- Maintenance access,
- Permanent pool dimensions,
- Forebay and main pond with hardened emergency spillway,
- Basin cross-section,
- Vegetation specification for planting shelf, and
- Filter strip.
3. Section view of the wet detention basin (1" = 20' or larger) showing:
- Side slopes, 3:1 or lower,
- Pretreatment and treatment areas, and
- Inlet and outlet structures.
/Z
4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified
on the plans prior to use as a wet detention basin.
�L L�
5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay,
to verify volume provided.
6. A construction sequence that shows how the wet detention basin will be protected from sediment until the
entire drainage area is stabilized.
7. The supporting calculations.
8. A copy of the signed and notarized operation and maintenance (O&M) agreement.
/2 t O
9. A copy of the deed restrictions (if required).
124,6 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County
soil maps are not an acceptable source of soils information.
Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III, Required Items Checklist, Page 1 of 1
SCS Type III Storage Routing
Stormwater Improvements for Commerce Park II - Wet Detention Pond
Design Stonn = SCS Type III Hydrograph
1 yr Storm
7.00 cfs
flow
I yr Storm
3.7 in/24 yr
precipitation
C pre
0.15
C post
0.78
Imp. Area
122841 sf
post development
Total Area
172329 sf
�Qpre
-�
�4.15 cfs
rational method
Pond Storage for l yr/24 hour precipitation
Rv
0.69
V
36745 cf
<==lyr/24 hr Storm Volume
Pond Storage
23225 of
<==Design
Time
Prec. Ratio
I yr storm (in)
Inflow (ft3)
Storage (ft3)
Outflow (fl3)/
Qufflow (cfs)
0.0
0.00000
0.00000
0.2
0.00200
0.00740
73.49
73.49
0.00
0.00
0.4
0.00400
0.01480
73.49
146.98
0.00
0.00
0.6
0.00600
0.02220
73.49
220.47
0.00
0.00
0.8
0.00800
0.02960
73.49
293.96
0.00
0.00
1.0
0.01000
0.03700
73.49
367.45
0.00
0.00
1.2
0.01200
0.04440
73.49
440.94
0.00
0.00
1.4
0.01400
0.05180
73.49
514.43
0.00
0.00
1.6
0.01600
0.05920
73.49
587.92
0.00
0.00
1.8
0.01800
0.06660
73.49
661.41
0.00
0.00
2.0
0.02000
0.07400
73.49
734.90
0.00
0.00
2.2
0.02203
0.08151
74.59
809.49
0.00
0.00
2.4
0.02412
1 0.08924
76.80
886.29
0.00
0.00
2.6
0.02627
0.09720
79.00
965.29
0.00
0.00
2.8
0.02848
0.10538
81.21
1046.50
0.00
0.00
3.0
0.03080
0.11396
85.25
1131.75
0.00
0.00
3.2
0.03308
0.12240
83.78
1215.53
0.00
0.00
3.4
0.03547
0.13124
87.82
1303.35
0.00
0.00
3.6
0.03792
0.14030
90.03
1393.37
0.00
0.00
3.8
0.04043
0.14959
92.23
1485.61
0.00
0.00
4.0
0.04300
0.15910
94.43
1580.04
0.00
0.00
4.2
0.04563
0.16883
96.64
1676.68
0.00
0.00
4.4
0.04832
0.17878
98.84
1775.52
0.00
0.00
4.6
0.05107
0.18896
101.05
1876.57
0.00
0.00
4.8
0.05388
0.19936
103.25
1979.83
1 0.00
0.00
5.0
0.05670
0.20979
103.62
2083.45
0.00
0.00
5.2
0.05968
0.22082
109.50
2192.95
0.00
0.00
5.4
0.06267
1 0.23188
109.87
2302.82
0.00
0.00
5.6
0.06572
0.24316
112.07
2414.89
0.00
0.00
5.8
0.06883
0.25467
114.28
2529.17
0.00
0.00
6.0
0.07200
0.26640
116.48
2645.65
0.00
0.00
6.2
0.07530
0.27861
121.26
2766.91
0.00
0.00
6.4
0.07880
0.29156
128.61
2895.52
0.00
0.00
6.6
0.08250
0.30525
135.96
3031.47
0.00
0.00
6.8
0.08640
0.31968
143.31
3174.78
0.00
0.00
7.0
0.09050
0.33485
150.65
3325.43
0.00
0.00
7.2
0.09480
0.35076
158.00
3483.44
0.00
0.00
7.4
0.09930
0.36741
165.35
3648.79
0.00
0.00
7.6
0.10400
0.38480
172.70
3821.49
0.00
0.00
7.8
0.10890
0.40293
180.05
4001.54
0.00
0.00
8.0
0.11400
0.42180
187.40
4188.94
0.00
0.00
8.2
0.11943
0.44189
199.53
4388.47
0.00
0.00
8.4
0.12532
0.46368
216.43
4604.90
0.00
0.00
8.6
0.13167
0.48718
233.33
4838.23
0.00
0.00
8.8
0.13848
0.51238
250.23
5088.46
0.00
0.00
9.0
0.14580
0.53946
268.97
5357.44
0.00
0.00
9.2
0.15348
0.56788
282.20
5639.64
0.00
0.00
9.4
0.16167
0.59818
300.94
5940.58
0.00
0.00
9.6
0.17032
0.63018
317.85
6258.43
0.00
0.00
9.8
0.17943
0.66389
334.75
6593.18
0.00
0.00
10.0
0.18900
0.69930
351.65
6944.83
0.00
0.00
10.2
0.19928
0.73734
377.74
7322.57
0.00
0.00
10.4
0.21052
0.77892
413.02
7735.58
0.00
0.00
10.6
0.22272
0.82406
448.29
8183.87
0.00
0.00
10.8
0.23588
0.87276
483.57
8667.44
0.00
0.00
11.0
0.25000
0.92500
518.84
9186.28
0.00
0.00
11.2
0.26644
0.98583
604.09
9790.37
0.00
0.00
11.4
0.28656
1.06027
739.31
10529.68
0.00
0.00
11.6
0.31430
1.16291
1019.31
11548.99
0.00
0.00
11.8
0.37330
1.38121
2167.96
13716.95
0.00
0.00
12.0
0.50000
1.85000
4655.61
18372.56
0.00
0.00
12.2
0.62670
2.31879
4655.61
23028.16
0.00
0.00
12.4
0.68570
2.53709
2167.96
25196.13
2167.96
_.89
12.6
0.71344
2.63973
1019.31
26215.44
1019.31
1.36
12.8
0.73336
2.71342
731.82
26947.25
731.82
0.98
13.0
0.75000
2.77500
611.59
27558.84
611.59
0.82
13.2
0.76412
2.82724
518.84
28077.69
518.84
0.69
13.4
0.77728
2.87594
483.57
28561.24
483.57
0.64
13.6
0.78948
2.92108
448.29
29009.53
448.29
0.60
13.8
0.80072
2.96266
413.02
29422.55
413.02
0.55
14.0
0.81100
3.00070
377.74
29800.29
377.74
0.50
14.2
0.82057
3.03611
351.65
30151.94
351.65
0.47
14.4
0.82968
3.06982
334.75
30486.69
334.75
0.45
14.6
0.83833
3.10182
317.85
30804.53
317.85
0.42
14.8
0.84652
3.13212
300.94
31105.48
300.94
0.40
15.0
0.85430
3.16091
285.88
31391.35
295.88
0.38
15.2
0.86152
3.18762
265.30
31656.65
265.30
0.35
15.4
0.86833
3.21282
250.23
31906.89
250.23
0.33
15.6
0.87468
3.23632
233.33
32140.22
233.33
0.31
15.8
0.88057
3.25811
216.43
32356.65
216.43
0.29
16.0
0.88600
3.27820
199.53
32556.17
199.53
0.27
16.2
0.89110
3.29707
187.40
32743.57
187.40
0.25
16.4
0.89600
3.31520
180.05
32923.62
180.05
0.24
16.6
0.90070
3.33259
172.70
33096.33
172.70
0.23
16.8
0.90520
3.34924
165.35
33261.68
165.35
0.22
17.0
0.90950
3.36515
158.00
33419.68
158.00
0.21
17.2
0.91360
3.38032
150.65
33570.34
150.65
0.20
17.4
0.91750
3.39475
143.31
33713.64
143.31
0.19
17.6
0.92120
3.40844
135.96
33849.60
135.96
0.18
17.8
0.92470
3.42139
128.61
33978.21
128.61
0.17
18.0
0.92800
3.43360
121.26
34099.47
121.26
0.16
18.2
0.93117
3.44533
116.48
34215.95
116.48
0.16
18.4
0.93428
3.45684
114.28
34330.23
114.28
0.15
18.6
0.93733
3.46812
112.07
34442.30
112.07
0.15
18.8
0.94032
3.47918
109.87
34552.17
109.87
0.15
19.0
0.94330
3.49021
109.50
34661.67
109.50
0.15
19.2
0.94612
3.50064
103.62
34765.29
103.62
0.14
19.4
0.94893
3.51104
103.25
34868.54
103.25
0.14
19.6
0.95168
3.52122
101.05
34969.59
101.05
0.13
19.8
0.95437
3.53117
98.84
35068.44
98.84
0.13
20.0
0.95700
3.54090
96.64
35165.08
96.64
0.13
20.2
0.95958
3.55045
94.80
35259.88
94.80
0.13
20.4
0.96211
3.55981
92.97
35352.84
92.97
0.12
20.6
0.96460
3.56902
91.50
35444.34
91.50
0.12
20.8
0.96704
3.57805
89.66
35534.00
89.66
0.12
21.0
0.96940
3.58678
86.72
35620.72
86.72
0.12
21.2
0.97179
3.59562
87.82
35708.54
87.82
0.12
21.4
0.97410
3.60417
84.88
35793.42
84.88
0.11
21.6
0.97636
3.61253
83.04
35876.46
83.04
0.11
21.8
0.97858
3.62075
81.57
35958.04
81.57
0.11
22.0
0.98080
3.62896
81.57
36039.61
81.57
0.11
22.2
0.98288
3.63666
76.43
36116.04
76.43
0.10
22.4
0.98496
3.64435
76.43
36192.47
76.43
0.10
22.6
0.98700
3.65190
74.96
36267.43
74.96
0.10
22.8
0.98899
3.65926
73.12
36340.55
73.12
0.10
23.0
0.99090
3.66633
70.18
36410.74
70.18
0.09
23.2
0.99284
3.67351
71.29
36482.02
71.29
0.10
23.4
0.99470
3.68039
68.35
36550.37
68.35
0.09
23.6
0.99651
3.68709
66.51
36616.88
66.51
0.09
23.8
0.99828
3.69364
65.04
36681.91
65.04
0.09
24.0
1.00000
3.70000
63.20
36745.12
63.20
0.08
��������
��������
��������
��������
��������
��
-�����
��������
��������
�������
��������
��������
��������
�������
C
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
�������
•
�������
�������
�������
�������
�������
�������
�������
�������
,
�������
�������
�������
�������
�������
�������
����.
-��
��-
����
��������
��������
��������
��������
�������
�.������
�.������
�.������
��������
��������
�C������
��������
��������
��������
��������
��������
��������
��������
��������
��������
��������
��������
��������
��������
�������
��������
��������
��������
��������
�������
��������
��������
��������
�������
��������
��������
��������
��������
��������
�������
�������
��������
��������
��������
. �������
Permit No.
(fo be provMetl by D 0)
RECEIVE®
APR - 9 2012
ATA
�/� �
NCDENR STORMWATERMANAGEMENTPERMITAQCATfOtJF �®
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information.
I. PROJECT INFORMATION
Project name Site Improvement for Commerce Park II
Contact person Bobby Billingsley, PE
Phone number
Date
Drainage area number
II. DESIGN INFORMATION
Site Characteristics
11.23.2010 (REVISED 4.5.2012)
1
Drainage area
194,329 e
Impervious area, post -development
138,341 ft'
%impervious
71.19 %
Design rainfall depth
1.5 in
Storage Volume: Non -SA Waters
Minimum volume required
16,800 g'
Volume provided 23,225 ft'
Storage Volume: $A Waters
1.5' runoff volume It,
Pre -development 1-yr, 24-hr runoff ft'
Post -development 1-yr, 24-hr runoff ft'
Minimum volume required ft'
Volume provided to
Peak Flow Calculations
OK
o�O p WATf9O
-O� ;
OK, volume provided is equal to or in excess of volume required.
Is the pre/post control of the lyr 24hr stone peak flow required?
Y (Y or N)
1-yr, 24-hr rainfall depth
3.7 in
Rational C, pre -development
0.15 (unifless)
Rational C, post -development
0.78 (unitiess)
Rainfall intensity: 1-yr, 24-hr storm
7.00 in/hr OK
Pre -development 1-yr, 24-hr peak flow
4.15 ft'/sec
Post -development 1-yr, 24-hr peak flow
239 ft3/sec
Pre/Post 1-yr, 24-hr peak flow control
-1.26 ft'Isec
Elevations
Temporary pool elevation
19.00 fmsl
Permanent pool elevation
17.00 fmsl
SHWT elevation (approx. at the perm. pool elevation)
to determine fmsl
Top of 1 Oft vegetated shelf elevation
17.50 fmsl
Bottom of 10ft vegetated shelf elevation
16.50 fmsl
Sediment cleanou6 top elevation (bottom of pond)
1o.50 fmsl
Sediment deanoul, bottom elevation
9.50 fmsl
Sediment storage pmvided
1.00 It
Is there additional volume stored above the state -required temp. pool?
N (Y or N)
Elevation of the top of the additional volume
fmsl
Fore SW401-Wet Detention 6asin-Rev.e-9/17/09 Parts I. & II. Design Summary, Page 1 of 2
Permit No.
(to be jam ded by DWO)
II. DESIGN INFORMATION
Surface Areas
Area, temporary pool 18,245 ftz
Area REQUIRED, permanent pool 9,911 If
SAIDA ratio 5.10 (unidess)
Area PROVIDED, permanent pool, Ap,,,,_y,l 8,850 ft` Insufficient permanent pool surface area
Area, bottom of 10ft vegetated shelf, A�vmw 6,788 ft p
Area, sediment cleancut, top elevation (bottom of pond), A�„a 3,404 fl` K T ,jCDENe 9 t 4 v t—
Volumes `190. 5corr VI^)S0.1—
Volume, temporary pool 23,225 ft'
Volume, permanent pool, Vp,,,, 34,486 Ill
Volume, forebay (sum of forebays if more than one forebay) 6,478 ft'
Forebay %of permanent pool volume 18.8% %
SAIDA Table Data
Design TSS removal
Coastal SAIDA Table Used?
MountainlPiadmont SAIDA Table Used?
SAIDA ratio
Average depth (used in SAIDA table):
Calculation option i used? (See Figure 10-2b)
Volume, permanent pool, Vp,,,,p,
Area provided, permanent pool, A, ,.,,, jw
Average depth calculated
Average depth used in SAIDA, dw, (Round to nearest 0.511)
Calculation option 2 used? (See Figure 10-21h)
Area provided, permanent pool, Ar,,,
Area, bottom of 10ft vegetated shelf, A,,(_ r
90 %
Y (Y or N)
N (Y or N)
5.10 (unidess)
N (Y or N)
34,486 ft'
8,850 ft
ft
Y (Y or N)
8,850 ft
6,788 ft`
OK
70
Need 3 If min.
Area, sediment cleanout, top elevation (bottom of pond), A,,.,
3,404 e
'Depth' (distance blw bottom of 10ft shelf and top of sediment)
6.00 It
Average depth calculated
4.94 ft OK
Average depth used in SAIDA, dr, (Round to nearest 0.511)
5.0 It OK
Drawdown Calculations
Drawdown through orifice?
Y (Y or N)
Diameter of office (if circular)
1.25 in
Area of orifice (if-noncimular)
in2
Coefficient of discharge (Co)
0.60 limitless)
Odvirg head (Ho)
2.00 It
Drawdown through weir?
(Y or N)
Weir type
limitless)
Coefficient of discharge (C„)
(unidess)
Length of weir (L)
ft
Driving head (H)
ft
Pre -development 1-yr, 24-hr peak flow
4.15 ft'/sec
Post -development 1-yr, 24-hr peak flow
2.89 ft'/sec
Storage volume discharge rate (through discharge orifice or weir)
0.04 ft'/sec
Storage volume drawdown lime
2.00 days
Additional Information
Vegetated side slopes
Vegetated shelf slope
Vegetated shelf width
Length of flowpath to width ratio
Length to width ratio
Trash rack for overflow & orifice?
Freeboard provided
Vegetated filter provided?
Recorded drainage easement provided?
Capures all runoff at ultimate build -out?
Drain mechanism for maintenance or emergencies is:
AA.A{LGK 27l7-0/2-
OK, draws down in 2-5 days.
3:1
OK
10 :1
OK
10.0 ft
OK
3 :1
Insufficient flow path to width ratio. Must not short-circuit pond.
2.6 :1
OK
Y (Y or N)
OK
1.5ft
OK
N (Y or N) OK
Y (Y or N) OK
Y (Y or N) OK
Mechanical Pumps
Fonn SW401-Wet Detention Basin-Rev.a-9117/09 Parts I. & J. Design Summary, Page 2 of 2