HomeMy WebLinkAboutSW7100904_CURRENT PERMIT_20201002STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW -7lDD 9D`i
DOC TYPE
CURRENT PERMIT
APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2oo2Ual
YYYYMMDD
I
i
ROY COOPER
Covernor
MICHAEL S. REGAN
Secremry
BRIAN WRENN
Actiny Director'
Mr. Lloyd Saunders
Greater Welch's Chapel
3250 Virginia Road
Tyner, NC 27980
NORTH CAROUNA
Environmental Quality
October 2, 2020
Baptist Church
tAbin , 0
Subject: Stormwater Permit No. SW7100904 Renewal
Greater Welch's Chapel Baptist Church
High Density Project
Chowan County
Dear Mr. Saunders:
The Washington Regional Office received a Stormwater Management Permit
Application for renewal of the subject permit on September 10, 2020. Staff review of the
applications have determined that the permit can be reissued. We are forwarding Permit
No. SW7100904 dated October 2, 2020, for the continued operation of the subject
project.
This permit, upon its effective date, will replace all previous State Stormwater permits for
this project. This permit shall be effective from February 1, 2021 until January 31, 2029
and shall be subject to the conditions and limitations as specified therein, and does not
supercede any other agency permit that may be required. Please pay special attention to
the Operation and Maintenance requirements in this permit. Failure to establish an
adequate system for operation and maintenance of the stormwater management system
will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you
have the right to request an adjudicatory hearing upon written request within thirty (30)
days following receipt of this permit. This request must be in the form of a written petition,
conforming to Chapter 150B of the North Carolina General Statutes, and filed with the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714.
Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
contact me at (252) 948-3923.
Sincerely,
Roger K. Thorpe
Environmental Engineer
North Carolina Department of Environmenx d Quality 1 Division of Cnergy. Mineral and Land Resources
Washinyton Regional Office 043 Washington Square tilall Washington. North Carolina ?7889
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules and Regulations
PERMISSION IS HEREBY GRANTED TO
Greater Welch's Chapel Baptist Church
Located at 3250 Virginia Road, Tyner, NC, Chowan County
FOR THE
construction, operation. and maintenance of a wet detention pond in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "storm water rules') and
the approved stormwater management plans and specifications and other supporting
data as attached and on file with and approved by the Division of Energy, Mineral, and
Land Resources (Division) and considered a part of this permit.
This permit shall be effective from February 1, 2021 until January 31, 2029, and shall be
subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.5 of this permit. The stormwater controls have
been designed to handle the runoff from 1.77 acres of impervious area.
All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans and permit.
4. The tract will be limited to the amount of built -upon area indicated Section 1.5 of
this permit, and per approved plans. The runoff from all built -upon area within
the permitted drainage areas of this project must be directed into the permitted
stormwater control system.
5. The following design criteria have been provided for the wet detention pond and
must be maintained at design condition:
a. Total Site Area:
5.18 acres
Total Drainage Area to Pond:
3.96 acres
Total Impervious Area:
1.77 acres
b. Design Storm:
1.5 - inch
C. TSS removal efficiency:
90 %
d. Required Surface Area:
6037 sf
e. Provided Surface Area:
7815 sf
(@ elev 30.0)
f. Required Storage Volume:
9756 cf
(based on 1.5-inch)
g. Provided Storage:
28,895 cf
h. Storage Elevations:
Top of Dike
36.0 ft
Top of Stand Pipe
32.0 ft
i Small Diameter Orifice:
1.5-inch
j. Receiving Stream:
UT -Indian Creek
k. Classification of Water Body:
B-NSW
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plans must be followed in
its entirety and maintenance must occur at the scheduled intervals including, but
not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of bypass structure, filter media, flow
spreader, catch basins, piping and vegetated filter.
g. A clear access path to the bypass structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of the Division. The records will indicate the
date, activity, name of person performing the, work and what actions were taken.
5. The facilities shall be constructed as shown on the approved plans. This permit
shall become voidable unless the facilities are constructed in accordance with the
conditions of this permit, the approved plans and specifications, and other
supporting data.
Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
8. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
10. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
11. A copy of the approved plans and specifications shall be maintained on file by
the Permittee at all times.
12. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
13. This permit shall be effective from February 1, 2021 until January 31, 2029.
Application for permit renewal shall be submitted 180 days prior to the expiration
date of this permit and must be accompanied by the processing fee.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division, accompanied by a
completed name/ownership change form, documentation from the parties
involved, and other supporting materials as may be appropriate. The approval of
this request will be considered on its merits and may or may not be approved.
The permittee is responsible for compliance with all permit conditions until such
time as the Division approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division, in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
5. The permittee grants DEQ Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit. A copy of the approved plans and
specifications shall be maintained on file by the Permittee for the life of the
project.
The permittee shall notify the Division of any name, ownership or mailing address
changes within 30 days.
Permit issued this the 2nd day of October 2020.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW7100904
ucmLM wM VNLr
Dale Received
Fee Paid
Permit Number
q It 0 IfI-C
J C. . co
W r r� (C
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
1RECET ED SEP 4
A. PROJECT INFORMATION
1. State Stormwater Permit Number: 2. Project name: l" agl_+efro Wp-lcktiI,tiCtY�.I_ �i
V)g16OU
3. Project street address: ,SvuSU `Jj ( jN 10 fcma
City: �V1�� County:
4. What, if any, changes have been made to the project as permitted?
iii►a
ZIP: 2,�o
If the project has changed from the original approved plans, please complete SWU-101 fora Major
Modification or Minor Modification Application form available at., h>tttps:Hdeg.nc.gov/about/divisions/energy-
m i neral-Ian d-resources/energv-minera I-land-rules/stormwater-program/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at. https://deg.nc.gov/abouUdivisions/energv-mineral-land-
resources/energv-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: (-A 1z-r+erL wP cC 6' C64)et 5dP s+ chwck
2. Signing Official's Name: f� UNri .9UIVAP-0S �t
3. Signing Official's Title: Ce0 0(- TcAe-� &-(VA IK 69Fakc Welcris Nalml '� Ckttr?(✓\
4, Mailing Address: ?� ViR-6VIni-Ce RWa �'r
City: T�eYL State: N( ZIP : �')q5-
5. Street Address: SQIrnE CAS Q66✓e-
City:
6. Phone: ( ) A,;�I- gD58 Email:
ZIP
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW. Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
1. A permit application processing fee of $505.00 payable to NCDEQ.
2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this appllicatidn to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act."
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee.
d. Partnership or limited partnership — the general partner,
e. Sole proprietor. or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
4. O&M Agreements, Please select one:
❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit. or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
5. Designer Certifications, Please select one:
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division, or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed, or
❑ The project has not yet been built.
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed.in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online services/search/bv title/ Business Registration
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMIT S RTI ATION�-/
— the person legally responsible for the permit, certify that I have
a copy of tX Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowledge, correc nd plet�%
Signature: Date: /3/:LD
NOTARIZATION:
I, 1 / ` O ulna �QIh -44d1t , \ZQIArl,
kja Notary Public for the State of
airyA LtVA%v'Cn , County of CAWIALV%. do hereby certify
that _ LLe<<A 3&LA_r personally appeared before me
this the 3 day of J&V�LDh6c y 20TO, and acknowledge the due
execution of the forgoing instrument. Witness my hand and official seal,
(Notary Seal)
Notary
My con
Stormwater Permit Renewal Application Form
Page 3 of 3
May 11, 2018
( N
!Jan 31 2011 3:57PM CFE, INC 757-271-1009 P.1
To:William Moore
Fax Phone Number: 2529469215
From:
Company -
Fax Number:
Voice Number:
Date: I/31/2011 Pages: I of 6
Jars 31 2011 3:57PM CAE, INC 757-271-1009 P.3
i
Permit No.
(to be xovidsd by DWO)
M Fpp w a r4,-q�
�y
WDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM o
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filledout printed and submitted
The Required Items Checklist!Part 111) must be printed, filled out and submitted aWg mm all of the required information.
I. PROJECT INFORMATION
Project name Greater Welch's Chapel Baptist Church
Contact person Twold Barnes
Phone number 252 267-6134
Date 17-Aul
Drainage area number A
II. DESIGN INFORMATION
Site Characteristics
Drainage area
Impervious area, postdevelopment
% impervious
Design rainfall depth
Storage Volume: Non -SA Waters
Minimum volume required
volume provi*d
Storage Volume: SA Waters
1.5' runoff volume
Pre -development 1-yr, 24hr mnaff
Post development 1-yr, 24hr runoff
Minimum volume required
Volume provided
Peak Flow Calculations
Is the pre,post control of the lyf 24hr storm peak flaw required?
1-yr, 24-hr rainfall depth
Rational C, pre-developmenl
Rational C, post development
Rainfall inlensily: 1-yr, 24-hr stone
Pre -development 1-yr, 24hr peak flow
Post -development 1-yr, 24hr peak Flew
Pre/Post 1-yr, 24hr peak flow control
Elevations
Temporary pool elevation
Permanent pool elevation
SHWT elevation (approx. at the perm, pi elevation)
Top of 10ff vegetated shelf elevation
Bottom of 10 vegetated shelf elevation
Sediment cleanauttop elevation (bottom of pond)
Sediment deanoutbottom elevation
Sediment storage provided
Is there additional volume stored above the state required tamp. pool?
Elevation of the top of the additional volume
172,668 fir
77.128 fir
44 67 %
1,5 in
9.756 h3 OK
975' he OK, volume provided is equal to or in excess of volume required.
If
It
ht
N (Y or IJ)
3.1 In
0.24 (unitless)
0.51 (unitless)
0.13 inthr OK
1.49 fll/sec
7 62 fit/soc
6.13 8'/sec
32.00 fmsl
30.00 lust
30 D3 hnsl
30.50 fmsl
29 50 fmsl
24.00 frnsl
23.00 final
1.00 h
Y (Y or N)
32.00 final OK
J-an 31 2011 3:57PM CAE, INC
757-271-1009 p.4
Permit No.
rho be prov,Hed by DWG)
II. DESIGN INFORMATION
Surface Areas
Area, temporary pool
19.191 re
Area REQUIRED; permanent pool
6.037 f1'
SAIDA ratio
3.50 (i nitless)
Area PROVIDED, permanent pool, A,,,,,, w,i
7,815 ft°
OK
Area, bottom of 1Dft vegetated shelf.. A„ ,,,r
6, 167 If
Area, sediment dearrout, top elevation (bottom of pond), Amy,,,
2,529 ttt
Volumes
Volume, temporary pool
9,756fi'
OK
Volume, permanent pool, V,,,,y„
24,832 hr
Volume, forebay (sum of forebays if more than one foreday)
11,773 h°
Forebay% of permanent pool volume
47.4%%
Insufficient forebay volume.
SAGA Table Data
Design TSS removal
90 %
Coastal SAIDA Table Used?
Y (Y or N)
Mountain/Piedmonl SAIDA Table Usecl?
N (Y or N)
SAIDA ratio
3.50 (unilless)
Average depth (used in SAIDA table)'.
Calculation option 1 used? (See Figure tir21o)
N (Y or N)
Volume, permanent pool, V,,,,,y„h
24,832 n'
Area provided, permanent pool, Are. ,m
7,at 5 112
Average depth calculated
468ft
OK
Average depth used in SA/DA, 4„ (Round to nearest 0.51)
4511
OK
Calculation option 2 used?(See Figure 142b)
Y (Y or N)
Area provided, permanent pool, A,,_,A
7,015 rlr
Area, bottom of 101 vegetated shelf, As,t mar
6, 167 It
Area, sediment cleanout, top elevation (bottom of pond), A,,,
2,529 fF
"Depth' (distance blw bottom of 10f1 shelf and lop of sediment)
550ft
Average depth calculated
4.68 ft
OK
Average depth used in SAIDA, d,,; (Round to nearest 0.5f1)
4.5 fl
OK
Drineci Calculations
Drawdown through onfri
Diameter of orifice (if circular)
Area of mitico (if non choler)
Coefficient of discharge (Co)
Driving head (H,)
Dna own through weir?
Weir type
Coefficient of discharge (C,)
Length of weir (L)
Driving head (H)
Pre-covelopment 1-yr, 24hr peak flow
Post -development 1-yr, 24hr peak flow
Storage volume discharge rate (through discharge orifice or weir)
Storage volume dmwdown time
Additional Information
Vegetated side slopes
Vegetated shelf slope
Vegetated shelf width
Length of howpath to width ratio ,
Length to width ratio
Trash rack for overflow 8 orifice?
Freeboard provided
Vegetated filler provided?
Recorded drainage easement provided?
Capures all runoff at ultimate bulknour?
Drain mechanism for maintenance or emergencies is'.
Fomr svvn[i Detarmmi 6avn-eav a -amine
Y (Y or N)
1.50 in
In
0 a0 (unitless)
025h
Y or N)
(unitless)
(unilless)
It
h
1.49 h'/sec
7.95 hrlsec
003 h'Isec
3 50 days
31
101
100 R
3 1
OK, draws down in 2.5 days.
OK
OK
OK
OK
2.1 :1
OK
Y
(Y or [4)
OK
3.0 ft
OK
Y
(Y or N)
OK
Y
(Y or N)
OK
Y
(Y or 14)
OK
Pump Out
Pans I. 8 rl. Dusgro Summery. Pate 2of2
Jan 31 2011 3:57PM CRE, INC 757-271-1009 p.2
Pennit Number:
(to be provided by DIPQ)
Drainage Area Number:
BMP element:
Potential roblem:
How I will remediate theproblem:
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankni nt.
remove the tree.
An annual inspevtion by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair. (if applicable)
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
oudet.
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads 25.5 feet in the main pond, the
sediment shall be removed.
"then the permanent pool depth reads 27.0 feet in the forebay, the sediment
shall be removed.
BASIN DIAGRAM
(fill in the blanks)
Permanent Pool Elevation 30.0.
Sediment Removal a. 27.0 Pe manes Pool
----------------- Voluntc Sediment Removal Elevation25.5 Voluo
Bottom Elevatio 26.0 -ft btin.
---------------------------------------------- -----
Sediment Bottom Elevation 24.0 I 1-it N
Storage Sedin
Storage
FOREBAY MAIN POND
Fonn S W401-Wet Detention Basin O&M-Rev.4 Page 3 of 4
Permit Number: S/yO`10�
(to be provided by DWQ)
Drainage Area Number.
Wet Detention Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
❑ does ® does not incorporate a vegetated filter at the outlet. SEP 9 2010
This system (check one):
❑ does ® does not incorporate pretreatment other than a forebay."t v
Important maintenance procedures:
— Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks).
— No portion of the wet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated shelf.
— Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
— If the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum extent practical.
Once a year, a dam safety expert should inspect the embankment
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a
Coastal County). Records of operation and maintenance should be kept in a known set
location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element
Potential blew
How I will remediate theproblem:
The entire BMP
Trash debris is present
Remove the trash debris.
The perimeter of the wet
Areas of bare soil and/or
Regrade the soil if necessary to
detention basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Vegetation is too short or boo
Maintain vegetation at a height of
long.
a roximate six inches.
Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 5
Permit Number:
(to be provided by DWQ)
Drainage Area Number.
BMP element Potentialproblem: How I will remediate theproblem:
The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the
swale I sediment off -site.
The pipe is cracked or
otherwise damaged.
Erosion is occurring it
swale.
The forebay Sediment has accumulated to
a depth greater than the
original design depth for
sediment storage.
The vegetated shelf
are present
Best professional practices
show that pruning is needed
to maintain optimal plant
health.
Plants are dead, diseased or
dying.
are present
a depth greater than the
original design sediment
storage depth.
Replace the pipe.
Regrade the Swale if necessary to
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than svravine.
Prune according to best professional
practices
uetermme me source or the
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil best indicates
hand. If pesticide is used, wipe it on
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Algal growth covers over I Consult a professional to remove
50% of the area. and control the aleal erowth.
cattaus, phragmrbes or other
invasive plants cover 50% of
Remove the plants by wiping
with pesticide (do not spray).
Form SW401-Wet Detention Basin O&M-RevA Page 2 of 5
jan di euii d:ovrn Unt, INC 757-271-1009 p.2
Permit. Number:
(to be provided by UNV)
Drainage Area Number:
BMP element
Potentialproblem:
How I wfll remediate the probleur
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to reprove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankment.
remove. the tree.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs re air. (if applicable)
The outlet device
Clogging, has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
outlet
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads 25.5 feet in the main pond, the
sediment shall be removed.
When the permanent pool depth reads 27.0 feet in the forebay, the sediment
shall be removed.
BASIN DIAGRAM
(fill in the binnks)
Permanent Pool Elevation 30.0
Sediment Removal A 27.0 Pe maven Pool
Volume Sediment Removal Elevation 25.5 Volume
_- 13ottom Flevatio 2fi.D -ft Min.
------------ ----
Sediment Bottom Elevation 24.0 1-ft r.
S101,18c Scdnocr
Storage
FOREBAY MAIN POND
Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number:
Storage
FOREBAY MAIN POND
Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 5
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:Greater Welch's Chanel Baptist Church
BMP drainage area
Print name:Llovd Saunders
Title:Chairman of Trustee Board of Greater Welch's Chapel Baptist Church
Address:3250 Virginia Road, Tyner, North Carolina 27980
Date: 9 / 71 e 0
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I,
a Notary Public for the State of
N- I i A8 , Countyof .i� I-}UCdo hereby certify that
01.9 Sc) O MO- CS personally appeared before me this
1 day of + , , )GIZi , and acknowledge the due
execution of the forgoing wet detention basin mainte uirements. Witness my
hand and official seal,
RUM
My commission expires �2 1 08 1 JO i 5
Form SW401-Wet Detention Basin O&M-Rev.4 Page 5 of 5