HomeMy WebLinkAboutSW7080218_COMPLIANCE_20110627STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
���o=.op=.fo.o.a.r,
1,
PERMIT NO.
�E
_
SW
,.>e
DOC TYPE
❑ CURRENT PERMIT
�I
o APPROVED Ppw�:
❑ APPROVED PLANS
o .�s.ow��.�r�ie
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
,�D -7
YYYYMMDD
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
June 27, 2011
Ms. Judy Harrison
Navy Federal Credit Union
820 Follin Lane SE
Vienna, VA 22180
Subject: NOTICE OF INSPECTION
Permit No. SW7080218
Navy Federal Credit Union
Craven County
Dear Ms. Harrison:
Dee Freeman
Secretary
On June 21, 2011, Mr. Samir Dumpor of the Washington Regional Office of the Division of Water Quality
(DWQ) inspected the Navy Federal Credit Union in Havelock, Craven County to determine compliance with
Stormwater Management Permit Number SW7080218, which was issued on March 17, 2008. DWQ site
inspection revealed that the project is in substantial compliance with the approved permit, however file review
revealed that, as of today, the Engineer's Certification was not received. (see attached Compliance Inspection
Report)
Please be reminded that Section II (Schedule of Compliance) of the Stormwater Permit SW7080218, item 6,
states the following: "Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from an appropriate designer for the system installed certifying that the
permitted facility has been installed in accordance with this permit, the approved plans and specifications,.....".
Please submit the required information as requested above by July 27, 2011. If additional time is needed to
complete these items, please submit a written request giving reasons by this date.
Please be advised that you are required to comply with the terms, conditions and limitations of your
Stormwater Management Permit under Title 15A North Carolina Administrative Code 2H .1003 and North
Carolina General. Statute 143-214.7, including operation and maintenance of your permitted stormwater
system.
Please be advised that violations of your Stormwater Management Permit may be subject to the assessment of
civil penalties of up to $25,000 per day per violation. If you have any questions please contact me at the
Washington Regional Office, telephone number (252) 946-6481.
Sincerely,
Samir Dumpor
Environmental Engineer
cc: V XWaRO Files
North Carolina Division of Water Quality Intemet: wwvv.ncvvatergualitv.org
943 Washington Square Mall Phone: 252-946-6481 One
Washington, NC 27889 FAX 252-946-9215 NorthC/arofn�a
An Equal Opportunity/Affirmative Action Employer -50%Recycled110% Post Consumer Paper Naturally
Compliance Inspection Report
Permit: SW7080218
County: Craven
Region: Washington
Effective: 03/17/08 Expiration: 03/17/18 Owner: Navy Federal Credit Union
Project: Navy Federal Credit Union - Havelock -
Express
US Hwy 70 W
Contact Person: Jim Gibbons Title:
Directions to Project:
Site is approx 750' west of intersect of the service road and "Tourist Center Drive."
Type of Project: State Stormwater - HD - Detention Pond
Drain Areas: 1 - (Wolf Pit Branch) (03-04-10) (C;Sw,NSW)
On -Site Representative(s):
Related Permits:
Inspection Date: 06121/2011 Entry Time: 11:00 AM
Primary Inspector: Samir Dumpor
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: ■ Compliant ❑ Not Compliant
Question Areas:
0 State Stormwater
(See attachment summary)
u
Havelock NC 28532
Phone: 703-206-4642
Exit Time: 12:00 AM
Phone:252-948-3960
Inspection Type: Compliance Evaluation
Page: 1
Permit: SW7080218 Owner - Project: Navy Federal Credit Union
0
Inspection Date: 06/21/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Inspection performed on June 21, 2011-., Site found in substantial compliance with the SW permit, however, file review
discovered that the Engineers Certification is not submitted.
File Review
Yes
No
NA
NE
Is the permit active?
■
❑
❑
❑
Signed copy of the Engineers certification is in the file?
130
❑
❑
Signed copy of the Operation & Maintenance Agreement is in the file?
In
❑
❑
Cl
Copy of the recorded deed restrictions is in the file?
❑
❑
In
❑
Comment: Engineers Certification is not submitted
Built Upon Area
Yes
No
NA
NE
Is the site BUA constructed as per the permit and approval plans?
■
❑
❑
❑
Is the drainage area as per the permit and approved plans?
■
❑
❑
❑
Is the BUA (as permitted) graded such that the runoff drains to the system?
■
❑
❑
❑
Comment:
SW Measures
Yes
No
NA
NE
Are the SW measures constructed as per the approved plans?
■
❑
❑
❑
Are the inlets located per the approved plans?
■
❑
❑
❑
Are the outlet structures located per the approved plans?
■
❑
❑
❑
Comment
Operation and Maintenance
Yes
No
NA
NE
Are the SW measures being maintained and operated as per the permit requirements?
■
❑
❑
❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWO
■
❑
❑
❑
upon request?
Comment:
Other Permit Conditions
Yes
No
NA
NE
Is the site compliant with other conditions of the permit?
■
❑
❑
❑
Comment:
Other WQ Issues
Yes
No
NA
NE
Is the site compliant with other water quality issues as noted during the inspection?
■
❑
❑
❑
Comment
Page:2