Loading...
HomeMy WebLinkAboutSW7091023_HISTORICAL FILE_20100215TYPE STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT �:�wwo..oP�:�= ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD OF W A 7r 9 Beverly Eaves Perdue, Governor �1) OG A(6o Dee Freeman, Secretary Co r `ems North Carolina Department f Environment and Natural Resources { J J 2U �✓ LI-�° Coleen H. Sullins, Director -5 S '37a� '�-u Chuck Wakiltl, P.E., Deputy Director ✓w-a-M SURFACE -WATER -PROTECTION -SECTION COASTAL STORMWATER PERMIT NAME/OWNERSHIP CHANGE FORM I. CURRENT PERMIT INFORMATION: 1. Stormwater Management Permit Number: Tre- nqS 'O 2. Permit Holder's name: J•M' I�LL")P- AGSOGlaks 3. Signing official's name: �� 0%ln Vck -c Title: " i peso �lyrlpps/(/Jrpennit) City: let h 4. Mailingra�ddress: o [l� J� State:I- ZipCode: �00S Phone: n/a- FAX: NO - (Area Code and Number) (Area Code and Number) II. NEW OWNER / PROJECT / ADDRESS INFORMATION .1. This request is for: (please check all that apply) X a. Change in ownership of the property/company (Please complete Items #2, #3, and #4 below) b. Name change of project (Please complete Item #5 below) C. Mailing address change. (Please complete Item #4 below) d. Other (please explain): Sw7+0910 2-33 , 2. New owner's name to be put on permit: &W �e � Assmol-kes DeV(? hpmeni (Of LLC 3. New owner's signing official's name and title: �Yyi S. QC1vk Maki- 0-k1?A K 1= Member Mahager(s) (Title) '' 1 4. New Mailing Address:POBOX Aa0 City: Wous in*r-) State:W(- zipCode:a SF Phone:a5194&-Ralol FAX:a5a-ilQt--4943 (Area Code and Number) (Area Code and Number) 5. New Project Name to be placed on permit: CheY!' q Qui-% 4 Iho oo) nq rrt't1tL Ir Page 1 of 2 .,r�rrr n North Carolina Division of Water Quality Internet: w.ca•.nav:ncrqualih.ore One 943 Washington Square Mall Phone (252) 946-6481 NorthCarofina Washington, NC 27889 Fax (252) 946-9215 N at//ral PERMIT NAME/OWNERSHIP CHANGE FORM THIS APPLICATION PACKAGE WILL NOT BE ACCEPTED BY THE DIVISION OF WATER QUALITY UNLESS ALL OF.THE APPLICABLE ITEMS LISTED BELOW ARE INCLUDED WITH THE SUBMITTAL. REQUIRED ITEMS: 1. This completed form. 2. A Legal documentation of the transfer of ownership. 3. kcopy of fhb recorded deed restrictions, if required by the permit. 4. The designer's certification, if required by the permit. 5. A signed Operation and Maintenance plan, if a system that requires maintenance will change ownership. 6. Maintenance records. CERTIFICATION MUST BE COMPLETED AND SIGNED BY BOTH THE CURRENT PERMIT HOLDER AND THE NEW APPLICANT IN THE CASE OF A CHANGE OF OWNERSHIP. FOR NAME CHANGES, COMPLETE AND SIGN ONLY THE CURRENT PERMITTEE'S CERTIFICATION. Current Permittee's Certification: I, , attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete - Signature: n /a' Date: New Applicant's Certification: (Must be completed for all transfers of ownership) I, J�Y� S . r2gv,115 attest that this application for an ownership changes been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attac m is ara not included. this, application package will be returned as iao6rholete.• n THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: North Carolina Department of Environment and Natural Resources Division of Water Quality, SWP 943 Washinton Square Mall _ Washington, NC 27889 Page 2 of 2 FEB 15 2010 Rawls & Associates Real Estate Developers FEB 15 2010 Post Office Box 220 Washington, North Carolina 27889 r 9 252-946-9219; 252-946-4943 Fax Email: alysa@wimcocorp.com February 15, 2010 William Moore, Environmental Engineer NC Department of Environment and Natural Resources Division of Water Quality (DWQ), Washington Regional Office (WaRO) 943 Washington Square Mall Washington, North Carolina 27889 RE: Cherry Run Shopping Center SW7091023 Beaufort County, NC Name / Ownership Change Rawls & Associates / Cherry Run Associates Dear Mr. Moore: In accordance with your letter dated December 21, 2009, 1 have addressed concerns associated with the Cherry Run Shopping Center Stormwater Permit, SW7091023. The Cherry Run Shopping Center Project is comprised of commercial structures and associated parking lots. In 1989, A wet detention pond was proposed and constructed to capture stormwater runoff from the site in accordance with 15A NCAC 2H.1000. For clarity, I have summarized the chronology as follows: A. A Determination of Compliance with SW Regulations was issued to J.M. Kane Associates on April 10, 1989 in accordance with the January 26, 1989 application. B. A revised Determination of Compliance was issued July 18, 1989 in accordance with a June 13, 1989 revised application. The revised submission anticipated a 75% impervious area, or 8.31 ac. of the 11.0 total property acreage and a 0.7 acre wet pond system. C. An Engineer's Certification was submitted on March 9, 1990, ensuring construction and compliance in accordance with the approved plans and specifications. D. On May 27, 2009, Hood Richardson submitted a letter to your office verifying the impervious acreage shortly after construction was complete and as exists today. This letter was associated with a proposal to utilize available pond capacity for new construction of a Dollar General Store. Please note that Mr. Granville Lilley, the lot owner, has since withdrawn that request and has submitted a separate application. E. A June 24, 2009 letter from you discussed updates to Stormwater Certification along with wet pond maintenance issues. Both of these issues have been further addressed in subsequent correspondence, inspections and discussions between representatives of your office and this office. Most recently, Alysa Aarup and Harley Caton, representatives of.Rawls & Associates, met with DWQ personnel to ensure an understanding of the maintenance issues. Shipping: WIMCO Building 2533 West 51h Street Washington, North Carolina 27889 www.wimcocorp.com Loan, %L!,aV: w it IN, M 71 " Mos, ":154 F:j"5y 01 W vowpay, E cc ;—%a abov, Ivy CYSISS: V "I 3: A r ..if rpS 4 w, , f S 1 rj .. 3 a or 9 sq om nams, Nn; pnou uw; Q 01 1 Q 10 41 G qm '"OV60 ma j PAL O_, WV CACTAWAMB V, �-":q 1" � ; -owl WE Aq: p jEsb 1 my qmsupau MIQ on; 1 so Owl :: J too (1040 yoscf T Owdu no, w, .000 flax I rroyto. buq -p- MUM '! r)svp Lj:jj,-, I 1-4,p, jRTCQK:RhnL LEB Q 1 2 Q-0 With this submission, we are attempting to address all open concerns. Each of the five items from your December 21, 2009 letter is addressed in order: 1. The application must be signed by the owner, or legal representative. We have revised and are resubmitting the Permit Name/Ownership Change Form. Please find attached the completed, signed application form indicating an ownership change to Rawls & Associates. 2. Details regarding changes to the site, along with revised (as built) plans, must be provided. I have attached a site plan, including the built upon area and detention pond. Please note that the only increase to the impervious surface is a generator (157 SF). With respect to the pond, a small ditch currently drains from a field into the southeastern part of the pond. The owner has been notified that that ditch will be blocked. Otherwise, the project and Stormwater Management Plan are consistent with the original submissions. 3. An engineer's certification is required. A copy of the engineer's certification was submitted in accordance with the original permit on March 9, 1990 by Tom Tysinger, JR., P.E. In addition, I have reviewed previous calculations and recent work performed by Hood Richardson. My assessment of the pond is that it has been constructed in accordance with the original design parameters and that it is performing as designed. I have attached a completed, signed and sealed certification of my review. 4. Signed operation & maintenance (O&M) agreement is required. In the past and in accordance with Section VII of the original Stormwater Management Plan submission, the detention pond banks have been regularly mowed and the trash removed. In accordance with revised requirements and per your request, a completed and signed form SW401 for Wet Detention Basin O&M is attached. Thank you for walking the site with Mr. Caton and Ms. Aarup. Based on that, I feel we have a clear understanding of what you would like to see and how we can achieve it. Following your recommendations, we have begun the process of removing several of the trees and excess vegetation, removing accumulated sediment, and where practical, extending the bank. The spillway behind Farmer's Furniture will be regraded and enhanced with additional filter cloth and rip rap. Also, we are incorporating the schedule and records keeping from the O&M into our regular maintenance recordkeeping. 5. Discussion and records of maintenance activities required to resolve NOV. The October 2, 2009 Notice of Violation requires actions regarding ownership and certification, which are addressed under items 1 — 3 above. The letter also describes maintenance issues which "need to be further defined and resolved". These have been addressed under item 4. In addition, excess sediment will be removed from the southernmost end of the pond. The depth is currently 1.8 feet; it will be dredged to the original average depth of 3.2. I ! ". " ­ c,1u_,Itj:, , , I 'qu ;A :xf:n"";m 0 0a. Lon, L cnow v1p,-5 GQ11ju GXT e? espy , 1 , )Q :Q% ^'. t, III.: ;I. .-o I! "."U C: , I. I,.-, WS 1QW2150 MbOP GISUI is, kx j. CMW "T;W Y"T"O -" IAL yva bn 1 , MIAMI 0 . vy: %n: it! co"i im av inuo ran," ej MY, Q VQQ�P'Jr , )Q 7 'A Al:IrO 0:- 1; -1 1, Im 1 is vo.rm •I, Sc,y. W, WVW4 00 1, 042 WWII: .70% f W, pdhy r isvp 1, T Ing ",m, 7' m Although it was not included in the items addressed above, we have discussed at some length, your recommendation for incorporation of a forebay into the existing system. While we understand the logic for inclusion in new or modified systems, we remain unclear with respect to the practical addition to and requirement for existing systems. Should we need to address this issue further, please contact me. Thank you for your cooperation. I feel we are well on our way to abetter understanding and process by which we can ensure future compliance. Sincerely, eryl S'Rawls, PE Member Manager enc: .�wz.. Name/Ownership Change Form Site Plan Designer's Certification Jeryl S. Rawls, F.E. P.O. Box 121 Washington. C 27889 Date: s W-1 �. I re, Bill Moore, Bill Monday, February 08, 2010 2:58 PM 'Jeryl S. Rawls' :ct: RE: Cherry Run Storm Water Afternoon Jeryl, with Alysa and Henry (maintenance contractor) on 02/03/10 at the Cherry Run Shopping Center to discuss pond tenance issues. After our discussion, I think we all had a good understanding about the type & level of tenance needed. I was there, I reminded Alysa that I was waiting on a response to my 12/21/09 letter to resolve the permit issues. vill recall that we met at our office on 01/18/10; you requested additional time to submit the required info. The ial due date was 01/21/10; 1 agreed to allow an additional couple of weeks. After our office meeting, I updated my )ase to show a due date of 02/05/10. As of today, I have not received the add info. I plan to return your cation as incomplete on Monday, February 15, 2010. If the application is returned then (1) DWQ will start cement action for operating a stormwater system without a permit, and (2) the application process starts over (ie application, new $ 505 fee, new plans & specs, etc.) I think we are close to resolving both the permit issues & the maintenance issues; please try to get the additional :o our office this week. If you have questions, please advise. v Jeryl S. Rawls [mailto:jeryl@wimcocorp.com] :: Monday, January 18, 2010 2:03 PM Moore, Bill tlysa R. Aarup; Artie Rawls ect: Cherry Run Storm Water ik you for extending me the courtesy to talk with me and allowing to review the files. Also, thank you for extending the ary 21, 2010 response date. lave a call into Amy so we can walk the pond with Alysa, our maintenance person and me. We will come to an rstanding with her on what to cut back and check the integrity of the banks. In the mean time I'll dust off my design s and go through the original calculation. -Jeryl Rawls, P.E. ICO Corp fox 121 hington, NC 27889 .wimcocorp.com 946-5175 946-4943 (Fax) 943-8861 Ebwimcocorp.com Rawls & Associates Real Estate Developers Post Office Box 220 Washington, North Carolina 27889 252-946-9219; 252-946-4943 Fax Email: alysa@wimcocorp.com FEB 18 2010 February 18, 2010 William Moore, Environmental Engineer INC Department of Environment and Natural Resources Division of Water Quality (DWQ), Washington Regional Office (WaRO) 943 Washington Square Mall Washington, North Carolina 27889 RE: Cherry Run Shopping Center SW7091023 Beaufort County, NC Name / Ownership Change Rawls & Associates / Cherry Run Associates Addendum Dear Mr. Moore: Enclosed are two copies of revised plans to addend the Name / Ownership Change for Cherry Run Shopping center. These plans supplement our February 15, 2010 submission and follow your meeting with our representative, Treva Maxwell -Anderson: 1. Site Plan: The site plan for Cherry Run Associates, survey date 3/20/1992 depicts the proposed development as permitted. The original stormwater management plan incorporated impervious surfaces for future development. The "As Built Plan with Pond Details" is referenced on the site plan. 2. As Built Plan with Pond Details: The April 23, 2009 surveyed drawing depicts the site as it has been developed. Lot 1 and the associated wet detention pond are owned by Rawls & Associates (SW7091023). Lot 2 was sold and developed as a furniture store and associated parking. As intended, stormwater from lot 2 is also treated in the wet pond. Glass " is the current owner and we understand that they have applied for an off -site permit (reference SW7920206). Shipping: WIMCO Building 2533 West 5th Street Washington, North Carolina 27889 www.wimcocorp.com �_�� J �{ SOlO Note that this drawing was originally submitted in early 2009 in association with the construction of a Dollar General Store. Although the Cherry Run Shopping Center wet detention pond was sized in anticipation of this additional development, the preliminary proposal for incorporation of the Dollar General Store was withdrawn. The owners of that store chose instead to propose a separate stormwater management system in a separate application. Should you need any additional information, please contact me or Alysa Aarup at 252- 946-9219. Thank you for your time and for your assistance. We look forward to hearing from you. Sincerely, `_--- eryl, . Rawls, PE Member Manager Encl: Site Plan, 2 copies As Built Plan with Pond Details, 2 copies 1 .. :'.1 a�'l, i - rl' ' • • .��.Ji� . ... '\: �:.�� v. .•. i�.i.� :M1 ii�. l,�( f .1` i ._ I � fr. i.a�': i•i" - 1.'-. r. L: .li..f �1�: '1 � •.r (i'.i. _tr:� ' S.:� _'q n S �l4'go ! t . i}l. �f' •.1 ?�: Il 1r ~I!'-�.. (iji ..1 l t: ♦�i: :'i„',_ � _.•l r_.. f` .. rya .j :.• ��"•, 1 1:J 'i. ):'. ... fjhi - ...ay .. .'d . OCT-13-2009(TUE) 10:06 WIMCO CORP. (FRX)2529464943 P.002/003 S W `70910�3 OCT 14 2009 Beverly Eaves Perdue, Governor Doe Frogman, Secretary North Carolina Department of Environment and Natural Resources COleen H. SUlilrta, Director 7 �epn � Chuck Waklld, P.E., Deputy Director I. CURRENT PERMIT INFORMATION: nn 1. Stormwater Management Permit Number 2. Permit Holder's name: J•M '�0.n1� SS06oJ6 3. Signing official's name: -J O-h-r) I�l'L1i-e Title: ( ogRm leg Ily sjlo for permit) ' �I 4. Mailing address: Q t� I d I (� City: Statei W- tpCode: a 1p OS Phone: Ma FAX: n/a (Area Cede and Number) (Area Code and Number) II. NEW OWNER / PROJECT l ADDRESS INFORMATION 1. This request is for. (please check all that apply) x a. Change in ownership of the property/company (Please complete Items #2, #3,'and #4 below) b. Name change of project (Please complete Item #5 below) C. Mailing address change. (Please complete Item #4 below) d. Other (please explain): 2. New owners name to be put on permit: �G ASSouaAeS Dmbp merY} COy LLC. 3. New owner's signing official's name and title: JCNI S. QQr45 and f bt- tki?n . j �Pr,�ber• Ma�aae, ►PCs) (Title), 1 .(.,. 4. New Mailing Address:POBOA `do10 Crty: washlnc(j2n State:N(- rpCode:'Z7 Phon05194&2• iq FAx:a5a-0l4-►-49I43 (Area Code and Number) (Area Code and Number) 5. New Project Name to be placed on permit: Page 1 of 2 North CarolinaAivicion nfWalcr Quality hatrntc mvwacWa;taquulilymri; ne 943 Wnahingtnn Squ= Mail Phone ('S2) 946.6481 No Carolina Wuahingm, NC 27889 Pax (2.52) 946-9215 Natural& 0 OCT713-2009(TUE) 10:06 WINCO CORP. (FRX)2529464943 P.003/003 PERMIT NAMEIOWNERSHIP CHANGE FORM THIS APPLICATION PACKAGE WILL NOT BE ACCEPTED BY THE DIVISION OF WATER QUALITY UNLESS ALL OF.THE APPLICABLE ITEMS LISTED BELOW ARE INCLUDED WITH THE SUBMITTAL REQUIRED ITEMS: t. This completed form. 2. Legal documentation of the transfer of ownership. 3. A copy of the recorded deed restrictions, if required by the permit 4. The designer's certification, if required by the permit 5. A signed Operation and Maintenance plan, if a system that requires maintenance will change ownership. 6. Maintenance records. CERTIFICATION MUST BE COMPLETED AND SIGNED BY BOTH THE CURRENT PERMIT HOLDER AND THE NEW APPLICANT IN THE CASE OF A CHANGE OF OWNERSHIP. FOR NAME CHANGES, COMPLETE AND SIGN ONLY THE CURRENT PERMITTEE'S CERTIFICATION. Current Permlttee's Certification: I, attest that this application for a namelownership change has-been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are;not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature: n �a' Date: New Applicant's Certification: (Must be completed for all ua'urer of ownership) I, Ali s a A -a ) attest that: this application for an ownership change has 13een reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package'will be returned as i complete. Signature: Date:_ i 0. 13 • Oq THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: North Carolina Department of Environment and; Natural Resources Division of Water Quality, SWP 943 Washinton Square Mall; Washington, NC 27889 Page 2 of 2 0CT-13-2009(TUE) 10:05 WIMCO CORP. (FAX)2529464943 P.001/003 Post Office Box 220 Washington, North Carolina 27889 Phone: 252-946-9219 Fax: 252-946-4943 Email: alysa@wimcocorp.com To:. Amy Adams From: Alysa Aarup Fax: 252-946-9215 bate: 08/18/09 Phone:252-946-6481 Pages: 3 total Re: Name Change Form 0 Urgent Please Reply Amy, CC: 0 For Review o Please Recycle ❑ Please Comment Please find attached the Name Change Form for the retention pond at the Cherry Run Center in Washington. Thank you for your help with this, tf there is any information that is incomplete, please let me know_ 1 Alysa Beverly Eaves Perdue, Governor Dee Freeman, Secretary North Carolina Department of Environment and Natural Resources 7 O :r^+ws —I December 21, 2009 Rawls & Associates, LLC Attn: Mr. Jeryl S. Rawls PO Box 220 Washington, NC 27889 Subject: Stormwater Review SW7091023 Cherry Run Shopping Center Beaufort County Dear Mr. Rawls: Coleen H. Sullins, Director Division of W ater Quality In May of this year, this office received an inquiry relating to a proposed development adjacent to the Cherry Run Shopping Center (see copy of attached letter). Due to this inquiry, staff conducted a site inspection that resulted in a Notice of Violation dated October 2, 2009 (copy attached). We received your request for a Name/Ownership change for the subject project on October 14. 2009. In order to complete your application, and before a permit can be issued, the following items must be addressed: 1. The application must be signed by the owner, or legal representative. 2. Details regarding changes to the site, along with revised (as built) plans, must be provided. 3. An engineers certification is required. 4. Signed operation & maintenance agreement is required. 5. Discussion and records of maintenance activities required to resolve NOV. The above requested information must be received in this office by January 21, 2010, or your request will be considered incomplete. If the as built plans show permanent modifications to the site, then a complete application along with a $ 505 fee will be required. If you have questions, please feel free to contact me at (252) 948-3919, or you can send a message to: bill.moore@ncdenr.gov. Sincerely, William J. Mo Environmental Engineer Washington Regional Office cc: Amy Adams, DWQ, WARD Beaufort -County Planning/Inspections Washington Regional Office Alailing Address Phone (919) 807-6300 Location �'oe�e't Carolina 1617 Mail Sen ice Center Fax (919) 807-6492 512 N. Salisbury St. �rtr arol in Raleigh, NC 27699-1617 Raleigh, NC 27604 Internet: wwe.ncaatercualihtore Customer Sen ice 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10%Post Consumer Paper MOA NC®ENR North Carolina Department of Environment and Wzalz Natural Resources Beverly Eaves Perdue Governor Hood Richardson, PA Attn: Mr. Hood Richardson 110 West Second Street Washington, NC 27889 Dear Mr. Richardson: Division of Water Quality Coleen H. Sullins Director June 24, 2009 Subject: New Commercial Development. Beaufort County Dee Freeman Secretary Our office received your letter dated May 28, 2009 regarding a potential new development. Your letter indicated that a new commercial development may be located on a tot adjacent to the Cherry Run Shopping Center, and that the stormwater runoff could be routed to the existing wet pond system. In addition, you provided survey plats and calculations to support the position that the stormwater runoff could be adequately handled in the wet: pond. l reviewed our files, along with the information you provided, and conducted a site visit on June 17, 2009. Following is a list of issues/questions that need to be addressed before any new built -upon areas, or additional runoff to the existing wet pond system can be allowed. First, a Stormwater Certification was issued to J. M. Kane & Associates on July 18, 1989 for a commercial shopping center to be located at the corner of US264 Bypass & West Fifth Street in Washington, NC. The project allowed 8.31-acres of impervious area on an 11-acre site and a 0.7 -acre wet pond system. A portion of the project. has been completed, including a. Food Lion Store, a Furniture Store and the wet pond system. We have learned that modifications have been made to the wetpond system, and that ownership has changed. The current owners must obtain a stormwater permit for the existing wet pond system, including any modifications, prior to accepting any additional stonmrvater flows into the pond. Second, our site visit revealed several maintenance issues with the wet pond system; including, (1) evidence of excessive sediment build-up in portions of the pond, (2) excessive woody vegeta.t3on, and (3) outlet/orifice elevations inconsistent witb the original design parameters. These maintenance issues need to be further defined and 3'eF;nlVecl once the eun*cnt "wirers obtain a. nermit. North Carolina Division of Water Quality 943 Washington Square Mall Washington, NC 27889 Internet: vnwencvvaterquality.org Phone: 252.946-64811 FAX: 252.946-9215 FAX: 252-946-9215 Nne orth iCaroiina An E.ual O000tlunily 1 At;Irmative Actin. Erroll Hood Richardson, FA June 24, 2009 }'age Tvao Third, based on information from previous site visits by Mir. Roberto Scheller, Water Quality staff, Washington Regional Office, the proposed development would be located on a lot that has existing vegetated buffers regulated by the Tar -Pamlico Buffer Pules. In fact, Mr. Granville LilIey, (current lot owner) has been advised of the buffer issues involved with his project and is currently seeking concurrence from the Division regarding a "vested rights" issue. In summary, the current owners of the shopping center and wet pond must obtain a stormwater permit and perform the necessary maintenance. The buffer issues relating to this lotmost he resolved by the current: owner(s) prior to any development. activi?y. Copies of this letter will be provided to all panties involved with these issues. If -you have any additional questions, please feel free to contact our office at (252)946-6481. Sincerely, r% Bill Moore, Environmental Engineer Division of Water Quality Washington Regional Oft 7ce cc: Mr. 3eryl S. Rawls Mr. Granville Lilley Mr. Al Hodge, l �WQ, WashingAon t )frce Mir. Roberto Schcller; F VQ, Washington Office ,_,;V�ARO t� t���pj�p�¢I t�}�a ��r�p7 � �I"�f®l'�19 R North Carolina Depailment of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary October 2, 2009 CERTIFIED MAIL #7009 0080 0000 5654 8767 CERTIFIED MAIL #7009 0080 0000 5654 8774 RETURN RECEIPT REOUESTED RETURN RECEIPT REQUESTED Rawls & Associates Development Company LLC Glass Properties, LLC Jeryl Rawls Robert Garren PO Box 220 1851 Telfair Street Washington NC 27889 Dublin GA 31021 Subject: STORMWATER MANAGEMENT PERMIT —REQUIRED SUBMITTALS Lot I -Cherry Run Associates Pt. Lot 2- Cherry Run Associates Cherry Run Shopping Center Beaufort County Dear Mr. Rawls and Mr.Garrett: This letter is to notify you that you are currently in violation of Title 15A North Carolina Administrative Code (NCAC) 2H .1003 in accordance with North Carolina General Statute (G.S.) 143-214.7 for failure to secure a Stormwater Management Permit. On June 17, 2009, Bill Moore and Amy Adams of the Washington Regional Office inspected the site and observed impervious surfaces installed on the subject development site known as Cherry Run Shopping Center located at 1706 US 264 West, Beaufort County, North Carolina. A review of DWQ files confirmed that a State Stormwater Management Permit was issued to J.M. Kane & Associates for this site. However, no State Stormwater Management Permit has been issued to the current property owners of record at the subject site as described above. State Stormwater Permits are not transferrable and require a request for name/ownership change to be, approved by DWQ. In addition, there are maintenance issues with the wet pond that must be addressed. These maintenance issues need to be further defined and resolved once the current owners obtain a permit. As a result of the site inspection and file review, the following issues must be remedied: Failure to Obtain a State Stormwater Management Permit Title 15A NCAC 214 .1003, in accordance with G.S. 143-214.7, requires a State Stormwater Management Permit for development activities within the 20 coastal counties that require a Coastal Area Management Act (CAMA) Major Permit or an Erosion and Sedimentation Control Plan. The inspection and DWQ file review confirms that a State Stormwater Management Permit has not been issued to the property owners of record for Cherry Run Shopping Center -Lot 1 and Lot 2. North Carolina Division of Water Quality Internet: vmw.ncwalergualihT.orq 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer - 50 % Recycled110% Post Consumer Paper No thCarohna Naturally Required 18esponsg This Office requests that you respond to this letter in writing within 30 calendar days of receipt of this Notice. Your response should be sent to this office at the letterhead address and should address the following items: 1. The Owners of Lot 1 (Food Lion Shopping Center and Wet Pond) should complete the enclosed Name/Ownership Change Form to transfer the existing permit into the current property owner's name including any modifications to the system which occurred since the time of original permit. Please note that a Designer's Certification is also required. 2. The Owners of Lot 2 (Farmer's Furniture site) should apply for an "off -site permit" with the enclosed application and supplement form for their impervious areas being treated in an offsite permitted stormwater facility. Thank you for your immediate attention to this matter. Please be advised, these violations and any continuing or future violations are subject to a civil penalty assessment of up to $25,000.00 per day for each violation pursuant to North Carolina General Statute 143-215.6A. This office requires that the issues, as detailed above, be properly resolved. Should you have any questions regarding these matters, please contact either Bill Moore or myself at (252) 946-6481. Sincerely, 01�k �� Amy Adams, Stormwater Compliance Surface Water Protection Section Washington Regional Office Enclosures: Name/Ownership Change Form Designer's Certification Form Permit Application and Off -site Supplement Form cc: 1 od Richardson, P.A. --, ✓aRO Files Central Office Files Required Response This Office requests that you respond to this letter in writing within 30 calendar days of receipt of this Notice. Your response should be sent to this office at the letterhead address and should address the following items: 1. The Owners of Lot 1 (Food Lion Shopping Center and Wet Pond) should complete the enclosed Name/Ownership Change Form to transfer the existing permit into the current property owner's name including any modifications to the system which occurred since the time of original permit. Please note that a Designer's Certification is also required. 2. The Owners of Lot 2 (Farmer's Furniture site) should apply for an "off site permit" with the enclosed application and supplement form for their impervious areas being treated in an offsite permitted stormwater facility. Thank you for your immediate attention to this matter. Please be advised, these violations and any continuing or future violations are subject to a civil penalty assessment of up to $25,000.00 per day for each violation pursuant to North Carolina General Statute 143-215.6A. This office requires that the issues, as detailed above, he properly resolved. Should you have any questions regarding these matters, please contact either Bill Moore or myself at (252) 946-6481. Sincerely, QAmfytdams, Stormwater Compliance Surface Water Protection Section ,Washington Regional Office Enclosures: Name/Ownership Change Form Designer's Certification Form Permit Application and Off -site Supplement Form cc: od Richardon, P.A. �aRO Files Central Office Files State of North Carolina Department of Environment, Health and Natural Resources Northeastern Region 1424 Carolina Avenue, Washington, North Carolina 27889-1424 James G. Martin, Governor William W. Cobey, Jr., Secretary DIVISION OF ENVIRONMENTAL MANAGEMENT March 5, 1992 J.M. Kane Associates P.O. BOX 12376 Raleigh, N.C. 27605 SUBJECT: Determination of Compliance with Stormwater Project:Heilig Meyers Furniture Co. Beaufort County Dear Mr. Kane: Lorraine G. Shinn Regional Manager The Washington Regional Office received your Sedimentation and Erosion Control Plan (or Stormwater Management Plan) submittal for the subject project on February, 28 1992. Stormwater from this development will be treated in the existing wet pond system that serves Cherry Run Shopping Center. Based upon our review of the project, the document complies with the Stormwater Regulations set forth in Title 15 NCAC 2H .1000. If you have any questions please contact Mr. Bill Moore at 919/946-6481. Sincerely, �v�— _ Roger K. Thorpe, PE Water Quality Regional Supervisor cc: Bill Mills P.O. Pm 2188, Washington, North Carolina 27889-2188 Telephone 91994(.6481 FAX: 919-975-3716 / 919-946-6639 An Equal Oppornmiry Affirmative Amon Employer