Loading...
HomeMy WebLinkAboutSW7100904_CURRENT PERMIT_20201002STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW -7lDD 9D`i DOC TYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2oo2Ual YYYYMMDD I i ROY COOPER Covernor MICHAEL S. REGAN Secremry BRIAN WRENN Actiny Director' Mr. Lloyd Saunders Greater Welch's Chapel 3250 Virginia Road Tyner, NC 27980 NORTH CAROUNA Environmental Quality October 2, 2020 Baptist Church tAbin , 0 Subject: Stormwater Permit No. SW7100904 Renewal Greater Welch's Chapel Baptist Church High Density Project Chowan County Dear Mr. Saunders: The Washington Regional Office received a Stormwater Management Permit Application for renewal of the subject permit on September 10, 2020. Staff review of the applications have determined that the permit can be reissued. We are forwarding Permit No. SW7100904 dated October 2, 2020, for the continued operation of the subject project. This permit, upon its effective date, will replace all previous State Stormwater permits for this project. This permit shall be effective from February 1, 2021 until January 31, 2029 and shall be subject to the conditions and limitations as specified therein, and does not supercede any other agency permit that may be required. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact me at (252) 948-3923. Sincerely, Roger K. Thorpe Environmental Engineer North Carolina Department of Environmenx d Quality 1 Division of Cnergy. Mineral and Land Resources Washinyton Regional Office 043 Washington Square tilall Washington. North Carolina ?7889 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Greater Welch's Chapel Baptist Church Located at 3250 Virginia Road, Tyner, NC, Chowan County FOR THE construction, operation. and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "storm water rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources (Division) and considered a part of this permit. This permit shall be effective from February 1, 2021 until January 31, 2029, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 of this permit. The stormwater controls have been designed to handle the runoff from 1.77 acres of impervious area. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans and permit. 4. The tract will be limited to the amount of built -upon area indicated Section 1.5 of this permit, and per approved plans. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control system. 5. The following design criteria have been provided for the wet detention pond and must be maintained at design condition: a. Total Site Area: 5.18 acres Total Drainage Area to Pond: 3.96 acres Total Impervious Area: 1.77 acres b. Design Storm: 1.5 - inch C. TSS removal efficiency: 90 % d. Required Surface Area: 6037 sf e. Provided Surface Area: 7815 sf (@ elev 30.0) f. Required Storage Volume: 9756 cf (based on 1.5-inch) g. Provided Storage: 28,895 cf h. Storage Elevations: Top of Dike 36.0 ft Top of Stand Pipe 32.0 ft i Small Diameter Orifice: 1.5-inch j. Receiving Stream: UT -Indian Creek k. Classification of Water Body: B-NSW II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plans must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, filter media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the, work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. This permit shall be effective from February 1, 2021 until January 31, 2029. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the project. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. Permit issued this the 2nd day of October 2020. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW7100904 ucmLM wM VNLr Dale Received Fee Paid Permit Number q It 0 IfI-C J C. . co W r r� (C NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. 1RECET ED SEP 4 A. PROJECT INFORMATION 1. State Stormwater Permit Number: 2. Project name: l" agl_+efro Wp-lcktiI,tiCtY�.I_ �i V)g16OU 3. Project street address: ,SvuSU `Jj ( jN 10 fcma City: �V1�� County: 4. What, if any, changes have been made to the project as permitted? iii►a ZIP: 2,�o If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at., h>tttps:Hdeg.nc.gov/about/divisions/energy- m i neral-Ian d-resources/energv-minera I-land-rules/stormwater-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at. https://deg.nc.gov/abouUdivisions/energv-mineral-land- resources/energv-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: (-A 1z-r+erL wP cC 6' C64)et 5dP s+ chwck 2. Signing Official's Name: f� UNri .9UIVAP-0S �t 3. Signing Official's Title: Ce0 0(- TcAe-� &-(VA IK 69Fakc Welcris Nalml '� Ckttr?(✓\ 4, Mailing Address: ?� ViR-6VIni-Ce RWa �'r City: T�eYL State: N( ZIP : �')q5- 5. Street Address: SQIrnE CAS Q66✓e- City: 6. Phone: ( ) A,;�I- gD58 Email: ZIP Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW. Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this appllicatidn to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act." c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee. d. Partnership or limited partnership — the general partner, e. Sole proprietor. or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. O&M Agreements, Please select one: ❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit. or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division, or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed, or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed.in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/bv title/ Business Registration Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMIT S RTI ATION�-/ — the person legally responsible for the permit, certify that I have a copy of tX Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, correc nd plet�% Signature: Date: /3/:LD NOTARIZATION: I, 1 / ` O ulna �QIh -44d1t , \ZQIArl, kja Notary Public for the State of airyA LtVA%v'Cn , County of CAWIALV%. do hereby certify that _ LLe<<A 3&LA_r personally appeared before me this the 3 day of J&V�LDh6c y 20TO, and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) Notary My con Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 ( N !Jan 31 2011 3:57PM CFE, INC 757-271-1009 P.1 To:William Moore Fax Phone Number: 2529469215 From: Company - Fax Number: Voice Number: Date: I/31/2011 Pages: I of 6 Jars 31 2011 3:57PM CAE, INC 757-271-1009 P.3 i Permit No. (to be xovidsd by DWO) M Fpp w a r4,-q� �y WDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM o 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filledout printed and submitted The Required Items Checklist!Part 111) must be printed, filled out and submitted aWg mm all of the required information. I. PROJECT INFORMATION Project name Greater Welch's Chapel Baptist Church Contact person Twold Barnes Phone number 252 267-6134 Date 17-Aul Drainage area number A II. DESIGN INFORMATION Site Characteristics Drainage area Impervious area, postdevelopment % impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required volume provi*d Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24hr mnaff Post development 1-yr, 24hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre,post control of the lyf 24hr storm peak flaw required? 1-yr, 24-hr rainfall depth Rational C, pre-developmenl Rational C, post development Rainfall inlensily: 1-yr, 24-hr stone Pre -development 1-yr, 24hr peak flow Post -development 1-yr, 24hr peak Flew Pre/Post 1-yr, 24hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm, pi elevation) Top of 10ff vegetated shelf elevation Bottom of 10 vegetated shelf elevation Sediment cleanauttop elevation (bottom of pond) Sediment deanoutbottom elevation Sediment storage provided Is there additional volume stored above the state required tamp. pool? Elevation of the top of the additional volume 172,668 fir 77.128 fir 44 67 % 1,5 in 9.756 h3 OK 975' he OK, volume provided is equal to or in excess of volume required. If It ht N (Y or IJ) 3.1 In 0.24 (unitless) 0.51 (unitless) 0.13 inthr OK 1.49 fll/sec 7 62 fit/soc 6.13 8'/sec 32.00 fmsl 30.00 lust 30 D3 hnsl 30.50 fmsl 29 50 fmsl 24.00 frnsl 23.00 final 1.00 h Y (Y or N) 32.00 final OK J-an 31 2011 3:57PM CAE, INC 757-271-1009 p.4 Permit No. rho be prov,Hed by DWG) II. DESIGN INFORMATION Surface Areas Area, temporary pool 19.191 re Area REQUIRED; permanent pool 6.037 f1' SAIDA ratio 3.50 (i nitless) Area PROVIDED, permanent pool, A,,,,,, w,i 7,815 ft° OK Area, bottom of 1Dft vegetated shelf.. A„ ,,,r 6, 167 If Area, sediment dearrout, top elevation (bottom of pond), Amy,,, 2,529 ttt Volumes Volume, temporary pool 9,756fi' OK Volume, permanent pool, V,,,,y„ 24,832 hr Volume, forebay (sum of forebays if more than one foreday) 11,773 h° Forebay% of permanent pool volume 47.4%% Insufficient forebay volume. SAGA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmonl SAIDA Table Usecl? N (Y or N) SAIDA ratio 3.50 (unilless) Average depth (used in SAIDA table)'. Calculation option 1 used? (See Figure tir21o) N (Y or N) Volume, permanent pool, V,,,,,y„h 24,832 n' Area provided, permanent pool, Are. ,m 7,at 5 112 Average depth calculated 468ft OK Average depth used in SA/DA, 4„ (Round to nearest 0.51) 4511 OK Calculation option 2 used?(See Figure 142b) Y (Y or N) Area provided, permanent pool, A,,_,A 7,015 rlr Area, bottom of 101 vegetated shelf, As,t mar 6, 167 It Area, sediment cleanout, top elevation (bottom of pond), A,,, 2,529 fF "Depth' (distance blw bottom of 10f1 shelf and lop of sediment) 550ft Average depth calculated 4.68 ft OK Average depth used in SAIDA, d,,; (Round to nearest 0.5f1) 4.5 fl OK Drineci Calculations Drawdown through onfri Diameter of orifice (if circular) Area of mitico (if non choler) Coefficient of discharge (Co) Driving head (H,) Dna own through weir? Weir type Coefficient of discharge (C,) Length of weir (L) Driving head (H) Pre-covelopment 1-yr, 24hr peak flow Post -development 1-yr, 24hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume dmwdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of howpath to width ratio , Length to width ratio Trash rack for overflow 8 orifice? Freeboard provided Vegetated filler provided? Recorded drainage easement provided? Capures all runoff at ultimate bulknour? Drain mechanism for maintenance or emergencies is'. Fomr svvn[i Detarmmi 6avn-eav a -amine Y (Y or N) 1.50 in In 0 a0 (unitless) 025h Y or N) (unitless) (unilless) It h 1.49 h'/sec 7.95 hrlsec 003 h'Isec 3 50 days 31 101 100 R 3 1 OK, draws down in 2.5 days. OK OK OK OK 2.1 :1 OK Y (Y or [4) OK 3.0 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or 14) OK Pump Out Pans I. 8 rl. Dusgro Summery. Pate 2of2 Jan 31 2011 3:57PM CRE, INC 757-271-1009 p.2 Pennit Number: (to be provided by DIPQ) Drainage Area Number: BMP element: Potential roblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankni nt. remove the tree. An annual inspevtion by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or oudet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 25.5 feet in the main pond, the sediment shall be removed. "then the permanent pool depth reads 27.0 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 30.0. Sediment Removal a. 27.0 Pe manes Pool ----------------- Voluntc Sediment Removal Elevation25.5 Voluo Bottom Elevatio 26.0 -ft btin. ---------------------------------------------- ----- Sediment Bottom Elevation 24.0 I 1-it N Storage Sedin Storage FOREBAY MAIN POND Fonn S W401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: S/yO`10� (to be provided by DWQ) Drainage Area Number. Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. SEP 9 2010 This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay."t v Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. Once a year, a dam safety expert should inspect the embankment After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element Potential blew How I will remediate theproblem: The entire BMP Trash debris is present Remove the trash debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or boo Maintain vegetation at a height of long. a roximate six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 5 Permit Number: (to be provided by DWQ) Drainage Area Number. BMP element Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale I sediment off -site. The pipe is cracked or otherwise damaged. Erosion is occurring it swale. The forebay Sediment has accumulated to a depth greater than the original design depth for sediment storage. The vegetated shelf are present Best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or dying. are present a depth greater than the original design sediment storage depth. Replace the pipe. Regrade the Swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or Provide additional erosion protection such as reinforced turf matting or riprap if needed to Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than svravine. Prune according to best professional practices uetermme me source or the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil best indicates hand. If pesticide is used, wipe it on Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over I Consult a professional to remove 50% of the area. and control the aleal erowth. cattaus, phragmrbes or other invasive plants cover 50% of Remove the plants by wiping with pesticide (do not spray). Form SW401-Wet Detention Basin O&M-RevA Page 2 of 5 jan di euii d:ovrn Unt, INC 757-271-1009 p.2 Permit. Number: (to be provided by UNV) Drainage Area Number: BMP element Potentialproblem: How I wfll remediate the probleur The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to reprove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove. the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs re air. (if applicable) The outlet device Clogging, has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 25.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 27.0 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the binnks) Permanent Pool Elevation 30.0 Sediment Removal A 27.0 Pe maven Pool Volume Sediment Removal Elevation 25.5 Volume _- 13ottom Flevatio 2fi.D -ft Min. ------------ ---- Sediment Bottom Elevation 24.0 1-ft r. S101,18c Scdnocr Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 5 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Greater Welch's Chanel Baptist Church BMP drainage area Print name:Llovd Saunders Title:Chairman of Trustee Board of Greater Welch's Chapel Baptist Church Address:3250 Virginia Road, Tyner, North Carolina 27980 Date: 9 / 71 e 0 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, a Notary Public for the State of N- I i A8 , Countyof .i� I-}UCdo hereby certify that 01.9 Sc) O MO- CS personally appeared before me this 1 day of + , , )GIZi , and acknowledge the due execution of the forgoing wet detention basin mainte uirements. Witness my hand and official seal, RUM My commission expires �2 1 08 1 JO i 5 Form SW401-Wet Detention Basin O&M-Rev.4 Page 5 of 5