HomeMy WebLinkAboutSW7091014_HISTORICAL FILE_20100114NORTH CAROLINA
Department of Environmental Qua
A)j
STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW �4 2&Z� �
DOGTYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
V
Tar -Pamlico Stormwater Rule 15A NCAC 28.0258
Last Modified 111/2010
Coastal Plain of the Tar -Pamlico River Basin:
Includes Greenville and Washington as well as Pitt and Beaufort Counties
Total Nitrogen and Total Phosphorus Loading Calculation Worksheet (A ompatted)
Project Name: First United Methodist Charch - Phase I E.vpansion �•'t ; /i�
Date: 1213012009
By: Pamlico Engineering Services, PLLC Checked By: Marie Peedin, PE
Directions (.same for pre -development and post -development tables):
> linter the acres of each type of land cover in the green boxes. The spreadsheet will calculate akft}ju*values in I W(Olue.
> Compare total areas of development in pre- and post- tables for consistency (bottom of column (2)), and a nsistency with
the site plans. If all of these values are not the same, there is an error that must be corrected.
> Unless drainage onto the development from offsite is diverted around or through the site, ol1'site catchment area draining in must
be included in the acreage values and treated.
Pre -development:
y(1)�(2):
,., (3) 'h+
a�;'d^t (4) r ',„
s , (5)
s ,:(6y
Type of Land Cover ' `
Area
S.M. Formula
Average EMC'
Column.
Average EMC
Column
,,
t!F. acres
0:5139.11
�='of7N m L'`
2 •, 3 i 4
'1iofTP. m L
2 - 3 ! 6'
6ransportatiop impervious
0.54
2.60
0.01
0.19
0.00
tv ,
Roofim'pervtous
c `'t.yr
0.54
1.95
0.00
0.11
0.00
Managed. pervious
R.' (lawti/landscaped)'"'
0.54
IA2
1.35
0.28
0.27
... Managed pervious
0.54
4.23
0.00
1.23
0.00
" (cropland)
Managed`pervtous '•" t
•
0.54
2.04
0.00
0.62
0.00
,m's(pnsture) _ ,n .;rMt
t555�"`x
n x;
•,•,Wooded, pervious �'':' �'
+ u 1+'
't
0.54
0.95
0.00
0.14
0.00
-
."� h i
''. = "
1'u^TN Loading
TP Loading
Fraction In p rvtous (1)
0.00
1.35
,E
?,tm'(lb/yr)=
0.27
_
Area of Deveuopmen[, n
1.77
+I -.t� t
TN Exp. Coe(f.
t`"
0.77
TP Eap. CoefT
tt `'
0.15
,Total
M +
(Ib/ac/ =
.
Iti/ec/ r'x'
Post -development:
'fl (1) t '� b
�,:
t.((2)l
W:A (3) t
K; t(4) Y. ,ilk
I'15):" i
a +rF(6)F Y+
rl'A'�' (7) Y'3i•:
Type of Land Cover
Area
S.M."Formula
Average EMC
Column
Average EMC
, Column , ;
%.S.s
acres
'ofTN m l;),.,
2
of-TP" m L ;
2-'i 3 �6
41
.Transportation impervious q
ct { f rt
5.54
2,60
8.35
0.19
0.61
" 1Roof impervious `
s
5.54
1.95
4.26
0.11
0.24
,2
' Mnnaged"pervtousti
r* 4'+,
5.54
1.42
6.21
0.28
1.22
,l
ai Wooded pervious 'd0 .
rr
5.54
0.94
0.00
0.14
0.00
:1'x
F
TN Loading
° TP�L ading
iieti n Imp o
pervtus(I)=
0.55
IS.83
2.08
,m�Y,
='+ r (lb/yr);-
t
Total Area ofDevelopmeat =J s
1.77
,.,+ a t '
-TN Exp. Coe f .
•+
10.67
TP Exp. COW..
1.18
•�• °m k;4•;p r :...
s
A (Ib/ac/yrf=
(Iti/adyry=
Note: The nutrient loading goals arc 4.0 Ib/ac/yr for TN and 0.4 Ib/ac/yr for TP. If the post -development nutrient
loading is below these levels, then no BMP is necessary. Otherwise, the next worksheet calculates
post -development TN and TP loadings after BMPs are installed.
11D
....
..
.
--
.,
�.
_
,.
..
.
, ..,
.,. �
,.
�
�
O
Tar,�amlico Stormwater Rule 15A NCAC 2B .0258
Last Modified 5/23103
Coastal Plain of the Tar -Pamlico River Basin:
Includes Greenville and Washington as well as fill and Beaufort Counties
BMP Removal Calculation Worksheet (Automated)
Project Name: First United Methodist Church - Phase t Expansion
Dutc'. 1213017009
By: Paudico Engineering Services, PLLC Checked By:
Marie Peedin, PE
Directions:
> It may be advantageous to split the development into separate catchments to be handled by separate BMPs. The (allies below allow
the development to be split into as many as three catchments, and can be copied for greater than three.
NOTE: Unless runoll' (lowing
onto the development from offsite is routed separately around or through the site, the olfsite catchment
area draining in must be
included in the acreage values of the appropriate land uses) and treated.
> Above each table: Enter the catchment acreage in the top green blank. Baud on a comparison of the
post -development TN and TP
export coefficients you calculated above to the role requirements of 4.0 Ib/ac/yr TN and 0.4 Ib/ac/yr TP, select BMP(s) from the list for
treating the catchment runoff- Enter the chosen BMP(s) nutrient removal rates in the green blanks. If
mum than one BMP is to be
used in series, the combined removal rates will be calculated automatically in the blue blanks.
> Catchment Tables: Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the light blue
boxes. NOTE: Compare the Total Catchment Acreage for the Development (final table) to the value you established in the pre-BMP
worksheet tables, and also to the site laps, for consistency. All ofthese values need to be the same
...,�,` TN TP. `..
Design Standard :.
BMP '! Wet Detention Pond - 25 40
NC (IMP Manual
r.
Nutrient SlormN'ater Welland 40 35
NC BMP Manual
Removal Send Filtera 35 45
NC RMP Manual
�,+'r Ilroretautio%i F lit 40 45
Rates
NC BMP Manual
a
Drags Swales 20 20
NC RMP Manual
'A'egetated^Fillcr Strip w/
20 35
. 'Level Spreader .
NC RMP Manual
10 10
NCRMP Manual
Catchment 1:
Total acreage ofcatchment l n,&L77ti %s, ac
First BMPs'IN removal rate y; q 401, First BMPs TP removal rate
'_ p 45 ti',; /o
Second BM Ps TN removal rate '.„0_g+L'� % Second RMPs'fP removal rate
Third BMI's'rN removal % Third BMPs TP removal rate
a5 "k 0 "( %
TOTAL IN REMOVAL RATE = 40 % TOTAL TP REMOVAL RATE =
45 %
'1"'(2) 0v
'.lt`(3) I
i%. (4) w 'iMk
°'if5) ' "�
�' r (6). �', o.
^�. t(7) ¢1�r'
Type of Land and Cnver% t
Catchment
S M.Tormula
.le3verage ENIC'
•" lumn "
Co
\verage FMC
Column .
Acreage
0.51+9.11 t
of TN /L m
: 2 3 4
'of-rP m I:
(2)•(3)-( 6
i
%7 rills ormhun rm crrious
P P
r• �-r g
F
2'
5.55
2.60
5.37
0.19
0.61
Roof%mpenious ��
5.55
1.95
4.33
0.11
0.24
Nianag<d Pervious
\
ILI�M
5.55
1.42
5.91
0.28
1.17
Wooded
5.55
pervious"
ti
,p-#
e1SS*.kf�E;
0.94
0.00
0.14
0.00
Aren,taken up byRMl
5.55
1.95
0.43
0.11
0.02
it
1
�L[,
�LF'f.�S YkSV
Fraction Impervious (I) (
0.55
.
Pre-IIMP TN
�,
'ILoad,(Ib/yr).=
19.04
f're-13�IP:I'I'
2.05
•
%:a �. ,n'11,t
_
Load ,(Ib/yr)„=
otal Area of Development='
1.77
"Pre-BNIP TN
10.76
Pre-RMPTP
1.16
Export(Ib/ac/yr)
Export(Ib/ac/yr)
%Post=RMPTNe
Post RMl'''fP
Load(lb/yr)=
I1.42
1-08d (Iblyr)=
1.12
r Is"; ' "' "
' 1.
s 'r' t
Post BMPTN
Export
6.45
Post-BMP TT'
0.64
i,. ,
•
(Ill/ac/yr)
Aiporl (Ill/ae/yr)
Tar -Pamlico Stormwater Rule 15A NCAC 28 .0258
Average of Nutrient Loadings from the Catchments:
Last Modified 5123/03
'Catchment
PosG11M1
[lost BDIP'-�'
'
Acreage
'I,N_Loading
IT Loading'
�Calebmenil,, -r,�
1.77
6.45
0.64
i ih �•.
Catm chment 2..
IIAO
6.26
0.37
t
0.00
0.00
0.00
_,Catchmentr3
FOR UF.\'ELOPMEN'F
1.77
6A5
0.64
Note•. The nutrient leading goals are 4.0 Ib/ae/yr for TN and 0.4 Ib/aelyr for 3'P. If the post -development nutrient
loading is below these levels, then the BMPs planned are adequate. Otherwise, additional BMI's and/or
modifications in development plans are required_
For DENR Use ONLY
Reviewer:
North Carolina Department of Environment and
Natural Resources seanir
NC®ENR Request for Express Permit Review n" e
Confum
FILL-IN all the information below and CHECK the Permits) you are requesting for express review. FAX or Email the completed form to Express
Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application Dackaae
of the project location. Please include this form in the application package.
• Asheville Region -Alison Davidson 828-296.4698;alison.davidson(dncdenr.gov Permits of request
• Fayetteville or Raleigh Region -David Lee 919-791.4203; daviddeeng ncdenrgov
• Mooresville & -Patrick Grogan 704-663.3772 or patrick.groganOncdenrgov SW
SW
• Washington Region -Lyn Hardison 252.946-9215 or lyn.hardison(7a ncdenrgov SW
• Wilmington Region -Janet Russell910-350.2004 or/anet.russella(7ncderingov
NOTE: Project application received after 12 noon will be stamped in the following work day. S"JL ki `l.i E VE D
Project Name: FIRST UNITED METHODIST CHURCH BUILDING ADDITION County: BEAUFORT
Applicant: FIRST UNITED METHODIST CHURCH Company: _ JAN 14 2010
Address: 304 W 2Ne ST City: WASHINGTON State: NC Zip: 27889_
Phone: 252.946.3311, Fax: _ _ Email: _@_ DWQ
Physical Location:304 W 2ND STREET PROJ #
Project Drains into PAMLICO RIVER waters - Water classification _ (for classification see-hftp:/ih2o.enr.state.nc.us/bims/reports/reportsWB.html)
Project Located in TAR PAM River Basin. Is project draining to class ORW waters? N , within Y2 mile and draining to class SA waters N, or within 1 mile and
draining to class HOW waters? N
Engineer/Consultant: MARIE U PEEDIN Company: PAMLICO ENGINEERING SERVICES, PLLC
Address: 128 ABBEY LANE City: WASHINGOTON State: NC Zip: 27889-_
Phone: 252-945-2983, Fax: 252-974-7618 Email: oesolic@embargmail.com
SECTION ONE: REQUESTING A SCOPING MEETING ONLY
® Scoping Meeting ONLY ® DWO, ❑ DCM, ❑ DLR, ❑ OTHER: _
SECTION TWO: CHECK ONLY THE PROGRAM IS) YOU ARE REQUESTING FOR EXPRESS PERMITTING
❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions
❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions
❑ 401 Water Quality Certification ❑ Isolated Welland (_linear it or _acres)
❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance
® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other
❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)J
❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems
® High Density-Bio-Retention 1 # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems
❑ High Density -Other _ # Treatment Systems /❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permil s)
❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information
❑ Upland Development ❑ Marina Development ❑ Urban Waterfront
❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use))
SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoainct and express meeting request)
Wetlands on Site ❑ Yes ® No
Wetlands Delineation has been completed: ❑ Yes ❑ No
US ACOE Approval of Delineation completed: ❑ Yes ❑ No
Received from US ACOE ❑ Yes ❑ No
Buffer Impacts: ® No ❑ YES: —acre(s)
Isolated wetland on Property ❑ Yes ® No
404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit
For DENR use only
Fee SPih for multiple permits: (Check# 1 Tntar Fm emnrrnr t
SUBMITTAL DATES
Fee
SUBMITTAL DATES
Fee
CAMA
S
Variance (❑ Mal; ❑ Min)
g
SW (❑ HO, ❑ lD, ❑ Gen)
$
401:
g
Los
$
Stream Deter,_
g
For DENR Use ONLY
North Carolina Department of Environment and Reviewer:
Natural Resources s°br
NC®ENR Request for Express Permit Review Thno
Confirm:
FILL-IN all the information below and CHECK the Permits) you are requesting for express review. FAX or Email the completed form to Express
Coordinator along with a completed DETAILED narrative site plan (PDF rile) and vicinity map (same items expected in the application package
of the project location. Please include this form in the application package.
• Asheville Region -Alison Davidson 828-296.4698;alison.davidson(a_ncdenr.gov
• Fayetteville or Raleigh Region -David Lee 919-791.4203; david.leeU),,ncdenr.gov
• Mooresville & -Patrick Grogan 704-663.3772 or patrick.grogan(@-ncdenr.gov
• Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison(ancdenr.gov
• Wilmington Region -Janet Russell 910-350.2004 orianet.russeil(@ncdenr.gov
NOTE: Project application received after 12 noon will be stamped in the following work day.
Enter Related SW
Permits of request
SW
SW
SW
- r VE D
Project Name: FIRST UNITED METHODIST CHURCH BUILDING ADDITION County: BEAUFORT
Applicant: FIRST UNITED METHODIST CHURCH Company: _ JAN 14 2010
Address: 304 W 2ND ST City: WASHINGTON. State: NC Zip: 27889-_
Phone: 252-946-3311, Fax:-----, Email: _@_ DWQ
Physical Location:304 W 2ND STREET PROJ #
Project Drains into PAMLICO RIVER waters - Water classification _ (for classification see-ht!p://h2o.enr.state.nc.us/bims/reporls/reportsWB.html)
Project Located in TAR PAM River Basin. Is project draining to class ORW waters? N, within Y2 mile and draining to class SA waters N, or within 1 mile and
draining to class HOW waters? N
Engineer/Consultant: MARIE U PEEDIN Company: PAMLICO ENGINEERING SERVICES, PLLC
Address: 128 ABBEY LANE City: WASHINGOTON State: NC Zip: 27889
Phone: 252-945-2983, Fax: 252-974-7618 Email: pesDIIC@embargmail.com
SECTION ONE: REQUESTING A SCOPING MEETING ONLY
® Scoping Meeting ONLY ® DWQ, ❑ DCM, ❑ DLR, ❑ OTHER:
SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING
714011 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions
❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions
❑ 401 Water Quality Certification ❑ Isolated Weiland (_linear it or _acres)
❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance
® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other
❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)]
❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems
® High Density-Bio-Retention 1 # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems
❑ High Density -Other _ # Treatment Systems /❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide Permit 4)
❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information
❑ Upland Development ❑ Marina Development ❑ Urban Waterfront
❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use))
SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scopinn and express meeting request)
Wetlands on Site ❑ Yes ® No
Wetlands Delineation has been completed: ❑ Yes ❑ No
US ACOE Approval of Delineation completed: ❑ Yes ❑ No
Received from US ACOE ❑ Yes ❑ No
_ For DENR use
Fee Split for multiple permits: (Check# 1
Buffer Impacts: ® No ❑ YES: —acre(s)
Isolated wetland on Property ❑ Yes ® No
404 Application in Process wl US ACOE: ❑ Yes ❑ No Permit
Total Fee Amount S
SUBMITTAL DATES
Fee
SUBMrTTAL DATES
Fee
CAMA
$
Variance (❑ Maj; ❑ Min)
$
SW (❑ HO, ❑ LD, ❑ Gen)
$
401:
$
LDS
$
Stream Deter—
$
For DENR Use ONLY
J&T Reviewer � North Carolina Department of Environment and sucmt:
Natural Resources
NCDENR Request for Express Permit Review Tne
Confirm:
FILL-IN all the information below and CHECK the Permil(s) you are requesting for express review. FAX or Email the completed form to Express
Coordinator along with a completed DETAILED narrative site plan (PDF file) and vicinity map (same items expected in the application package
of the project location. Please include this form in the application package.
• Asheville Region -Alison Davidson 828.296-4698;alison.davidson(ncdenr.gov
• Fayetteville or Raleigh Region -David Lee 919-791.4203; david.lee(rDncdenngov
• Mooresville & -Patrick Grogan 704-663-3772 or patrick.groganil2incdenr.gov
• Washington Region -Lyn Hardison 252.946-9215 or Iyn.hardison(a).ncdenr.gov
• Wilmington Region -Janet Russell 910-350-2004 or janet.russell(rDncdenr.gov
NOTE: Project application received after 12 noon will be stamped in the following work day.
Permits of request
SW
SW
SW
SW
SW
Project Name: FIRST UNITED METHODIST CHURCH BUILDING ADDITION County: BEAUFORT riIN'PIr.00
Applicant: FIRST UNITED METHODIST CHURCH Company: _ JAN 1 L 2010
Address: 304 W 2ND ST City: WASHINGTON, State: NC Zip: 27889-_ ,
Phone: 252-946-3311, Fax:_- __, Email: _@_ C�'
Physical Location:304 W 2ND STREET Nost�++ DENR
Project Drains into PAMLICO RIVER waters - Water classification (for classification see htto'1/h2o enr state nc us/bimslreuorts/reportsWB.himl)
Project Located in TAR PAM River Basin. Is project draining to class ORW waters? N , within Y2 mile and draining to class SA waters N or within 1 mile and
draining to class HQW waters? N
Engineer/Consultant: MARIE U PEEDIN Company: PAMLICO ENGINEERING SERVICES. PLLC
Address: 128 ABBEY LANE City: WASHINGOTON. State: NC Zip: 27889
Phone: 252-945-2983, Fax: 252-974-7618, Email: f)esollc@embaramail.com
SECTION ONE: REQUESTING A SCOPING MEETING ONLY
Z Scoping Meeting ONLY ® DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: _
SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING
❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions
❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions
❑ 401 Water Quality Cer6ficabon ❑ Isolated Wetland (_linear It or _acres)
❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance
® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other
❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)]
❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems
® High Density -Bio-Retention 1 # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems
❑ High Density -Other _ # Treatment Systems /❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit 9)
❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information
❑ Upland Development ❑ Marina Development ❑ Urban Waterfront
❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK It (for DENR use))
SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for troth scoping and express meeting request)
Wetlands on Site ❑ Yes ® No
Wetlands Delineation has been completed: ❑ Yes ❑ No
US ACOE Approval of Delineation completed: ❑ Yes ❑ No
Received from US ACOE ❑ Yes ❑ No
For DENR use only
Fees lit for multiplepermits: check#
Buffer Impacts: ® No ❑ YES: —acre(s)
Isolated wetland on Property ❑ Yes ® No
404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit
Total Fee Amount $
SUBMITTAL DATES
Fee
SUBMfTTALDATES
Fee
CAMA
$
Variance (❑ Mai; ❑ Min)
$
SW (❑ HO, ❑ LD, ❑ Gen)
$
LQS
$
Stream Deter—
$
NCDENR EXPRESS March 2009
WIMCO Corp JOB/ SUB JOB NO. CO DIV VENDOR REFERENCE CHECK NO.
1 0 4203
INV NUMBER INV DATE DESCRIPTION GROSS AMOUNT DISCOUNT NET AMOUNT
DETACH AND RETAIN THIS STATEMENT
THE ATTACHED CHECK IS IN PAYMENT OF ITEMS DESCRIBED ABOVE TOTALS
IF NOT CORRECT PLEASE NOTIFY US PROMPTLY. NO RECEIPT DESIRED
��,,�,��,,����I��► WIMCO Corp wACHOVIABANK, N.A. 66021630
GTON, NC
2533 West 5th Street wnsBRANCH 03 567889
PO Box 121
Washington, NC 27889-0121
CHEC DAT CHECK NO
�Z �%G 4203
PAY
TO�C7 ]
THE /V
ORDER
OF
"IL,20 3,11 1:0530002191: 208227007L.SPmS'
11
Storm Sewer Tabulation
Page 1
Station
Len
Drng Area
RnoH
coeff
Area x C
Tc
Rain
(1)
Total
flow
Cep
full
Vol
Pipe
Invert Elev
HGL Elev
Gmd / Rim Elev
Line ID
Line
i e
Incr Total
Incr
Total
Inlet
Syst
Size
Slope
On
Up
Dn
Up
On
Up
(ft)
Jac) Jac)
(C)
(min)
(min)
(In1hr)
(cfs)
(cfs)
(ft/s)
(In)
(%)
(ft)
(N)
fNl
Ift1
(it)
(N)
1
End
42.000
0.20
0.20
0.90
0.18
OAS
5.0
5.0
8.0
1.45
4.35
3.59
12
0.71
3.25
3.55
3.76
4.06
5.50
5.00
2
End
46.000
0.74
1.24
0.71
0.63
1.02
5.0
5.6
7.8
7.94
8.95
5.73
18
0.35
3.00
3.16
4.08
4.28
5.50
5.00
3
2
107.0
0.50
0.50
0.98
0.49
0.49
5.0
5.0
8.0
3.94
3.75
3.21
15
0.34
3.16
3.52
4.99
5.39
5.00
5.00
�v
6 f•'
��
")
Zix
Project File: PIPES.stm
Number of lines: 3
Run Date: 11-18-2009
NOTES: Intensity - 78.50 / (Inlet time + 12.30) A 0.80; Return period = 10 Yrs. c = cir e = ellip b = box
HyaratIM Stwm Sewers etlarwm %6056
Storm Sewer Summary Report
Pave t
Line
No.
Line ID
Flow
rate
(cis)
Line
size
(In)
Line
shape
Line
length
(k)
Invert
EL Dn
(k)
Invert
EL Up
Ik)
Line
slope
N
HGL
down
(k)
HGL
up
(it)
V
Minor
loan
(k)
HGL
Junct
(k)
One
Onlin
No.
Junction
T
Type
1
2
3
1.45
7.94
3.94
12
18
15
Cir
Clr
Cir
42.000
46.000
107.000
3.25
3.00
3.18
3.55
3.16
3.52
0.714
0.348
0.336
3.78
4.08
4.99'
4.06
4.28
5.39'
n/a
We
0.16
4.331
4.991
5.55
End
End
2
7DtopGrate
ropGrate
Project File: PIPES.stm
Number of lines: 3 Run Date: 11-18-2009
NOTES: Return period - 10 Yrs. ; 'Surcharged (HGL above crown). ; i - Inlet control.
HyErsA w Sloan Sewers EMeesbn MOE6
Storm Sewer Profile
Pmi file. DIDFC tee..,
Elev. (ft)
12.00 -
0
8
b
- -
Olt
z
5 ?;
g $0
+ ujw
tq K
b�
M
c
CD
12.00
10,00
10.00
8.00 -
—
- 8.00
- 6.00
4.00 -
4.00
2.090Lt •
12' @ 0.71%
2.00
—
0
10
FIGL
20 30 40 50 60 70
Reach (ft)
80 90 100 2.00
Sewer Profile
Pr0j. file: PIPES.stm
r
Elev.
Ll
dal
o
t
o
rn
(
"u
O
`y
ax
z
-g
8
(ft) $
S
N�g
1.00
8VY g8
ui
as b
5
8( 5
w --
�uiu v2
Kg=
y
0
8'i
WW
9.00 —
7.00 —
5.00 —
1'00 —
°°
07_0001.f=
0.34%
40.0000- S
.00
i00 125 150
HGL
Reach (ft)
11.00
7.00
5.00
1.00
175
Hydraf ow Storm Sewers Extension
Storm Sewer Profile
PrOJ. file: PIPES.stm
N
Elev.
H.
1
11.00
9.00
7.00
5
50
75 100 125
1.00
HGL
150
175
Reach (ft)
(ft)$��
�9
N
1.00 .
c
�
(�9 � �
c
55 00
MM 8 ON
We7W � NM
E♦;� � WW
N cc�
9.00 —
7.00 —
5.00
_ _ _ nyeratrow storm Sewers Extension
Pamlico Engineering Services, PLLC
128 Abbey Lane
WASI HNGrON, NC 27889
PHONE (252)945-2983
WE ARE SENDING YOU ® Attached ❑ Under separate cover via
the following items:
ioiunar ;•IU
i •.
NOV 1 9 2009
❑ ❑ Sam Specifications
Shop drawings ❑ Prints ®Plans ❑ Samples ❑ S P
❑ Copy of letter ❑ Change order
THESE ARE TRANSMITTED as checked below: Resubmit _ Copies for approval
® For approval ❑ Approved as submitted ❑ P
[I For your use ❑ Approved as noted ❑ Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corrected prints
❑ For review and comment ❑
[I FOR BIDS DUE 20_ ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS:
Please call if you have any questions.
Marie U. Peedin, PE.
7n"
w�
NCDENR
North Carolina Department of Environment and
Beverly Eaves Perdue
Governor
Mr. Frederick howdy, Jr.
First United Methodist Church
304 West Second Street
Washington, NC 27889
Dear Mr. Howdy:
Division of Water Quality
Coleen H. Sullins
Director
November 9, 2009
Natural Resources
Dee Freeman
Secretary
Subject: Request for Stormwater Application
Stormwater Review SW7091014
Proposed First United Methodist Church Addition
Beaufort County
This office received a copy of your Sedimentation R Erosion Control application and plans for a
proposed building addition at First United Methodist Church located in Washington, NC on October 21,
2009. North Carolina Administrative Code 15 NCAC 21-1.1000 requires that any project located in a coastal
County that must receive either a Sedimentation and Erosion Control Plan approval and/or a CAMA Major
permit apply for and receive a Stormwater Management Permit by the Division of Water Quality.
To obtain a Stormwater Permit you must submit a completed application, application fee of
$505.00, two sets of plans and specifications showing the proposed project and all stormwater treatment
units along with engineering calculations and a narrative description. The application package should be
received by this office prior to December 9, 2009. If an application package is not received by this date we
will consider the project incomplete. We also have an Express Permitting program. If you are interested in
this program you may contact Ms. Lyn Hardison, One Stop Permit Coordinator, at 252-948-3842.
Any development of the site prior to receipt of the required permit will constitute a violation of
15A NCAC 2H.1000 and North Carolina General Statute 143-215.1 and may result in appropriate
enforcement action including civil penalty assessment of up to $25,000 per day.
If you have questions, please feel free to contact me at (252) 948-3923.
Sincerely,
Roger K. Thorpe
Environmental Engineer
Washington Regional Office
cc: ✓Washington Regional Office
Pamlico Engineering Services, PLLC
North Carolina Division of water Quality Internet tc�co'. ncw1terqumlit or.
943 Washington Square Mill Phonc: 252-946-6481 One
Washington, NC 27889 FAX 252-946-9215 NorthCarohna
An Equal OpportunitylAffrmative Action Employer -50%Recycled110% Post Consumer Paper Naturally
CWA�)rC—IAL RESPONSIBILITY/OWNERSHIP FORM
SEDIMENTATION POLLUTION CONTROL ACT
No person may initiate any land -disturbing activity on one or more acres as covered by the Act before this
form and an acceptable erosion and sedimentation control plan have been completed and approved by the
Land Quality Section, N.C. Department of Environment and Natural Resources. (Please type or print and, if
the question is not applicable or the e-mail and/or fax information unavailable, place N/A in the,lilari`7 q;?ED,
Part A.
OCT 2 12009
1. Project Name First United Methodist Church Bldg Addition
2. Location of land -disturbing activity: County_Beaufort City or Township!'Washington_
Highway/Street 3rd St Latitude 35.544885 Longitude 77.057629
3. Approximate date land -disturbing activity will commence: Dec 2009
4. Purpose of development (residential, commercial, industrial, institutional, etc.):_ Commercial_
5. Total acreage disturbed or uncovered (including off -site borrow and waste areas):1.77
6. Amount of fee enclosed: $ 130 . The application fee of $65.00 per acre (rounded
up to the next acre) is assessed without a ceiling amount (Example: a 9-acre application fee is $565).
7. Has an erosion and sediment control plan been filed? Yes No Enclosed_x_
8. Person to contact should erosion and sediment control issues arise during land -disturbing activity:
Name Rick Howdy
Telephone 252-946-331
E-mail Address_rickhowdy@drhowdy.com; _ _
Cell # _ _ Fax #
9. Landowner(s) of Record (attach accompanied page to list additional owners):
FUMC 946-3311
Name Telephone Fax Number
304 W Second Street
Current Mailing Address Current Street Address
Washington NC 27889
City State Zip City State Zip
10. Deed Book No._789_ Page No._657 Provide a copy of the most current deed.
Part B.
Person(s) or firm(s) who are financially responsible for the land -disturbing activity (Provide a
comprehensive list of all responsible parties on an attached sheet):
First United Methodist Church
Name E-mail Address
304 W. 2n° Street RECEIVED
Current Mailing Address Current Street Address
OCT 1 6 ?009
Washington NC 27889
City State Zip City State LAND QUALTY 02CTZI".
946-3311 WAMNGTON RECIONAL OFFICE
Telephone Fax Number
2. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address
of the designated North Carolina Agent:
Name
Mailing Address
City
State
E-mail Address
Current Street Address
City State Zip
Fax Number
(b) If the Financially Responsible Party is a Partnership or other person engaging in business under an
assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible
Party is a Corporation, give name and street address of the Registered Agent:
Name of Registered Agent E-mail Address
Current Mailing Address Current Street Address
City State Zip City State Zip
Telephone Fax Number
The above information is true and correct to the best of my knowledge and belief and was provided
by me under oath (This form must be signed by the Financially Responsible Person if an individual
or his attorney -in -fact, or if not an individual, by an officer, director, partner, or registered agent with
the authority to execute instruments for the Financially Responsible Person). I agree to provide
corrected information should there be any change in the information provided herein.
Type or print name Title or Authority
y� ES /C
Signature Date '
I, �M S. �n ers0 a Notary Public of ttth++"e County of
State of North Carolina, hereby certify that FrecPricklidv Jr.
appeared personally before me this day and being duly sworn acknowledged that the above form
was executed by him.
Witness my hand and notarial seal, this I I' K` day of 00- - L er , 20 0 q
No a
Seal n
My commission expires \' `3 Zo I o
\j
ELEV OF TOP OF j— Cleanout
91 0 RETENTION 5.8 1
2 ELEV OF BOT-OF
2 pg.
4
r ELEV
I FILTE
2' MIN'
Woshed
57 stone
envelope
JAN 2 6 2010.
PI?OJ,O W4K'Q
O
OVER FLOW
STRUCTURE
.SEE DETAIL r— Storage zone
l
EKIST STRUCTURE
TO BE REWAT MiTM
WEN MALL AS DETAILED
W OVER. ROW
STRUCTJK
6' unlined,
slotted PVC Permeable filter fabric
lining entire bloretention cell
over envelope
BIO- RETENTION BASIN DETAIL (N:.T.S
CAROfr,
ee
5 P:
,,,,5 AFTERFEACH PERIKM T APS SAND ERNN4FAIOO RFMOr A�
:$epNENi-AND RESTORE TRAP. TO ITS ORIGNAL DIMENSIONS WHEN THE
SEOMENi HAS ACCUNULATEO TO ONE-HALF THE OESKN DEPTH OF TIE
-TRAP. PLACE THE SED'LIEM THAT M REMOVED W A CESICJUTED
WSFW AREA AND R ACE THE-CoITA NATED PART OF THE MAVEL
FACING.
CHECK THE STRUCNRE FOR DAMAGE FROM EROSION M PIPING.
PEPoOCICALLY CHECK THE DEPTH OF THE SPRLWAY TO ENSURE 17 M A
MIMMUTA OF 1.5 FT BELOW N. LOW P T, OF THE. EMBANKMENT.
UmMATRY. F U'MY SETTLEMENT OF THE EMBANKMENT TO SUFHTLY
ABOVE DEVON MADE ANY RIP RAP OSNACED " THE SPILLWAY
MUST BE. REPLACED IMIAEOIATEIY.
STA81 M THE EMBANKMENT AIRI: ALL DGTMsED AREAS ASOVE. THE
,EamE DONS EAN FRON THE TRAP'WMX ELY A
CO,SULTON METH FTEN
Vinson, Scott
From:
Pamlico Engineering Services [pespllc@embargmail.com]
Sent:
Tuesday, January 26, 2010 1:16 PM
To:
Vinson, Scott
Subject:
revised bio retetion detail as requested
Attachments:
bio retetion.jpg
Scott
Here is the revised detail as we discussed. Thanks for the help
Marie Peedin, PE
Pamlico Engineering Services, PLLC
252-945-2983
JAN 2 6 2010
DWQ
PROD #